Environmental Impact Statements and Regulations; Availability of EPA Comments, 15134-15135 [E7-5905]
Download as PDF
cprice-sewell on PROD1PC66 with NOTICES
15134
Federal Register / Vol. 72, No. 61 / Friday, March 30, 2007 / Notices
Description: California Independent
System Operator Corporation submits a
proposed amendment to Section
40.5.2.2 of the ISO tariff.
Filed Date: 03/22/2007.
Accession Number: 20070326–0019.
Comment Date: 5 p.m. Eastern Time
on Thursday, April 12, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St, NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
VerDate Aug<31>2005
15:49 Mar 29, 2007
Jkt 211001
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5888 Filed 3–29–07; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6685–5]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in the Federal Register dated April 7,
2006 (71 FR 17845).
Draft EISs
EIS No. 20060300, ERP No. D–AFS–
J65469–CO, White River National
Forest Travel Management Plan, To
Accommodate and Balance
Transportation Needs,
Implementation, Eagle, Garfield,
Gunnison, Mesa, Moffat, Pitkin, Rio
Blanco, Routt and Summit Counties,
CO.
Summary: EPA expressed
environmental concerns about the
potential for adverse impacts to water
quality from non-system roads and from
roads needing repair or maintenance.
The final EIS should address the
strategy for implementing effective
enforcement and compliance with new
road designations and restrictions, as
well as repairing and maintaining
existing roads.
Rating EC2.
EIS No. 20060501, ERP No. D–BLM–
K65323–00, Yuma Field Office (YFO)
Resource Management Plan, Provide
Direction Managing Public Lands,
Implementation, Yuma, La Paz and
Maricopa Counties, AZ and Imperial
and Riverside Counties, CA.
Summary: EPA expressed
environmental concerns about air
quality impacts from off-highway
vehicles and requested clarification on
the Travel Management Network, and
recommends restricting OHV usage and
implementing other mitigation
measures.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Rating EC2.
EIS No. 20070007, ERP No. D–NPS–
G65103–NM, Bandelier National
Monument, Ecological Restoration
Plan, Reestablish Healthy, Sustainable
Vegetative Conditions within the
Pinon-Juniper Woodland, Los Alamos
and Sandoval Counties, NM.
Summary: EPA does not object to the
preferred action.
Rating LO.
EIS No. 20070015, ERP No. D–CDB–
C80016–NY, East River Waterfront
Esplanade and Piers Project,
Revitalization, Connecting Whitehall
Ferry Terminal and Peter Minuit
Plaza to East River Park, Funding New
York, NY.
Summary: EPA expressed
environmental concerns about traffic
and related air quality impacts.
Rating EC2.
EIS No. 20070016, ERP No. D–COE–
F36167–OH, Dover Dam Safety
Assurance Program Project,
Modifications and Upgrades,
Funding, Muskingum River Basin,
Tscarawas County, OH.
Summary: EPA expressed
environmental concerns about the
proposed approach to remediate
potential hazardous wastes that may be
present in the project area, and
recommended that a detailed evaluation
and remediation plan be developed and
included in the Final EIS to support the
proposed approach.
Rating EC2.
EIS No. 20070025, ERP No. D–AFS–
L65531–OR, Invasive Plant
Treatments within the Deschutes and
Ochoco National Forests and the
Crooked River National Grassland,
Reduction of Invasive Plant
Infestation and Protection of
Uninfested Areas, Implementation,
Several Cos. OR.
Summary: EPA expressed
environmental concerns about potential
adverse impacts to water quality from
both herbicides and sediment. The final
EIS should include information about
aquatic invasive plant infestations and
how these would be treated to prevent
deterioration of water quality.
Rating EC1.
EIS No. 20070026, ERP No. D–FRC–
G03033–LA, Kinder Morgan
Louisiana Pipeline Project, Natural
Gas Pipeline Facilities, Construction
and Operation, U.S. Army COE
Section 10 and 404 Permits,
Evangeline, Cameron, and Acadia
Parishes, LA.
Summary: EPA does not object to the
preferred actions as described in the
DEIS.
E:\FR\FM\30MRN1.SGM
30MRN1
Federal Register / Vol. 72, No. 61 / Friday, March 30, 2007 / Notices
Rating LO.
cprice-sewell on PROD1PC66 with NOTICES
Final EISs
EIS No. 20060459, ERP No. F–NPS–
J61108–SD, Badlands National Park/
North Unit General Management Plan,
Implementation, Jackson, Pennington
and Shananon Counties, SD.
Summary: The final EIS addressed
EPA’s concerns about impacts on water
quality and riparian habitat; however,
we continue to have concerns about the
downward trend in air quality, which is
believed to be due to human-caused
sources and fires within and outside of
the Park. EPA encourages the NPS to
continue taking actions to mitigate these
sources of air pollution in and around
the Park.
EIS No. 20060470, ERP No. F–FHW–
J40170–CO, I–25 Valley Highway
Project, Transportation Improvement
from Logan to U.S. 6, Denver County,
CO.
Summary: EPA does not object to the
proposed project.
EIS No. 20070012, ERP No. F–FHW–
K40258–CA, Campus Parkway
Project, Construction of a New
Expressway from Mission Avenue
Interchange to Yosemite Avenue/Lake
Road, U.S. Army COE Section 404
Permit, City of Merced, Merced
County, CA.
Summary: EPA expressed
environmental concerns about potential
indirect and cumulative impacts
associated with induced growth.
EIS No. 20070022, ERP No. F–AFS–
F65062–MN, Echo Trail Area Forest
Management Project, Forest
Vegetation Management and Related
Transportation System, Superior
National Forest Land and Resource
Management Plan, Implementation,
Lacroix Ranger District and
Kawishiwi Ranger District, St. Louis
and Lake Counties, MN.
Summary: The final EIS addressed
previous concerns regarding mitigation
for impacts to water quality and
operational maintenance of logging
equipment; therefore, EPA does not
object to the proposed action.
EIS No. 20070037, ERP No. F–FHW–
J40165–MT, U.S. Highway 89,
Improvements, from Browning to
Hudson Bay Divide, Endangered
Species Act, NPDES Permit and U.S.
Army COE Section 404 Permit,
Glacier County, MT.
Summary: EPA expressed
environmental concerns about impacts
to water quality, wetlands, and aquatic
habitat, as well as impacts to wildlife
and wildlife movement.
VerDate Aug<31>2005
15:49 Mar 29, 2007
Jkt 211001
EIS No. 20070040, ERP No. F–DOD–
A10076–00, Programmatic—Missile
Defense Agency, To Incrementally
Develop, Test, Deploy, and Plan for
Decommissioning of the Ballistic
Missile Defense System (BMDS).
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070043, ERP No. F–AFS–
K65302–CA, Commercial Park Stock
Permit Reissuance for the Sierra
National Forest and Trail
Management Plan for the Dinkey
Lakes Wilderness, Application
Reissuance Special-Use-Permit,
Mariposa, Madera and Fresno
Counties, CA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070086, ERP No. F–USA–
D15000–VA, Fort Lee, Virginia and
Fort A.P. Hill, Virginia Project,
Implementation of Base Closure and
Realignment (BRAC)
Recommendations and Other Army
Actions, Prince George County,
Petersburg, Virginia Hopewell,
Virginia; Caroline County, Essex
County, VA.
Summary: The Final EIS adequately
addressed EPA’s comments; therefore,
EPA does not object to the proposed
project.
Dated: March 27, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–5905 Filed 3–29–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6685–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/19/2007 through 03/23/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070108, Final EIS, AFS, AK,
Scratchings Timber Sale Project,
Timber Harvest up to Approximately
42 Million Board Feet, Suemez Island,
Craig Ranger District, Tongass
National Forest, AK, Wait Period
Ends: 04/30/2007, Contact: Dennis
Sylvia 907–826–3271.
EIS No. 20070109, Draft EIS, NGB, MS,
Camp Shelby Joint Force Training
Center, Implementation of Installation
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
15135
Mission Support Activities, Renewal
of Special Use Permit, DeSoto
National Forest, in portions of Forrest,
George and Perry Counties, MS,
Comment Period Ends: 05/14/2007,
Contact: Alisa Dickson 703–607–9620.
EIS No. 20070110, Final EIS, FHW, MN,
Trunk Highway 23 Improvements
Project, From 0.25 Miles West of
CSAH 6 in Kandiyohi County to 0.3
Miles Southwest of CSAH 123 Stearns
County, City of Paynesville,
Kandiyohi and Stearns Counties, MN,
Wait Period Ends: 04/30/2007,
Contact: Cheryl Martin 651–291–
6120.
EIS No. 20070111, Draft EIS, HUD, WA,
Westpark Redevelopment Master
Plan, Redevelop of 82-acre Site to
create a Mixed-Use, Mixed-Income
Pedestrian Oriented Urban
Community, Funding and U.S. Army
COE Section 10 Permit, City of
Bremerton, Kitsap County, WA,
Comment Period Ends: 05/14/2007,
Contact: Andrea Spencer 360–473–
5283.
EIS No. 20070112, Draft Supplement,
SFW, CA, Coachella Valley, Revision
to the Multiple Species Habitat
Conservation Plan (MSHCP), Natural
Community Conservation Plan, Santa
Rosa and San Jacinto Mountains
Trails Plan, Issuance of Incidental
Take Permit, Riverside County, CA,
Comment Period Ends: 05/29/2007,
Contact: Therese O’Rourke 760–431–
9440.
EIS No. 20070113, Draft Supplement,
TVA, TN, Watts Bar Nuclear Plant
Unit 2, Completion and Operation,
Updated Information on Extensive
Environmental Record, Rhea County,
TN, Comment Period Ends: 05/14/
2007, Contact: Ruth M. Horton 865–
632–3719.
EIS No. 20070114, Draft EIS, USA, NM,
Cannon Air Force Base (AFB),
Proposal to Beddown, or Locate Air
Force Special Operations Command
(AFSOC), Implementation, Base
Realignment and Closure (BRAC),
NM, Comment Period Ends: 05/14/
2007, Contact: Carl Hoffman 850–
884–5984.
EIS No. 20070115, Draft EIS, FAA, FL,
Fort Lauderdale-Hollywood
International Airport, Proposed
Development and Extension of
Runway 9R/27L and other Associated
Airport Projects, Funding, U.S. Army
COE Section 404 Permit and NPDES
Permit, Fort Lauderdale, Broward
County, FL, Comment Period Ends:
05/14/2007, Contact: Virginia Lane
407–812–6331
Ext. 129.
EIS No. 20070116, Draft EIS, AFS, 00,
Norwood Project, Proposes to
E:\FR\FM\30MRN1.SGM
30MRN1
Agencies
[Federal Register Volume 72, Number 61 (Friday, March 30, 2007)]
[Notices]
[Pages 15134-15135]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5905]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6685-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in the Federal Register dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060300, ERP No. D-AFS-J65469-CO, White River National Forest
Travel Management Plan, To Accommodate and Balance Transportation
Needs, Implementation, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin,
Rio Blanco, Routt and Summit Counties, CO.
Summary: EPA expressed environmental concerns about the potential
for adverse impacts to water quality from non-system roads and from
roads needing repair or maintenance. The final EIS should address the
strategy for implementing effective enforcement and compliance with new
road designations and restrictions, as well as repairing and
maintaining existing roads.
Rating EC2.
EIS No. 20060501, ERP No. D-BLM-K65323-00, Yuma Field Office (YFO)
Resource Management Plan, Provide Direction Managing Public Lands,
Implementation, Yuma, La Paz and Maricopa Counties, AZ and Imperial and
Riverside Counties, CA.
Summary: EPA expressed environmental concerns about air quality
impacts from off-highway vehicles and requested clarification on the
Travel Management Network, and recommends restricting OHV usage and
implementing other mitigation measures.
Rating EC2.
EIS No. 20070007, ERP No. D-NPS-G65103-NM, Bandelier National Monument,
Ecological Restoration Plan, Reestablish Healthy, Sustainable
Vegetative Conditions within the Pinon-Juniper Woodland, Los Alamos and
Sandoval Counties, NM.
Summary: EPA does not object to the preferred action.
Rating LO.
EIS No. 20070015, ERP No. D-CDB-C80016-NY, East River Waterfront
Esplanade and Piers Project, Revitalization, Connecting Whitehall Ferry
Terminal and Peter Minuit Plaza to East River Park, Funding New York,
NY.
Summary: EPA expressed environmental concerns about traffic and
related air quality impacts.
Rating EC2.
EIS No. 20070016, ERP No. D-COE-F36167-OH, Dover Dam Safety Assurance
Program Project, Modifications and Upgrades, Funding, Muskingum River
Basin, Tscarawas County, OH.
Summary: EPA expressed environmental concerns about the proposed
approach to remediate potential hazardous wastes that may be present in
the project area, and recommended that a detailed evaluation and
remediation plan be developed and included in the Final EIS to support
the proposed approach.
Rating EC2.
EIS No. 20070025, ERP No. D-AFS-L65531-OR, Invasive Plant Treatments
within the Deschutes and Ochoco National Forests and the Crooked River
National Grassland, Reduction of Invasive Plant Infestation and
Protection of Uninfested Areas, Implementation, Several Cos. OR.
Summary: EPA expressed environmental concerns about potential
adverse impacts to water quality from both herbicides and sediment. The
final EIS should include information about aquatic invasive plant
infestations and how these would be treated to prevent deterioration of
water quality.
Rating EC1.
EIS No. 20070026, ERP No. D-FRC-G03033-LA, Kinder Morgan Louisiana
Pipeline Project, Natural Gas Pipeline Facilities, Construction and
Operation, U.S. Army COE Section 10 and 404 Permits, Evangeline,
Cameron, and Acadia Parishes, LA.
Summary: EPA does not object to the preferred actions as described
in the DEIS.
[[Page 15135]]
Rating LO.
Final EISs
EIS No. 20060459, ERP No. F-NPS-J61108-SD, Badlands National Park/North
Unit General Management Plan, Implementation, Jackson, Pennington and
Shananon Counties, SD.
Summary: The final EIS addressed EPA's concerns about impacts on
water quality and riparian habitat; however, we continue to have
concerns about the downward trend in air quality, which is believed to
be due to human-caused sources and fires within and outside of the
Park. EPA encourages the NPS to continue taking actions to mitigate
these sources of air pollution in and around the Park.
EIS No. 20060470, ERP No. F-FHW-J40170-CO, I-25 Valley Highway Project,
Transportation Improvement from Logan to U.S. 6, Denver County, CO.
Summary: EPA does not object to the proposed project.
EIS No. 20070012, ERP No. F-FHW-K40258-CA, Campus Parkway Project,
Construction of a New Expressway from Mission Avenue Interchange to
Yosemite Avenue/Lake Road, U.S. Army COE Section 404 Permit, City of
Merced, Merced County, CA.
Summary: EPA expressed environmental concerns about potential
indirect and cumulative impacts associated with induced growth.
EIS No. 20070022, ERP No. F-AFS-F65062-MN, Echo Trail Area Forest
Management Project, Forest Vegetation Management and Related
Transportation System, Superior National Forest Land and Resource
Management Plan, Implementation, Lacroix Ranger District and Kawishiwi
Ranger District, St. Louis and Lake Counties, MN.
Summary: The final EIS addressed previous concerns regarding
mitigation for impacts to water quality and operational maintenance of
logging equipment; therefore, EPA does not object to the proposed
action.
EIS No. 20070037, ERP No. F-FHW-J40165-MT, U.S. Highway 89,
Improvements, from Browning to Hudson Bay Divide, Endangered Species
Act, NPDES Permit and U.S. Army COE Section 404 Permit, Glacier County,
MT.
Summary: EPA expressed environmental concerns about impacts to
water quality, wetlands, and aquatic habitat, as well as impacts to
wildlife and wildlife movement.
EIS No. 20070040, ERP No. F-DOD-A10076-00, Programmatic--Missile
Defense Agency, To Incrementally Develop, Test, Deploy, and Plan for
Decommissioning of the Ballistic Missile Defense System (BMDS).
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070043, ERP No. F-AFS-K65302-CA, Commercial Park Stock Permit
Reissuance for the Sierra National Forest and Trail Management Plan for
the Dinkey Lakes Wilderness, Application Reissuance Special-Use-Permit,
Mariposa, Madera and Fresno Counties, CA.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070086, ERP No. F-USA-D15000-VA, Fort Lee, Virginia and Fort
A.P. Hill, Virginia Project, Implementation of Base Closure and
Realignment (BRAC) Recommendations and Other Army Actions, Prince
George County, Petersburg, Virginia Hopewell, Virginia; Caroline
County, Essex County, VA.
Summary: The Final EIS adequately addressed EPA's comments;
therefore, EPA does not object to the proposed project.
Dated: March 27, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-5905 Filed 3-29-07; 8:45 am]
BILLING CODE 6560-50-P