Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 14796-14797 [E7-5764]
Download as PDF
jlentini on PROD1PC65 with NOTICES
14796
Federal Register / Vol. 72, No. 60 / Thursday, March 29, 2007 / Notices
facilities. The proposed project would
consist of: (1) Two developments,
Development 1, containing (1) a
powerhouse with two turbines and
generators with a total capacity of 2,962
kW, and (2) a new 72-inch-diameter,
1,000 to 2,000-foot-long, penstock, and
(3) Development 2, containing multiple
hydrokinetic turbines located in the
outlet channel of Arkbutla Dam
immediately below the discharge point
of Development 1, and (4) a 69 Kv
transmission line, 500 to 1500-foot-long,
connecting the development to the
switch yard; (5) a switch yard; and (6)
a new 69 Kv transmission line, one-tofive miles-long, routed to the local
utility. The project would have an
estimated average annual generation of
13 gigawatt-hours.
l. Locations of Applications: A copy
of the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
VerDate Aug<31>2005
17:20 Mar 28, 2007
Jkt 211001
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’,
‘‘COMPETING APPLICATION’’ OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5763 Filed 3–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
March 23, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12761–000.
c. Date filed: December 28, 2006 and
amended on February 22, 2007.
d. Applicant: Hydro Green Energy,
LLC.
e. Name of Project: Mississippi 3
Project.
f. Location: The project would be
located at the U.S. Army Corps of
Engineers’ existing Grenada Reservoir
Dam, on the Yalobusha River, in
Grenada, Yalobusha, and Calhoun
Counties, Mississippi.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. §§ 791(a)–825(r).
h. Applicant Contacts: Mr. James H.
Hancock, Jr., Batch & Bingham LLP,
1710 Sixth Avenue North, Birmingham,
AL 35203–2014, (205) 226–3418. Mr.
James R. Kunkel, PhD, P.E., Knight
Piesold and Co., 1050 Seventeenth
Street, Suite 450, Denver, CO 80265,
(303) 629–8788.
i. FERC Contact: Etta Foster, (202)
502–8769.
E:\FR\FM\29MRN1.SGM
29MRN1
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 72, No. 60 / Thursday, March 29, 2007 / Notices
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would utilize the U.S.
Army Corps of Engineers’ Grenada Dam,
reservoir, and all appurtenant facilities.
The proposed project would consist of:
(1) Two developments: Development 1,
consisting of (1) a powerhouse
containing two turbines and generators
with a total capacity of 23,038 kW, and
(2) a new 72-inch-diameter, 1,000 to
2,000-foot-long, penstock; and (3)
Development 2, containing multiple
hydrokinetic turbines located in the
outlet channel of Grenada Dam
immediately below the discharge point
of Development 1, and (4) a 69 Kv
transmission line, 500 to 1500-foot-long,
connecting the development to the
switch yard; (5) a switch yard; and (6)
a new 69 Kv transmission line, one to
five miles-long, routed to the local
utility. The project would have an
estimated average annual generation of
101 gigawatt-hours.
l. Locations of Applications: A copy
of the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
VerDate Aug<31>2005
17:20 Mar 28, 2007
Jkt 211001
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
and 385.214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
14797
motions to intervene must be received
on or before the specified comment date
for the particular application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001 (a) (1) (iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’,
‘‘COMPETING APPLICATION’’ OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5764 Filed 3–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
March 23, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12762–000.
c. Date filed: December 28, 2006 and
amended on February 22, 2007.
d. Applicant: Hydro Green Energy,
LLC.
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 72, Number 60 (Thursday, March 29, 2007)]
[Notices]
[Pages 14796-14797]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5764]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests, and Comments
March 23, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12761-000.
c. Date filed: December 28, 2006 and amended on February 22, 2007.
d. Applicant: Hydro Green Energy, LLC.
e. Name of Project: Mississippi 3 Project.
f. Location: The project would be located at the U.S. Army Corps of
Engineers' existing Grenada Reservoir Dam, on the Yalobusha River, in
Grenada, Yalobusha, and Calhoun Counties, Mississippi.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Sec. Sec.
791(a)-825(r).
h. Applicant Contacts: Mr. James H. Hancock, Jr., Batch & Bingham
LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2014, (205) 226-
3418. Mr. James R. Kunkel, PhD, P.E., Knight Piesold and Co., 1050
Seventeenth Street, Suite 450, Denver, CO 80265, (303) 629-8788.
i. FERC Contact: Etta Foster, (202) 502-8769.
[[Page 14797]]
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project would utilize the
U.S. Army Corps of Engineers' Grenada Dam, reservoir, and all
appurtenant facilities. The proposed project would consist of: (1) Two
developments: Development 1, consisting of (1) a powerhouse containing
two turbines and generators with a total capacity of 23,038 kW, and (2)
a new 72-inch-diameter, 1,000 to 2,000-foot-long, penstock; and (3)
Development 2, containing multiple hydrokinetic turbines located in the
outlet channel of Grenada Dam immediately below the discharge point of
Development 1, and (4) a 69 Kv transmission line, 500 to 1500-foot-
long, connecting the development to the switch yard; (5) a switch yard;
and (6) a new 69 Kv transmission line, one to five miles-long, routed
to the local utility. The project would have an estimated average
annual generation of 101 gigawatt-hours.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street NE., Room 2A,
Washington DC 20426, or by calling (202) 502-8371. This filing may also
be viewed on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
o. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
p. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining the appropriate action to take,
the Commission will consider all protests or other comments filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001 (a) (1) (iii)
and the instructions on the Commission's Web site under ``e-filing''
link. The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', ``COMPETING APPLICATION'' OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
t. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5764 Filed 3-28-07; 8:45 am]
BILLING CODE 6717-01-P