Notice of Intent To File License Application, Filing of Pre-Application Document, and Approval of Use of the Traditional Licensing Process, 14795 [E7-5762]
Download as PDF
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 72, No. 60 / Thursday, March 29, 2007 / Notices
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, 385.211, 385.214. In
determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
All filings must: (1) Bear in all capital
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. A license applicant must file, no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5699 Filed 3–28–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
17:20 Mar 28, 2007
Jkt 211001
related to this or other pending projects.
For assistance, contact FERC Online
Support.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approval of Use of the
Traditional Licensing Process
March 23, 2007.
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 12455–003.
c. Dated Filed: September 1, 2006.
d. Submitted by: Borough of Leighton,
Pennsylvania.
e. Name of Project: Beltzville
Hydroelectric Project.
f. Location: The project would be
connected to the U.S. Army Corps of
Engineers Beltzville Dam, located on
Pohopoco Creek, in the Borough of
Leighton, Carbon County, Pennsylvania.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: Mr. John F.
Hanosek, P.E., Borough Manager, P.O.
Box 29, Municipal Building, Second
and South Street, Leighton, PA 18235,
(610) 377–4002.
i. FERC Contact: Jack Hannula, (202)
502–8917 or john.hannula@ferc.gov.
j. The Borough of Leighton,
Pennsylvania filed its request to use the
Traditional Licensing Process on August
31, 2006. The Borough of Leighton,
Pennsylvania filed public notice of its
request on September 19, 2006. In a
letter dated October 27, 2006, the
Director of the Office of Energy Projects
approved the Borough of Leighton,
Pennsylvania’s request to use the
Traditional Licensing Process.
k. The Borough of Leighton,
Pennsylvania filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
l. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, of for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://ferc.gov/docsfiling/esubscription.asp to be notified
via e-mail of new filing and issuances
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
14795
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5762 Filed 3–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
March 23, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12760–000.
c. Date filed: December 28, 2006 and
amended on February 22, 2007.
d. Applicant: Hydro Green Energy,
LLC.
e. Name of Project: Mississippi 5
Project.
f. Location: The project would be
located at the U.S. Army Corps of
Engineers’ existing Arkabutla Reservoir
Dam, on the Yazoo River, in DeSoto and
Tate Counties, Mississippi.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. §§ 791(a)–825(r).
h. Applicant Contacts: Mr. James H.
Hancock, Jr., Batch & Bingham LLP,
1710 Sixth Avenue North, Birmingham,
AL 35203–2014, (205) 226–3418. Mr.
James R. Kunkel, PhD, P.E., Knight
Piesold and Co., 1050 Seventeenth
Street, Suite 450, Denver, CO 80265,
(303) 629–8788.
i. FERC Contact: Etta Foster, (202)
502–8769.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would utilize the U.S.
Army Corps of Engineers’ Arkabutla
Dam, reservoir and all appurtenant
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 72, Number 60 (Thursday, March 29, 2007)]
[Notices]
[Page 14795]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5762]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approval of Use of the Traditional Licensing
Process
March 23, 2007.
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 12455-003.
c. Dated Filed: September 1, 2006.
d. Submitted by: Borough of Leighton, Pennsylvania.
e. Name of Project: Beltzville Hydroelectric Project.
f. Location: The project would be connected to the U.S. Army Corps
of Engineers Beltzville Dam, located on Pohopoco Creek, in the Borough
of Leighton, Carbon County, Pennsylvania.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Applicant Contact: Mr. John F. Hanosek, P.E., Borough Manager,
P.O. Box 29, Municipal Building, Second and South Street, Leighton, PA
18235, (610) 377-4002.
i. FERC Contact: Jack Hannula, (202) 502-8917 or
john.hannula@ferc.gov.
j. The Borough of Leighton, Pennsylvania filed its request to use
the Traditional Licensing Process on August 31, 2006. The Borough of
Leighton, Pennsylvania filed public notice of its request on September
19, 2006. In a letter dated October 27, 2006, the Director of the
Office of Energy Projects approved the Borough of Leighton,
Pennsylvania's request to use the Traditional Licensing Process.
k. The Borough of Leighton, Pennsylvania filed a Pre-Application
Document (PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
l. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, of for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
Register online at https://ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5762 Filed 3-28-07; 8:45 am]
BILLING CODE 6717-01-P