Notice of Intent To File License Application, Filing of Pre-Application Document, and Approval of Use of the Traditional Licensing Process, 14795 [E7-5762]

Download as PDF jlentini on PROD1PC65 with NOTICES Federal Register / Vol. 72, No. 60 / Thursday, March 29, 2007 / Notices n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST,’’ ‘‘MOTION TO INTERVENE,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. A license applicant must file, no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Philis J. Posey, Acting Secretary. [FR Doc. E7–5699 Filed 3–28–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 17:20 Mar 28, 2007 Jkt 211001 related to this or other pending projects. For assistance, contact FERC Online Support. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File License Application, Filing of Pre-Application Document, and Approval of Use of the Traditional Licensing Process March 23, 2007. a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 12455–003. c. Dated Filed: September 1, 2006. d. Submitted by: Borough of Leighton, Pennsylvania. e. Name of Project: Beltzville Hydroelectric Project. f. Location: The project would be connected to the U.S. Army Corps of Engineers Beltzville Dam, located on Pohopoco Creek, in the Borough of Leighton, Carbon County, Pennsylvania. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Applicant Contact: Mr. John F. Hanosek, P.E., Borough Manager, P.O. Box 29, Municipal Building, Second and South Street, Leighton, PA 18235, (610) 377–4002. i. FERC Contact: Jack Hannula, (202) 502–8917 or john.hannula@ferc.gov. j. The Borough of Leighton, Pennsylvania filed its request to use the Traditional Licensing Process on August 31, 2006. The Borough of Leighton, Pennsylvania filed public notice of its request on September 19, 2006. In a letter dated October 27, 2006, the Director of the Office of Energy Projects approved the Borough of Leighton, Pennsylvania’s request to use the Traditional Licensing Process. k. The Borough of Leighton, Pennsylvania filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. l. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, of for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https://ferc.gov/docsfiling/esubscription.asp to be notified via e-mail of new filing and issuances PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 14795 Philis J. Posey, Acting Secretary. [FR Doc. E7–5762 Filed 3–28–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments March 23, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12760–000. c. Date filed: December 28, 2006 and amended on February 22, 2007. d. Applicant: Hydro Green Energy, LLC. e. Name of Project: Mississippi 5 Project. f. Location: The project would be located at the U.S. Army Corps of Engineers’ existing Arkabutla Reservoir Dam, on the Yazoo River, in DeSoto and Tate Counties, Mississippi. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. §§ 791(a)–825(r). h. Applicant Contacts: Mr. James H. Hancock, Jr., Batch & Bingham LLP, 1710 Sixth Avenue North, Birmingham, AL 35203–2014, (205) 226–3418. Mr. James R. Kunkel, PhD, P.E., Knight Piesold and Co., 1050 Seventeenth Street, Suite 450, Denver, CO 80265, (303) 629–8788. i. FERC Contact: Etta Foster, (202) 502–8769. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Project: The proposed project would utilize the U.S. Army Corps of Engineers’ Arkabutla Dam, reservoir and all appurtenant E:\FR\FM\29MRN1.SGM 29MRN1

Agencies

[Federal Register Volume 72, Number 60 (Thursday, March 29, 2007)]
[Notices]
[Page 14795]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5762]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approval of Use of the Traditional Licensing 
Process

March 23, 2007.
    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 12455-003.
    c. Dated Filed: September 1, 2006.
    d. Submitted by: Borough of Leighton, Pennsylvania.
    e. Name of Project: Beltzville Hydroelectric Project.
    f. Location: The project would be connected to the U.S. Army Corps 
of Engineers Beltzville Dam, located on Pohopoco Creek, in the Borough 
of Leighton, Carbon County, Pennsylvania.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Applicant Contact: Mr. John F. Hanosek, P.E., Borough Manager, 
P.O. Box 29, Municipal Building, Second and South Street, Leighton, PA 
18235, (610) 377-4002.
    i. FERC Contact: Jack Hannula, (202) 502-8917 or 
john.hannula@ferc.gov.
    j. The Borough of Leighton, Pennsylvania filed its request to use 
the Traditional Licensing Process on August 31, 2006. The Borough of 
Leighton, Pennsylvania filed public notice of its request on September 
19, 2006. In a letter dated October 27, 2006, the Director of the 
Office of Energy Projects approved the Borough of Leighton, 
Pennsylvania's request to use the Traditional Licensing Process.
    k. The Borough of Leighton, Pennsylvania filed a Pre-Application 
Document (PAD; including a proposed process plan and schedule) with the 
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
    l. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, of for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    Register online at https://ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filing and issuances related to this or 
other pending projects. For assistance, contact FERC Online Support.

Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5762 Filed 3-28-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.