Notice of Application for Amendment of Shoreline Management Plan and Soliciting Comments, Motions To Intervene and Protests, 14793 [E7-5696]
Download as PDF
Federal Register / Vol. 72, No. 60 / Thursday, March 29, 2007 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of Shoreline Management Plan and
Soliciting Comments, Motions To
Intervene and Protests
jlentini on PROD1PC65 with NOTICES
March 22, 2007.
a. Type of Application: Application to
amend the shoreline management plan
to change land classifications.
b. Project Number: P–1417–198.
c. Date Filed: February 12, 2007.
d. Applicant: Central Nebraska Public
Power and Irrigation District.
e. Name of Project: Kingsley Dam
Hydroelectric Project No. 1417.
f. Location: The project is located on
the Platte and North Platte Rivers in
Keith, Adams, Gosper, Phelps, Lincoln,
Dawson, and Kearney Counties,
Nebraska.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and §§ 799
and 801.
h. Applicant Contact: Mr. Michael
Drain, Natural Resources Manager,
Central Nebraska Public Power and
Irrigation District, 415 Lincoln S., P.O.
Box 740, Hodrege, NE 68949, telephone
(308) 995–8601.
i. FERC Contact: Any questions on
this notice should be addressed to Chris
Yeakel at (202) 502–8132, or e-mail
address: christopher.yeakel@ferc.gov.
j. Deadline for filing comments and or
motions: April 23, 2007.
k. Description of Request: Central
Nebraska Public Power and Irrigation
District proposes to change the
classification of shoreline lands along
Plum Creek Canyon Reservoir from
open-space/pasture to residential. The
proposed change will correct errors in
the initial land classification, and
accommodate ongoing development of a
pre-existing subdivision and new
subdivision outside of the project
boundary. The areas proposed for
reclassification are located along the
east and southeast shoreline. The
amendment proposal was developed
after consultation with the U.S. Fish and
Wildlife Service, Nebraska Game and
Parks Commission, and Dawson and
Gosper Counties.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
VerDate Aug<31>2005
17:20 Mar 28, 2007
Jkt 211001
number excluding the last three digits in
the docket number field (p–1417) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers (p–1417–198). All
documents (original and eight copies)
should be filed with: Philis J. Posey,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. A
copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
14793
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5696 Filed 3–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
March 22, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No.: 2232–536.
c. Date Filed: February 14, 2006.
d. Applicant: Duke Energy Carolinas,
LLC.
e. Name of Project: Catawba-Wateree
Hydroelectric Project.
f. Location: The project is located in
Alexander, Burke, Caldwell, Catawba,
Gaston, Iredell, Lincoln, McDowell and
Mecklenburg Counties, North Carolina
and Chester, Fairfield, Kershaw,
Lancaster, and York Counties, South
Carolina. This project does not occupy
any Federal or tribal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and §§ 799
and 801.
h. Applicant Contact: Mr. Joe Hall,
Lake Management Representative, Duke
Energy Carolinas, LLC, P.O. Box 1006,
Charlotte, North Carolina 28201–1006,
(704) 382–8576.
i. FERC Contact: Any questions on
this notice should be addressed to
Shana High at (202) 502–8674, or e-mail
address: shana.high@ferc.gov.
j. Deadline for filing comments and or
motions: April 10, 2007.
k. Description of Request: Duke
Energy Carolinas, LLC is seeking
Commission approval to lease 2.86 acres
of project lands on Lake Rhodhiss in
Burke County to Paradise Harbor, LLC
for the construction of a commercial/
residential marina which would consist
of two leased areas with thirteen cluster
docks and 171 boat docking locations.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 72, Number 60 (Thursday, March 29, 2007)]
[Notices]
[Page 14793]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5696]
[[Page 14793]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of Shoreline Management Plan
and Soliciting Comments, Motions To Intervene and Protests
March 22, 2007.
a. Type of Application: Application to amend the shoreline
management plan to change land classifications.
b. Project Number: P-1417-198.
c. Date Filed: February 12, 2007.
d. Applicant: Central Nebraska Public Power and Irrigation
District.
e. Name of Project: Kingsley Dam Hydroelectric Project No. 1417.
f. Location: The project is located on the Platte and North Platte
Rivers in Keith, Adams, Gosper, Phelps, Lincoln, Dawson, and Kearney
Counties, Nebraska.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
and Sec. Sec. 799 and 801.
h. Applicant Contact: Mr. Michael Drain, Natural Resources Manager,
Central Nebraska Public Power and Irrigation District, 415 Lincoln S.,
P.O. Box 740, Hodrege, NE 68949, telephone (308) 995-8601.
i. FERC Contact: Any questions on this notice should be addressed
to Chris Yeakel at (202) 502-8132, or e-mail address:
christopher.yeakel@ferc.gov.
j. Deadline for filing comments and or motions: April 23, 2007.
k. Description of Request: Central Nebraska Public Power and
Irrigation District proposes to change the classification of shoreline
lands along Plum Creek Canyon Reservoir from open-space/pasture to
residential. The proposed change will correct errors in the initial
land classification, and accommodate ongoing development of a pre-
existing subdivision and new subdivision outside of the project
boundary. The areas proposed for reclassification are located along the
east and southeast shoreline. The amendment proposal was developed
after consultation with the U.S. Fish and Wildlife Service, Nebraska
Game and Parks Commission, and Dawson and Gosper Counties.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (p-1417) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, 385.214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers (p-1417-198). All documents (original and eight
copies) should be filed with: Philis J. Posey, Acting Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5696 Filed 3-28-07; 8:45 am]
BILLING CODE 6717-01-P