People of State of Illinois, ex rel., Illinois Attorney General Lisa Madigan, Complainant v. Exelon Generation Co., LLC, Constellation Energy Commodities Group, Inc., Dynegy Power Marketing, Inc., J.P. Morgan Ventures Energy Corporation, Ameren Energy Marketing Company, American Electric Power Service Corporation, Conectiv Energy Supply, Inc., DTE Energy Trading, Inc., Edison Mission Marketing & Trading, Inc., Energy America, LLC, FPL Energy Power Marketing, Inc., J. Aron & Company, Morgan Stanley Capital Group, Inc., PPL EnergyPlus, LLC, Sempra Energy Trading Corp., WPS Energy Services, Inc., Respondents; Notice of Complaint, 14273-14274 [E7-5518]

Download as PDF Federal Register / Vol. 72, No. 58 / Tuesday, March 27, 2007 / Notices Comment Date: 5 p.m. Eastern Time April 6, 2007. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Philis J. Posey, Acting Secretary. [FR Doc. E7–5525 Filed 3–26–07; 8:45 am] [Docket No. RP07–356–000] BILLING CODE 6717–01–P 14273 receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Philis J. Posey, Acting Secretary. [FR Doc. E7–5522 Filed 3–26–07; 8:45 am] March 21, 2007. sroberts on PROD1PC70 with NOTICES Northern Natural Gas Company; Notice of Request for Limited Waiver of Tariff Provisions BILLING CODE 6717–01–P Take notice that on March 16, 2007, Northern Natural Gas Company (Northern) tendered for filing its petition for a limited waiver of its FERC Gas Tariff in order to allow Northern to resolve two separate items related to imbalance resolution. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Aug<31>2005 16:38 Mar 26, 2007 Jkt 211001 [Docket No. RP07–353–000] DEPARTMENT OF ENERGY Stingray Pipeline Company, L.L.C.; Notice of Proposed Changes in FERC Gas Tariff Federal Energy Regulatory Commission March 21, 2007. [Docket No. EL07–47–000] Take notice that on March 15, 2007, Stingray Pipeline Company, L.L.C. (Stingray) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. 300. Stingray states that the tariff sheet is being filed to resolve an issue that currently exists in its Tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to People of State of Illinois, ex rel., Illinois Attorney General Lisa Madigan, Complainant v. Exelon Generation Co., LLC, Constellation Energy Commodities Group, Inc., Dynegy Power Marketing, Inc., J.P. Morgan Ventures Energy Corporation, Ameren Energy Marketing Company, American Electric Power Service Corporation, Conectiv Energy Supply, Inc., DTE Energy Trading, Inc., Edison Mission Marketing & Trading, Inc., Energy America, LLC, FPL Energy Power Marketing, Inc., J. Aron & Company, Morgan Stanley Capital Group, Inc., PPL EnergyPlus, LLC, Sempra Energy Trading Corp., WPS Energy Services, Inc., Respondents; Notice of Complaint PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 March 21, 2007. Take notice that on March 16, 2007, pursuant to sections 205, 206 and 222 of the Federal Power Act, 16 U.S.C. 824d, 824e and 824v, and Rule 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206, the People of the State of Illinois, ex rel. Illinois Attorney General Lisa Madigan (complainant) filed a formal amended complaint against Exelon Generation Co., LLC, Constellation Energy Commodities Group, Inc., Dynegy Power Marketing, Inc., J.P. Morgan Ventures Energy Corporation, Ameren Energy Marketing Company, American Electric Power Service Corporation, Conectiv Energy Supply, Inc., DTE Energy Trading, Inc., Edison Mission Marketing & Trading, Inc., Energy America, LLC, FPL Energy Power Marketing, Inc., J. Aron & Company, Morgan Stanley Capital Group, Inc., PPL EnergyPlus, LLC, Sempra Energy Trading Corp. and WPS Energy Services, Inc., (collectively respondents) requesting that the Commission investigate evidence of price manipulation in the Illinois E:\FR\FM\27MRN1.SGM 27MRN1 14274 Federal Register / Vol. 72, No. 58 / Tuesday, March 27, 2007 / Notices sroberts on PROD1PC70 with NOTICES auction, require refunds for sales at rates that are not just and reasonable, and direct certain wholesale electricity suppliers to show cause why their market-based rate authority should not be revoked. The Complainant states that copies of the public version of the complaint have been served on the respondents, Commonwealth Edison, Ameren, and the Illinois Commerce Commission. The Complainant also states a non-public version of the complaint was served on the Illinois Commerce Commission. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 16, 2007. Philis J. Posey, Acting Secretary. [FR Doc. E7–5518 Filed 3–26–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 16:38 Mar 26, 2007 Jkt 211001 Docket Numbers: ER07–570–001. Applicants: New York Independent Federal Energy Regulatory System Operator, Inc. Description: New York Independent Commission System Operator, Inc submits a minor Combined Notice of Filings #1 amendment/addition to the proposed revisions to Attachment F to its Open March 21, 2007. Access Transmission Tariff. Take notice that the Commission Filed Date: 03/16/2007. received the following electric rate Accession Number: 20070321–0057. filings: Comment Date: 5 p.m. Eastern Time Docket Numbers: ER99–2915–002. on Friday, April 06, 2007. Applicants: Indeck-Olean Limited Docket Numbers: ER07–637–000. Partnership. Applicants: Entergy Gulf States, Inc.; Description: Indeck-Olean Limited Partnership submits its Triennial Market Calcasieu Power, LLC. Description: American Electric Power Power update filed pursuant to FERC’s Service Corporation submits a Unit 3/16/04 letter order. Power Agreement under which AEP Filed Date: 03/16/2007. Generating Co proposes to sell all of the Accession Number: 20070321–0055. capacity and associated energy, & Comment Date: 5 p.m. Eastern Time ancillary services from MW on Friday, April 06, 2007. Lawrenceburg generating plant. Docket Numbers: ER00–2885–015; Filed Date: 03/16/2007. ER06–864–007; ER06–1543–005; ER01– Accession Number: 20070321–0062. 2765–014; ER02–1582–013; ER02–1785– Comment Date: 5 p.m. Eastern Time 010; ER02–2102–014; ER97–2414–010; on Friday, April 06, 2007. ER03–1283–008. Docket Numbers: ER07–r638–000. Applicants: Cedar Brakes I, L.L.C.; Applicants: Maine Public Service Bear Energy LP; Brush Cogeneration Company. Partners; Cedar Brakes II, L.L.C.; Description: Maine Public Service Mohawk River Funding IV, L.L.C.; Company submits an informational Thermo Cogeneration Partnership L.P.; filing setting forth the changed loss Utility contract Funding, L.L.C.; Lowell factor effective 3/1/07 together with Cogeneration Company Limited back-up materials. Partnership; Vineland Energy LLC. Filed Date: 03/15/2007. Description: Bear Energy, LP and its Accession Number: 20070321–0063. Affiliates notify the FERC that it has Comment Date: 5 p.m. Eastern Time entered into an energy management on Thursday, April 05, 2007. agreement with Milford Power Co, LLC Take notice that the Commission in accordance with Order 652. received the following electric securities Filed Date: 03/19/2007. filings: Accession Number: 20070321–0056. Docket Numbers: ES07–17–001. Comment Date: 5 p.m. Eastern Time Applicants: AEP Generating on Monday, April 09, 2007. Company. Docket Numbers: ER98–2259–005. Description: AEP Generating Applicants: LSP Energy Limited Company submits an amended Partnership. application under section 204 of the Description: LSP Energy Limited FPA for authorization to issue Partnership submits its updated securities. triennial market power analysis Filed Date: 03/20/2007. pursuant to the requirements of FERC’s Accession Number: 20070320–5017. 5/14/98 Order. Comment Date: 5 p.m. Eastern Time Filed Date: 03/19/2007. on Friday, March 30, 2007. Accession Number: 20070321–0054. Comment Date: 5 p.m. Eastern Time Docket Numbers: ES07–27–000. Applicants: Detroit Edison Company. on Monday, April 09, 2007. Description: The Detroit Edison Docket Numbers: ER01–1385–028; ER01–3155–019; ER04–230–029; EL01– Company’s application for an order authorizing short-term securities bearing 45–027. final maturity dates not to exceed one Applicants: New York Independent year after issue, in an aggregate System Operator, Inc. principal amount not to exceed $1.0 Description: New York Independent System Operator, Inc. submits its Tenth billion. Filed Date: 03/19/2007. Quarterly Report regarding effort to Accession Number: 20070321–0058. efficiently utilize combined cycle units Comment Date: 5 p.m. Eastern Time in the NYISO markets. on Monday, April 09, 2007. Filed Date: 03/15/2007. Take notice that the Commission Accession Number: 20070315–5035. Comment Date: 5 p.m. Eastern Time received the following electric on Thursday, April 05, 2007. reliability filings: DEPARTMENT OF ENERGY PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1

Agencies

[Federal Register Volume 72, Number 58 (Tuesday, March 27, 2007)]
[Notices]
[Pages 14273-14274]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5518]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL07-47-000]


People of State of Illinois, ex rel., Illinois Attorney General 
Lisa Madigan, Complainant v. Exelon Generation Co., LLC, Constellation 
Energy Commodities Group, Inc., Dynegy Power Marketing, Inc., J.P. 
Morgan Ventures Energy Corporation, Ameren Energy Marketing Company, 
American Electric Power Service Corporation, Conectiv Energy Supply, 
Inc., DTE Energy Trading, Inc., Edison Mission Marketing & Trading, 
Inc., Energy America, LLC, FPL Energy Power Marketing, Inc., J. Aron & 
Company, Morgan Stanley Capital Group, Inc., PPL EnergyPlus, LLC, 
Sempra Energy Trading Corp., WPS Energy Services, Inc., Respondents; 
Notice of Complaint

March 21, 2007.
    Take notice that on March 16, 2007, pursuant to sections 205, 206 
and 222 of the Federal Power Act, 16 U.S.C. 824d, 824e and 824v, and 
Rule 206 of the Rules of Practice and Procedure of the Federal Energy 
Regulatory Commission (Commission), 18 CFR 385.206, the People of the 
State of Illinois, ex rel. Illinois Attorney General Lisa Madigan 
(complainant) filed a formal amended complaint against Exelon 
Generation Co., LLC, Constellation Energy Commodities Group, Inc., 
Dynegy Power Marketing, Inc., J.P. Morgan Ventures Energy Corporation, 
Ameren Energy Marketing Company, American Electric Power Service 
Corporation, Conectiv Energy Supply, Inc., DTE Energy Trading, Inc., 
Edison Mission Marketing & Trading, Inc., Energy America, LLC, FPL 
Energy Power Marketing, Inc., J. Aron & Company, Morgan Stanley Capital 
Group, Inc., PPL EnergyPlus, LLC, Sempra Energy Trading Corp. and WPS 
Energy Services, Inc., (collectively respondents) requesting that the 
Commission investigate evidence of price manipulation in the Illinois

[[Page 14274]]

auction, require refunds for sales at rates that are not just and 
reasonable, and direct certain wholesale electricity suppliers to show 
cause why their market-based rate authority should not be revoked.
    The Complainant states that copies of the public version of the 
complaint have been served on the respondents, Commonwealth Edison, 
Ameren, and the Illinois Commerce Commission. The Complainant also 
states a non-public version of the complaint was served on the Illinois 
Commerce Commission.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on April 16, 2007.

Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5518 Filed 3-26-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.