Northern Natural Gas Company; Notice of Application, 14272 [E7-5515]
Download as PDF
14272
Federal Register / Vol. 72, No. 58 / Tuesday, March 27, 2007 / Notices
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5524 Filed 3–26–07; 8:45 am]
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5520 Filed 3–26–07; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RP07–311–001]
[Docket No. CP07–107–000]
Northern Border Pipeline Company;
Notice of Gas Tariff Filing
Northern Natural Gas Company; Notice
of Application
sroberts on PROD1PC70 with NOTICES
March 21, 2007.
Take notice that on March 19, 2007,
Northern Border Pipeline Company
(Northern Border) tendered for filing as
part of its FERC Gas Tariff, First Revised
Volume No. 1, the tariff sheets attached
to the filing, to become effective April
1, 2007.
Northern Border states that the
purpose of this filing is to substitute
certain tariff sheets that Northern Border
filed on February 27, 2007 at Docket No.
RP07–311–000 to reflect a change in the
name of the operator of Northern Border
to TransCanada Northern Border Inc.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
VerDate Aug<31>2005
16:38 Mar 26, 2007
Jkt 211001
March 20, 2007.
Take notice that on March 16, 2007,
Northern Natural Gas Company
(Northern), 1111 South 103rd Street,
Omaha, Nebraska 68124, filed in Docket
No. CP07–107–000, an application
pursuant to section 7 of the Natural Gas
Act (NGA) to expand the certificated
storage boundary at the Cunningham
Storage Field located in Pratt and
Kingman counties, Kansas all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. This filing may be
also viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call (866) 208–3676 or TTY,
(202) 502–8659.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any questions regarding this
application may be directed to Michael
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
T. Loeffler, Director of Certificates for
Northern, 1111 South 103rd Street,
Omaha, Nebraska 68124, (402) 398–
7103 or Bret Fritch, Senior Regulatory
Analyst, at (402) 398–7140.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, before the comment date of this
notice, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link.
Comment Date: April 10, 2007.
Philis Posey,
Acting Secretary.
[FR Doc. E7–5515 Filed 3–26–07; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\27MRN1.SGM
27MRN1
Agencies
[Federal Register Volume 72, Number 58 (Tuesday, March 27, 2007)]
[Notices]
[Page 14272]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5515]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-107-000]
Northern Natural Gas Company; Notice of Application
March 20, 2007.
Take notice that on March 16, 2007, Northern Natural Gas Company
(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in
Docket No. CP07-107-000, an application pursuant to section 7 of the
Natural Gas Act (NGA) to expand the certificated storage boundary at
the Cunningham Storage Field located in Pratt and Kingman counties,
Kansas all as more fully set forth in the application which is on file
with the Commission and open to public inspection. This filing may be
also viewed on the Web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, call (866)
208-3676 or TTY, (202) 502-8659.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all Federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Any questions regarding this application may be directed to Michael
T. Loeffler, Director of Certificates for Northern, 1111 South 103rd
Street, Omaha, Nebraska 68124, (402) 398-7103 or Bret Fritch, Senior
Regulatory Analyst, at (402) 398-7140.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, before the
comment date of this notice, file with the Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426, a motion to
intervene in accordance with the requirements of the Commission's Rules
of Practice and Procedure (18 CFR 385.214 or 385.211) and the
Regulations under the NGA (18 CFR 157.10). A person obtaining party
status will be placed on the service list maintained by the Secretary
of the Commission and will receive copies of all documents filed by the
applicant and by all other parties. A party must submit 14 copies of
filings made with the Commission and must mail a copy to the applicant
and to every other party in the proceeding. Only parties to the
proceeding can ask for court review of Commission orders in the
proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link.
Comment Date: April 10, 2007.
Philis Posey,
Acting Secretary.
[FR Doc. E7-5515 Filed 3-26-07; 8:45 am]
BILLING CODE 6717-01-P