Drawbridge Operation Regulations; Gowanus Canal, Brooklyn, NY, 13693 [E7-5389]
Download as PDF
Federal Register / Vol. 72, No. 56 / Friday, March 23, 2007 / Rules and Regulations
a term of viticultural significance until
April 23, 2009.
(b) Approved maps. The appropriate
maps for determining the boundary of
the Green Valley of Russian River Valley
viticultural area are three United States
Geological Survey maps. They are titled:
*
*
*
*
*
(c) Boundary. The Green Valley of
Russian River Valley viticultural area is
located in Sonoma County, California.
The beginning point is located in the
northeastern portion of the ‘‘Camp
Meeker Quadrangle’’ map where the
line separating Section 31 from Section
32, in Township 8 North (T.8N.), Range
9 West (R.9W.) intersects River Road.
*
*
*
*
*
(d) From December 21, 1983, until
April 23, 2007, the name of this
viticultural area was ‘‘Sonoma County
Green Valley’’. Effective April 23, 2007,
this viticulture area is named ‘‘Green
Valley of Russian River Valley’’.
Existing certificates of label approval
showing ‘‘Sonoma County Green
Valley’’ as the appellation of origin will
be revoked by operation of this
regulation on April 23, 2009.
Signed: January 3, 2007.
John J. Manfreda,
Administrator.
Approved: February 1, 2007.
Timothy E. Skud,
Deputy Assistant Secretary (Tax, Trade, and
Tariff Policy).
[FR Doc. E7–5413 Filed 3–22–07; 8:45 am]
BILLING CODE 4810–31–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–026]
Drawbridge Operation Regulations;
Gowanus Canal, Brooklyn, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
sroberts on PROD1PC70 with RULES
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Hamilton Avenue
Bridge across Gowanus Canal, mile 1.2,
at Brooklyn, New York. Under this
temporary deviation the draw may
remain in the closed position from April
3, 2007 through April 5, 2007 and from
April 6, 2007 through September 29,
2007, a four-hour advance notice shall
be required for all bridge openings. This
VerDate Aug<31>2005
18:36 Mar 22, 2007
Jkt 211001
deviation is necessary to facilitate
scheduled bridge maintenance.
DEPARTMENT OF HOMELAND
SECURITY
This deviation is effective from
April 3, 2007 through September 29,
2007.
Coast Guard
Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York,
10004, between 7 a.m. and 3 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
13693
[CGD01–07–020]
DATES:
ADDRESSES:
Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7165.
FOR FURTHER INFORMATION CONTACT:
The
Hamilton Avenue Bridge across
Gowanus Canal, mile 1.2, at Brooklyn,
New York, has a vertical clearance in
the closed position of 19 feet at mean
high water and 23 feet at mean low
water. The existing operating
regulations are listed at 33 CFR 117.5.
The bridge owner, New York City
Department of Transportation
(NYCDOT), requested a temporary
deviation to allow the bridge to remain
in the closed position to facilitate
scheduled electrical and mechanical
bridge maintenance.
Under this temporary deviation the
Hamilton Avenue Bridge may remain in
the closed position from April 3, 2007
through April 5, 2007, and from April
6, 2007 through September 29, 2007, the
draw shall open after at least a four-hour
advance notice is given by calling the
contractor at (201) 400–5243.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
SUPPLEMENTARY INFORMATION:
Dated: March 15, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–5389 Filed 3–22–07; 8:45 am]
BILLING CODE 4910–15–P
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
33 CFR Part 117
Drawbridge Operation Regulations;
Taunton River, Fall River and
Somerset, MA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Brightman Street
Bridge across the Taunton River at mile
1.8, between Fall River and Somerset,
Massachusetts. Under this temporary
deviation, the bridge may remain in the
closed position from 9 p.m. on April 13,
2007 through 5 p.m. on April 28, 2007.
This deviation is necessary to facilitate
un-scheduled bridge maintenance.
DATES: This deviation is effective from
9 p.m. on April 13, 2007 through 5 p.m.
on April 28, 2007.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, 408
Atlantic Avenue, Boston,
Massachusetts, 02110, between 7 a.m.
and 3 p.m., Monday through Friday,
except Federal holidays. The telephone
number is (617) 223–8364. The First
Coast Guard District Bridge Branch
Office maintains the public docket for
this temporary deviation.
FOR FURTHER INFORMATION CONTACT: John
McDonald, Project Officer, First Coast
Guard District, at (617) 223–8364.
SUPPLEMENTARY INFORMATION: The
Brightman Street Bridge, across the
Taunton River at mile 1.8, between Fall
River and Somerset, Massachusetts, has
a vertical clearance in the closed
position of 27 feet at mean high water
and 31 feet at mean low water. The
existing drawbridge operation
regulations are listed at 33 CFR 117.619.
The owner of the bridge,
Massachusetts Highway Department
(MHD), requested a temporary deviation
to facilitate un-scheduled emergency
bridge maintenance, replacement of
deteriorated floor beams. The bridge
will not be able to open while the bridge
maintenance is underway.
Under this temporary deviation, the
Brightman Street Bridge need not open
for the passage of vessel traffic from 9
p.m. on April 13, 2007 through 5 p.m.
on April 28, 2007.
E:\FR\FM\23MRR1.SGM
23MRR1
Agencies
[Federal Register Volume 72, Number 56 (Friday, March 23, 2007)]
[Rules and Regulations]
[Page 13693]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5389]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-07-026]
Drawbridge Operation Regulations; Gowanus Canal, Brooklyn, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Hamilton Avenue Bridge across Gowanus Canal, mile 1.2, at Brooklyn, New
York. Under this temporary deviation the draw may remain in the closed
position from April 3, 2007 through April 5, 2007 and from April 6,
2007 through September 29, 2007, a four-hour advance notice shall be
required for all bridge openings. This deviation is necessary to
facilitate scheduled bridge maintenance.
DATES: This deviation is effective from April 3, 2007 through September
29, 2007.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, One South Street, New York, New York, 10004, between 7 a.m. and
3 p.m., Monday through Friday, except Federal holidays. The telephone
number is (212) 668-7165. The First Coast Guard District Bridge Branch
Office maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7165.
SUPPLEMENTARY INFORMATION: The Hamilton Avenue Bridge across Gowanus
Canal, mile 1.2, at Brooklyn, New York, has a vertical clearance in the
closed position of 19 feet at mean high water and 23 feet at mean low
water. The existing operating regulations are listed at 33 CFR 117.5.
The bridge owner, New York City Department of Transportation
(NYCDOT), requested a temporary deviation to allow the bridge to remain
in the closed position to facilitate scheduled electrical and
mechanical bridge maintenance.
Under this temporary deviation the Hamilton Avenue Bridge may
remain in the closed position from April 3, 2007 through April 5, 2007,
and from April 6, 2007 through September 29, 2007, the draw shall open
after at least a four-hour advance notice is given by calling the
contractor at (201) 400-5243.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: March 15, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E7-5389 Filed 3-22-07; 8:45 am]
BILLING CODE 4910-15-P