Combined Notice of Filings #1, 13271-13272 [E7-5129]
Download as PDF
Federal Register / Vol. 72, No. 54 / Wednesday, March 21, 2007 / Notices
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5122 Filed 3–20–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
jlentini on PROD1PC65 with NOTICES
March 15, 2007.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER98–4652–004.
Applicants: Boralex Stratton Energy,
LP.
Description: Boralex Stratton Energy,
LP submits FERC Electric Tariff, First
Revised Volume 1.
Filed Date: 03/12/2007.
Accession Number: 20070314–0057.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER01–2568–004.
Applicants: Boralex Ashland, LP.
Description: Boralex Ashland, LP
submits tariff sheets to FERC Electric
Tariff, First Revised Volume 1.
Filed Date: 03/12/2007.
Accession Number: 20070314–0058.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER01–2569–004.
Applicants: Boralex Livermore Falls,
LP.
Description: Boralex Livermore Falls,
LP submits Revised Original Sheet 1 to
FERC Electric Tariff, Revised Original
Volume 1 in compliance w/Designation
of Electric Rate Schedule Sheets, Order
614.
Filed Date: 03/12/2007.
Accession Number: 20070314–0052.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
VerDate Aug<31>2005
17:08 Mar 20, 2007
Jkt 211001
Docket Numbers: ER02–1175–003.
Applicants: Boralex Fort Fairfield, LP.
Description: Boralex Ft Fairfield, LP
submits Revised Original Sheet 1 to
FERC Electric Tariff, First Revised
Original Volume 1 in compliance
w/Designation of Electric Rate Schedule
Sheets, Order 614.
Filed Date: 03/12/2007.
Accession Number: 20070314–0053.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER02–2330–046.
Applicants: New England Power Pool.
Description: ISO New England, Inc.
submits the eighteenth of the required
Standard Market Design Status Report
pursuant to the Commission’s 9/20/02
Order.
Filed Date: 03/12/2007.
Accession Number: 20070314–0051.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER07–423–001.
Applicants: South Carolina Electric &
Gas Company.
Description: South Carolina Electric &
Gas Company submits its responses to
FERC’s 2/9/07 deficiency letter.
Filed Date: 03/12/2007.
Accession Number: 20070314–0059.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER07–606–000.
Applicants: Duke Energy Indiana, Inc.
Description: Duke Energy Indiana,
Inc. submits the updated summary
schedules for the Transmission and
Local Facilities Agreement for the
calendar year 2005 w/Wabash Valley
Power Association, Inc. etc.
Filed Date: 03/07/2007.
Accession Number: 20070309–0559.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 28, 2007.
Docket Numbers: ER07–615–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits a Large
Generator Interconnection Agreement
among Walnut Creek Energy LLC and
California Independent System Operator
Corporation.
Filed Date: 03/12/2007.
Accession Number: 20070314–0079.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER07–616–000.
Applicants: Carolina Power & Light
Company.
Description: Carolina Power & Light
Co. dba Progress Energy Carolinas, Inc.
submits an amendment to Large
Generator Interconnection Agreement to
add Appendix N, a dynamic schedule
arrangement etc., effective 2/13/07.
Filed Date: 03/12/2007.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
13271
Accession Number: 20070314–0080.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER07–617–000.
Applicants: Carolina Power & Light
Company.
Description: Carolina Power & Light
Co. dba Progress Energy Carolinas, Inc.
requests to amend its Large Generator
Interconnection Agreement to add
Appendix N etc., with an effective date
of 2/13/07.
Filed Date: 03/12/2007.
Accession Number: 20070314–0081.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Docket Numbers: ER07–618–000.
Applicants: American Transmission
Systems, Inc.
Description: American Transmission
Systems, Inc., acting on its own behalf
as well as an agent for Ohio Edison
Company submits a Construction
Agreement, Open Access Transmission
Tariff, Service Agreement 353, effective
2/9/07.
Filed Date: 03/12/2007.
Accession Number: 20070314–0060.
Comment Date: 5 p.m. Eastern Time
on Monday, April 02, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5:00 p.m.
Eastern time on the specified comment
date. It is not necessary to separately
intervene again in a subdocket related to
a compliance filing if you have
previously intervened in the same
docket. Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. In
reference to filings initiating a new
proceeding, interventions or protests
submitted on or before the comment
deadline need not be served on persons
other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using
the FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
E:\FR\FM\21MRN1.SGM
21MRN1
13272
Federal Register / Vol. 72, No. 54 / Wednesday, March 21, 2007 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–5129 Filed 3–20–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No.: P–2232–522]
Duke Energy Carolinas LLC; Notice of
Site Visits
jlentini on PROD1PC65 with NOTICES
March 15, 2007.
Take notice that the following
hydroelectric application was filed with
Commission and is available for public
inspection:
a. Type of Application: New Major
License.
b. Project No.: P–2232–522.
c. Dates filed: August 29, 2006.
d. Applicant: Duke Energy Carolinas,
LLC.
e. Name of Project: Catawba-Wateree
Hydroelectric Project.
f. Locations: The Catawba-Wateree
Project is located on the Catawba River
in Alexander, Burke, Caldwell, Catawba,
Gaston, Iredell, Lincoln, McDowell, and
Mecklenburg counties, North Carolina,
and on the Catawba and Wateree Rivers
in the counties of Chester, Fairfield,
Kershaw, Lancaster, and York, South
Carolina. There are no federal lands
affected by this project.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Jeffrey G.
Lineberger, Catawba-Wateree Hydro
Relicensing Manager; and E. Mark
Oakley, Catawba-Wateree Relicensing
Project Manager, Duke Energy, Mail
Code EC12Y, P.O. Box 1006, Charlotte,
NC 28201–1006.
VerDate Aug<31>2005
17:08 Mar 20, 2007
Jkt 211001
i. FERC Contacts: Sean Murphy at
(202) 502–6145 or
sean.murphy@ferc.gov.
j. Site Visit: The Applicant and FERC
staff will conduct a series of project site
visits beginning at 8 a.m. on March 26,
27, 29, and 30, 2007. All interested
individuals, organizations, and agencies
are invited to attend. Anyone with
questions about the site visits should
contact the applicant.
k. This application is not ready for
environmental analysis at this time.
l. The existing Catawba-Wateree
Project consists of eleven developments:
1. The Bridgewater development
consists of the following existing
facilities: (1) The Catawba dam
consisting of: (a) A 1,650-foot-long, 125foot-high earth embankment; (b) a 305foot-long, 120-foot-high concrete gravity
ogee spillway; and (c) a 850-foot-long,
125-foot-high earth embankment; (2) the
Paddy Creek dam consisting of: a 1,610foot-long, 165-foot-high earth
embankment; (3) the Linville dam
consisting of: a 1,325-foot-long, 160foot-high earth embankment; (4) a 430foot-long uncontrolled low overflow
weir spillway situated between Paddy
Creek Dam and Linville Dam; (5) a 6,754
acre reservoir formed by Catawba,
Paddy Creek, and Linville with a normal
water surface elevation of 1,200 feet
above mean-sea-level (msl); (6) a 900foot-long concrete-lined intake tunnel;
(7) a powerhouse containing two
vertical Francis-type turbines directly
connected to two generators, each rated
at 10,000 kilowatts (kW), for a total
installed capacity of 20.0 megawatts
(MW); and (8) other appurtenances.
2. The Rhodhiss development consists
of the following existing facilities: (1)
The Rhodhiss dam consisting of: (a) A
119.58-foot-long concrete gravity
bulkhead; (b) a 800-foot-long, 72-foothigh concrete gravity ogee spillway; (c)
a 122.08-foot-long concrete gravity
bulkhead with an additional 8-foot-high
floodwall; and (d) a 283.92-foot-long
rolled fill earth embankment; (2) a 2,724
acre reservoir with a normal water
surface elevation of 995.1 feet above
msl; (4) a powerhouse integral to the
dam, situated between the bulkhead on
the left bank and the ogee spillway
section, containing three vertical
Francis-type turbines directly connected
to three generators, two rated at 12,350
kW, one rated at 8,500 kW for a total
installed capacity of 28.4 MW; and (5)
other appurtenances.
3. The Oxford development consists
of the following existing facilities: (1)
The Oxford dam consisting of: (a) A
74.75-foot-long soil nail wall; (b) a 193foot-long emergency spillway; (c) a 550foot-long gated concrete gravity
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
spillway; (d) a 112-foot-long
embankment wall situated above the
powerhouse; and (e) a 429.25-foot-long
earth embankment; (2) a 4,072 acre
reservoir with a normal water surface
elevation of 935 feet above msl; (4) a
powerhouse integral to the dam,
situated between the gated spillway and
the earth embankment, containing two
vertical Francis-type turbines directly
connected to two generators, each rated
at 18,000 kW for a total installed
capacity of 35.7 MW; and (5) other
appurtenances.
4. The Lookout Shoals development
consists of the following existing
facilities: (1) The Lookout Shoals dam
consisting of: (a) A 282.08-foot-long
concrete gravity bulkhead section; (b) a
933-foot-long uncontrolled concrete
gravity ogee spillway; (c) a 65-foot-long
gravity bulkhead section; and (d) a
1,287-foot-long, 88-foot-high earth
embankment; (2) a 1,155 acre reservoir
with a normal water surface elevation of
838.1 feet above msl; (3) a powerhouse
integral to the dam, situated between
the bulkhead on the left bank and the
ogee spillway, containing three main
vertical Francis-type turbines and two
smaller vertical Francis-type turbines
directly connected to five generators,
three main generators rated at 8,970 kW,
and two smaller rated at 450 kW for a
total installed capacity of 25.7 MW; and
(4) other appurtenances.
5. The Cowans Ford development
consists of the following existing
facilities: (1) The Cowans Ford dam
consisting of: (a) A 3,535-foot-long
embankment; (b) a 209.5-foot-long
gravity bulkhead; (c) a 465-foot-long
concrete ogee spillway with eleven
Taintor gates, each 35-feet-wide by 25feet-high; (d) a 276-foot-long bulkhead;
and (e) a 3,924-foot-long earth
embankment; (2) a 3,134-foot-long
saddle dam (Hicks Crossroads); (3) a
32,339 acre reservoir with a normal
water surface elevation of 760 feet above
msl; (4) a powerhouse integral to the
dam, situated between the spillway and
the bulkhead near the right
embankment, containing four vertical
Kaplan-type turbines directly connected
to four generators rated at 83,125 kW for
a total installed capacity of 332.5 MW;
and (5) other appurtenances.
6. The Mountain Island development
consists of the following existing
facilities: (1) The Mountain Island dam
consisting of: (a) A 997-foot-long, 97foot-high uncontrolled concrete gravity
ogee spillway; (b) a 259-foot-long
bulkhead on the left side of the
powerhouse; (c) a 200-foot-long
bulkhead on the right side of the
powerhouse; (d) a 75-foot-long concrete
core wall; and (e) a 670-foot-long, 140-
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 72, Number 54 (Wednesday, March 21, 2007)]
[Notices]
[Pages 13271-13272]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-5129]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
March 15, 2007.
Take notice that the Commission received the following electric
rate filings.
Docket Numbers: ER98-4652-004.
Applicants: Boralex Stratton Energy, LP.
Description: Boralex Stratton Energy, LP submits FERC Electric
Tariff, First Revised Volume 1.
Filed Date: 03/12/2007.
Accession Number: 20070314-0057.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER01-2568-004.
Applicants: Boralex Ashland, LP.
Description: Boralex Ashland, LP submits tariff sheets to FERC
Electric Tariff, First Revised Volume 1.
Filed Date: 03/12/2007.
Accession Number: 20070314-0058.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER01-2569-004.
Applicants: Boralex Livermore Falls, LP.
Description: Boralex Livermore Falls, LP submits Revised Original
Sheet 1 to FERC Electric Tariff, Revised Original Volume 1 in
compliance w/Designation of Electric Rate Schedule Sheets, Order 614.
Filed Date: 03/12/2007.
Accession Number: 20070314-0052.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER02-1175-003.
Applicants: Boralex Fort Fairfield, LP.
Description: Boralex Ft Fairfield, LP submits Revised Original
Sheet 1 to FERC Electric Tariff, First Revised Original Volume 1 in
compliance w/Designation of Electric Rate Schedule Sheets, Order 614.
Filed Date: 03/12/2007.
Accession Number: 20070314-0053.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER02-2330-046.
Applicants: New England Power Pool.
Description: ISO New England, Inc. submits the eighteenth of the
required Standard Market Design Status Report pursuant to the
Commission's 9/20/02 Order.
Filed Date: 03/12/2007.
Accession Number: 20070314-0051.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER07-423-001.
Applicants: South Carolina Electric & Gas Company.
Description: South Carolina Electric & Gas Company submits its
responses to FERC's 2/9/07 deficiency letter.
Filed Date: 03/12/2007.
Accession Number: 20070314-0059.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER07-606-000.
Applicants: Duke Energy Indiana, Inc.
Description: Duke Energy Indiana, Inc. submits the updated summary
schedules for the Transmission and Local Facilities Agreement for the
calendar year 2005 w/Wabash Valley Power Association, Inc. etc.
Filed Date: 03/07/2007.
Accession Number: 20070309-0559.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 28, 2007.
Docket Numbers: ER07-615-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison Company submits a Large
Generator Interconnection Agreement among Walnut Creek Energy LLC and
California Independent System Operator Corporation.
Filed Date: 03/12/2007.
Accession Number: 20070314-0079.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER07-616-000.
Applicants: Carolina Power & Light Company.
Description: Carolina Power & Light Co. dba Progress Energy
Carolinas, Inc. submits an amendment to Large Generator Interconnection
Agreement to add Appendix N, a dynamic schedule arrangement etc.,
effective 2/13/07.
Filed Date: 03/12/2007.
Accession Number: 20070314-0080.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER07-617-000.
Applicants: Carolina Power & Light Company.
Description: Carolina Power & Light Co. dba Progress Energy
Carolinas, Inc. requests to amend its Large Generator Interconnection
Agreement to add Appendix N etc., with an effective date of 2/13/07.
Filed Date: 03/12/2007.
Accession Number: 20070314-0081.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Docket Numbers: ER07-618-000.
Applicants: American Transmission Systems, Inc.
Description: American Transmission Systems, Inc., acting on its own
behalf as well as an agent for Ohio Edison Company submits a
Construction Agreement, Open Access Transmission Tariff, Service
Agreement 353, effective 2/9/07.
Filed Date: 03/12/2007.
Accession Number: 20070314-0060.
Comment Date: 5 p.m. Eastern Time on Monday, April 02, 2007.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies
[[Page 13272]]
of the intervention or protest to the Federal Energy Regulatory
Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5129 Filed 3-20-07; 8:45 am]
BILLING CODE 6717-01-P