On March 7, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Bell IPC should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is April 4, 2007.
Absent a request to be heard in
opposition by the deadline above, Bell
IPC is authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Bell
IPC, compatible with the public interest,
and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Bell IPC’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4475 Filed 3–12–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RP07–142–001]
[Docket No. RP96–200–168]
CenterPoint Energy Gas Transmission
Company; Notice of Compliance Filing
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
March 7, 2007.
March 7, 2007.
Take notice that on March 2, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing as
part of its FERC Gas Tariff, Sixth
Revised Volume No. 1, Substitute
Second Revised Sheet No. 603, to be
effective March 1, 2007:
CEGT states that the purpose of this
filing is to comply with the
Commission’s order dated February 27,
2007 in which CEGT was directed to
correct a word processing error.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that on February 27, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval an amended negotiated rate
agreement between CEGT and
Constellation Energy Commodities
Group, Inc. CEGT has entered into the
amended agreement to provide
amended firm transportation service to
this shipper under Rate Schedule FT to
be effective March 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4486 Filed 3–12–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
14:58 Mar 12, 2007
Jkt 211001
11343
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
E:\FR\FM\13MRN1.SGM
13MRN1
11344
Federal Register / Vol. 72, No. 48 / Tuesday, March 13, 2007 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4490 Filed 3–12–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–93–000]
Columbia Gas Transmission
Corporation; Notice of Application
cprice-sewell on PROD1PC66 with NOTICES
March 7, 2007.
Take notice that on February 28, 2007,
Columbia Gas Transmission Corporation
(Columbia), 1700 MacCorkle Avenue,
SE., Charleston, West Virginia 25314,
filed in Docket No. CP07–93–000, an
application pursuant to section 7(c) of
the Natural Gas Act (NGA), to: (1) uprate
approximately 1⁄3 mile of its Line WB
between its Inventory Station No. 0+00
to 16+54 from 750 psig to 809 psig, and
(2) increase the discharge of its Cobb
Compressor Station from 750 psig to 809
psig. Columbia states that its proposal is
intended to improve its system
operations and the modifications will
not increase capacity available for sale
due to the short length of pipeline
involved. Columbia also states that all of
its facilities are located in Kanawha
County, West Virginia, all as more fully
set forth in the application which is on
file with the Commission and open to
public inspection. This filing may also
be viewed on the Commission’s Web
site at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, call (202)
502–8659 or TTY, (202) 208–3676.
Any questions regarding this
application should be directed to
counsel for Columbia, Fredric J. George,
Lead Counsel, Columbia Gas
Transmission Corporation, P.O. Box
1273, Charleston, West Virginia 25325–
1273; telephone 304–357–2359, fax
304–357–3206.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
VerDate Aug<31>2005
14:58 Mar 12, 2007
Jkt 211001
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments protests
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web (https://
www.ferc.gov) site under the ‘‘e-Filing’’
link.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Comment Date: 5 p.m. Eastern
Standard Time, March 28, 2007.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4472 Filed 3–12–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP97–13–029]
East Tennessee Natural Gas, LLC;
Notice of Negotiated Rate
March 7, 2007.
Take notice that on February 28, 2007,
East Tennessee Natural Gas, LLC (East
Tennessee) tendered for filing as part of
its FERC Gas Tariff, Third Revised
Volume No. 1, the following tariff
sheets, reflecting an effective date of
April 1, 2007:
Original Sheet No. 27
Original Sheet No.28
Sheet Nos. 29–100
East Tennessee states that this filing is
being made in connection with
negotiated rate transactions pursuant to
Section 49 of the General Terms and
Conditions of East Tennessee’s FERC
Gas Tariff. East Tennessee states that the
tariff sheets listed above identify and
describe the negotiated rate
transactions, including the exact legal
name of each of the relevant shippers,
the negotiated rates, the rate schedules,
the contract terms, and the contract
quantities.
East Tennessee states that copies of its
filing have been mailed to all affected
customers and interested state
commissions, as well as all parties on
the official service list compiled by the
Secretary of the Federal Energy
Regulatory Commission in the
captioned proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
E:\FR\FM\13MRN1.SGM
13MRN1
Agencies
[Federal Register Volume 72, Number 48 (Tuesday, March 13, 2007)]
[Notices]
[Pages 11343-11344]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4490]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP96-200-168]
CenterPoint Energy Gas Transmission Company; Notice of Negotiated
Rate Filing
March 7, 2007.
Take notice that on February 27, 2007, CenterPoint Energy Gas
Transmission Company (CEGT) tendered for filing and approval an amended
negotiated rate agreement between CEGT and Constellation Energy
Commodities Group, Inc. CEGT has entered into the amended agreement to
provide amended firm transportation service to this shipper under Rate
Schedule FT to be effective March 1, 2007.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 11344]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Philis J. Posey,
Acting Secretary.