Fenton Power Partners I, LLC; Notice of Issuance of Order, 11009 [E7-4339]
Download as PDF
Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments protests
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web (https://
www.ferc.gov) site under the ‘‘e-Filing’’
link.
Comment Date: March 26, 2007.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4336 Filed 3–9–07; 8:45 am]
BILLING CODE 6717–01–P
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4387 Filed 3–9–07; 8:45 am]
BILLING CODE 6717–01–P
[Docket No. RP07–325–000]
DEPARTMENT OF ENERGY
Equitrans, L.P.; Notice of Proposed
Changes In FERC Gas Tariff
Federal Energy Regulatory
Commission
March 6, 2007.
[Docket Nos. ER07–357–000, ER07–357–
001]
Seventeenth Revised Sheet No. 5
Twenty-Sixth Revised Sheet No. 6
Fifteenth Revised Sheet No. 10
pwalker on PROD1PC71 with NOTICES
Take notice that on March 1, 2007,
Equitrans, L.P. (Equitrans) tendered for
filing as part of its FERC Gas Tariff,
Original Volume No. 1, the following
revised tariff sheets, with an effective
date of April 1, 2007:
Fenton Power Partners I, LLC (Fenton
Power) filed an application for marketbased rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Fenton Power also requested
waivers of various Commission
regulations. In particular, Fenton Power
requested that the Commission grant
blanket approval under 18 CFR Part 34
of all future issuances of securities and
assumptions of liability by Fenton
Power.
On March 1, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Fenton Power should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
VerDate Aug<31>2005
18:04 Mar 09, 2007
Jkt 211001
Fenton Power Partners I, LLC; Notice
of Issuance of Order
March 5, 2007.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
11009
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is April 2, 2007.
Absent a request to be heard in
opposition by the deadline above,
Fenton Power is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Fenton Power, compatible
with the public interest, and is
reasonably necessary or appropriate for
such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Fenton Power’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4339 Filed 3–9–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–324–000]
Florida Gas Transmission Company,
LLC; Notice of Proposed Changes in
FERC Gas Tariff
March 6, 2007.
Take notice that on March 1, 2007,
Florida Gas Transmission Company,
LLC (FGT) tendered for filing as part of
its FERC Gas Tariff, Fourth Revised
Volume No. 1, the following tariff
sheets, to become effective April 1,
2007:
E:\FR\FM\12MRN1.SGM
12MRN1
Agencies
[Federal Register Volume 72, Number 47 (Monday, March 12, 2007)]
[Notices]
[Page 11009]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4339]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER07-357-000, ER07-357-001]
Fenton Power Partners I, LLC; Notice of Issuance of Order
March 5, 2007.
Fenton Power Partners I, LLC (Fenton Power) filed an application
for market-based rate authority, with an accompanying rate schedule.
The proposed market-based rate schedule provides for the sale of
energy, capacity and ancillary services at market-based rates. Fenton
Power also requested waivers of various Commission regulations. In
particular, Fenton Power requested that the Commission grant blanket
approval under 18 CFR Part 34 of all future issuances of securities and
assumptions of liability by Fenton Power.
On March 1, 2007, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development--West, granted the requests
for blanket approval under Part 34. The Director's order also stated
that the Commission would publish a separate notice in the Federal
Register establishing a period of time for the filing of protests.
Accordingly, any person desiring to be heard or to protest the blanket
approvals of issuances of securities or assumptions of liability by
Fenton Power should file a motion to intervene or protest with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest is April 2, 2007.
Absent a request to be heard in opposition by the deadline above,
Fenton Power is authorized to issue securities and assume obligations
or liabilities as a guarantor, indorser, surety, or otherwise in
respect of any security of another person; provided that such issuance
or assumption is for some lawful object within the corporate purposes
of Fenton Power, compatible with the public interest, and is reasonably
necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of Fenton Power's issuance of securities or
assumptions of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-4339 Filed 3-9-07; 8:45 am]
BILLING CODE 6717-01-P