Californians for Renewable Energy, Inc. (CARE), Complainant v. California Public Utilities Commission, Pacific Gas and Electric Company, Metcalf Energy Center and the Los Medanos Energy Center, LLC, Respondents; Notice of Complaint, 11019-11020 [E7-4337]
Download as PDF
Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4353 Filed 3–9–07; 8:45 am]
BILLING CODE 6717–01–P
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4355 Filed 3–9–07; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. RP07–321–000]
DEPARTMENT OF ENERGY
Williston Basin Interstate Pipeline
Company; Notice of Proposed
Changes in FERC Gas Tariff
Federal Energy Regulatory
Commission
[Docket No. RP07–322–000]
pwalker on PROD1PC71 with NOTICES
March 5, 2007.
Take notice that on March 1, 2007,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing as part of its FERC Gas Tariff
Second Revised Volume No. 1, Seventh
Revised Sheet No. 724, to be effective
March 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
VerDate Aug<31>2005
18:04 Mar 09, 2007
Jkt 211001
Williston Basin Interstate Pipeline
Company; Notice of Proposed
Changes in FERC Gas Tariff
11019
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4356 Filed 3–9–07; 8:45 am]
BILLING CODE 6717–01–P
March 5, 2007.
Take notice that on March 1, 2007,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing as part of its FERC Gas Tariff,
Second Revised Volume No. 1, the
following revised tariff sheets to become
effective April 1, 2007.
Sixty-Fifth Revised Sheet No. 15
Thirty-Eighth Revised Sheet No. 15A
Sixty-Third Revised Sheet No. 18
Thirty-Eighth Revised Sheet No. 18A
Thirty-Eighth Revised Sheet No. 19
Thirty-Eighth Revised Sheet No. 20
Eighth Revised Sheet No. 724
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL07–40–000]
Californians for Renewable Energy,
Inc. (CARE), Complainant v. California
Public Utilities Commission, Pacific
Gas and Electric Company, Metcalf
Energy Center and the Los Medanos
Energy Center, LLC, Respondents;
Notice of Complaint
March 5, 2007.
Take notice that on March 2, 2007,
Californians for Renewable Energy, Inc.
(CARE) tendered for filing pursuant to
section 206 of the Federal Power Act a
complaint against the California Public
Utilities Commission (CPUC) for its
action on February 15, 2007 authorizing
Pacific Gas Electric Company (PG&E) to
enter into a power purchase agreement
with Metcalf Energy Center, LLC and
the Los Medanos Energy Center, LLC, in
alleged violation of the ‘‘filed rate
doctrine’’. CARE requests the contract
be subject to the Commission’s review
under the December 19, 2006 opinions
by the U.S. Court of Appeals for the
Ninth Circuit in a pair of opinions—
Public Utility Dist. No. 1 v. FERC 471
F.3d 1053 (9th Cir. 2006) and Public
Utility commission of the State of
E:\FR\FM\12MRN1.SGM
12MRN1
11020
Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices
California v. FERC, 2006 U.S. App.
LEXIS 31140 (9th Cir. De. 19, 2006)
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 22, 2007.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–4337 Filed 3–9–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
pwalker on PROD1PC71 with NOTICES
March 5, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER07–484–001.
Applicants: Idaho Power Company.
Description: Idaho Power Co. submits
a revised Network Integration Service
Agreement, Fourth Revised Service
VerDate Aug<31>2005
18:04 Mar 09, 2007
Jkt 211001
Agreement 155, omitted from the
1/30/07 filing.
Filed Date: 02/28/2007
Accession Number: 20070302–0088.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Docket Numbers: ER07–494–001.
Applicants: Southern Company
Services.
Description: Alabama Power Co.
submits a revised Table of Contents to
the Small Generator Interconnection
Agreement.
Filed Date: 02/28/2007.
Accession Number: 20070302–0087.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Docket Numbers: ER07–574–000.
Applicants: Appalachian Power
Company.
Description: Appalachian Power Co.
submits a Letter Agreement with
American Municipal Power-Ohio, Inc
and the Blue Ridge Power Authority.
Filed Date: 02/27/2007.
Accession Number: 20070301–0141.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 20, 2007.
Docket Numbers: ER07–575–000.
Applicants: MidAmerican Energy
Company.
Description: MidAmerican Energy Co.
submits an amended Network
Integration Transmission Service
Agreement and an amended Network
Operating Agreement with the City of
Denver, Iowa.
Filed Date: 02/27/2007.
Accession Number: 20070301–0142.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 20, 2007.
Docket Numbers: ER07–577–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc
submits an unexecuted Facilities
Construction Agreement with Endeavor
Power Partners, LLC et al.
Filed Date: 02/28/2007.
Accession Number: 20070302–0092.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Docket Numbers: ER07–578–000.
Applicants: CinCap VIII, LLC.
Description: CinCap VIII, LLC submits
notice of cancellation of First Revised
Sheet 1 to FERC Electric Tariff, Original.
Filed Date: 02/28/2007.
Accession Number: 20070302–0086.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Docket Numbers: ER07–579–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
submits an unexecuted amended and
restated Generator Interconnection
Agreement w/Michigan Electric
Transmission Co., LLC etc pursuant
Order 614.
Filed Date: 02/28/2007.
Accession Number: 20070302–0089.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Docket Numbers: ER07–580–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
(MISO) submits an unexecuted Large
Generator Interconnection Agreement
w/Michigan Electric Transmission Co,
LLC and on 3/2/07 MISO filed an errata
to this filing.
Filed Date: 02/28/2007; 03/02/07.
Accession Number: 20070302–0091.
Comment Date: 5 p.m. Eastern Time
on Monday, March 12, 2007.
Docket Numbers: ER07–581–000.
Applicants: American Electric Power
Service Corporation.
Description: AEP Texas North Co
submits a fully executed
Interconnection Agreement with Buffalo
Gap Wind Farm 3, LLC dated 2/20/07.
Filed Date: 03/01/2007.
Accession Number: 20070302–0090.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 22, 2007.
Docket Numbers: ER07–582–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits Second Revised
Schedule 136, an agreement entitled
‘‘Form of Distribution Facilities
Agreement—Electric Standby Service
etc.
Filed Date: 03/02/2007.
Accession Number: 20070305–0188.
Comment Date: 5 p.m. Eastern Time
on Friday, March 23, 2007.
Docket Numbers: ER07–584–000.
Applicants: American Electric Power
Service Corporation.
Description: American Electric Power
Service Corporation, agent for Indiana
Michigan Power Co, submits and
requests acceptance of a new Power
Quality Agreement with Wabash Valley
Power Authority etc.
Filed Date: 02/28/2007.
Accession Number: 20070305–0186.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
E:\FR\FM\12MRN1.SGM
12MRN1
Agencies
[Federal Register Volume 72, Number 47 (Monday, March 12, 2007)]
[Notices]
[Pages 11019-11020]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4337]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL07-40-000]
Californians for Renewable Energy, Inc. (CARE), Complainant v.
California Public Utilities Commission, Pacific Gas and Electric
Company, Metcalf Energy Center and the Los Medanos Energy Center, LLC,
Respondents; Notice of Complaint
March 5, 2007.
Take notice that on March 2, 2007, Californians for Renewable
Energy, Inc. (CARE) tendered for filing pursuant to section 206 of the
Federal Power Act a complaint against the California Public Utilities
Commission (CPUC) for its action on February 15, 2007 authorizing
Pacific Gas Electric Company (PG&E) to enter into a power purchase
agreement with Metcalf Energy Center, LLC and the Los Medanos Energy
Center, LLC, in alleged violation of the ``filed rate doctrine''. CARE
requests the contract be subject to the Commission's review under the
December 19, 2006 opinions by the U.S. Court of Appeals for the Ninth
Circuit in a pair of opinions--Public Utility Dist. No. 1 v. FERC 471
F.3d 1053 (9th Cir. 2006) and Public Utility commission of the State of
[[Page 11020]]
California v. FERC, 2006 U.S. App. LEXIS 31140 (9th Cir. De. 19, 2006)
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on March 22, 2007.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-4337 Filed 3-9-07; 8:45 am]
BILLING CODE 6717-01-P