Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals, 11079-11082 [07-1129]

Download as PDF Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals Federal Aviation Administration (FAA), DOT ACTION: Monthly Notice of PFC Approvals and Disapprovals. In January 2007, there were five applications approved. This notice also includes information on nine applications, one approved in November 2005, one approved in March 2006, one approved in April 2006, one approved in August 2006, one approved in October 2006, and four approved in December 2006, inadvertently left off the November 2005, March 2006, April 2006, August 2006, October 2006, and December 2006 notices, respectively. Additionally, eight approved amendments to previously approved applications are listed. AGENCY: pwalker on PROD1PC71 with NOTICES SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of (Title IX of the Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101–508) and Part 158 of the Federal Aviation Regulations (14 CFR Part 158). This notice is published pursuant to paragraph d of § 158.29. PFC Applications Approved Public Agency: South Jersey Transportation Authority, Atlantic City, New Jersey. Application Number: 05–04–U–00– ACY. Application Type: Use PFC revenue. PFC Level: $4.50. Total PFC Revenue to be Used in this Decision: $31,301. Charge Effective Date: February 1, 2006. Estimated Charge Expiration Date: November 1, 2006. Class of Air Carriers not Required to Collect PFC’S: No change from previous decision. Brief Description of Project Approved for Use: Environmental design mitigation. Decision Date: November 3, 2005. FOR FURTHER INFORMATION CONTACT: Dan Vornea, New York Airports District Office, (516) 227–3812, extension 231. Public Agency: Louisville Regional Airport Authority, Louisville, Kentucky. Application Number: 06–04–C–00– SDF. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $1,267,315. VerDate Aug<31>2005 19:36 Mar 09, 2007 Jkt 211001 Earliest Charge Effective Date: September 1, 2013. Estimated Charge Expiration Date: October 1, 2013. Class of Air Carriers not Required to Collect PFC’S: Air taxi/commercial operators filing, or required to file, FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Louisville International Airport. Brief Description of Projects Approved for Collection and Use: Emergency operations center. Southwest perimeter road. Repair airfield pavement joints. Airfield cable, LED light fixtures and signage installation. Airfield pavement repairs. Purchase Oshkosh high-speed snow plow. Purchase M–B high-speed snow broom. Purchase Mack high-speed snow plow. Purchase Oshkosh high-speed snow broom. Purchase proximity gear. PFC implementation and administration. Brief Description of Withdrawn Project: Purchase rescue vehicle. Date of withdrawal: March 13, 2006. Decision Date: March 16, 2006. For Further Information Contact: Tommy DuPree, Memphis Airports District Office, (901) 322–8185. Public Agency: Savannah Airport Commission, Savannah, Georgia. Application Number: 06–06–C–00– SAV. Application Type: Impose and use a PFC. PCF Level: $4.50. Total PCF Revenue Approved in this Decision: $3,203,972. Earliest Charge Effective Date: May 1, 2013. Estimated Charge Expiration Date: November 1, 2013. Class of Air Carriers not Required to Collect PFC’s Air taxi/commercial operators filing FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Savannah/ Hilton Head International Airport. Brief Description of Projects Approved for Collection and Use: Security enhancements. Relocate airfield lighting controls (air traffic control tower). Runway safety area improvements. PO 00000 Frm 00109 Fmt 4703 Sfmt 4703 11079 Airfield lighting improvements (phase 1). Replace aircraft rescue and firefighting bridge. Terminal expansion (design and construction). Apron expansion (design and construction). Airfield lighting improvements—vault (phase II). Taxiway E milling. Loading bridges and bag lifts. Relocate runway 36 localizer. PFC implementation and administration. Runways redesignation. Brief Description of Project Partially Approved for Collection and Use: General aviation connector taxiways. Determination: Corporate and private hangars are not eligible development at small hub and larger airports. In addition, utilities associated with ineligible development are also ineligible. The approved amount has been reduced from that requested due to the ineligible portions of the project. Brief Description of Withdrawn Project: Relocate airfield maintenance road. Date of withdrawal: April 17, 2006. Decision Date: April 21, 2006. For Further Information Contact: Daniel Gaetan, Atlanta Airports District Office, (404) 305–7146. Public Agency: Cities of Dallas and Fort Worth acting by and through the Dallas-Forth Worth International Airport Board, Dallas-Fort Worth, Texas. Applications Number: 06–09–C–00– DFW. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $36,868,000. Earliest Charge Effective Date: December 1, 2032. Estimated Charge Expiration Date: September 1, 2034. Class of Air Carriers not Required to Collect PFC’s: All Part 135 air taxi/ commercial operators filing FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Dallas-Fort Worth International Airport. Brief Description of Projects Approved for Collection and Use: Construct southeast perimeter taxiway system. Decision Date: August 22, 2006. For Further Information Contact: Rick Compton, Texas Airports Development Office, (817) 222–5608. E:\FR\FM\12MRN1.SGM 12MRN1 pwalker on PROD1PC71 with NOTICES 11080 Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices Public Agency: City of Redmond, Oregon. Application Number: 06–05–C–00– RDM. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in This Decision: $645,420. Earliest Charge Effective Date: March 1, 2007. Estimated Charge Expiration Date: May 1, 2009. Class of Air Carriers not Required to Collect PFC’s: Nonscheduled/ondemand air carriers filing FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Roberts Field. Brief Description of Projects Approved for Collection and Use: Construct snow removal equipment facility, phase 2. Terminal emergency power supply. Pavement condition index study. Airfield electrical improvements. Airport master plan update. General aviation ramp rehabilitation. Terminal expansion phase 1—design. Terminal Drive relocation including storm water drainage outfalls. Terminal expansion phase 2—design. Service road construction including taxiway A transition. Decision Date: October 19, 2006. For Further Information Contact: Suzanne Lee-Pang, Seattle Airports District Office, (425) 227–2654. Public Agency: Rhode Island Airport Corporation, Warwick, Rhode Island. Application Number: 06–05–C–00– PVD. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $31,826,316. Earliest Charge Effective Date: January 1, 2011. Estimated Charge Expiration Date: April 1, 2013. Class of Air Carriers not Required to collect PFC’s: Air taxi/commercial operators. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at T.F. Green State Airport. Brief Description of Projects Approved for Collection and Use at a $4.50 PFC Level: VerDate Aug<31>2005 18:04 Mar 09, 2007 Jkt 211001 In-line explosive detection system. Security screening checkpoint expansion. Brief Description of Projects Approved for Collection and Use at a $3.00 PFC Level: Aircraft rescue and firefighting vehicle. Taxiway T rehabilitation. PFC implementation/administration. Decision Date: December 14, 2006. For Further Information Contact: Priscilla Scott, New England Region Airports Division, (781) 238–7614. Public Agency: Salt Lake City Department of Airports, Salt Lake City, Utah. Application Number: 06–10–C–00– SLC. Application Type: Impose and use a PFC. Total PFC Revenue Approved in this Decision: $75,362,174. Earliest Charge Effective Date: December 1, 2007. Estimated Charge Expiration Date: September 1, 2009. Class of Air Carriers not Required to Collect PFC’S: Air taxi/commercial operators filing or required to file FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Salt Lake City International Airport (SLC). Brief Description of Projects Approved for Collection at SLC and Use at SLC at a $4.50 PFC Level: Airport passenger loading bridge acquisitions. Passenger loading bridge refurbishment program. TU–2 bag claim and circulation. TU–1 bag claim and circulation. Sterile corridor expansion. TU–1 security screening. Modifications for explosive detection system. Runway 17/35 overlay. Runway 14/32 overlay. Taxiway R overlay. Airfield lighting control system. Concourse apron rehabilitation. Taxiway K resurface. Taxiway centerline light trench pavement reconstruction. Airport property security fence (phase I). Airport property security fence (phase II). Land acquisition for airport compatibility and approach protection. Brief Description of Projects Approved for Collection at SLC and Use at SLC at a $3.00 PFC Level: PO 00000 Frm 00110 Fmt 4703 Sfmt 4703 Maintenance equipment. Concourse E elevator replacement. Protective bollards—terminal fronts. Apron deicing modifications. Midfield pump station and outfall drain line. Prehistoric site cultural resource investigation and data recovery. Airfield/airspace system capacity analysis. Planning analysis for airport development. Brief Description of Projects Approved for Collection at SLC and Use at Tooele Valley Airport at a $3.00 PFC Level: Land acquisition for airport compatibility and approach protection. Taxilane. Brief Description of Projects Approved for Collection at SLC and Use at Salt Lake City Municipal Airport No. 2 at a $3.00 PFC Level: Apron rehabilitation. Secondary fuel containment. Tie-down apron reconstruction. Master plan update. Brief Description of Disapproved Project: Water main loop extension—2200 North. Determination:The public agency’s application did not provide sufficient information to determine the eligibility of the project. The application also did not demonstrate that the project would make a significant contribution to reducing current or anticipated congestion or meet the PFC objective of preserving or enhancing capacity at SLC. Decision Date: December 20, 2006. FOR FURTHER INFORMATION CONTACT: Chris Schaffer, Denver Airports District Office, (303) 342–1258. Public Agency: City of Boise, Idaho. Application Number: 06–04–C–00– BOI. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $5,377,736. Earliest Charge Effective Date: August 1, 2018. Estimated Charge Expiration Date: August 1, 2019. Class of Air Carriers not Required to Collect PFC’s: Part 135 air taxi/ commercial operators who conduct operations in air commerce carrying persons for compensation or hire, except air taxi/commercial operators, public or private charters, with seating of 10 or more. Determination: Approved. Based on information submitted in the public E:\FR\FM\12MRN1.SGM 12MRN1 pwalker on PROD1PC71 with NOTICES Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices agency’s application, The FAA has determined that the approved lass accounts for less than 1 percent of the total annual enplanements at Boise Air Terminal. Brief Description of Projects Approved for Collection and Use: Taxiway J rehabilitation. Airfield lighting and electrical building. Baggage system modifications. Concourse B improvements. Concourse B apron rehabilitation and expansion. Decision Date: December 29, 2006. FOR FURTHER INFORMATION CONTACT: Suzanne Lee-Pang, Seattle Airports District Office, (425) 227–2654. Public Agency: Ports of Douglas County and Chelan County, East Wenatchee, Washington. Application Number: 07–07–C–00– EAT. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in This Decision: $176,755. Earliest Charge Effective Date: February 1, 2007. Estimated Charge Expiration Date: May 1, 2008. Class of Air Carriers not Required to Collect PFC’s: None. Brief Description of Projects Approved for Collection and Use: Acquire Davis property. Phase 1 instrument landing system/ environmental assessment. Phase 2 instrument landing system/ runway 12/30 shift. Acquire Houtz/Yonaka property, plus easements. Repave airport fire station access road. Purchase 3 airport fire department airpacs. Decision Date: December 29, 2006. FOR FURTHER INFORMATION CONTACT: Suzanne Lee-Pang, Seattle Airports District Office, (425) 227–2654. Public Agency: South Jersey Transportation Authority, Atlantic City, New Jersey. Application Number: 07–05–C–00– ACY. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in This Decision: $5,418,189. Earliest Charge Effective Date: April 1, 2007. Estimated Charge Expiration Date: June 1, 2009. Class of Air Carriers not Required to Collect PFC’s: Nonscheduled/ondemand air carriers with less than 1,200 annual enplaned passengers filing FAA Form 1800–31. VerDate Aug<31>2005 18:04 Mar 09, 2007 Jkt 211001 Determination: Approved. Based on information submitted to the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Atlantic City International Airport. Brief Description of Projects Approved for Collection and Use: Acquire snow removal equipment. Acquire aircraft rescue and firefighting vehicle. Security project—phase I through II. Environmental mitigation—phase III. Install weather reporting equipment. Acquire interactive training system. Install of common use terminal equipment. Decision Date: January 3, 2007. Dan Vornea, New York Airports District Office, (516) 22–3812, extension 231. Public Agency: City and County of Twin Falls, Idaho. Application Number: 07–03–C–00– TWF. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $560,416. Earliest Charge Effective Date: June 1, 2007. Estimated Charge Expiration Date: October 1, 2011. Class of Air Carriers not Required to Collect PFC’s: Air taxi/commercial operators utilizing aircraft having a seating capacity of less than 20 passengers. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Joslin Field—Magic Valley Regional Airport. Brief Description of Projects Approved for Collection and Use: Runway 7/25 pavement rehabilitation. Taxilane reconstruction. Update airport master plan study. Taxiway and taxilane rehabilitation. Acquire snow plow and snow removal equipment. Construct snow removal equipment storage building. Security enhancement project. Taxilane reconstruction. Construction of taxilanes 10, 11, and 12. Taxiway Delta extension. Acquire sweeper, snow plow, and snow blower. Apron rehabilitation. Access road rehabilitation. Runway 12 safety area. Decision Date: January 8, 2007. FOR FURTHER INFORMATION CONTACT: PO 00000 Frm 00111 Fmt 4703 Sfmt 4703 11081 For Further Information Contact: Trang Tran, Seattle Airports District Office, (425) 227–1662. Public Agency: Chisholm-Hibbing Airport Authority, Hibbing, Minnesota. Application Number: 07–02–C–00– HIB. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $461,737. Earliest Charge Effective Date: May 1, 2007. Estimated Charge Expiration Date: November 1, 2017. Class of Air Carriers not Required to Collect PFC’s: Air taxi/commercial operators. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at ChisholmHibbing Airport. Brief Description of Projects Approved for Collection and Use: Aircraft rescue and firefighting vehicle. Aircraft rescue and firefighting building addition. Medium approach lighting system/ taxiway lighting. Update airport layout plan. Land acquisition—three parcels. Drainage and safety area improvements. Land acquisition—one parcel. Deer fence and drainage improvements. Truck with sander and snow plow. Terminal security improvements. Pavement rehabilitation. Install security fencing. High speed rotary snow blower. Pavement rehabilitation. Install emergency generator. Land acquisition. Obstruction removal. Loader with broom and ramp plow. Update master plan and airport layout plan. Truck mounted deicer. Easement for clear zone. Skid loader with snow blower. Runway safety area improvements. Decision Date: January 10, 2007. For Further Information Contact: Nancy Nistler, Minneapolis Airports District Office, (612) 713–4353. Public Agency: City of Santa Barbara, California. Application Number: 07–06–C–00– SBA. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $4,944,000. Earliest Charge Effective Date: December 1, 2007. E:\FR\FM\12MRN1.SGM 12MRN1 11082 Federal Register / Vol. 72, No. 47 / Monday, March 12, 2007 / Notices Estimated Charge Expiration Date: October 1, 2009. Class of Air Carriers not Required to Collect PFC’s: Nonscheduled/ondemand air carriers filing FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Santa Barbara Municipal Airport. Brief Description of Projects Approved for Collection and Use: Schematic design and design development for airline terminal improvements. Decision Date: January 12, 2007. For Further Information Contact: Chuck McCormick, Los Angeles Airports District Office, (310) 725–3626. Public Agency: County of Eagle, Eagle, Colorado. Application Number: 07–06–C–00– EGE. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $5,581,125. Earliest Charge Effective Date; September 1, 2018. Estimated Charge Expiration Date: July 1, 2024. Brief Description of Projects Approved for Collection and Use: Construct aircraft deicing facility. Acquire development land. Terminal road improvements. Decision Date: January 17, 2007. For Further Information Contact: Chris Schaffer, Denver Airports District Office, (303) 342–1258. AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment No. city, state 04–03–02–MFE; McAllen, TX .............................................. 03–04–C–01–ILM; Wilmington, NC ..................................... 02–02–C–01–SFO; San Francisco, CA ............................... 06–07–C–01–GJT; Grand Junction, CO ............................. 96–01–C–01–RST; Rochester, MN ..................................... 99–02–C–02–GRB; Green Bay, WI ..................................... 93–01–C–06–RHI; Rhinelander, WI .................................... 95–02–U–02–RHI; Rhinelander, WI .................................... 01/08/07 01/11/07 01/12/07 01/23/07 01/31/07 01/31/07 01/31/07 01/31/07 Original approved net PFC revenue $2,422,037 12,785,647 224,034,821 6,355,297 1,160,582 3,028,496 210,219 (*) Amended approved net PVC revenue Original estimated charge exp. date Amended estimated charge exp. date $6,133,439 11,585,647 224,034,821 8,330,000 1,117,326 2,468,496 204,771 (*) 04/01/07 04/01/18 01/01/06 08/01/19 04/01/99 03/01/02 04/01/96 04/01/96 11/01/11 05/01/17 01/01/06 08/01/23 04/01/99 03/01/02 04/01/96 04/01/96 *Non applicable. Issued in Washington, DC, on March 5, 2007. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. 07–1129 Filed 3–9–07; 8:45 am] BILLING CODE 4910–13–M DEPARTMENT OF TRANSPORTATION Federal agency actions on the highway project will be barred unless the claim is filed on or before September 10, 2007. If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Clarence W. Coleman, P.E., Operations Engineer, Federal Highway Administration, 310 New Bern Avenue, Notice of Final Federal Agency Actions Ste. 410, Raleigh, North Carolina 27601– 1418; Telephone: (919) 856–4350 on Proposed Highway in North extension 133; e-mail: Carolina clarence.coleman@fhwa.dot.gov. FHWA AGENCY: Federal Highway North Carolina Division Office’s normal Administration (FHWA), DOT. business hours are 8 a.m. to 5 p.m. ACTION: Notice of limitation on claims (Eastern Time). You may also contact for judicial review of actions by FHWA Gregory J. Thorpe, PhD, Project and other Federal Agencies. Development and Environmental SUMMARY: This notice announces actions Analysis Branch Manager, North Carolina Department of Transportation taken by the FHWA and other Federal (NCDO), 1 South Wilmington Street agencies that are final within the (Delivery), 1548 Mail Service Center, meaning of 23 U.S.C. 139(I)(1). The Raleigh, North CArolina 27699–1548; actions relate to a proposed highway Telephone (919) 733–3141, project, Greensboro-High Point Road gthorpe@dot.state.nc.us. NCDOT— Improvements, from US 311 (I–74) to Project Development and Environmental Hilltop Road (SR 1424) in Greensboro, Analysis Branch Office’s normal North Carolina, Guilford County, North business hours are 8 a.m. to 5 p.m. Carolina. Those actions grant licenses, (Eastern Time). permits, and approvals for the project. DATES: By this notice, the FHWA is SUPPLEMENTARY INFORMATION: Notice is advising the public of final agency hereby given that the FHWA and other actions subject to 23 U.S.C. 139(I)(1). A Federal agencies have taken final agency claim seeking judicial review of the actions by issuing licenses, permits, and pwalker on PROD1PC71 with NOTICES Federal Highway Administration VerDate Aug<31>2005 18:04 Mar 09, 2007 Jkt 211001 PO 00000 Frm 00112 Fmt 4703 Sfmt 4703 approvals for the following highway project in the State of North Carolina: Greensboro-High Point Road Improvements, Federal Air No. STP– 4121(1), Guilford County, North Carolina. the proposed action will improve 12.7 km (7.9 miles) of the Greensboro-High Point Road from the northbound ramp terminal of the US 311 bypass (future I–74) interchange in High Point to the Hilltop Road intersection in Greensboro, North Carolina. Portions of the selected alternative (Corridor 2) widen existing roadways and portions construct a four to six-land facility on new location. The actions by the Federal agencies, and the laws under which such actions were taken, are described in the Final Environmental Impact Statement (FEIS) for the project, approved on May 15, 2006, in the FHWA Record of Decision (ROD) issued on December 30, 2006, and in other documents in the FHWA administrative record. The FEIS, ROD, and other documents in the FHWA administrative record file are available by contacting the FHWA or NCDOT at the addresses provided above. The FHWA FEIS and ROD can be viewed at the NCDOT—Project Development and Environmental Analysis Branch, 1 South Wilmington Street, Raleigh, North Carolina; NCDOT—Division 7 Construction Engineer Office, 1584 Yanceyville Street, Greensboro, North Carolina and Greensboro MPO Office, E:\FR\FM\12MRN1.SGM 12MRN1

Agencies

[Federal Register Volume 72, Number 47 (Monday, March 12, 2007)]
[Notices]
[Pages 11079-11082]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-1129]



[[Page 11079]]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Passenger Facility Charge (PFC) Approvals and 
Disapprovals

AGENCY: Federal Aviation Administration (FAA), DOT

ACTION: Monthly Notice of PFC Approvals and Disapprovals. In January 
2007, there were five applications approved. This notice also includes 
information on nine applications, one approved in November 2005, one 
approved in March 2006, one approved in April 2006, one approved in 
August 2006, one approved in October 2006, and four approved in 
December 2006, inadvertently left off the November 2005, March 2006, 
April 2006, August 2006, October 2006, and December 2006 notices, 
respectively. Additionally, eight approved amendments to previously 
approved applications are listed.

-----------------------------------------------------------------------

SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
approvals and disapprovals under the provisions of the Aviation Safety 
and Capacity Expansion Act of (Title IX of the Omnibus Budget 
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the 
Federal Aviation Regulations (14 CFR Part 158). This notice is 
published pursuant to paragraph d of Sec.  158.29.

PFC Applications Approved

    Public Agency: South Jersey Transportation Authority, Atlantic 
City, New Jersey.
    Application Number: 05-04-U-00-ACY.
    Application Type: Use PFC revenue.
    PFC Level: $4.50.
    Total PFC Revenue to be Used in this Decision: $31,301.
    Charge Effective Date: February 1, 2006.
    Estimated Charge Expiration Date: November 1, 2006.
    Class of Air Carriers not Required to Collect PFC'S: No change from 
previous decision.
    Brief Description of Project Approved for Use: Environmental design 
mitigation.
    Decision Date: November 3, 2005.

FOR FURTHER INFORMATION CONTACT: Dan Vornea, New York Airports District 
Office, (516) 227-3812, extension 231.

    Public Agency: Louisville Regional Airport Authority, Louisville, 
Kentucky.
    Application Number: 06-04-C-00-SDF.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $1,267,315.
    Earliest Charge Effective Date: September 1, 2013.
    Estimated Charge Expiration Date: October 1, 2013.
    Class of Air Carriers not Required to Collect PFC'S: Air taxi/
commercial operators filing, or required to file, FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Louisville International Airport.
    Brief Description of Projects Approved for Collection and Use:

Emergency operations center.
Southwest perimeter road.
Repair airfield pavement joints.
Airfield cable, LED light fixtures and signage installation.
Airfield pavement repairs.
Purchase Oshkosh high-speed snow plow.
Purchase M-B high-speed snow broom.
Purchase Mack high-speed snow plow.
Purchase Oshkosh high-speed snow broom.
Purchase proximity gear.
PFC implementation and administration.

    Brief Description of Withdrawn Project: Purchase rescue vehicle.
    Date of withdrawal: March 13, 2006.
    Decision Date: March 16, 2006.
    For Further Information Contact: Tommy DuPree, Memphis Airports 
District Office, (901) 322-8185.

    Public Agency: Savannah Airport Commission, Savannah, Georgia.
    Application Number: 06-06-C-00-SAV.
    Application Type: Impose and use a PFC.
    PCF Level: $4.50.
    Total PCF Revenue Approved in this Decision: $3,203,972.
    Earliest Charge Effective Date: May 1, 2013.
    Estimated Charge Expiration Date: November 1, 2013.
    Class of Air Carriers not Required to Collect PFC's Air taxi/
commercial operators filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Savannah/Hilton Head International Airport.
    Brief Description of Projects Approved for Collection and Use:

Security enhancements.
Relocate airfield lighting controls (air traffic control tower).
Runway safety area improvements.
Airfield lighting improvements (phase 1).
Replace aircraft rescue and firefighting bridge.
Terminal expansion (design and construction).
Apron expansion (design and construction).
Airfield lighting improvements--vault (phase II).
Taxiway E milling.
Loading bridges and bag lifts.
Relocate runway 36 localizer.
PFC implementation and administration.
Runways redesignation.

    Brief Description of Project Partially Approved for Collection and 
Use: General aviation connector taxiways.
    Determination: Corporate and private hangars are not eligible 
development at small hub and larger airports. In addition, utilities 
associated with ineligible development are also ineligible. The 
approved amount has been reduced from that requested due to the 
ineligible portions of the project.
    Brief Description of Withdrawn Project: Relocate airfield 
maintenance road.
    Date of withdrawal: April 17, 2006.
    Decision Date: April 21, 2006.
    For Further Information Contact: Daniel Gaetan, Atlanta Airports 
District Office, (404) 305-7146.

    Public Agency: Cities of Dallas and Fort Worth acting by and 
through the Dallas-Forth Worth International Airport Board, Dallas-Fort 
Worth, Texas.
    Applications Number: 06-09-C-00-DFW.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $36,868,000.
    Earliest Charge Effective Date: December 1, 2032.
    Estimated Charge Expiration Date: September 1, 2034.
    Class of Air Carriers not Required to Collect PFC's: All Part 135 
air taxi/commercial operators filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Dallas-Fort Worth International Airport.
    Brief Description of Projects Approved for Collection and Use:

Construct southeast perimeter taxiway system.

    Decision Date: August 22, 2006.
    For Further Information Contact: Rick Compton, Texas Airports 
Development Office, (817) 222-5608.


[[Page 11080]]


    Public Agency: City of Redmond, Oregon.
    Application Number: 06-05-C-00-RDM.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $645,420.
    Earliest Charge Effective Date: March 1, 2007.
    Estimated Charge Expiration Date: May 1, 2009.
    Class of Air Carriers not Required to Collect PFC's: Nonscheduled/
on-demand air carriers filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Roberts Field.
    Brief Description of Projects Approved for Collection and Use:

Construct snow removal equipment facility, phase 2.
Terminal emergency power supply.
Pavement condition index study.
Airfield electrical improvements.
Airport master plan update.
General aviation ramp rehabilitation.
Terminal expansion phase 1--design.
Terminal Drive relocation including storm water drainage outfalls.
Terminal expansion phase 2--design.
Service road construction including taxiway A transition.

    Decision Date: October 19, 2006.
    For Further Information Contact: Suzanne Lee-Pang, Seattle Airports 
District Office, (425) 227-2654.

    Public Agency: Rhode Island Airport Corporation, Warwick, Rhode 
Island.
    Application Number: 06-05-C-00-PVD.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $31,826,316.
    Earliest Charge Effective Date: January 1, 2011.
    Estimated Charge Expiration Date: April 1, 2013.
    Class of Air Carriers not Required to collect PFC's: Air taxi/
commercial operators.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at T.F. Green State Airport.
    Brief Description of Projects Approved for Collection and Use at a 
$4.50 PFC Level:

In-line explosive detection system.
Security screening checkpoint expansion.

    Brief Description of Projects Approved for Collection and Use at a 
$3.00 PFC Level:

Aircraft rescue and firefighting vehicle.
Taxiway T rehabilitation.
PFC implementation/administration.

    Decision Date: December 14, 2006.
    For Further Information Contact: Priscilla Scott, New England 
Region Airports Division, (781) 238-7614.

    Public Agency: Salt Lake City Department of Airports, Salt Lake 
City, Utah.
    Application Number: 06-10-C-00-SLC.
    Application Type: Impose and use a PFC.
    Total PFC Revenue Approved in this Decision: $75,362,174.
    Earliest Charge Effective Date: December 1, 2007.
    Estimated Charge Expiration Date: September 1, 2009.
    Class of Air Carriers not Required to Collect PFC'S: Air taxi/
commercial operators filing or required to file FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Salt Lake City International Airport (SLC).
    Brief Description of Projects Approved for Collection at SLC and 
Use at SLC at a $4.50 PFC Level:

Airport passenger loading bridge acquisitions.
Passenger loading bridge refurbishment program.
TU-2 bag claim and circulation.
TU-1 bag claim and circulation.
Sterile corridor expansion.
TU-1 security screening.
Modifications for explosive detection system.
Runway 17/35 overlay.
Runway 14/32 overlay.
Taxiway R overlay.
Airfield lighting control system.
Concourse apron rehabilitation.
Taxiway K resurface.
Taxiway centerline light trench pavement reconstruction.
Airport property security fence (phase I).
Airport property security fence (phase II).
Land acquisition for airport compatibility and approach protection.

    Brief Description of Projects Approved for Collection at SLC and 
Use at SLC at a $3.00 PFC Level:

Maintenance equipment.
Concourse E elevator replacement.
Protective bollards--terminal fronts.
Apron deicing modifications.
Midfield pump station and outfall drain line.
Prehistoric site cultural resource investigation and data recovery.
Airfield/airspace system capacity analysis.
Planning analysis for airport development.

    Brief Description of Projects Approved for Collection at SLC and 
Use at Tooele Valley Airport at a $3.00 PFC Level:

Land acquisition for airport compatibility and approach protection.
Taxilane.

    Brief Description of Projects Approved for Collection at SLC and 
Use at Salt Lake City Municipal Airport No. 2 at a $3.00 PFC Level:

Apron rehabilitation.
Secondary fuel containment.
Tie-down apron reconstruction.
Master plan update.

    Brief Description of Disapproved Project:

Water main loop extension--2200 North.
    Determination:The public agency's application did not provide 
sufficient information to determine the eligibility of the project. The 
application also did not demonstrate that the project would make a 
significant contribution to reducing current or anticipated congestion 
or meet the PFC objective of preserving or enhancing capacity at SLC.
    Decision Date: December 20, 2006.

FOR FURTHER INFORMATION CONTACT: Chris Schaffer, Denver Airports 
District Office, (303) 342-1258.

    Public Agency: City of Boise, Idaho.
    Application Number: 06-04-C-00-BOI.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $5,377,736.
    Earliest Charge Effective Date: August 1, 2018.
    Estimated Charge Expiration Date: August 1, 2019.
    Class of Air Carriers not Required to Collect PFC's: Part 135 air 
taxi/commercial operators who conduct operations in air commerce 
carrying persons for compensation or hire, except air taxi/commercial 
operators, public or private charters, with seating of 10 or more.
    Determination: Approved. Based on information submitted in the 
public

[[Page 11081]]

agency's application, The FAA has determined that the approved lass 
accounts for less than 1 percent of the total annual enplanements at 
Boise Air Terminal.
    Brief Description of Projects Approved for Collection and Use:

Taxiway J rehabilitation.
Airfield lighting and electrical building.
Baggage system modifications.
Concourse B improvements.
Concourse B apron rehabilitation and expansion.

    Decision Date: December 29, 2006.

FOR FURTHER INFORMATION CONTACT: Suzanne Lee-Pang, Seattle Airports 
District Office, (425) 227-2654.

    Public Agency: Ports of Douglas County and Chelan County, East 
Wenatchee, Washington.
    Application Number: 07-07-C-00-EAT.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $176,755.
    Earliest Charge Effective Date: February 1, 2007.
    Estimated Charge Expiration Date: May 1, 2008.
    Class of Air Carriers not Required to Collect PFC's: None.
    Brief Description of Projects Approved for Collection and Use:

Acquire Davis property.
Phase 1 instrument landing system/environmental assessment.
Phase 2 instrument landing system/runway 12/30 shift.
Acquire Houtz/Yonaka property, plus easements.
Repave airport fire station access road.
Purchase 3 airport fire department airpacs.

    Decision Date: December 29, 2006.

FOR FURTHER INFORMATION CONTACT: Suzanne Lee-Pang, Seattle Airports 
District Office, (425) 227-2654.

    Public Agency: South Jersey Transportation Authority, Atlantic 
City, New Jersey.
    Application Number: 07-05-C-00-ACY.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $5,418,189.
    Earliest Charge Effective Date: April 1, 2007.
    Estimated Charge Expiration Date: June 1, 2009.
    Class of Air Carriers not Required to Collect PFC's: Nonscheduled/
on-demand air carriers with less than 1,200 annual enplaned passengers 
filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted to the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Atlantic City International Airport.
    Brief Description of Projects Approved for Collection and Use:
Acquire snow removal equipment.
Acquire aircraft rescue and firefighting vehicle.
Security project--phase I through II.
Environmental mitigation--phase III.
Install weather reporting equipment.
Acquire interactive training system.
Install of common use terminal equipment.

    Decision Date: January 3, 2007.

FOR FURTHER INFORMATION CONTACT: Dan Vornea, New York Airports District 
Office, (516) 22-3812, extension 231.

    Public Agency: City and County of Twin Falls, Idaho.
    Application Number: 07-03-C-00-TWF.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $560,416.
    Earliest Charge Effective Date: June 1, 2007.
    Estimated Charge Expiration Date: October 1, 2011.
    Class of Air Carriers not Required to Collect PFC's: Air taxi/
commercial operators utilizing aircraft having a seating capacity of 
less than 20 passengers.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Joslin Field--Magic Valley Regional Airport.
    Brief Description of Projects Approved for Collection and Use:

Runway 7/25 pavement rehabilitation.
Taxilane reconstruction.
Update airport master plan study.
Taxiway and taxilane rehabilitation.
Acquire snow plow and snow removal equipment.
Construct snow removal equipment storage building.
Security enhancement project.
Taxilane reconstruction.
Construction of taxilanes 10, 11, and 12.
Taxiway Delta extension.
Acquire sweeper, snow plow, and snow blower.
Apron rehabilitation.
Access road rehabilitation.
Runway 12 safety area.

    Decision Date: January 8, 2007.
    For Further Information Contact: Trang Tran, Seattle Airports 
District Office, (425) 227-1662.

    Public Agency: Chisholm-Hibbing Airport Authority, Hibbing, 
Minnesota.
    Application Number: 07-02-C-00-HIB.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $461,737.
    Earliest Charge Effective Date: May 1, 2007.
    Estimated Charge Expiration Date: November 1, 2017.
    Class of Air Carriers not Required to Collect PFC's: Air taxi/
commercial operators.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Chisholm-Hibbing Airport.
    Brief Description of Projects Approved for Collection and Use:

Aircraft rescue and firefighting vehicle.
Aircraft rescue and firefighting building addition.
Medium approach lighting system/taxiway lighting.
Update airport layout plan.
Land acquisition--three parcels.
Drainage and safety area improvements.
Land acquisition--one parcel.
Deer fence and drainage improvements.
Truck with sander and snow plow.
Terminal security improvements.
Pavement rehabilitation.
Install security fencing.
High speed rotary snow blower.
Pavement rehabilitation.
Install emergency generator.
Land acquisition.
Obstruction removal.
Loader with broom and ramp plow.
Update master plan and airport layout plan.
Truck mounted deicer.
Easement for clear zone.
Skid loader with snow blower.
Runway safety area improvements.

    Decision Date: January 10, 2007.
    For Further Information Contact: Nancy Nistler, Minneapolis 
Airports District Office, (612) 713-4353.

    Public Agency: City of Santa Barbara, California.
    Application Number: 07-06-C-00-SBA.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $4,944,000.
    Earliest Charge Effective Date: December 1, 2007.

[[Page 11082]]

    Estimated Charge Expiration Date: October 1, 2009.
    Class of Air Carriers not Required to Collect PFC's: Nonscheduled/
on-demand air carriers filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Santa Barbara Municipal Airport.
    Brief Description of Projects Approved for Collection and Use: 
Schematic design and design development for airline terminal 
improvements.

    Decision Date: January 12, 2007.
    For Further Information Contact: Chuck McCormick, Los Angeles 
Airports District Office, (310) 725-3626.

    Public Agency: County of Eagle, Eagle, Colorado.
    Application Number: 07-06-C-00-EGE.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $5,581,125.
    Earliest Charge Effective Date; September 1, 2018.
    Estimated Charge Expiration Date: July 1, 2024.
    Brief Description of Projects Approved for Collection and Use:

Construct aircraft deicing facility.
Acquire development land.
Terminal road improvements.

    Decision Date: January 17, 2007.
    For Further Information Contact: Chris Schaffer, Denver Airports 
District Office, (303) 342-1258.

                                           Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
                                                                                     Original         Amended
                                     Amendment       Original         Amended        estimated       estimated
    Amendment No. city, state      approved date   approved net    approved net     charge exp.     charge exp.
                                                    PFC revenue     PVC revenue        date            date
----------------------------------------------------------------------------------------------------------------
04-03-02-MFE; McAllen, TX.......        01/08/07      $2,422,037      $6,133,439        04/01/07        11/01/11
03-04-C-01-ILM; Wilmington, NC..        01/11/07      12,785,647      11,585,647        04/01/18        05/01/17
02-02-C-01-SFO; San Francisco,          01/12/07     224,034,821     224,034,821        01/01/06        01/01/06
 CA.............................
06-07-C-01-GJT; Grand Junction,         01/23/07       6,355,297       8,330,000        08/01/19        08/01/23
 CO.............................
96-01-C-01-RST; Rochester, MN...        01/31/07       1,160,582       1,117,326        04/01/99        04/01/99
99-02-C-02-GRB; Green Bay, WI...        01/31/07       3,028,496       2,468,496        03/01/02        03/01/02
93-01-C-06-RHI; Rhinelander, WI.        01/31/07         210,219         204,771        04/01/96        04/01/96
95-02-U-02-RHI; Rhinelander, WI.        01/31/07             (*)             (*)        04/01/96        04/01/96
----------------------------------------------------------------------------------------------------------------
*Non applicable.


    Issued in Washington, DC, on March 5, 2007.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 07-1129 Filed 3-9-07; 8:45 am]
BILLING CODE 4910-13-M
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.