Environmental Impacts Statements; Notice of Availability, 10749-10750 [E7-4247]
Download as PDF
Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices
Highway Component, from I–130 to
Louis Armstrong International
Airport, to Central Business District
(CBD), Jefferson, Orleans and St.
Charles Parishes, LA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070013, ERP No. F–DOE–
E01016–FL, Orlando Gasification
Project (DOE/EIS–0383), To Provide
Cost-Shared Funding for
Construction, Design, and Operation a
New Plant, Orlando, FL.
Summary: EPA continues to have
environmental concerns about impacts
to air quality and wetlands, and
requested that additional mitigation
measures be implemented.
EIS No. 20070020, ERP No. F–AFS–
L65474–AK, Tuxekan Island Timber
Sale(s) Project, Timber Harvesting,
Implementation, Coast Guard Bridge
Permit, U.S. Army COE Section 10
and 404 Permits, Tongass National
Forest, Thorne Bay Ranger District,
Thorne Bay, AK.
Summary: EPA’s previous
environmental concerns about impacts
to water quality, fisheries, wetlands, and
wildlife habitat have been addressed;
therefore, EPA does not object to the
proposed action.
EIS No. 20070034, ERP No. F–SFW–
J65447–WY, Bison and Elk
Management Plan, Implementation,
National Elk Refuge/Grand Teton
National Park/John D. Rockefeller, Jr.
Memorial Parkway, Teton County,
WY.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070054, ERP No. F–NPS–
J61110–UT, Utah Museum of Natural
History, Construction and Operation,
New Museum Facility at University of
Utah, Salt Lake City, UT.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–4246 Filed 3–8–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
jlentini on PROD1PC65 with NOTICES
[ER–FRL–6684–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
VerDate Aug<31>2005
21:24 Mar 08, 2007
Jkt 211001
Weekly receipt of Environmental Impact
Statements
Filed 02/26/2007 through 03/02/2007
pursuant to 40 CFR 1506.9.
EIS No. 20070072, Second Draft
Supplement, FHW, NC, NC 12
Replacement of Herbert C. Bonner
Bridge (Bridge No. 11 ) Revisions and
Additions, over Oregon Inlet
Construction, Funding, U.S. Coast
Guard Permit, Special-Use-Permit,
Right-of-Way Permit, U.S. Army COE
Section 10 and 404 Permit, Dare
County, NC , Comment Period Ends:
04/23/2007, Contact: John F. Sullivan
919–856–4346.
EIS No. 20070073, Draft EIS, IBR, CO,
Colorado River Interim Guidelines for
Lower Basin Shortages and and
Coordinated Operations for Lake
Powell and Lake Mead,
Implementation, Colorado River, CO,
Comment Period Ends: 04/30/2007,
Contact: Nan Yoder 702–293–8500.
EIS No. 20070074, Final EIS, SFW, CA,
East Contra Costa County Habitat
Conservation Plan and Natural
Community Conservation Plan,
Implementation, Incidental Take
Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa
County, CA, Wait Period Ends: 04/09/
2007, Contact: Lori Rinek 916–444–
6600.
EIS No. 20070075, Draft Supplement,
APH, 00, Importation of Solid Wood
Packing Material, To Reevaluate and
Refine Estimates of Methyl Bromide
Usage in the Treatment,
Implementation, United States,
Comment Period Ends: 04/23/2007,
Contact: David A. Bergston 301–734–
6103.
EIS No. 20070076, Final EIS, AFS, WI,
Boulder Project, Timber Harvesting,
Vegetation and Road Management,
U.S. Army COE Section 404 Permit,
Chequamegon-Nicolet National
Forest, Lakewood-Laona Ranger
District, Oconto and Langlade
Counties, WI, Wait Period Ends: 04/
09/2007, Contact: Paul Sweeney 715–
276–6333.
EIS No. 20070077, Draft EIS, AFS, SD,
Mitchell Project Area, To Implement
Multiple Resource Management
Actions, Mystic Ranger District, Black
Hills National Forest, Pennington
County, SD, Comment Period Ends:
04/23/2007, Contact: Roberts. J.
Thompson 605–343–1567.
EIS No. 20070078, Draft EIS, NPS, NY,
Sagamore Hill National Historic Site,
General Management Plan,
Implementation, Oyster Bay, Nassau
County, NY, Comment Period Ends:
05/08/2007, Contact: Greg A. Marshall
516–922–4452.
PO 00000
Frm 00120
Fmt 4703
Sfmt 4703
10749
EIS No. 20070079, Draft Supplement,
AFS, WA,. School Fire Salvage
Recovery Project, To Clarify
Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger
District, Umatilla National Forest,
Columbia and Garfield Counties, WA,
Comment Period Ends: 04/23/2007,
Contact: Dean R. Millett 509–843–
4644.
EIS No. 20070080, Draft EIS, NIG, CA,
Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust,
Implementation, Federated Indians of
Graton Rancheria (Tribe), Sonoma
County, CA, Comment Period Ends:
04/23/2007, Contact: Brad Meharry
202–632–7003.
EIS No. 20070081, Final EIS, JUS, TX,
Laredo Detention Facility, Proposed
Contractor-Owned/ContractorOperated Detention Facility,
Implementation, Webb County, TX,
Wait Period Ends: 04/09/2007,
Contact: Scott P. Stermer 202–353–
4601.
EIS No. 20070082, Final EIS, GSA, VA,
Federal Bureau of Investigation (FBI)
Central Records Complex, Alternative
4—Sempeles Site, Winchester,
Frederick County, VA, Wait Period
Ends: 04/09/2007, Contact: Katrina
Scarpato 215–446–4651.
EIS No. 20070083, Draft EIS, SFW/COE,
CA, PROGRAMMATIC—South Bay
Salt Pond Restoration Project,
Restored Tidal Marsh, Managed
Ponds, Flood Control Measures and
Public Access Features, Don Edward
San Francisco Bay National Wildlife
Refuge, Alameda, Santa Clara and San
Mateo Counties, CA, Comment Period
Ends: 04/23/2007, Contact: Clyde
Morris 510–792–0222 (SFW); and
Yvonne LeTellier, 415–503–6744
(COE).
EIS No. 20070084, Draft EIS, BPA, WA,
Port Angeles—Juan de Fuca
Transmission Project, Construct a
550-Megawatt Direct Current Cable
from Victoria, British Columbia,
across the Strait of Juan de Fuca to
Port Angeles, Presidential Permit,
Clallam County, WA, Comment
Period Ends: 04/24/2007, Contact:
Stacy Mason 503–230–5455.
EIS No. 20070085, Draft EIS, USN, GU,
Kilo Wharf Extension (MILCON P–
52), To Provide Adequate Berthing
Facilities for Multi-Purpose Dry
Cargo/Ammunition Ship (the T–AKE),
Apra Harbor Naval Complex, Mariana
Island, GU, Comment Period Ends:
04/23/2007, Contact: Nora Macariola
808–472–1402.
EIS No. 20070086, Final EIS, USA, VA,
Fort Lee, Virginia and Fort A. P. Hill,
Virginia Project, Implementation of
Base Closure and Realignment (BRAC)
E:\FR\FM\09MRN1.SGM
09MRN1
10750
Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices
Recommendations and Other Army
Actions, Prince George County,
Petersburg, Virginia Hopewell,
Virginia; Caroline County, Essex
County, VA, Wait Period Ends: 04/09/
2007, Contact: Karen Wilson 703–
602–2861.
EIS No. 20070087, Final EIS, FTA, FL,
Miami North Corridor Project, Build
Alternative is Selected, Transit
Improvement between NW 62 Street
at Dr. Martin Luther King Jr. Station
and NW 215th Street at the Dade/
Broward Counties Line, Funding,
Dade County, FL, Wait Period Ends:
04/09/2007, Contact: James Garland
404–562–3512.
Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–4247 Filed 3–8–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2007–0118; FRL–8117–5]
Experimental Use Permit; Receipt of
Application
Environmental Protection
Agency (EPA).
ACTION: Notice.
jlentini on PROD1PC65 with NOTICES
AGENCY:
SUMMARY: This notice announces receipt
of an application 75624–EUP–E from
The Acta Group, on behalf of Circle One
Global, Inc., requesting an experimental
use permit (EUP) for Aspergillus flavus
NRRL 21882. The Agency has
determined that the application may be
of regional and national significance.
Therefore, in accordance with 40 CFR
172.11(a), the Agency is soliciting
comments on this application.
DATES: Comments must be received on
or before April 9, 2007.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2007–0118 by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S–4400, One
Potomac Yard (South Building), 2777 S.
Crystal Drive, Arlington, VA. Deliveries
are only accepted during the Docket’s
normal hours of operation (8:30 a.m. to
VerDate Aug<31>2005
21:24 Mar 08, 2007
Jkt 211001
4 p.m., Monday through Friday,
excluding legal holidays). Special
arrangements should be made for
deliveries of boxed information. The
Docket telephone number is (703) 305–
5805.
Instructions: Direct your comments to
docket ID number EPA–HQ–OPP–2007–
0118. EPA’s policy is that all comments
received will be included in the docket
without change and may be made
available on-line at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through regulations.gov or email. The Federal regulations.gov
website is an ‘‘anonymous access’’
system, which means EPA will not
know your identity or contact
information unless you provide it in the
body of your comment. If you send an
e-mail comment directly to EPA without
going through regulations.gov, your email address will be automatically
captured and included as part of the
comment that is placed in the docket
and made available on the Internet. If
you submit an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
disk or CD-ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
Electronic files should avoid the use of
special characters, any form of
encryption, and be free of any defects or
viruses.
Docket: All documents in the docket
are listed in the docket index available
in regulations.gov. To access the
electronic docket, go to https://
www.regulations.gov, select ‘‘Advanced
Search,’’ then ‘‘Docket Search.’’ Insert
the docket ID number where indicated
and select the ‘‘Submit’’ button. Follow
the instructions on the regulations.gov
web site to view the docket index or
access available documents. Although
listed in the index, some information is
not publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available either in the
electronic docket at https://
www.regulations.gov, or, if only
available in hard copy, at the OPP
PO 00000
Frm 00121
Fmt 4703
Sfmt 4703
Regulatory Public Docket in Rm. S–
4400, One Potomac Yard (South
Building), 2777 S. Crystal Drive,
Arlington, VA. The hours of operation
of this Docket Facility are from 8:30 a.m.
to 4 p.m., Monday through Friday,
excluding legal holidays. The Docket
telephone number is (703) 305–5805.
FOR FURTHER INFORMATION CONTACT:
Shanaz Bacchus, Biopesticides and
Pollution Prevention Division (7511P),
Office of Pesticide Programs,
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001; telephone number:
(703) 308–8097; e-mail address:
bacchus.shanaz@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Does this Action Apply to Me?
This action is directed to the public
in general. This action may, however, be
of interest to to those persons who are
interested in agricultural biotechnology
or may be required to conduct testing of
pesticidal substances under the Federal
Food, Drug, and Cosmetic Act (FFDCA)
or the Federal Insecticide, Fungicide,
and Rodenticide Act (FIFRA). Since
other entities may also be interested, the
Agency has not attempted to describe all
the specific entities that may be affected
by this action. If you have any questions
regarding the applicability of this action
to a particular entity, consult the person
listed under FOR FURTHER INFORMATION
CONTACT.
B. What Should I Consider as I Prepare
My Comments for EPA?
1. Submitting CBI. Do not submit this
information to EPA through
regulations.gov or e-mail. Clearly mark
the part or all of the information that
you claim to be CBI. For CBI
information in a disk or CD ROM that
you mail to EPA, mark the outside of the
disk or CD ROM as CBI and then
identify electronically within the disk or
CD ROM the specific information that is
claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2.
2. Tips for preparing your comments.
When submitting comments, remember
to:
i. Identify the document by docket ID
number and other identifying
information (subject heading, Federal
Register date and page number).
E:\FR\FM\09MRN1.SGM
09MRN1
Agencies
[Federal Register Volume 72, Number 46 (Friday, March 9, 2007)]
[Notices]
[Pages 10749-10750]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4247]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 02/26/2007 through 03/02/2007 pursuant to 40 CFR 1506.9.
EIS No. 20070072, Second Draft Supplement, FHW, NC, NC 12 Replacement
of Herbert C. Bonner Bridge (Bridge No. 11 ) Revisions and Additions,
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and
404 Permit, Dare County, NC , Comment Period Ends: 04/23/2007, Contact:
John F. Sullivan 919-856-4346.
EIS No. 20070073, Draft EIS, IBR, CO, Colorado River Interim Guidelines
for Lower Basin Shortages and and Coordinated Operations for Lake
Powell and Lake Mead, Implementation, Colorado River, CO, Comment
Period Ends: 04/30/2007, Contact: Nan Yoder 702-293-8500.
EIS No. 20070074, Final EIS, SFW, CA, East Contra Costa County Habitat
Conservation Plan and Natural Community Conservation Plan,
Implementation, Incidental Take Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa County, CA, Wait Period Ends: 04/09/
2007, Contact: Lori Rinek 916-444-6600.
EIS No. 20070075, Draft Supplement, APH, 00, Importation of Solid Wood
Packing Material, To Reevaluate and Refine Estimates of Methyl Bromide
Usage in the Treatment, Implementation, United States, Comment Period
Ends: 04/23/2007, Contact: David A. Bergston 301-734-6103.
EIS No. 20070076, Final EIS, AFS, WI, Boulder Project, Timber
Harvesting, Vegetation and Road Management, U.S. Army COE Section 404
Permit, Chequamegon-Nicolet National Forest, Lakewood-Laona Ranger
District, Oconto and Langlade Counties, WI, Wait Period Ends: 04/09/
2007, Contact: Paul Sweeney 715-276-6333.
EIS No. 20070077, Draft EIS, AFS, SD, Mitchell Project Area, To
Implement Multiple Resource Management Actions, Mystic Ranger District,
Black Hills National Forest, Pennington County, SD, Comment Period
Ends: 04/23/2007, Contact: Roberts. J. Thompson 605-343-1567.
EIS No. 20070078, Draft EIS, NPS, NY, Sagamore Hill National Historic
Site, General Management Plan, Implementation, Oyster Bay, Nassau
County, NY, Comment Period Ends: 05/08/2007, Contact: Greg A. Marshall
516-922-4452.
EIS No. 20070079, Draft Supplement, AFS, WA,. School Fire Salvage
Recovery Project, To Clarify Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger District, Umatilla National Forest,
Columbia and Garfield Counties, WA, Comment Period Ends: 04/23/2007,
Contact: Dean R. Millett 509-843-4644.
EIS No. 20070080, Draft EIS, NIG, CA, Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust, Implementation, Federated Indians
of Graton Rancheria (Tribe), Sonoma County, CA, Comment Period Ends:
04/23/2007, Contact: Brad Meharry 202-632-7003.
EIS No. 20070081, Final EIS, JUS, TX, Laredo Detention Facility,
Proposed Contractor-Owned/Contractor-Operated Detention Facility,
Implementation, Webb County, TX, Wait Period Ends: 04/09/2007, Contact:
Scott P. Stermer 202-353-4601.
EIS No. 20070082, Final EIS, GSA, VA, Federal Bureau of Investigation
(FBI) Central Records Complex, Alternative 4--Sempeles Site,
Winchester, Frederick County, VA, Wait Period Ends: 04/09/2007,
Contact: Katrina Scarpato 215-446-4651.
EIS No. 20070083, Draft EIS, SFW/COE, CA, PROGRAMMATIC--South Bay Salt
Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood
Control Measures and Public Access Features, Don Edward San Francisco
Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo
Counties, CA, Comment Period Ends: 04/23/2007, Contact: Clyde Morris
510-792-0222 (SFW); and Yvonne LeTellier, 415-503-6744 (COE).
EIS No. 20070084, Draft EIS, BPA, WA, Port Angeles--Juan de Fuca
Transmission Project, Construct a 550-Megawatt Direct Current Cable
from Victoria, British Columbia, across the Strait of Juan de Fuca to
Port Angeles, Presidential Permit, Clallam County, WA, Comment Period
Ends: 04/24/2007, Contact: Stacy Mason 503-230-5455.
EIS No. 20070085, Draft EIS, USN, GU, Kilo Wharf Extension (MILCON P-
52), To Provide Adequate Berthing Facilities for Multi-Purpose Dry
Cargo/Ammunition Ship (the T-AKE), Apra Harbor Naval Complex, Mariana
Island, GU, Comment Period Ends: 04/23/2007, Contact: Nora Macariola
808-472-1402.
EIS No. 20070086, Final EIS, USA, VA, Fort Lee, Virginia and Fort A. P.
Hill, Virginia Project, Implementation of Base Closure and Realignment
(BRAC)
[[Page 10750]]
Recommendations and Other Army Actions, Prince George County,
Petersburg, Virginia Hopewell, Virginia; Caroline County, Essex County,
VA, Wait Period Ends: 04/09/2007, Contact: Karen Wilson 703-602-2861.
EIS No. 20070087, Final EIS, FTA, FL, Miami North Corridor Project,
Build Alternative is Selected, Transit Improvement between NW 62 Street
at Dr. Martin Luther King Jr. Station and NW 215th Street at the Dade/
Broward Counties Line, Funding, Dade County, FL, Wait Period Ends: 04/
09/2007, Contact: James Garland 404-562-3512.
Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-4247 Filed 3-8-07; 8:45 am]
BILLING CODE 6560-50-P