Environmental Impacts Statements; Notice of Availability, 10749-10750 [E7-4247]

Download as PDF Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices Highway Component, from I–130 to Louis Armstrong International Airport, to Central Business District (CBD), Jefferson, Orleans and St. Charles Parishes, LA. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070013, ERP No. F–DOE– E01016–FL, Orlando Gasification Project (DOE/EIS–0383), To Provide Cost-Shared Funding for Construction, Design, and Operation a New Plant, Orlando, FL. Summary: EPA continues to have environmental concerns about impacts to air quality and wetlands, and requested that additional mitigation measures be implemented. EIS No. 20070020, ERP No. F–AFS– L65474–AK, Tuxekan Island Timber Sale(s) Project, Timber Harvesting, Implementation, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Tongass National Forest, Thorne Bay Ranger District, Thorne Bay, AK. Summary: EPA’s previous environmental concerns about impacts to water quality, fisheries, wetlands, and wildlife habitat have been addressed; therefore, EPA does not object to the proposed action. EIS No. 20070034, ERP No. F–SFW– J65447–WY, Bison and Elk Management Plan, Implementation, National Elk Refuge/Grand Teton National Park/John D. Rockefeller, Jr. Memorial Parkway, Teton County, WY. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070054, ERP No. F–NPS– J61110–UT, Utah Museum of Natural History, Construction and Operation, New Museum Facility at University of Utah, Salt Lake City, UT. Summary: No formal comment letter was sent to the preparing agency. Dated: March 6, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–4246 Filed 3–8–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY jlentini on PROD1PC65 with NOTICES [ER–FRL–6684–7] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 Weekly receipt of Environmental Impact Statements Filed 02/26/2007 through 03/02/2007 pursuant to 40 CFR 1506.9. EIS No. 20070072, Second Draft Supplement, FHW, NC, NC 12 Replacement of Herbert C. Bonner Bridge (Bridge No. 11 ) Revisions and Additions, over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit, Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and 404 Permit, Dare County, NC , Comment Period Ends: 04/23/2007, Contact: John F. Sullivan 919–856–4346. EIS No. 20070073, Draft EIS, IBR, CO, Colorado River Interim Guidelines for Lower Basin Shortages and and Coordinated Operations for Lake Powell and Lake Mead, Implementation, Colorado River, CO, Comment Period Ends: 04/30/2007, Contact: Nan Yoder 702–293–8500. EIS No. 20070074, Final EIS, SFW, CA, East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan, Implementation, Incidental Take Permit, Cities of Brentwood, Clayton, Oakley and Pittsburg, Contra Costa County, CA, Wait Period Ends: 04/09/ 2007, Contact: Lori Rinek 916–444– 6600. EIS No. 20070075, Draft Supplement, APH, 00, Importation of Solid Wood Packing Material, To Reevaluate and Refine Estimates of Methyl Bromide Usage in the Treatment, Implementation, United States, Comment Period Ends: 04/23/2007, Contact: David A. Bergston 301–734– 6103. EIS No. 20070076, Final EIS, AFS, WI, Boulder Project, Timber Harvesting, Vegetation and Road Management, U.S. Army COE Section 404 Permit, Chequamegon-Nicolet National Forest, Lakewood-Laona Ranger District, Oconto and Langlade Counties, WI, Wait Period Ends: 04/ 09/2007, Contact: Paul Sweeney 715– 276–6333. EIS No. 20070077, Draft EIS, AFS, SD, Mitchell Project Area, To Implement Multiple Resource Management Actions, Mystic Ranger District, Black Hills National Forest, Pennington County, SD, Comment Period Ends: 04/23/2007, Contact: Roberts. J. Thompson 605–343–1567. EIS No. 20070078, Draft EIS, NPS, NY, Sagamore Hill National Historic Site, General Management Plan, Implementation, Oyster Bay, Nassau County, NY, Comment Period Ends: 05/08/2007, Contact: Greg A. Marshall 516–922–4452. PO 00000 Frm 00120 Fmt 4703 Sfmt 4703 10749 EIS No. 20070079, Draft Supplement, AFS, WA,. School Fire Salvage Recovery Project, To Clarify Definitions of Live and Dead Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA, Comment Period Ends: 04/23/2007, Contact: Dean R. Millett 509–843– 4644. EIS No. 20070080, Draft EIS, NIG, CA, Graton Rancheria Casino and Hotel Project, Transfer of Land into Trust, Implementation, Federated Indians of Graton Rancheria (Tribe), Sonoma County, CA, Comment Period Ends: 04/23/2007, Contact: Brad Meharry 202–632–7003. EIS No. 20070081, Final EIS, JUS, TX, Laredo Detention Facility, Proposed Contractor-Owned/ContractorOperated Detention Facility, Implementation, Webb County, TX, Wait Period Ends: 04/09/2007, Contact: Scott P. Stermer 202–353– 4601. EIS No. 20070082, Final EIS, GSA, VA, Federal Bureau of Investigation (FBI) Central Records Complex, Alternative 4—Sempeles Site, Winchester, Frederick County, VA, Wait Period Ends: 04/09/2007, Contact: Katrina Scarpato 215–446–4651. EIS No. 20070083, Draft EIS, SFW/COE, CA, PROGRAMMATIC—South Bay Salt Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood Control Measures and Public Access Features, Don Edward San Francisco Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo Counties, CA, Comment Period Ends: 04/23/2007, Contact: Clyde Morris 510–792–0222 (SFW); and Yvonne LeTellier, 415–503–6744 (COE). EIS No. 20070084, Draft EIS, BPA, WA, Port Angeles—Juan de Fuca Transmission Project, Construct a 550-Megawatt Direct Current Cable from Victoria, British Columbia, across the Strait of Juan de Fuca to Port Angeles, Presidential Permit, Clallam County, WA, Comment Period Ends: 04/24/2007, Contact: Stacy Mason 503–230–5455. EIS No. 20070085, Draft EIS, USN, GU, Kilo Wharf Extension (MILCON P– 52), To Provide Adequate Berthing Facilities for Multi-Purpose Dry Cargo/Ammunition Ship (the T–AKE), Apra Harbor Naval Complex, Mariana Island, GU, Comment Period Ends: 04/23/2007, Contact: Nora Macariola 808–472–1402. EIS No. 20070086, Final EIS, USA, VA, Fort Lee, Virginia and Fort A. P. Hill, Virginia Project, Implementation of Base Closure and Realignment (BRAC) E:\FR\FM\09MRN1.SGM 09MRN1 10750 Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices Recommendations and Other Army Actions, Prince George County, Petersburg, Virginia Hopewell, Virginia; Caroline County, Essex County, VA, Wait Period Ends: 04/09/ 2007, Contact: Karen Wilson 703– 602–2861. EIS No. 20070087, Final EIS, FTA, FL, Miami North Corridor Project, Build Alternative is Selected, Transit Improvement between NW 62 Street at Dr. Martin Luther King Jr. Station and NW 215th Street at the Dade/ Broward Counties Line, Funding, Dade County, FL, Wait Period Ends: 04/09/2007, Contact: James Garland 404–562–3512. Dated: March 6, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–4247 Filed 3–8–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2007–0118; FRL–8117–5] Experimental Use Permit; Receipt of Application Environmental Protection Agency (EPA). ACTION: Notice. jlentini on PROD1PC65 with NOTICES AGENCY: SUMMARY: This notice announces receipt of an application 75624–EUP–E from The Acta Group, on behalf of Circle One Global, Inc., requesting an experimental use permit (EUP) for Aspergillus flavus NRRL 21882. The Agency has determined that the application may be of regional and national significance. Therefore, in accordance with 40 CFR 172.11(a), the Agency is soliciting comments on this application. DATES: Comments must be received on or before April 9, 2007. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2007–0118 by one of the following methods: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the on-line instructions for submitting comments. • Mail: Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. • Delivery: OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S–4400, One Potomac Yard (South Building), 2777 S. Crystal Drive, Arlington, VA. Deliveries are only accepted during the Docket’s normal hours of operation (8:30 a.m. to VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 4 p.m., Monday through Friday, excluding legal holidays). Special arrangements should be made for deliveries of boxed information. The Docket telephone number is (703) 305– 5805. Instructions: Direct your comments to docket ID number EPA–HQ–OPP–2007– 0118. EPA’s policy is that all comments received will be included in the docket without change and may be made available on-line at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through regulations.gov or email. The Federal regulations.gov website is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through regulations.gov, your email address will be automatically captured and included as part of the comment that is placed in the docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. Docket: All documents in the docket are listed in the docket index available in regulations.gov. To access the electronic docket, go to https:// www.regulations.gov, select ‘‘Advanced Search,’’ then ‘‘Docket Search.’’ Insert the docket ID number where indicated and select the ‘‘Submit’’ button. Follow the instructions on the regulations.gov web site to view the docket index or access available documents. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either in the electronic docket at https:// www.regulations.gov, or, if only available in hard copy, at the OPP PO 00000 Frm 00121 Fmt 4703 Sfmt 4703 Regulatory Public Docket in Rm. S– 4400, One Potomac Yard (South Building), 2777 S. Crystal Drive, Arlington, VA. The hours of operation of this Docket Facility are from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The Docket telephone number is (703) 305–5805. FOR FURTHER INFORMATION CONTACT: Shanaz Bacchus, Biopesticides and Pollution Prevention Division (7511P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001; telephone number: (703) 308–8097; e-mail address: bacchus.shanaz@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? This action is directed to the public in general. This action may, however, be of interest to to those persons who are interested in agricultural biotechnology or may be required to conduct testing of pesticidal substances under the Federal Food, Drug, and Cosmetic Act (FFDCA) or the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA). Since other entities may also be interested, the Agency has not attempted to describe all the specific entities that may be affected by this action. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. What Should I Consider as I Prepare My Comments for EPA? 1. Submitting CBI. Do not submit this information to EPA through regulations.gov or e-mail. Clearly mark the part or all of the information that you claim to be CBI. For CBI information in a disk or CD ROM that you mail to EPA, mark the outside of the disk or CD ROM as CBI and then identify electronically within the disk or CD ROM the specific information that is claimed as CBI. In addition to one complete version of the comment that includes information claimed as CBI, a copy of the comment that does not contain the information claimed as CBI must be submitted for inclusion in the public docket. Information so marked will not be disclosed except in accordance with procedures set forth in 40 CFR part 2. 2. Tips for preparing your comments. When submitting comments, remember to: i. Identify the document by docket ID number and other identifying information (subject heading, Federal Register date and page number). E:\FR\FM\09MRN1.SGM 09MRN1

Agencies

[Federal Register Volume 72, Number 46 (Friday, March 9, 2007)]
[Notices]
[Pages 10749-10750]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4247]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6684-7]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 02/26/2007 through 03/02/2007 pursuant to 40 CFR 1506.9.

EIS No. 20070072, Second Draft Supplement, FHW, NC, NC 12 Replacement 
of Herbert C. Bonner Bridge (Bridge No. 11 ) Revisions and Additions, 
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit, 
Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and 
404 Permit, Dare County, NC , Comment Period Ends: 04/23/2007, Contact: 
John F. Sullivan 919-856-4346.
EIS No. 20070073, Draft EIS, IBR, CO, Colorado River Interim Guidelines 
for Lower Basin Shortages and and Coordinated Operations for Lake 
Powell and Lake Mead, Implementation, Colorado River, CO, Comment 
Period Ends: 04/30/2007, Contact: Nan Yoder 702-293-8500.
EIS No. 20070074, Final EIS, SFW, CA, East Contra Costa County Habitat 
Conservation Plan and Natural Community Conservation Plan, 
Implementation, Incidental Take Permit, Cities of Brentwood, Clayton, 
Oakley and Pittsburg, Contra Costa County, CA, Wait Period Ends: 04/09/
2007, Contact: Lori Rinek 916-444-6600.
EIS No. 20070075, Draft Supplement, APH, 00, Importation of Solid Wood 
Packing Material, To Reevaluate and Refine Estimates of Methyl Bromide 
Usage in the Treatment, Implementation, United States, Comment Period 
Ends: 04/23/2007, Contact: David A. Bergston 301-734-6103.
EIS No. 20070076, Final EIS, AFS, WI, Boulder Project, Timber 
Harvesting, Vegetation and Road Management, U.S. Army COE Section 404 
Permit, Chequamegon-Nicolet National Forest, Lakewood-Laona Ranger 
District, Oconto and Langlade Counties, WI, Wait Period Ends: 04/09/
2007, Contact: Paul Sweeney 715-276-6333.
EIS No. 20070077, Draft EIS, AFS, SD, Mitchell Project Area, To 
Implement Multiple Resource Management Actions, Mystic Ranger District, 
Black Hills National Forest, Pennington County, SD, Comment Period 
Ends: 04/23/2007, Contact: Roberts. J. Thompson 605-343-1567.
EIS No. 20070078, Draft EIS, NPS, NY, Sagamore Hill National Historic 
Site, General Management Plan, Implementation, Oyster Bay, Nassau 
County, NY, Comment Period Ends: 05/08/2007, Contact: Greg A. Marshall 
516-922-4452.
EIS No. 20070079, Draft Supplement, AFS, WA,. School Fire Salvage 
Recovery Project, To Clarify Definitions of Live and Dead Trees, 
Implementation, Pomeroy Ranger District, Umatilla National Forest, 
Columbia and Garfield Counties, WA, Comment Period Ends: 04/23/2007, 
Contact: Dean R. Millett 509-843-4644.
EIS No. 20070080, Draft EIS, NIG, CA, Graton Rancheria Casino and Hotel 
Project, Transfer of Land into Trust, Implementation, Federated Indians 
of Graton Rancheria (Tribe), Sonoma County, CA, Comment Period Ends: 
04/23/2007, Contact: Brad Meharry 202-632-7003.
EIS No. 20070081, Final EIS, JUS, TX, Laredo Detention Facility, 
Proposed Contractor-Owned/Contractor-Operated Detention Facility, 
Implementation, Webb County, TX, Wait Period Ends: 04/09/2007, Contact: 
Scott P. Stermer 202-353-4601.
EIS No. 20070082, Final EIS, GSA, VA, Federal Bureau of Investigation 
(FBI) Central Records Complex, Alternative 4--Sempeles Site, 
Winchester, Frederick County, VA, Wait Period Ends: 04/09/2007, 
Contact: Katrina Scarpato 215-446-4651.
EIS No. 20070083, Draft EIS, SFW/COE, CA, PROGRAMMATIC--South Bay Salt 
Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood 
Control Measures and Public Access Features, Don Edward San Francisco 
Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo 
Counties, CA, Comment Period Ends: 04/23/2007, Contact: Clyde Morris 
510-792-0222 (SFW); and Yvonne LeTellier, 415-503-6744 (COE).
EIS No. 20070084, Draft EIS, BPA, WA, Port Angeles--Juan de Fuca 
Transmission Project, Construct a 550-Megawatt Direct Current Cable 
from Victoria, British Columbia, across the Strait of Juan de Fuca to 
Port Angeles, Presidential Permit, Clallam County, WA, Comment Period 
Ends: 04/24/2007, Contact: Stacy Mason 503-230-5455.
EIS No. 20070085, Draft EIS, USN, GU, Kilo Wharf Extension (MILCON P-
52), To Provide Adequate Berthing Facilities for Multi-Purpose Dry 
Cargo/Ammunition Ship (the T-AKE), Apra Harbor Naval Complex, Mariana 
Island, GU, Comment Period Ends: 04/23/2007, Contact: Nora Macariola 
808-472-1402.
EIS No. 20070086, Final EIS, USA, VA, Fort Lee, Virginia and Fort A. P. 
Hill, Virginia Project, Implementation of Base Closure and Realignment 
(BRAC)

[[Page 10750]]

Recommendations and Other Army Actions, Prince George County, 
Petersburg, Virginia Hopewell, Virginia; Caroline County, Essex County, 
VA, Wait Period Ends: 04/09/2007, Contact: Karen Wilson 703-602-2861.
EIS No. 20070087, Final EIS, FTA, FL, Miami North Corridor Project, 
Build Alternative is Selected, Transit Improvement between NW 62 Street 
at Dr. Martin Luther King Jr. Station and NW 215th Street at the Dade/
Broward Counties Line, Funding, Dade County, FL, Wait Period Ends: 04/
09/2007, Contact: James Garland 404-562-3512.

    Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-4247 Filed 3-8-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.