Environmental Impact Statements and Regulations; Availability of EPA Comments, 10748-10749 [E7-4246]
Download as PDF
10748
Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6684–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
jlentini on PROD1PC65 with NOTICES
Draft EISs
EIS No. 20060462, ERP No. D–COE–
K59006–CA, Cajon, Third Main Track,
Construction from Summit to
Keenbrook, Special Use Permit and
U.S. Army COE 404 Permit, San
Bernardino County, CA.
Summary: EPA expressed
environmental concerns about air
quality impacts and water-related
issues. Rating EC2.
EIS No. 20060467, ERP No. D–FHW–
K40262–CA, Interstate 5 (Santa Ana
Freeway) Project, Improvement from
State Route 91 in Orange County to
Interstate 605 in Los Angeles County,
CA.
Summary: EPA expressed
environmental concerns about the
potential for project segmentation, a
lack of analysis for mobile source air
toxics (MSATs) hotspots, and the
inconsistent reporting of environmental
justice impacts. EPA recommends
quantifying the construction and
operational emissions for MSATs,
conducting dispersion modeling of the
most significant MSATs, and identifying
hotspots and appropriate avoidance,
minimization, and/or mitigation
opportunities. Rating EC2.
EIS No. 20060498, ERP No. D–COE–
K60037–CA, Rio del Oro Specific Plan
Project, To Establish a Development
Framework for Land Use, Resource
Protection, Circulation, Public
Utilities and Services, City of Rancho
Cordova, Sacramento County, CA.
Summary: EPA expressed
environmental concerns about wetland
impacts, and requested additional
information regarding compliance with
the Clean Water Act. Rating EC2.
EIS No. 20060509, ERP No. D–SFW–
L61233–WA, Hanford Reach National
Monument Comprehensive
VerDate Aug<31>2005
21:24 Mar 08, 2007
Jkt 211001
Conservation Plan, Management of
Monument Resources, Programs and
Visitors for the next 15 years, Adams,
Benton. Franklin and Grant Counties,
WA.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20060518, ERP No. D–FHW–
F40438–IN, I–69 Evansville to
Indianapolis Project, I–69 Tier 2
Section 1: Evansville to Oakland City,
from 1–64 to IN–64, Gibson and
Warrick Counties, IN
Summary: EPA does not object to the
proposed action, but requests
clarification of mitigation measures and
their implementation. Rating LO.
EIS No. 20060535, ERP No. D–FHW–
L40232–ID, US–95 Garwood to Sagle
(from MP–438.4 to MP 469.75)
Transportation Improvements to
Present and Future Traffic Demand,
Funding, NPDES Permit and U.S.
Army COE Section 404 Permit,
Kootenai and Bonner Counties, ID.
Summary: EPA expressed
environmental concerns about potential
impacts to aquatic resources, wildlife
habitat, and prime farmland. EPA
recommended mitigation for air quality
impacts during construction, and
requested more information regarding
groundwater/sole source aquifer
impacts, surface water quality and
TMDL implementation, riparian and
floodplain impacts and avoidance.
Rating EC2.
EIS No. 20070001, ERP No. D–AFS–
K65325–CA, Turntable Bay Marina
Master Development Plan, To Build
and Operate a Resort Marina, SpecialUse-Permit, Shasta-Trinity National
Forest, Shasta Lake at Turntable Bay,
Shasta and Trinity Counties, CA.
Summary: While EPA does not object
to the Preferred Alternative, but
requested clarification on project goals
and timing of construction to minimize
air quality impacts. Rating LO.
EIS No. 20070011, ERP No. D–FHW–
F40402–MI, I–94 Jackson Freeway
Modernization Project, Improvements
between Michigan State Route-60
(MI–60) and Sargent Road, Funding
and NPDES and US Army COE
Section 404 Permits Issuance, Jackson
County, MI.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does
not object to the proposed action. Rating
LO.
EIS No. 20060477, ERP No. DS–AFS–
J65403–00, Southern Rockies Canada
Lynx Amendment, Updated
Information, Incorporating
Management Direction for Canada
Lynx Habitat by Amending Land and
PO 00000
Frm 00119
Fmt 4703
Sfmt 4703
Resource Management Plans, for
Arapaho-Roosevelt, Pike-San Isabel,
Grand Mesa-Uncompahgre-Gunnison,
San Juan, Rio Grande and Medicine
Bow-Routt National Forests,
Implementation, CO and WY.
Summary: EPA expressed
environmental concerns about the
preferred alternative has the most
potential of the action alternatives to
adversely effect water quality from
erosion and sedimentation, impact
wildlife and vegetation and cause
fragmentation of critical lynx habitat. In
addition, the final EIS should expand
the analysis of cumulative impacts.
Rating EC2.
Final EISs
EIS No. 20060533, ERP No. F–FHW–
D40310–VA, I–73 Location Study,
between Roanoke and the North
Carolina State Line Commonwealth of
Virginia, Construction and Operation,
Cities of Roanoke and Martinsville,
Counties of Bedford, Botetourt,
Franklin, Henry, and Roanoke, VA.
Summary: EPA continues to have
environmental concerns about forest
habitat impacts, and requested
mitigation to reduce those impacts.
EIS No. 20060538, ERP No. F–FRC–
E03016–MS, Casotte Landing
Liquefied Natural Gas (LNG) Import
and Interstate Natural Gas
Transmission Facilities, Construction
and Operation, U.S. Army COE
Section 404 Permit, (FERC/EIS–
0193D), near the City of Pascagoula,
Jackson County, MS.
Summary: EPA supports the selected
preferred alternative for the proposed
project with the FERC staff’s mitigation
measures identified in the final EIS.
EPA requested that FERC and the
applicant give further consideration to
addressing the remaining outstanding
issues including air quality, risk
analysis, and wetland impacts.
EIS No. 20070000, ERP No. F–AFS–
L65455–ID, Clearwater National
Forest, Proposes to Approve Plans-ofOperation for Small-Scale Suction
Dredging in Lolo Creek and Moose
Creek, Clearwater National Forest,
North Fork Ranger District, Clearwater
and Idaho Counties, ID.
Summary: The final EIS adequately
addressed EPA’s major concerns with
water quality, especially by using
monitoring, timing and location
provisions and adaptive management to
minimize impacts from projects.
Therefore, EPA does not object to the
proposed project.
EIS No. 20070010, ERP No. F–FHW–
G40187–LA, East-West Corridor
E:\FR\FM\09MRN1.SGM
09MRN1
Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices
Highway Component, from I–130 to
Louis Armstrong International
Airport, to Central Business District
(CBD), Jefferson, Orleans and St.
Charles Parishes, LA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070013, ERP No. F–DOE–
E01016–FL, Orlando Gasification
Project (DOE/EIS–0383), To Provide
Cost-Shared Funding for
Construction, Design, and Operation a
New Plant, Orlando, FL.
Summary: EPA continues to have
environmental concerns about impacts
to air quality and wetlands, and
requested that additional mitigation
measures be implemented.
EIS No. 20070020, ERP No. F–AFS–
L65474–AK, Tuxekan Island Timber
Sale(s) Project, Timber Harvesting,
Implementation, Coast Guard Bridge
Permit, U.S. Army COE Section 10
and 404 Permits, Tongass National
Forest, Thorne Bay Ranger District,
Thorne Bay, AK.
Summary: EPA’s previous
environmental concerns about impacts
to water quality, fisheries, wetlands, and
wildlife habitat have been addressed;
therefore, EPA does not object to the
proposed action.
EIS No. 20070034, ERP No. F–SFW–
J65447–WY, Bison and Elk
Management Plan, Implementation,
National Elk Refuge/Grand Teton
National Park/John D. Rockefeller, Jr.
Memorial Parkway, Teton County,
WY.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070054, ERP No. F–NPS–
J61110–UT, Utah Museum of Natural
History, Construction and Operation,
New Museum Facility at University of
Utah, Salt Lake City, UT.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–4246 Filed 3–8–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
jlentini on PROD1PC65 with NOTICES
[ER–FRL–6684–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
VerDate Aug<31>2005
21:24 Mar 08, 2007
Jkt 211001
Weekly receipt of Environmental Impact
Statements
Filed 02/26/2007 through 03/02/2007
pursuant to 40 CFR 1506.9.
EIS No. 20070072, Second Draft
Supplement, FHW, NC, NC 12
Replacement of Herbert C. Bonner
Bridge (Bridge No. 11 ) Revisions and
Additions, over Oregon Inlet
Construction, Funding, U.S. Coast
Guard Permit, Special-Use-Permit,
Right-of-Way Permit, U.S. Army COE
Section 10 and 404 Permit, Dare
County, NC , Comment Period Ends:
04/23/2007, Contact: John F. Sullivan
919–856–4346.
EIS No. 20070073, Draft EIS, IBR, CO,
Colorado River Interim Guidelines for
Lower Basin Shortages and and
Coordinated Operations for Lake
Powell and Lake Mead,
Implementation, Colorado River, CO,
Comment Period Ends: 04/30/2007,
Contact: Nan Yoder 702–293–8500.
EIS No. 20070074, Final EIS, SFW, CA,
East Contra Costa County Habitat
Conservation Plan and Natural
Community Conservation Plan,
Implementation, Incidental Take
Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa
County, CA, Wait Period Ends: 04/09/
2007, Contact: Lori Rinek 916–444–
6600.
EIS No. 20070075, Draft Supplement,
APH, 00, Importation of Solid Wood
Packing Material, To Reevaluate and
Refine Estimates of Methyl Bromide
Usage in the Treatment,
Implementation, United States,
Comment Period Ends: 04/23/2007,
Contact: David A. Bergston 301–734–
6103.
EIS No. 20070076, Final EIS, AFS, WI,
Boulder Project, Timber Harvesting,
Vegetation and Road Management,
U.S. Army COE Section 404 Permit,
Chequamegon-Nicolet National
Forest, Lakewood-Laona Ranger
District, Oconto and Langlade
Counties, WI, Wait Period Ends: 04/
09/2007, Contact: Paul Sweeney 715–
276–6333.
EIS No. 20070077, Draft EIS, AFS, SD,
Mitchell Project Area, To Implement
Multiple Resource Management
Actions, Mystic Ranger District, Black
Hills National Forest, Pennington
County, SD, Comment Period Ends:
04/23/2007, Contact: Roberts. J.
Thompson 605–343–1567.
EIS No. 20070078, Draft EIS, NPS, NY,
Sagamore Hill National Historic Site,
General Management Plan,
Implementation, Oyster Bay, Nassau
County, NY, Comment Period Ends:
05/08/2007, Contact: Greg A. Marshall
516–922–4452.
PO 00000
Frm 00120
Fmt 4703
Sfmt 4703
10749
EIS No. 20070079, Draft Supplement,
AFS, WA,. School Fire Salvage
Recovery Project, To Clarify
Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger
District, Umatilla National Forest,
Columbia and Garfield Counties, WA,
Comment Period Ends: 04/23/2007,
Contact: Dean R. Millett 509–843–
4644.
EIS No. 20070080, Draft EIS, NIG, CA,
Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust,
Implementation, Federated Indians of
Graton Rancheria (Tribe), Sonoma
County, CA, Comment Period Ends:
04/23/2007, Contact: Brad Meharry
202–632–7003.
EIS No. 20070081, Final EIS, JUS, TX,
Laredo Detention Facility, Proposed
Contractor-Owned/ContractorOperated Detention Facility,
Implementation, Webb County, TX,
Wait Period Ends: 04/09/2007,
Contact: Scott P. Stermer 202–353–
4601.
EIS No. 20070082, Final EIS, GSA, VA,
Federal Bureau of Investigation (FBI)
Central Records Complex, Alternative
4—Sempeles Site, Winchester,
Frederick County, VA, Wait Period
Ends: 04/09/2007, Contact: Katrina
Scarpato 215–446–4651.
EIS No. 20070083, Draft EIS, SFW/COE,
CA, PROGRAMMATIC—South Bay
Salt Pond Restoration Project,
Restored Tidal Marsh, Managed
Ponds, Flood Control Measures and
Public Access Features, Don Edward
San Francisco Bay National Wildlife
Refuge, Alameda, Santa Clara and San
Mateo Counties, CA, Comment Period
Ends: 04/23/2007, Contact: Clyde
Morris 510–792–0222 (SFW); and
Yvonne LeTellier, 415–503–6744
(COE).
EIS No. 20070084, Draft EIS, BPA, WA,
Port Angeles—Juan de Fuca
Transmission Project, Construct a
550-Megawatt Direct Current Cable
from Victoria, British Columbia,
across the Strait of Juan de Fuca to
Port Angeles, Presidential Permit,
Clallam County, WA, Comment
Period Ends: 04/24/2007, Contact:
Stacy Mason 503–230–5455.
EIS No. 20070085, Draft EIS, USN, GU,
Kilo Wharf Extension (MILCON P–
52), To Provide Adequate Berthing
Facilities for Multi-Purpose Dry
Cargo/Ammunition Ship (the T–AKE),
Apra Harbor Naval Complex, Mariana
Island, GU, Comment Period Ends:
04/23/2007, Contact: Nora Macariola
808–472–1402.
EIS No. 20070086, Final EIS, USA, VA,
Fort Lee, Virginia and Fort A. P. Hill,
Virginia Project, Implementation of
Base Closure and Realignment (BRAC)
E:\FR\FM\09MRN1.SGM
09MRN1
Agencies
[Federal Register Volume 72, Number 46 (Friday, March 9, 2007)]
[Notices]
[Pages 10748-10749]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4246]
[[Page 10748]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-8]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060462, ERP No. D-COE-K59006-CA, Cajon, Third Main Track,
Construction from Summit to Keenbrook, Special Use Permit and U.S. Army
COE 404 Permit, San Bernardino County, CA.
Summary: EPA expressed environmental concerns about air quality
impacts and water-related issues. Rating EC2.
EIS No. 20060467, ERP No. D-FHW-K40262-CA, Interstate 5 (Santa Ana
Freeway) Project, Improvement from State Route 91 in Orange County to
Interstate 605 in Los Angeles County, CA.
Summary: EPA expressed environmental concerns about the potential
for project segmentation, a lack of analysis for mobile source air
toxics (MSATs) hotspots, and the inconsistent reporting of
environmental justice impacts. EPA recommends quantifying the
construction and operational emissions for MSATs, conducting dispersion
modeling of the most significant MSATs, and identifying hotspots and
appropriate avoidance, minimization, and/or mitigation opportunities.
Rating EC2.
EIS No. 20060498, ERP No. D-COE-K60037-CA, Rio del Oro Specific Plan
Project, To Establish a Development Framework for Land Use, Resource
Protection, Circulation, Public Utilities and Services, City of Rancho
Cordova, Sacramento County, CA.
Summary: EPA expressed environmental concerns about wetland
impacts, and requested additional information regarding compliance with
the Clean Water Act. Rating EC2.
EIS No. 20060509, ERP No. D-SFW-L61233-WA, Hanford Reach National
Monument Comprehensive Conservation Plan, Management of Monument
Resources, Programs and Visitors for the next 15 years, Adams, Benton.
Franklin and Grant Counties, WA.
Summary: EPA does not object to the proposed action. Rating LO.
EIS No. 20060518, ERP No. D-FHW-F40438-IN, I-69 Evansville to
Indianapolis Project, I-69 Tier 2 Section 1: Evansville to Oakland
City, from 1-64 to IN-64, Gibson and Warrick Counties, IN
Summary: EPA does not object to the proposed action, but requests
clarification of mitigation measures and their implementation. Rating
LO.
EIS No. 20060535, ERP No. D-FHW-L40232-ID, US-95 Garwood to Sagle (from
MP-438.4 to MP 469.75) Transportation Improvements to Present and
Future Traffic Demand, Funding, NPDES Permit and U.S. Army COE Section
404 Permit, Kootenai and Bonner Counties, ID.
Summary: EPA expressed environmental concerns about potential
impacts to aquatic resources, wildlife habitat, and prime farmland. EPA
recommended mitigation for air quality impacts during construction, and
requested more information regarding groundwater/sole source aquifer
impacts, surface water quality and TMDL implementation, riparian and
floodplain impacts and avoidance. Rating EC2.
EIS No. 20070001, ERP No. D-AFS-K65325-CA, Turntable Bay Marina Master
Development Plan, To Build and Operate a Resort Marina, Special-Use-
Permit, Shasta-Trinity National Forest, Shasta Lake at Turntable Bay,
Shasta and Trinity Counties, CA.
Summary: While EPA does not object to the Preferred Alternative,
but requested clarification on project goals and timing of construction
to minimize air quality impacts. Rating LO.
EIS No. 20070011, ERP No. D-FHW-F40402-MI, I-94 Jackson Freeway
Modernization Project, Improvements between Michigan State Route-60
(MI-60) and Sargent Road, Funding and NPDES and US Army COE Section 404
Permits Issuance, Jackson County, MI.
Summary: EPA's previous concerns have been resolved; therefore, EPA
does not object to the proposed action. Rating LO.
EIS No. 20060477, ERP No. DS-AFS-J65403-00, Southern Rockies Canada
Lynx Amendment, Updated Information, Incorporating Management Direction
for Canada Lynx Habitat by Amending Land and Resource Management Plans,
for Arapaho-Roosevelt, Pike-San Isabel, Grand Mesa-Uncompahgre-
Gunnison, San Juan, Rio Grande and Medicine Bow-Routt National Forests,
Implementation, CO and WY.
Summary: EPA expressed environmental concerns about the preferred
alternative has the most potential of the action alternatives to
adversely effect water quality from erosion and sedimentation, impact
wildlife and vegetation and cause fragmentation of critical lynx
habitat. In addition, the final EIS should expand the analysis of
cumulative impacts. Rating EC2.
Final EISs
EIS No. 20060533, ERP No. F-FHW-D40310-VA, I-73 Location Study, between
Roanoke and the North Carolina State Line Commonwealth of Virginia,
Construction and Operation, Cities of Roanoke and Martinsville,
Counties of Bedford, Botetourt, Franklin, Henry, and Roanoke, VA.
Summary: EPA continues to have environmental concerns about forest
habitat impacts, and requested mitigation to reduce those impacts.
EIS No. 20060538, ERP No. F-FRC-E03016-MS, Casotte Landing Liquefied
Natural Gas (LNG) Import and Interstate Natural Gas Transmission
Facilities, Construction and Operation, U.S. Army COE Section 404
Permit, (FERC/EIS-0193D), near the City of Pascagoula, Jackson County,
MS.
Summary: EPA supports the selected preferred alternative for the
proposed project with the FERC staff's mitigation measures identified
in the final EIS. EPA requested that FERC and the applicant give
further consideration to addressing the remaining outstanding issues
including air quality, risk analysis, and wetland impacts.
EIS No. 20070000, ERP No. F-AFS-L65455-ID, Clearwater National Forest,
Proposes to Approve Plans-of-Operation for Small-Scale Suction Dredging
in Lolo Creek and Moose Creek, Clearwater National Forest, North Fork
Ranger District, Clearwater and Idaho Counties, ID.
Summary: The final EIS adequately addressed EPA's major concerns
with water quality, especially by using monitoring, timing and location
provisions and adaptive management to minimize impacts from projects.
Therefore, EPA does not object to the proposed project.
EIS No. 20070010, ERP No. F-FHW-G40187-LA, East-West Corridor
[[Page 10749]]
Highway Component, from I-130 to Louis Armstrong International Airport,
to Central Business District (CBD), Jefferson, Orleans and St. Charles
Parishes, LA.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070013, ERP No. F-DOE-E01016-FL, Orlando Gasification Project
(DOE/EIS-0383), To Provide Cost-Shared Funding for Construction,
Design, and Operation a New Plant, Orlando, FL.
Summary: EPA continues to have environmental concerns about impacts
to air quality and wetlands, and requested that additional mitigation
measures be implemented.
EIS No. 20070020, ERP No. F-AFS-L65474-AK, Tuxekan Island Timber
Sale(s) Project, Timber Harvesting, Implementation, Coast Guard Bridge
Permit, U.S. Army COE Section 10 and 404 Permits, Tongass National
Forest, Thorne Bay Ranger District, Thorne Bay, AK.
Summary: EPA's previous environmental concerns about impacts to
water quality, fisheries, wetlands, and wildlife habitat have been
addressed; therefore, EPA does not object to the proposed action.
EIS No. 20070034, ERP No. F-SFW-J65447-WY, Bison and Elk Management
Plan, Implementation, National Elk Refuge/Grand Teton National Park/
John D. Rockefeller, Jr. Memorial Parkway, Teton County, WY.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070054, ERP No. F-NPS-J61110-UT, Utah Museum of Natural
History, Construction and Operation, New Museum Facility at University
of Utah, Salt Lake City, UT.
Summary: No formal comment letter was sent to the preparing agency.
Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-4246 Filed 3-8-07; 8:45 am]
BILLING CODE 6560-50-P