Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions, 10513-10514 [E7-4122]
Download as PDF
Federal Register / Vol. 72, No. 45 / Thursday, March 8, 2007 / Notices
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3968 Filed 3–7–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
sroberts on PROD1PC70 with NOTICES
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
March 2, 2007.
Take notice that the following
hydroelectric application has been filed
VerDate Aug<31>2005
18:53 Mar 07, 2007
Jkt 211001
with the Commission and is available
for public inspection.
a. Application Type: Amendment of
license to upgrade the installed
capacity.
b. Project No.: 2778–035.
c. Date Filed: August 17, 2006.
d. Applicant: Idaho Power Company.
e. Name of Project: Shoshone Falls.
f. Location: The project is located on
the on the Snake River in Jerome and
Twin Falls Counties, Idaho. Part of the
project occupies lands owned by the
Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Tom R. Saldin,
Senior Vice President, Idaho Power Co.,
P.O. Box 70, Boise, Idaho 83707. Tel:
(208) 388–2550. Also, Mr. Nathan F.
Gardiner, Idaho Power Co., P.O. Box 70,
Boise, Idaho 83707. Tel: (208) 388–2975.
i. FERC Contact: Any questions on
this notice should be addressed to
Vedula Sarma at (202) 502–6190 or
vedula.sarma@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions is 60 days from
the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice. All
documents (original and eight copies)
should be filed with: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene, protests,
comments, recommendations, terms and
conditions, and fishway prescriptions
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
k. This application has been accepted
for filing and is ready for further
environmental analysis. On February
27, 2007, Commission staff issued a
draft environmental assessment to
facilitate the generation of further
analysis on the proposed project
expansion. Idaho Power Company (IPC)
proposes to demolish a section of the
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
10513
Shoshone Falls powerhouse built in
1907 and containing two generating
units 0.4 MW, and 0.6 MW and replace
it with a new powerhouse containing a
50 MW generating unit. The project’s
authorized installed capacity would
increase from 11,875 kilowatts (kW) to
60,875 kW, and the hydraulic capacity
would increase from 815 cubic feet per
second (cfs) to 4,815 cfs. The IPC also
requests an extension of the license term
for the project from 30 to 50 years.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/esubscribenow.htm to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
m. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘ TERMS
AND CONDITIONS,’’ or ‘‘ FISHWAY
PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All comments,
recommendations, terms and conditions
E:\FR\FM\08MRN1.SGM
08MRN1
10514
Federal Register / Vol. 72, No. 45 / Thursday, March 8, 2007 / Notices
or prescriptions should relate to project
works which are the subject of the
license amendment. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
n. An applicant must file no later than
60 days following the date of issuance
of this notice of acceptance and ready
for environmental analysis provided for
in § 4.34(b)(5)(i): (1) A copy of the water
quality certification; (2) a copy of the
request for certification, including proof
of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Magalie R. Salas,
Secretary.
[FR Doc. E7–4122 Filed 3–7–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PL05–10–000]
Criteria for Reassertion of Jurisdiction
Over the Gathering Services of Natural
Gas Company Affiliates
February 15, 2007.
Federal Energy Regulatory
Commission, DOE.
ACTION: Order Terminating Proceeding
and Clarifying Policy.
sroberts on PROD1PC70 with NOTICES
AGENCY:
SUMMARY: The Federal Energy
Regulatory Commission is terminating
the instant proceeding. The Commission
also finds that it may only assert
jurisdiction over a gathering provider
affiliated with an interstate pipeline
when the gatherer has used its market
power over gathering to benefit the
pipeline in its performance of
jurisdictional transportation or sales
service and that benefit is contrary to
the Commission’s policies concerning
jurisdictional service adopted pursuant
to the NGA. Further, the order clarifies
that, where the gathering affiliate has
engaged in the type of conduct
described above as justifying an
assertion of jurisdiction, the
Commission need not also find
VerDate Aug<31>2005
18:53 Mar 07, 2007
Jkt 211001
‘‘concerned action’’ between the
pipeline and its gathering affiliate.
FOR FURTHER INFORMATION CONTACT:
Richard Howe, Office of the General
Counsel, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. (202) 502–8389.
SUPPLEMENTARY INFORMATION:
Before Commissioners: Joseph T. Kelliher,
Chairman; Suedeen G. Kelly, Marc Spitzer,
Philip D. Moeller, and Jon Wellinghoff.
Order Terminating Proceeding and
Clarifying Policy
1. In September 2005, the
Commission issued a Notice of Inquiry
(NOI) 1 to evaluate possible changes in
the criteria set forth in Arkla Gathering
Service Co.2 for determining when the
Commission may assert Natural Gas Act
(NGA) jurisdiction over the gathering
activities of a gathering affiliate of a
natural gas pipeline to guard against
abusive practices by the affiliated
companies. In Arkla, the Commission
held that gathering affiliates of interstate
pipelines are generally exempt from the
Commission’s NGA jurisdiction.
However, the Commission also held that
‘‘if an affiliated gatherer acts in concert
with its pipeline affiliate in connection
with the transportation of gas in
interstate commerce and in a manner
that frustrates the Commission’s
effective regulation of the interstate
pipeline, then the Commission may look
through, or disregard, the separate
corporate structures and treat the
pipeline and gatherer as a single
entity.’’ 3
2. In Williams Gas Processing—Gulf
Coast Company, L.P. v. FERC,4 the
United States Court of Appeals for the
District of Columbia Circuit vacated and
remanded Commission orders, in which
the Commission had sought to reassert
jurisdiction over certain affiliated
gathering activities under the criteria set
forth in Arkla. The court held that the
Commission had not met its own test
under Arkla for reassertion of
jurisdiction. In light of the court’s
holding that the circumstances
presented by the Williams Gas
Processing case did not satisfy the Arkla
test, the Commission determined to
explore whether that test should be
1 112
FERC ¶ 61,292 (2005).
Gathering Service Co., 67 FERC ¶ 61,257,
at 61,871 (1994), order on reh’g, 69 FERC ¶ 61,280
(1994), reh’g denied, 70 FERC ¶ 61,079 (1995),
reconsideration denied, 71 FERC ¶ 61,297 (1995)
(collectively, Arkla), aff’d in part and reversed in
part, Conoco Inc. v. FERC, 90 F.3d 536 (D.C. Cir.
1996) (Conoco).
3 Arkla, 67 FERC at 61,871.
4 Williams Gas Processing-Gulf Coast Co., L.P. v.
FERC, 373 F.3d 1335 (D.C. Cir. 2004) (Williams Gas
Processing).
2 Arkla
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
modified. To assist this reevaluation of
the Arkla test, the Commission issued
the NOI, asking parties to submit
comments and respond to a number of
specific questions. After carefully
reviewing the comments, the
Commission has determined not to
change its current policies with respect
to affiliated gatherers, although we do
clarify the existing Arkla test.
I. Statutory and Regulatory Backdrop
3. Section 1(b) of the NGA gives the
Commission jurisdiction over (1)
transportation of natural gas in
interstate commerce, (2) sales in
interstate commerce of natural gas for
resale,5 and ‘‘natural gas companies’’ 6
engaged in such transportation or sales.
However, section 1(b) exempts
‘‘gathering of natural gas’’ from
Commission jurisdiction. The
Commission uses the ‘‘primary
function’’ test to determine whether a
facility is devoted to jurisdictional
interstate transportation or nonjurisdictional gathering of natural gas.7
Under that test, the Commission relies
on various physical characteristics of
the facilities to determine their
jurisdictional status.
4. Before Order No. 436,8 interstate
natural gas pipelines generally did not
perform transportation-only or
gathering-only services. Rather, they
used all their facilities, including any
gathering facilities they owned, to
provide a bundled transportation and
sale for resale service, for which they
charged a single bundled rate. The
United States Supreme Court held that
the gathering exemption did not
foreclose the Commission from
reflecting ‘‘the production and gathering
5 The Wellhead Decontrol Act of 1989 removed
all first sales from Commission jurisdiction.
6 Section 2(6) of the NGA defines ‘‘natural-gas
company’’ as ‘‘a person engaged in the
transportation of natural gas in interstate commerce,
or the sale in interstate commerce of such gas for
resale.’’
7 The Commission first articulated the primary
function test in Farmland Industries, Inc., 23 FERC
¶ 61,063 (1983). The Commission subsequently
modified the test in Amerada Hess Corp., 52 FERC
¶ 61,268 (1990).
8 Regulation of Natural Gas Pipelines After Partial
Wellhead Decontrol, Order No. 436, 50 Fed. Reg.
42,408 (Oct. 18, 1985), FERC Stats. & Regs. ¶ 30,665
at 31,554 (1985), vacated and remanded,
Associated Gas Distributors v. FERC, 824 F.2d 981
(D.C. Cir. 1987), cert. denied, 485 U.S. 1006 (1988),
readopted on an interim basis, Order No. 500, 52
FR 30,334 (Aug. 14, 1987), FERC Stats. & Regs.
¶ 30,761 (1987), remanded, American Gas Ass’n v.
FERC, 888 F.2d 136 (D.C. Cir. 1989), readopted,
Order No. 500–H, 54 FR 52,344 (Dec. 21, 1989),
FERC Stats. & Regs. ¶ 30,867 (1989), reh’g granted
in part and denied in part, Order No. 500–I, 55 FR
6,605 (Feb. 26, 1990), FERC Stats. & Regs. ¶ 30,880
(1990), aff’d in part and remanded in part,
American Gas Ass’n v. FERC, 912 F.2d 1496 (D.C.
Cir. 1990), cert. denied, 498 U.S. 1084 (1991).
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 72, Number 45 (Thursday, March 8, 2007)]
[Notices]
[Pages 10513-10514]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4122]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing, Soliciting Motions To
Intervene and Protests, Ready for Environmental Analysis, and
Soliciting Comments, Recommendations, Terms and Conditions, and Fishway
Prescriptions
March 2, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Application Type: Amendment of license to upgrade the installed
capacity.
b. Project No.: 2778-035.
c. Date Filed: August 17, 2006.
d. Applicant: Idaho Power Company.
e. Name of Project: Shoshone Falls.
f. Location: The project is located on the on the Snake River in
Jerome and Twin Falls Counties, Idaho. Part of the project occupies
lands owned by the Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Tom R. Saldin, Senior Vice President, Idaho
Power Co., P.O. Box 70, Boise, Idaho 83707. Tel: (208) 388-2550. Also,
Mr. Nathan F. Gardiner, Idaho Power Co., P.O. Box 70, Boise, Idaho
83707. Tel: (208) 388-2975.
i. FERC Contact: Any questions on this notice should be addressed
to Vedula Sarma at (202) 502-6190 or vedula.sarma@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, preliminary terms and conditions, and preliminary
fishway prescriptions is 60 days from the issuance of this notice;
reply comments are due 105 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene, protests, comments, recommendations, terms
and conditions, and fishway prescriptions may be filed electronically
via the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
k. This application has been accepted for filing and is ready for
further environmental analysis. On February 27, 2007, Commission staff
issued a draft environmental assessment to facilitate the generation of
further analysis on the proposed project expansion. Idaho Power Company
(IPC) proposes to demolish a section of the Shoshone Falls powerhouse
built in 1907 and containing two generating units 0.4 MW, and 0.6 MW
and replace it with a new powerhouse containing a 50 MW generating
unit. The project's authorized installed capacity would increase from
11,875 kilowatts (kW) to 60,875 kW, and the hydraulic capacity would
increase from 815 cubic feet per second (cfs) to 4,815 cfs. The IPC
also requests an extension of the license term for the project from 30
to 50 years.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, 202-502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
Register online at https://www.ferc.gov/esubscribenow.htm to be
notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
m. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, .214. In determining the appropriate action to
take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) Bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' `` TERMS AND CONDITIONS,'' or `` FISHWAY
PRESCRIPTIONS;'' (2) set forth in the heading the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish the name, address, and telephone number of the person
protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). All comments, recommendations, terms and conditions
[[Page 10514]]
or prescriptions should relate to project works which are the subject
of the license amendment. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
n. An applicant must file no later than 60 days following the date
of issuance of this notice of acceptance and ready for environmental
analysis provided for in Sec. 4.34(b)(5)(i): (1) A copy of the water
quality certification; (2) a copy of the request for certification,
including proof of the date on which the certifying agency received the
request; or (3) evidence of waiver of water quality certification.
Magalie R. Salas,
Secretary.
[FR Doc. E7-4122 Filed 3-7-07; 8:45 am]
BILLING CODE 6717-01-P