Questar Pipeline Company; Notice of Availability of the Environmental Assessment for the Proposed Southern System Expansion Project II, 10510-10511 [E7-4121]
Download as PDF
10510
Federal Register / Vol. 72, No. 45 / Thursday, March 8, 2007 / Notices
Comment Date: 5 p.m. Eastern Time
on March 9, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7–4119 Filed 3–7–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
sroberts on PROD1PC70 with NOTICES
March 2, 2007.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC07–63–000.
Applicants: Hardee Power Partners
Limited.
Description: Hardee Power Partners
Limited submits a request for
authorization for a transaction that
would result in an indirect change in
the upstream ownership.
Filed Date: 02/27/2007.
Accession Number: 20070301–0152.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 20, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER98–411–014.
Applicants: Wolverine Power Supply
Cooperative, Inc.
Description: Wolverine Power Supply
Coop, Inc submits its third triennial
market power analysis update.
Filed Date: 02/26/2007.
Accession Number: 20070301–0091.
Comment Date: 5 p.m. Eastern Time
on Monday, March 19, 2007.
Docket Numbers: ER99–1005–007;
ER05–1280–002; ER03–1079–008;
ER02–47–007; ER02–1381–003; ER02–
309–007.
Applicants: Kansas City Power &
Light Company; Strategic Energy, LLC;
Aquila, Inc.; Aquila Long Term, Inc.;
Aquila Merchant Services, Inc.; MEP
Clarksdale Power, LLC.
Description: Kansas City Power &
Light Co and Strategic Energy, LLC
submit a notification of Great Plains
Energy Inc’s pending acquisitions of
Aquila and Aquila’s MBR Entities.
Filed Date: 02/26/2007.
Accession Number: 20070301–0090.
Comment Date: 5 p.m. Eastern Time
on Monday, March 19, 2007.
Docket Numbers: ER04–835–007;
EL04–103–002.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corp submits a
VerDate Aug<31>2005
18:53 Mar 07, 2007
Jkt 211001
compliance filing pursuant to FERC’s
12/27/06 Order 492.
Filed Date: 02/26/2007.
Accession Number: 20070301–0088.
Comment Date: 5 p.m. Eastern Time
on Monday, March 19, 2007.
Docket Numbers: ER07–572–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: Alliant Energy Corporate
Services, Inc on behalf of Wisconsin and
Light Co submits a Revised Master
Power Supply Agreement with Great
Lakes Utilities.
Filed Date: 02/26/2007.
Accession Number: 20070301–0087.
Comment Date: 5 p.m. Eastern Time
on Monday, March 19, 2007.
Docket Numbers: ER07–573–000.
Applicants: Ocean State Power.
Description: Ocean State Power
submits revisions to Rate Schedule
FERC 1–4 and Rate Schedule FERC 5–
8 to update the rate of return on equity.
Filed Date: 02/26/2007.
Accession Number: 20070301–0089.
Comment Date: 5 p.m. Eastern Time
on Monday, March 19, 2007.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES07–25–000.
Applicants: Upper Peninsula Power
Company.
Description: Upper Peninsula Power
Company submits its Application for
Renewed Authorization to Issue
Securities Under Section 204 of the
FPA.
Filed Date: 02/28/2007.
Accession Number: 20070228–5062.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 21, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E7–4118 Filed 3–7–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–25–000]
Questar Pipeline Company; Notice of
Availability of the Environmental
Assessment for the Proposed
Southern System Expansion Project II
March 2, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
natural gas pipeline facilities proposed
by Questar Pipeline Company (Questar)
in the above-referenced docket. This EA
has been prepared in cooperation with
the U.S. Department of Interior’s,
Bureau of Land Management, U.S.
Geological Survey, and U.S. Fish and
Wildlife Service (collectively,
‘‘cooperating agencies’’).
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff and
cooperating agencies conclude that
approval of the proposed project, with
E:\FR\FM\08MRN1.SGM
08MRN1
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 72, No. 45 / Thursday, March 8, 2007 / Notices
appropriate mitigating measures, would
not constitute a major federal action
significantly affecting the quality of the
human environment.
The EA assesses the potential
environmental effects of the
construction and operation of the
proposed Southern System Expansion
Project II including:
Main Line 104 Extension Pipeline—
Consisting of about 53.9 miles of new
24-inch-diameter pipeline loop and
ancillary facilities in Uintah, Duchesne
and Carbon Counties, Utah. The new
pipeline would loop Questar’s existing
Main Line 40 northeast of Price, Utah
and include a pig launcher, four new
mainline block valves, a 200-barrel slug
catcher, cathodic protection systems,
and associated crossover piping, taps,
and valves.
Main Line 104 Loop Pipeline—
Consisting of about 4.7 miles of new 24inch-diameter pipeline loop and
ancillary facilities. The ML 104 Loop
pipeline would parallel Questar’s
existing ML 104 between its existing
Fausett Junction and Oak Spring
Compressor Station facilities.
Blind Canyon Compressor Station
Upgrades—Consisting of upgrades to
one of two existing compressor units.
Additional proposed facility upgrades
would include the installation of about
1,200 feet of new station suction and
discharge piping, one pig launcher, one
pig receiver, one block valve, one
spillover valve, one ultrasonic gas
meter, and one filter separator.
Oak Spring Compressor Station
Upgrades—Consisting of restaging two
of the three existing compressor units.
Additional proposed facility upgrades
would include installation of one pig
receiver, one block valve, and one valve
associated with the pig receiver.
Price Yard Facilities—Consisting of
approximately 200 feet of inlet and
outlet piping, a 200-barrel slug catcher,
a filter separator, and associated valves
that would be installed within the
boundary of the existing facility site.
The purpose of the Southern System
Expansion Project II is to deliver up to
approximately 175,000 dekatherms per
day of natural gas on a firm basis from
various receipt points on Questar’s
southern transmission system to a
delivery point at an existing
interconnect facility with the Kern River
Gas Transmission Company pipeline
near Goshen, Utah.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference and Files Maintenance
VerDate Aug<31>2005
18:53 Mar 07, 2007
Jkt 211001
Branch, 888 First Street, NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Copies of the EA have been mailed to
federal, state and local agencies, public
interest groups, interested individuals,
affected landowners, newspapers, and
parties to this proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below.
Please note that the Commission
strongly encourages electronic filing of
any comments or interventions or
protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide. Before
you can file comments you will need to
create a free account which can be
created by clicking on ‘‘Sign-up.’’
If you are filing written comments,
please carefully follow these
instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your comments to: Secretary, Federal
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426.
• Label one copy of the comments for
the attention of the Gas Branch 3, PJ
11.3.
• Reference Docket No. CP07–25–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before April 2, 2007.
Comments will be considered by the
Commission but will not serve to make
the commentor a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
10511
at 1–866–208–FERC or on the FERC
Internet Web site (www.ferc.gov) using
the eLibrary link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number excluding the
last three digits in the Docket Number
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at 1–866–208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to www.ferc.gov/
esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E7–4121 Filed 3–7–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–442–000]
UGI LNG, Inc.; Notice of Availability of
the Environmental Assessment for the
Temple LNG Plant
March 2, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared this
Environmental Assessment (EA) to
discuss the environmental impacts
involving the operation of facilities for
the existing Temple LNG Plant
proposed by UGI LNG, Inc. (UGI LNG)
in the above referenced docket. The
proposed project is located in Berks
County, Pennsylvania.
Because the Temple LNG Plant is an
existing facility the EA focused on the
operation of the proposed project, the
cryogenic design aspects of the plant
and public safety.
This EA has been prepared to comply
with the requirements of the National
Environmental Policy Act (NEPA), the
Council of Environmental Quality (CEQ)
regulations for implementing NEPA
(Title 40, Code of Federal Regulations
[CFR], sections 1500–1508), and the
Commission’s regulations (18 CFR 380).
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 72, Number 45 (Thursday, March 8, 2007)]
[Notices]
[Pages 10510-10511]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-4121]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-25-000]
Questar Pipeline Company; Notice of Availability of the
Environmental Assessment for the Proposed Southern System Expansion
Project II
March 2, 2007.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) on the
natural gas pipeline facilities proposed by Questar Pipeline Company
(Questar) in the above-referenced docket. This EA has been prepared in
cooperation with the U.S. Department of Interior's, Bureau of Land
Management, U.S. Geological Survey, and U.S. Fish and Wildlife Service
(collectively, ``cooperating agencies'').
The EA was prepared to satisfy the requirements of the National
Environmental Policy Act. The staff and cooperating agencies conclude
that approval of the proposed project, with
[[Page 10511]]
appropriate mitigating measures, would not constitute a major federal
action significantly affecting the quality of the human environment.
The EA assesses the potential environmental effects of the
construction and operation of the proposed Southern System Expansion
Project II including:
Main Line 104 Extension Pipeline--Consisting of about 53.9 miles of
new 24-inch-diameter pipeline loop and ancillary facilities in Uintah,
Duchesne and Carbon Counties, Utah. The new pipeline would loop
Questar's existing Main Line 40 northeast of Price, Utah and include a
pig launcher, four new mainline block valves, a 200-barrel slug
catcher, cathodic protection systems, and associated crossover piping,
taps, and valves.
Main Line 104 Loop Pipeline--Consisting of about 4.7 miles of new
24-inch-diameter pipeline loop and ancillary facilities. The ML 104
Loop pipeline would parallel Questar's existing ML 104 between its
existing Fausett Junction and Oak Spring Compressor Station facilities.
Blind Canyon Compressor Station Upgrades--Consisting of upgrades to
one of two existing compressor units. Additional proposed facility
upgrades would include the installation of about 1,200 feet of new
station suction and discharge piping, one pig launcher, one pig
receiver, one block valve, one spillover valve, one ultrasonic gas
meter, and one filter separator.
Oak Spring Compressor Station Upgrades--Consisting of restaging two
of the three existing compressor units. Additional proposed facility
upgrades would include installation of one pig receiver, one block
valve, and one valve associated with the pig receiver.
Price Yard Facilities--Consisting of approximately 200 feet of
inlet and outlet piping, a 200-barrel slug catcher, a filter separator,
and associated valves that would be installed within the boundary of
the existing facility site.
The purpose of the Southern System Expansion Project II is to
deliver up to approximately 175,000 dekatherms per day of natural gas
on a firm basis from various receipt points on Questar's southern
transmission system to a delivery point at an existing interconnect
facility with the Kern River Gas Transmission Company pipeline near
Goshen, Utah.
The EA has been placed in the public files of the FERC. A limited
number of copies of the EA are available for distribution and public
inspection at: Federal Energy Regulatory Commission, Public Reference
and Files Maintenance Branch, 888 First Street, NE., Room 2A,
Washington, DC 20426, (202) 502-8371.
Copies of the EA have been mailed to federal, state and local
agencies, public interest groups, interested individuals, affected
landowners, newspapers, and parties to this proceeding.
Any person wishing to comment on the EA may do so. To ensure
consideration prior to a Commission decision on the proposal, it is
important that we receive your comments before the date specified
below.
Please note that the Commission strongly encourages electronic
filing of any comments or interventions or protests to this proceeding.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site at https://www.ferc.gov under the ``e-Filing'' link and the
link to the User's Guide. Before you can file comments you will need to
create a free account which can be created by clicking on ``Sign-up.''
If you are filing written comments, please carefully follow these
instructions to ensure that your comments are received in time and
properly recorded:
Send an original and two copies of your comments to:
Secretary, Federal Energy Regulatory Commission, 888 First St., NE.,
Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of the
Gas Branch 3, PJ 11.3.
Reference Docket No. CP07-25-000; and
Mail your comments so that they will be received in
Washington, DC on or before April 2, 2007.
Comments will be considered by the Commission but will not serve to
make the commentor a party to the proceeding. Any person seeking to
become a party to the proceeding must file a motion to intervene
pursuant to Rule 214 of the Commission's Rules of Practice and
Procedures (18 CFR 385.214).\1\ Only intervenors have the right to seek
rehearing of the Commission's decision.
---------------------------------------------------------------------------
\1\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (www.ferc.gov) using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number excluding the last three digits in the Docket Number field. Be
sure you have selected an appropriate date range. For assistance,
please contact FERC Online Support at FercOnlineSupport@ferc.gov or
toll free at 1-866-208-3676, or for TTY, contact (202) 502-8659. The
eLibrary link also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E7-4121 Filed 3-7-07; 8:45 am]
BILLING CODE 6717-01-P