Oil and Gas and Sulphur Operations on the Outer Continental Shelf (OCS)-Oil and Gas Production Requirements, 9884-9901 [E7-3846]

Download as PDF 9884 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules TABLE 1.—AIRBUS SERVICE BULLETINS—Continued Revision level A320–27–1117 .................................................................................................................................... cprice-sewell on PROD1PC67 with PROPOSALS Service Bulletin Revision 03 .............. General Visual Inspections (j) For all airplanes: At the time specified in paragraph (j)(1) or (j)(2) of this AD, as applicable, do a general visual inspection of the inboard flap trunnions for any wear marks and of the sliding panels for any cracking at the long edges, and do all applicable corrective actions, by accomplishing all of the applicable actions specified in the Accomplishment Instructions of Airbus Service Bulletin A320– 57–1133, Revision 01, dated August 7, 2006; except as provided by paragraph (p) of this AD. All corrective actions must be done at the compliance times specified in Figures 5 and 6, as applicable, of the service bulletin; except as provided by paragraphs (m), (n), and (o) of this AD. Repeat the inspection thereafter at intervals not to exceed 4,000 flight hours. Accomplishment of the general visual inspection required by this paragraph terminates the detailed inspection requirement of paragraph (g) of this AD. Note 3: For the purposes of this AD, a general visual inspection is: ‘‘A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.’’ (1) For airplanes on which the detailed inspection required by paragraph (g) of this AD has been done before the effective date of this AD: Inspect before accumulating 4,000 total flight hours on the inboard flap trunnion since new, or within 4,000 flight hours after accomplishing the most recent inspection required by paragraph (g) of this AD, whichever occurs later. (2) For airplanes other than those identified in paragraph (j)(1) of this AD: Inspect at the latest of the applicable times specified in paragraphs (j)(2)(i), (j)(2)(ii), and (j)(2)(iii) of this AD. (i) Before accumulating 4,000 total flight hours on the inboard flap trunnion since new. (ii) Within 4,000 flight hours after accomplishing paragraph (f) or (h) of this AD. (iii) Within 600 flight hours after the effective date of this AD. Actions Accomplished According to Previous Issue of Service Bulletins (k) Accomplishment of the modification required by paragraph (f) of this AD before the effective date of this AD, in accordance with Airbus Service Bulletin A320–27–1117, Revision 03, dated August 24, 2001, is VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 acceptable for compliance with the requirements of that paragraph. (l) Accomplishment of the inspections required by paragraph (j) of this AD before the effective date of this AD, in accordance with Airbus Service Bulletin A320–57–1133, dated July 28, 2005, is acceptable for compliance with the requirements of that paragraph. Compliance Times Grace Period Assessment (o) Where Airbus Service Bulletins A320– 57–1133, dated July 28, 2005; and Revision 01, dated August 7, 2006; specify contacting the manufacturer for a grace period assessment after replacing the trunnion or flap, contact the Manager, International Branch, ANM–116, Transport Airplane Directorate, FAA; the Direction Ge´ne´rale de l’Aviation Civile; or the European Aviation Safety Agency (or its delegated agent); for the grace period assessment. No Reporting Requirement (p) Although Airbus Service Bulletins A320–57–1133, dated July 28, 2005; and Revision 01, dated August 7, 2006; specify to submit certain information to the manufacturer, this AD does not include that requirement. Alternative Methods of Compliance (AMOCs) (q)(1) The Manager, International Branch, ANM–116, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. (2) Before using any AMOC approved in accordance with 14 CFR 39.19 on any airplane to which the AMOC applies, notify the appropriate principal inspector in the FAA Flight Standards Certificate Holding District Office. Related Information (r) French airworthiness directive F–2005– 139, dated August 3, 2005, also addresses the subject of this AD. Frm 00013 Fmt 4702 August 24, 2001. Issued in Renton, Washington, on February 23, 2007. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E7–3841 Filed 3–5–07; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF THE INTERIOR (m) Where Airbus Service Bulletins A320– 57–1133, dated July 28, 2005; and Revision 01, dated August 7, 2006; specify replacing the sliding panel at the next opportunity if damaged, replace it within 600 flight hours after the inspection required by paragraph (g) or (j) of this AD, as applicable. (n) If any damage to the trunnion is found during any inspection required by paragraph (g) or (j) of this AD, before further flight, do the corrective actions specified in Airbus Service Bulletin A320–57–1133, dated July 28, 2005; or Revision 01, dated August 7, 2006. As of the effective date of this AD, only Revision 01 may be used. PO 00000 Date Sfmt 4702 Minerals Management Service 30 CFR Part 250 RIN 1010–AD12 Oil and Gas and Sulphur Operations on the Outer Continental Shelf (OCS)— Oil and Gas Production Requirements Minerals Management Service (MMS), Interior. ACTION: Proposed rule. AGENCY: SUMMARY: MMS proposes to amend the regulations regarding oil and natural gas production. This is a complete rewrite of these regulations, addressing issues such as production rates, burning oil, and venting and flaring natural gas. The proposed rule would eliminate most restrictions on production rates and clarify flaring and venting limits. The proposed rule was written using plain language, so it will be easier to read and understand. DATES: Submit comments by June 4, 2007. MMS may not fully consider comments received after this date. Submit comments to the Office of Management and Budget on the information collection burden in this rule by April 5, 2007. ADDRESSES: You may submit comments on the rulemaking by any of the following methods. Please use the Regulation Identifier Number (RIN) 1010–AD12 as an identifier in your message. See also Public Comment Procedures under Procedural Matters. • MMS’s Public Connect on-line commenting system, https:// ocsconnect.mms.gov. Follow the instructions on the Web site for submitting comments. • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the instructions on the Web site for submitting comments. • E-mail MMS at rules.comments@mms.gov. Use RIN 1010–AD12 in the subject line. E:\FR\FM\06MRP1.SGM 06MRP1 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules cprice-sewell on PROD1PC67 with PROPOSALS • Fax: 703–787–1546. Identify with the RIN, 1010–AD12. • Mail or hand-carry comments to the Department of the Interior; Minerals Management Service; Attention: Rules Processing Team (RPT); 381 Elden Street, MS–4024; Herndon, Virginia 20170–4817. Please reference ‘‘Oil and Gas Production Requirements, 1010– AD12’’ in your comments and include your name and return address. • Send comments on the information collection in this rule to: Interior Desk Officer 1010–AD12, Office of Management and Budget; 202/395–6566 (facsimile); e-mail: oira_docket@omb.eop.gov. FOR FURTHER INFORMATION CONTACT: Amy C. White, Regulations and Standards Branch, 703–787–1665. SUPPLEMENTARY INFORMATION: This rule proposes to revise subpart K, Oil and Gas Production Rates, of 30 CFR 250. The new version of subpart K would represent a major change in the structure and readability of the regulation with some changes in the requirements. This revision would eliminate some requirements that are no longer necessary in today’s industry and clarify other requirements. Some of these revisions are based on a Government Accountability Office (GAO) report on natural gas flaring and venting. GAO Report In July 2004, the GAO issued a report on world-wide emissions from vented and flared natural gas titled, ‘‘Natural Gas Flaring and Venting—Opportunities to Improve Data and Reduce Emissions’’ (GAO–04–809). This report is available on the GAO Web site at: https:// www.gao.gov/new.items/d04809.pdf. This report reviewed the flaring and venting data available, the extent of flaring and venting, their contributions to greenhouse gas emissions, and opportunities for the federal government to reduce flaring and venting. The report found that: • The amount of gas emitted through flaring and venting worldwide is small compared with global natural gas production and represents a small portion of greenhouse gas emissions. • Worldwide flaring and venting is estimated to contribute, respectively, about 4 percent of the total methane and about 1 percent of the total carbon dioxide emissions caused by human activity. • EIA [Energy Information Administration] estimates that the United States flares or vents about 0.4 percent of its production, representing only 3 percent of the world’s total amount of natural gas flared and vented. • In the United States, there are welldeveloped natural gas markets and infrastructure to reduce the flaring and venting of associated natural gas. • Since 1990, the quantity of oil produced has increased, but because of various global reduction initiatives, the quantity of natural gas flared and vented has remained constant. Consequently, natural gas emissions as a percentage of oil production have decreased. • Since the impact of methane (venting) on the earth’s atmosphere is about 23 times greater than that of carbon dioxide (flaring), a small change in the ratio of flaring to venting could cause a disproportionate change in the impact of emissions. The report concluded that more accurate records on flaring and venting are needed to determine the amount of the resource that is lost and the volume of greenhouse gas emissions these practices contribute to the atmosphere each year. The GAO made two recommendations to the Secretary of the Interior: (1) ‘‘Consider the cost and benefit of requiring that companies flare the natural gas, whenever possible, when flaring or venting is necessary,’’ and (2) ‘‘consider the cost and benefit of requiring that companies use flaring and venting meters to improve oversight.’’ In addition, there was a recommendation to the Secretary of Energy to consider, ‘‘in consultation with EPA [Environmental Protection Agency], MMS, and BLM [Bureau of Land Management], how to best collect separate statistics on flaring and venting.’’ In comments on the draft report, the Department of the Interior (DOI) concurred with the report’s recommendations and agreed to assess the cost effectiveness of requiring the oil and gas industry to implement these changes. MMS conducted analyses to assess the costs and benefits of requiring flare/vent meters and also of requiring flaring instead of venting. The first analysis supported the recommendation to require meters provided that the Current rule 15:32 Mar 05, 2007 Jkt 211001 facilities process more than 2,000 barrels of oil per day (BOPD). This requirement is included in the proposed rule. The second analysis indicated that a regulatory change to require flaring instead of venting may be appropriate. However, the cost of implementing this requirement is significant, and input from potentially affected parties is necessary to establish a reasonable threshold. MMS plans to work directly with interested parties to determine the best approach in considering the GAO recommendation to require flaring instead of venting natural gas. We are soliciting comments on this issue in this proposed rule. We would like comments related to additional costs, environmental impacts, and conditions or situations where flaring may not be advisable. We are planning a workshop to discuss the issue. The workshop would be followed by appropriate rulemaking. To improve data collection, as the GAO report suggested, MMS is proposing that operators report flaring and venting volumes to MMS separately. Currently, MMS only collects information on the total natural gas flared and vented. Operators do not need to differentiate between the two categories. In addition, MMS inspectors currently use infrared cameras to verify natural gas venting. Proposed Rule Organization The proposed rule would completely restructure subpart K. The new version is divided into shorter, easier-to-read sections. Each section focuses on one topic instead of the arrangement in the current version, which covers multiple topics in each section. For example, in the current edition of subpart K, the regulations regarding burning liquid hydrocarbons, as well as those governing flaring or venting natural gas, are in one section. In the proposed rule, these same requirements are in five sections, making it easier for an operator to find the information that applies to its particular situation. The numbering for subpart K would start at § 250.1150 instead of § 250.1100 to accommodate other planned rulemaking. The proposed structure is shown in the following table: Proposed rule § 250.1100 Definitions for production rates ........................................... § 250.105 Definitions. § 250.1101 General requirements and classification of reservoirs ........ VerDate Aug<31>2005 9885 PO 00000 Frm 00014 Fmt 4702 § 250.105 Definitions. § 250.1150 General reservoir production requirements. § 250.1154 How do I determine if my reservoir is sensitive? § 250.1155 What information must I submit for sensitive reservoirs? Sfmt 4702 E:\FR\FM\06MRP1.SGM 06MRP1 9886 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules Current rule Proposed rule § 250.1102 Oil and gas production rates ............................................... § 250.1103 Well production testing ........................................................ § 250.1104 Bottomhole pressure survey ............................................... § 250.1105 Flaring or venting of gas and burning liquid hydrocarbons § 250.1106 Downhole commingling ....................................................... § 250.1107 Enhanced oil and gas recovery operations ........................ New ........................................................................................................... cprice-sewell on PROD1PC67 with PROPOSALS The organization of the proposed rule reflects the actual sequence of events that occurs as wells are developed and the resources produced. The proposed rule is written in plain language to conform to the DOI’s standards for rule writing. These changes include incorporating tables, using a question format for section headings, and using pronouns. These changes would make the rule easier to understand. Finally, a table at the end of the rule lists the information that operators would have to submit to MMS to receive approvals for various operations. Major Changes to the Rule Some requirements from the previous edition of subpart K would be eliminated by the proposed rule because they are unnecessary in today’s petroleum industry. For example, MMS required operators to establish maximum production rates (MPR’s) for producing well completions, and maximum efficient rates (MER’s) for producing reservoirs, in OCS Order No. 11 in 1974, during a period of oil shortages and energy crises. In 1988, MMS reduced the MER requirement. Currently, MER’s are required only on sensitive reservoirs (primarily oil reservoirs with associated gas caps). Determining and maintaining production rates imposes a significant burden on operators. Based on the past 30 years of experience, MMS has concluded that maximum rate requirements and production balancing requirements can be largely eliminated VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 § 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line? § 250.1157 How do I receive approval to produce gas from an oil reservoir with an associated gas cap? Requirements for production rates are largely eliminated. Portions retained were combined with new information in ‘‘§ 250.1159 May the Regional Supervisor limit my well or reservoir production rates?’’ § 250.1151 How often must I conduct well production tests? § 250.1152 How do I conduct well tests? § 250.1153 When must I conduct a static bottomhole pressure survey? § 250.1160 When may I flare or vent gas? § 250.1161 When may I flare or vent gas for extended periods of time? § 250.1162 When may I burn produced liquid hydrocarbons? § 250.1163 How must I measure gas flaring or venting and liquid hydrocarbon burning volumes and what records must I maintain? § 250.1164 What are the requirements for flaring or venting gas containing H2S? § 250.1158 How do I receive approval to downhole commingle hydrocarbons? § 250.1165 What must I do for enhanced recovery operations? § 250.1159 May the Regional Supervisor limit my well or reservoir production rates? § 250.1166 What additional reporting is required for developments in the Alaska Region? § 250.1167 What information must I submit for approvals? without significant detriment to efforts for conservation and maximization of ultimate recovery. However, the proposed rule would allow the Regional Supervisor to set production rates in cases where excessive production could harm ultimate recovery from the reservoir. The proposed rule would clarify required information submittals to MMS, including requirements relating to the documents submitted to MMS and the timing of those submissions. For example, there is additional guidance on notifying adjoining operators regarding production within 500 feet of a common lease or unit line. The proposed rule would provide more detail as to when the notification must occur, what the notice must include, and how to verify the notification with MMS. The proposed rule would incorporate several Notices to Lessees and Operators (NTLs) that clarify the current regulations. These NTLs would be obsolete if the proposed rule becomes final and MMS would withdraw all of these NTLs at that time. However, if necessary, MMS would issue additional NTLs to provide guidance. The NTLs affected include: • NTL No. 97–16, ‘‘Production Within 500 Feet of a Unit or Lease Line,’’ effective August 1, 1997. This NTL clarifies MMS policy on issuing approvals for production within 500 feet of a unit or lease line, and includes details on what the requesting operator needs to provide to MMS for approval. PO 00000 Frm 00015 Fmt 4702 Sfmt 4702 Those details are addressed in the proposed rule. • NTL No. 98–23, ‘‘Interim Reporting Requirements for 30 CFR 250, subpart K, Oil and Gas Production Rates,’’ effective October 15, 1998. This NTL addressed oral approvals for gas flaring and relaxed some of the requirements regarding production rates, including MER and MPR in certain circumstances. The NTL clarified the submittal of written summary letters on flaring incidents that received oral approval. These requirements are addressed in the proposed rule. • NTL No. 99–G20, ‘‘Downhole Commingling Applications,’’ effective September 7, 1999. This NTL was issued in conjunction with NTL No. 99– G19. It clarifies what information the applicant needs to include in downhole commingling applications to ensure that the application is processed without delay. These information requirements were added to the proposed rule. • NTL No. 2006–N06, ‘‘Flaring and Venting Approvals,’’ effective December 19, 2006. This NTL clarifies the definitions of flaring and venting, the record-keeping requirements, the classification of emitted natural gas, and the MMS policy regarding continuous flaring or venting of small volumes of oil-well gas or gas-well gas from storage vessels or other low-pressure production vessels when the gas cannot be economically recovered. These issues are addressed in the proposed rule. This NTL also provides contact information for each Region and provides sample E:\FR\FM\06MRP1.SGM 06MRP1 cprice-sewell on PROD1PC67 with PROPOSALS Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules field records. These two items are not addressed in the proposed rule. MMS would issue a new NTL to include only this information, after we publish the final rule. The most significant change, with regard to cost, would be a proposed requirement for natural gas flare/vent meters on facilities that process significant volumes of oil. The current MMS requirements rely heavily on the accuracy of operator calculations and record keeping. Recent incidents have shown that these methods are insufficient to accurately capture actual flaring and venting volumes. The proposed rule would require the installation of meters to accurately measure all flared and vented natural gas on facilities that process more than 2,000 BOPD. These facilities have the potential to flare or vent significant volumes of associated gas. MMS estimates the cost of purchasing and installing these meters to be $77,000 per facility. Limiting the requirement to facilities that process over 2,000 BOPD ensures that the meters are a small expense relative to the cost of operating those facilities and relative to the income generated by those facilities; and that the requirement would not be an unfair burden to small operators. MMS estimates that 34 operators would have to install the meters on 112 facilities. Of those operators that would have to install the meters, nine are considered small businesses, according to the North American Industry Classification System (NAICS). The July 2004 GAO report on worldwide emissions from vented and flared natural gas, discussed above, recommended that more accurate records on flaring and venting are needed to determine the amount of the resource that is wasted, and the volume of greenhouse gas these practices contribute to the atmosphere each year. The report recommended that DOI consider requiring flare/vent meters to measure the gas lost. MMS agrees with that recommendation. However, MMS believes installing these meters on facilities that process less than 2,000 BOPD would not be cost effective, and might be an undue burden on smaller operators. MMS is also proposing to add new definitions for ‘‘flaring’’ and ‘‘venting’’ to 30 CFR part 250 subpart A, and to revise the definition for ‘‘sensitive reservoir.’’ The following is a brief section-bysection description of the substantive proposed changes to subpart K: § 250.105 Definitions. In the current rule, definitions appear in subpart A at VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 30 CFR 250.105 and in subpart K at 30 CFR 250.1100. MMS proposes removing the definitions from subpart K because they already appear in subpart A. General § 250.1150 What are General Reservoir Production Requirements? Because the first section of subpart K would no longer contain the definitions, this section would contain the general requirements for producing wells and reservoirs. Well Tests and Surveys § 250.1151 How often must I conduct well production tests? Well production testing is required for all wells. This proposed section defines when an operator must perform the tests and describes the conditions for the tests. This section would cover well flow potential tests, semi-annual well tests, and any special tests that the Regional Supervisor may require. Operators would no longer be required to submit Semiannual Well Test Reports within 45 days of the tests. Instead, they would submit the reports within 45 days after the end of the calendar halfyear. This would allow operators to submit all their well tests at one time and include the most recent tests for those few completions that produced during the 6-month period, but were not tested within the last 45 days. § 250.1152 How do I conduct well tests? This proposed section describes how operators must conduct a well test. The testing procedures would be the same as in the current version of the rule. However, the section would be reformatted to make the procedures easier to follow. This reformatting would include the procedure for ensuring that the well is stabilized before conducting the test; the required duration of the test; the usage of correction factors and adjustments; and an option to use other procedures with approval from the Regional Supervisor. It also discusses conducting additional tests that the Regional Supervisor may require. § 250.1153 When must I conduct a static bottomhole pressure survey? Static bottomhole pressure surveys are required on all new producing reservoirs, and annually on reservoirs with three or more producing completions. This proposed section addresses when operators must conduct static bottomhole pressure surveys and what information operators must submit to MMS. The proposed new provision would allow the operator to request a departure from this requirement from the Regional Supervisor, with appropriate justification. PO 00000 Frm 00016 Fmt 4702 Sfmt 4702 9887 Classifying Reservoirs § 250.1154 How do I determine if my reservoir is sensitive? MMS requires that operators classify all reservoirs as either sensitive or non-sensitive. A sensitive reservoir is a reservoir in which high reservoir production rates would decrease ultimate recovery. This section would define the requirements for classifying reservoirs; when the Regional Supervisor may reclassify a reservoir; and when an operator may or must request reclassification of a reservoir. There are not substantive changes between the requirements of the current version of the rule and the proposed; this section would be reorganized and easier to read. § 250.1155 What information must I submit for sensitive reservoirs? This proposed section defines what information MMS requires for sensitive reservoirs and when operators must submit that information. The only proposed change is that the Regional Supervisor may request that the operator submit Form MMS–127 (Sensitive Reservoir Information Report) and supporting information. Approvals Prior to Production § 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line? In the current version of subpart K, a number of requirements, including approval for producing within 500 feet of a unit or lease line and basic classification requirements, are included in one section, 30 CFR 250.1101. In the proposed rule, each of these issues is addressed in a separate section. Title 30 CFR 250.1156 would address only the approval and service fee for producing within 500 feet of a lease or unit line. The proposed approval requirements are clearer than in the current rule, and include issues addressed in NTL 97–16. In addition to receiving approval from the Regional Supervisor, operators must notify operators of adjacent leases. The requirement to notify adjacent operators would be clearer, and there is a list of information the notification would have to include. § 250.1157 How do I receive approval to produce gas from an oil reservoir with an associated gas cap? This section would address how to receive approval to produce from an associated gas cap and its service fee. The required supporting information is listed in the table at proposed 30 CFR 250.1167 at the end of the rule. § 250.1158 How do I receive approval to downhole commingle hydrocarbons? This section would address how to obtain MMS approval to E:\FR\FM\06MRP1.SGM 06MRP1 9888 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules downhole commingle hydrocarbons and the service fee that must accompany your request. For downhole commingling in a competitive reservoir, the operator would be required to notify the operators of all leases that contain the reservoir. The request for approval must document this notification. Operators of the other leases would have 30 days after the notification to provide the Regional Supervisor with letters of acceptance or objection. If the notified operators do not respond within the specified period, the Regional Supervisor will assume the operators do not object. The Regional Supervisor will consider any objections, but may approve the commingling request to protect correlative rights. This section would also incorporate issues addressed in NTL’s No. 99–G19 and 99– G20. cprice-sewell on PROD1PC67 with PROPOSALS Production Rates § 250.1159 May the Regional Supervisor limit my well or reservoir production rates? Generally, this proposed rule would eliminate MPR’s and MER’s. However, this section would retain the Regional Supervisor’s authority to set an MPR for a producing well completion or an MER for a sensitive reservoir. If the Regional Supervisor sets an MPR or MER, it would be subject to the terms and conditions set by the Regional Supervisor. Those terms and conditions would include production restrictions that allow for normal variations and fluctuations in production rates. Flaring, Venting, and Burning Hydrocarbons § 250.1160 When may I flare or vent gas? The current regulation contains all of the flaring, venting, and burning regulations in one section. The proposed rule covers these in separate sections, so it is easier to find the requirements for a given situation. The new format also allows for the inclusion of more detail and clarification of flaring and venting situations that are not described in the current rule. Since there are many situations under which flaring and venting might occur, the table in this section reflects general categories that encompass the situations under which MMS would allow flaring or venting without approval from the Regional Supervisor. Under most circumstances, the proposed rule would allow operators to treat gas flashing from gas-well condensate similar to oilwell gas for flaring and venting approval purposes. The proposed rule would require operators to receive approval before flaring or venting gas in volumes higher VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 than those specified in their previouslyapproved plans. This would enable MMS to ensure that flaring and venting activities are in compliance with environmental laws. The proposed rule would also allow the Regional Supervisor to specify flaring and venting volume limits (in addition to time limits) in order to prevent air quality degradation or the loss of reserves. This is sometimes necessary because offshore production facilities are now capable of flaring or venting extremely large volumes in a short amount of time. § 250.1161 When may I flare or vent gas for extended periods of time? This section would define when operators must receive approval from the Regional Supervisor to flare or vent gas for an extended period of time. If there is a need to flare or vent a small amount of gas (less than 10 MCF per day) due to improperly working valves or pipe fittings and the Regional Supervisor determines that it is prudent to postpone the repair until a scheduled facility shutdown occurs, then the proposed rule would allow the Regional Supervisor to exempt the amount flared or vented from the time limits set in § 250.1160. § 250.1162 When may I burn produced liquid hydrocarbons? The regulations on burning produced liquid hydrocarbon would not change. Operators must receive approval from the Regional Supervisor in all cases before burning liquid hydrocarbons. § 250.1163 How must I measure gas flaring or venting volumes, and liquid hydrocarbon burning volumes; and what records must I maintain? Requirements for measuring and keeping records on flaring, venting, and burning would change. The proposed rule would require vent/flare meters on all facilities that process more than 2,000 BOPD. Operators would be required to install these meters within 120 days after the final rule is published. This extended time frame is to accommodate operators that are required to install meters at multiple facilities. Facilities that do not process more than 2,000 BOPD when the final rule is published, but increase production above this level after the rule is published, would be required to install meters within 90 days. Operators would be required to keep records on flaring, venting, and burning for 6 years to comply with 30 CFR Part 212—Records and Files Maintenance. The operators would be required to store these records on the facility for the first 2 years after the flaring, venting, or burning event. After that, the operator would be able to keep the records at a PO 00000 Frm 00017 Fmt 4702 Sfmt 4702 separate location, but they must be available for MMS review. The proposed rule would clarify reporting procedures and require operators to report flared and vented volumes separately. The previously discussed GAO report concluded that MMS should collect flared and vented volumes separately. MMS tentatively agrees with this conclusion, and does not believe it will pose a significant burden on operators because they already report the volumes of gas flared and vented to MMS on Form MMS– 4054 (Oil and Gas Operations Report). Operators would only need to identify whether the gas volumes were flared or vented. The proposed rule would require operators to identify the facilities where the gas is flared or vented. This would enable MMS to directly compare volumes reported on Forms MMS–4054 with field records. This requirement would also reduce the burden on operators during royalty audits because operators would no longer have to reconstruct historical flare/vent allocations for MMS auditors. The proposed rule would require operators to retain meter recordings on facilities that require flare/vent meters. This would allow MMS to compare eyewitness observations with field records and ensure that flaring and venting incidents are properly recorded. MMS does not believe this would be a significant burden on those facilities with flare/vent meters because these meters typically record such events automatically and operators usually maintain these electronic records for their own purposes. In addition, the proposed rule would clarify when royalties are due on flared gas, vented gas, and burned liquid hydrocarbons under 30 CFR 202.100 Royalty on Oil and 30 CFR 202.150 Royalty on Gas. As in the current rule, royalties would not be due if the hydrocarbons were unavoidably lost. In most cases, MMS will consider hydrocarbons that are flared, vented or burned with MMS approval as ‘‘unavoidably lost’’ and the operator would not be required to pay royalties. However, MMS would retain the authority to determine whether or not the loss was avoidable or due to negligence, even if approved by MMS. For example, if you received MMS approval to flare 100 MCF of gas per day, then actually flared 100,000 MCF of gas per day under conditions that would not have been approved, MMS might determine that the entire volume flared was ‘‘avoidably lost’’ and royalties would be due on the entire volume. MMS would also be able to E:\FR\FM\06MRP1.SGM 06MRP1 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules management plans enable the MMS to monitor recoverable oil and assure proper allocation of reserves for royalty payment and to be consistent with the State of Alaska requirements. This provision would also enable the MMS to manage its responsibility for conservation of resources on a real time basis. The number, type, spacing and sequencing of development wells (producers and injectors) will vary from the original approved development and production plan as more information on the reservoir is obtained. An annual reservoir management plan would enable the MMS to track development activities with the approved development and production plan and assure maximum recovery based on the most current knowledge of the reservoir. Enhanced Recovery § 250.1165 What must I do for enhanced recovery operations? There are no significant proposed changes to the regulations regarding enhanced recovery operations. Operators would still be required to initiate enhanced recovery operations; receive Regional Supervisor approval for the plans; and submit reports on the substances injected, produced, or reproduced. cprice-sewell on PROD1PC67 with PROPOSALS pursue civil penalties, under 30 CFR 250 subpart N—Outer Continental Shelf (OCS) Civil Penalties, if we determine that the loss was avoidable or due to negligence. § 250.1164 What are the requirements for flaring or venting gas containing H2S? The proposed rule would require Regional Supervisor approval before emitting more than 15 lbs of SO2 per hour per mile from shore. This would ensure that flaring activities are in compliance with environmental laws. MMS does not believe this would create an excessive burden on operators. The proposed regulations specify the records that the operator would have to keep. These records must be kept for 6 years, meeting the same requirements as in the previous section. Information Needed With Forms and for Approvals § 250.1167 What information must I submit with forms and for approvals? This proposed table is designed to be an easy-to-use reference to determine the information and supporting documentation to submit to the Regional Supervisor and to remind lessees to pay the appropriate service fee. Forms MMS–126 (Well Potential Test Report) and MMS–127 (Sensitive Reservoir Information Report) would require supporting documents. Also, several operations covered under subpart K (gas cap production, downhole commingling, reservoir reclassification, and production within 500 feet of a unit or lease line), would require that the operator submit applications and supporting documents to the Regional Supervisor. All of these documents are covered in the table. Special Alaska OCS Region Requirements § 250.1166 What additional reporting is required for developments in the Alaska Region? This new section addresses special proposed reporting requirements for Alaska. This would require operators to submit an annual reservoir management report to the Regional Supervisor for any development in Alaska. If a development is regulated by both the MMS and the State of Alaska, the operator would be able to coordinate reporting requirements with MMS and the State of Alaska Oil and Gas Conservation Commission. This section would also require operators to request an MER for sensitive reservoirs in Alaska. This is necessary for the MMS Alaska Region to administer Section 7 Agreements between the Secretary of the Interior and the Governor of the State of Alaska. Under existing Section 7 Agreements, oil and gas reserves underlying a common geologic structure must be unitized and the allocation of production between Federal and State leases for royalty payment must be based on recoverable oil and gas. Under agreement with the State, this determination will be based on reservoir performance following completion of the development drilling program and sustained production. Annual reservoir VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 Questions In addition to comments on these proposed regulations, MMS is requesting comments on the following questions. 1. Are these regulations well organized and easy to read? 2. Is the submittal table useful? 3. Is the 2,000 BOPD requirement for installing flare/vent meters reasonable? Are the cost estimates accurate? 4. Would the requirement to install flare/vent meters pose a safety hazard by restricting flow during emergency facility blowdowns, or are accurate meters (such as ultrasonic meters) available that do not impede gas flow? 5. Should MMS require operators to flare natural gas instead of venting it, under approved flaring and venting conditions? This question is based on a recommendation from the GAO report on flaring and venting natural gas, and reflects concerns about the amount of PO 00000 Frm 00018 Fmt 4702 Sfmt 4702 9889 greenhouse gas that is released into the environment by venting. MMS is studying this recommendation before proposing any regulatory change. We would like comments on this issue, including comments related to additional costs, environmental impacts, and conditions or situations where flaring may not be advisable. Procedural Matters Public Availability of Comments Before including your address, phone number, e-mail address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. Regulatory Planning and Review (Executive Order (E.O.) 12866) This proposed rule is not a significant rule as determined by the Office of Management and Budget (OMB) and is not subject to review under E.O. 12866. (1) The proposed rule would not have an annual economic effect of $100 million or more on the economy. It would not adversely affect in a material way the economy, productivity, competition, jobs, the environment, public health or safety, or State, local, or tribal governments or communities. A cost-benefit and economic analysis is not required. This proposed rule revises the requirements for oil and gas production. The changes in the rule are not significant enough to have an impact on the economy or an economic sector, productivity, jobs, the environment, or other units of government. Some of the current requirements would be relaxed. For example, limits on production rates were eliminated in most cases. This would allow the operators to produce the oil and gas at the rates that they determine are best, and would not have a significant effect on any sector of the economy. (2) The proposed rule would not create a serious inconsistency or otherwise interfere with action taken or planned by another agency because MMS is the only Federal government agency directly involved in setting production requirements for the offshore oil and natural gas industry. (3) This proposed rule would not alter the budgetary effects of entitlements, grants, user fees or loan programs, or the rights and obligations of their recipients. E:\FR\FM\06MRP1.SGM 06MRP1 9890 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules cprice-sewell on PROD1PC67 with PROPOSALS (4) This proposed rule would not raise novel legal or policy issues. There are some changes in production requirements in this proposal, but most of the changes clarify existing MMS requirements. Some may require additional paperwork for the operators. Since the basic production requirements are not changed, and restrictions on production rates are decreased, this proposed rule should not raise novel legal or policy issues. Regulatory Flexibility Act (RFA) The Department of the Interior certifies that this proposed rule would not have a significant economic effect on a substantial number of small entities as defined under the RFA (5 U.S.C. 601 et seq.). An initial Regulatory Flexibility Analysis is not required. Accordingly, a Small Entity Compliance Guide is not required. This rule applies to all lessees operating on the OCS. Lessees fall under the Small Business Administration’s North American Industry Classification System (NAICS) code 211111, Crude Petroleum and Natural Gas Extraction. Under this NAICS code, companies with less than 500 employees are considered small businesses. MMS estimates that 130 lessees explore for and produce oil and gas on the OCS; approximately 70 percent of them (91 companies) fall into the small business category. The proposed regulation would therefore affect a substantial number of small entities. However, we have determined that it would not have a significant economic effect on these small entities. One new requirement that would impose a cost to operators is a requirement to install flaring/venting meters on all facilities that process more than 2,000 BOPD. The GAO report on flaring and venting natural gas, released in July 2004, recommended that MMS require these meters to improve oversight. MMS agrees with this recommendation. MMS regulations allow flaring and venting in very limited circumstances. These meters would help MMS: • Verify the amounts of natural gas that operators flare or vent into the environment; • Prevent waste of resources; • Collect the proper royalties on avoidably flared or vented gas; • Determine if an operator is violating MMS regulations; and • Assess the impacts on the environment. In determining the criteria for which facilities must install the meters, MMS considered the cost of the meters and the amount of production needed to justify the cost. To ensure that the VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 requirement to install flare/vent meters would not produce an undue burden on small companies, it was limited to those facilities that process more than an average of 2,000 BOPD. MMS estimates that 34 companies would have to install meters on 112 facilities at an average cost of $77,000 per facility and a total cost to industry of $8,624,000 (112 × $77,000 = $8,624,000). Of those, nine companies are considered small businesses, based on the NAICS. These nine companies represent only 7 percent of the 130 operators on the OCS. We estimate that seven of these nine companies would need to install meters on one facility each; one company would need to install meters on two facilities; and one company would need to install meters on three facilities. This represents an average cost of $105,875 for each of the small companies (11 facilities × $77,000/9 companies). The average cost to non small companies would be $311,080 per company (101 facilities × $77,000/25 companies). In addition, this does not represent an unfair burden to small companies because the cost of these meters is small in comparison to the revenues generated by the amount of oil processed by those facilities. Your comments are important. The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency’s responsiveness to small business. If you wish to comment on the actions of MMS, call 1–888–734–3247. You may comment to the Small Business Administration without fear of retaliation. Disciplinary action for retaliation by an MMS employee may include suspension or termination from employment with the DOI. Small Business Regulatory Enforcement Fairness Act (SBREFA) The proposed rule is not a major rule under SBREFA (5 U.S.C. 804(2)). This proposed rule: a. Would not have an annual effect on the economy of $100 million or more. This proposed rule revises the requirements for oil and gas production. The changes would not have an impact on the economy or an economic sector, productivity, jobs, the environment, or other units of government. Most of the new requirements are paperwork requirements, and would not add significant time to development and production processes. One new requirement would add new costs for PO 00000 Frm 00019 Fmt 4702 Sfmt 4702 some operators. Operators would be required to install flare/vent meters on any facility that processes more than an average of 2,000 BOPD. MMS estimates that 34 companies would have to install meters on 112 facilities at an average cost of $77,000 per facility and a total cost to industry of $8,624,000 (112 × $77,000 = $8,624,000). b. Would not cause a major increase in costs or prices for consumers, individual industries, Federal, State, or local government agencies, or geographic regions. In most cases, this proposed rule would eliminate the requirement for operators to set limits on production rates, allowing the operators to determine the best rate to produce their reservoirs. The limits on burning, flaring, and venting are clearer. These limits would encourage conservation of our natural resources, without putting undue production restrictions on operators. There would be a new requirement to install meters on facilities that process more than an average of 2,000 BOPD. As discussed above, this requirement would not significantly increase the cost of doing business offshore. c. Would not have significant adverse effects on competition, employment, investment, productivity, innovation, or the ability of U.S.-based enterprises to compete with foreign-based enterprises. This proposed rule would eliminate the requirement for operators to set limits on production rates, allowing the operators to determine the best rate to produce their reservoirs. There are clearer limits on burning, flaring, and venting, which would encourage conservation of our natural resources. Unfunded Mandates Reform Act (UMRA) of 1995 This proposed rule would not impose an unfunded mandate on State, local, or tribal governments or the private sector of more than $100 million per year. The proposed rule would not have a significant or unique effect on State, local, or tribal governments or the private sector. A statement containing the information required by UMRA (2 U.S.C. 1531 et seq.) is not required. This is because the proposal would not affect State, local, or tribal governments, and the effect on the private sector is small. Takings Implication Assessment (Executive Order 12630) The proposed rule is not a governmental action capable of interference with constitutionally protected property rights. Thus, MMS did not need to prepare a Takings Implication Assessment according to E:\FR\FM\06MRP1.SGM 06MRP1 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules E.O. 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights. Federalism (Executive Order 13132) With respect to E.O. 13132, this proposed rule would not have federalism implications. This proposed rule would not substantially and directly affect the relationship between the Federal and State governments. To the extent that State and local governments have a role in OCS activities, this proposed rule would not affect that role. MMS has the authority to regulate offshore oil and gas production. State governments do not have authority over offshore production in Federal waters. Civil Justice Reform (Executive Order 12988) With respect to E.O. 12988, the Office of the Solicitor has determined that the proposed rule would not unduly burden the judicial system and does not meet the requirements of sections 3(a) and 3(b)(2) of the Order. MMS drafted this proposed rule in plain language to provide clear standards. We consulted with the Department of the Interior’s Office of the Solicitor throughout the drafting process for the same reasons. cprice-sewell on PROD1PC67 with PROPOSALS Paperwork Reduction Act (PRA) The proposed rule contains a collection of information that has been submitted to OMB for review and approval under § 3507(d) of the PRA. As part of our continuing effort to reduce paperwork and respondent burdens, MMS invites the public and other Federal agencies to comment on any aspect of the reporting and recordkeeping burden. You may submit your comments on the information collection aspects of this proposed rule directly to the Office of Management and Budget (OMB), Office of Information and Regulatory Affairs, OMB Attention: Desk Officer for the Department of the Interior via OMB email: (OIRA_DOCKET@omb.eop.gov); or by fax (202) 395–6566; identify with 1010–AD12. Send a copy of your comments to the Rules Processing Team (RPT), Attn: Rules Comments; 381 Elden Street, MS–4024; Herndon, Virginia 20170–4817. Please reference ‘‘Oil and Gas Production Requirements—AD12’’ 9891 minor changes to the information collection burden. The changes are: • Report to Minerals Revenue Management (MRM) measured gas flaring or venting and liquid hydrocarbon burning. Submit periodic reports of volumes of oil, gas, or other substances injected, produced, or produced for a second time. Both requirements and burdens are now reported to MRM and their respective burdens are covered under OMB Control Number 1010–0139 (–154 burden hours); • Request Regional Supervisor approval for emitting more than 15 lbs. of SO2 (+10 burden hours); • Submit to Regional Supervisor air quality modeling analysis report. The proposed burden hours represent an adjustment to a current requirement for information that was not previously collected (+40 burden hours); • For Alaska Region Only: Submit to Regional Supervisor annual reservoir management report and supporting information. (At this time, the state requires the same information and MMS receives a copy). Alaska has started producing in state waters. If new development occurs in Federal waters, a minimal burden for submitting an annual reservoir management report, and burden hours for annual revisions are being added (+161 burden hours). • Maintain meter records for detailing gas flaring or venting, and liquid hydrocarbon burning for 6 years. These new burden requirements do not add additional burden hours. • General departure or alternative compliance requests (+5 burden hours). The currently approved information collection for this subpart (1010–0041) will be superseded by this collection when final regulations take effect. Currently, regulations covered under OMB Control Number 1010–0041 have 43,065 annual burden hours. MMS estimates the total annual reporting and recordkeeping ‘‘hour’’ burden for the proposed rule to be 43,127 hours; this is an increase of 62 burden hours. With the exception of the recordkeeping requirement changes and the items identified as ‘‘new’’ in the following chart, the burden estimates shown are those that are estimated for the current subpart K regulations. in your comments. You may obtain a copy of the supporting statement for the new collection of information by contacting the Bureau’s Information Collection Clearance Officer at (202) 208–7744. The PRA provides that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. OMB is required to make a decision concerning the collection of information contained in these proposed regulations 30–60 days after publication of this document in the Federal Register. Therefore, a comment to OMB is best assured of having its full effect if OMB receives it by April 5, 2007. This does not affect the deadline for the public to comment to MMS on the proposed regulations. The title of the collection of information for the rule is ‘‘30 CFR 250, Subpart K, Oil and Gas Production Requirements.’’ The proposed regulations concern oil and gas production requirements, and the information is used in our efforts to conserve natural resources, prevent waste, and protect correlative rights, including the government’s royalty interest. Respondents are the approximately 130 Federal oil and gas and sulphur lessees. Responses to this collection are mandatory. The frequency of response is on occasion, monthly, semi-annually, annually, and as a result of situations encountered depending upon the requirement. The information collection (IC) does not include questions of a sensitive nature. MMS will protect proprietary information according to the Freedom of Information Act (5 U.S.C. 552) and its implementing regulations (43 CFR part 2), and 30 CFR 250.196, ‘‘Data and information to be made available to the public,’’ and 30 CFR part 252, ‘‘OCS Oil and Gas Information Program.’’ Proprietary information concerning geological and geophysical data will be protected according to 43 U.S.C. 1352. The collection of information required by the current subpart K regulations is approved under OMB Control Number 1010–0041. The proposed rule imposes Fee/non-hour cost 30 CFR 250 Subpart K Reporting & recordkeeping requirement Average number of annual responses Hour burden 1151(a), (c); 1155; 1165; 1166(c); 1167. Annual burden hours 3 1,325 forms ...................... 3,975 Submit form MMS–127 and supporting information .. VerDate Aug<31>2005 Submit form MMS–126 and supporting information .. 2.2 2,189 forms ...................... 4,816 17:43 Mar 05, 2007 Jkt 211001 PO 00000 Frm 00020 Fmt 4702 Sfmt 4702 E:\FR\FM\06MRP1.SGM 06MRP1 9892 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules Fee/non-hour cost 30 CFR 250 Subpart K Reporting & recordkeeping requirement Average number of annual responses Hour burden Submit form MMS–128 and supporting information .. 1151(b) .............................. 1152(b), (c) ....................... 1152(d) .............................. 1153 .................................. 1154; 1167 ........................ 1156; 1167 ........................ 0.1—3 Request extension of time to submit results of semiannual well test. Obtain Regional Supervisor approval to conduct well testing using alternative procedures; conduct tests/retests to establish proper MPR or MER; conduct multipoint backpressure test for open flow potential. Provide advance notice of time and date of well tests. Submit results of all static bottomhole pressure surveys obtained by lessee using form MMS–140. Request departure requirement w/justification to Regional Supervisor; submit with Form MMS–140 and supporting information. Request reclassification of reservoir for Regional Supervisor approval and submit supporting information. Request approval to produce within 500 feet of a unit or lease line and submit supporting information; notify operators; provide proof of date to Regional Supervisor. Annual burden hours 1,336* 0.5 13,000 GOM forms .......... 600 POCS forms 37 requests ...................... 0.5 37 requests ...................... 19 0.5 10 notices ........................ 5 14 1 1,270 surveys .................. 120 survey waivers .......... 17,780 120 6 20 requests ...................... 120 5 50 requests ...................... 250 19 3,300 × 50 requests = $165,000 1157; 1167 ........................ Request approval to produce gas cap of a sensitive reservoir and submit supporting information; obtain approval to produce gas from an oil reservoir with an associated gas cap. 12 125 requests .................... 1,500 $4,200 × 125 requests = $525,000 1158; 1167 ........................ Submit request to downhole commingle hydrocarbons and supporting information; notify operators; provide proof of date to Regional Supervisor. 6 119 applications ............... 714 $4,900 × 119 applications = $583,100 1160; 1161 ........................ Request Regional Supervisor approval/inform to flare or vent oil-well gas or gas-well gas/exceed volume; submit documentation. 0.5 1,007 requests ................. 504 1162; 1163(e) .................... Request approval to burn produced liquid hydrocarbons; submit documentation. Initial purchase and install gas meters to measure the amount of gas flared or vented. This is a nonhour cost burden. 0.5 60 requests ...................... 30 0 112 ................................... 0 NEW 1163 ......................... 112 meters @ $77,000 ea = $8,624,000 Report to MRM measured gas flaring or venting and liquid hydrocarbon burning—burden covered under 1010–0139 NEW 1164(b)(1) ................ Request Regional Supervisor approval for emitting more than 15 lbs. of SO2. 1164(b)(2) ......................... H2S Contingency, Exploration, or Development and Production Plans—burden covered under 1010–0141 and 1010–0151 NEW 1164(b)(3) ................ cprice-sewell on PROD1PC67 with PROPOSALS NEW 1163(b); 1165(c) ...... Submit to Regional Supervisor air quality modeling analysis. Submit monthly reports of flared or vented gas containing H2S. Submit proposed plan for enhanced recovery operations. 1164(c) .............................. 1165 .................................. 1165(c) .............................. VerDate Aug<31>2005 0.5 20 requests ...................... Jkt 211001 PO 00000 Frm 00021 Fmt 4702 Sfmt 4702 10 0 40 1 modeling analysis ......... 40 2 3 operators × 12 mos. = 36. 27 plans ........................... 72 12 Submit periodic reports of volumes of oil, gas, or other substances injected, produced, or produced for a second time—burden covered under OMB approval 1010–0139 18:12 Mar 05, 2007 0 E:\FR\FM\06MRP1.SGM 06MRP1 324 0 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules 9893 Fee/non-hour cost 30 CFR 250 Subpart K Reporting & recordkeeping requirement Average number of annual responses Hour burden NEW 1166 ......................... Alaska Region only: submit to Regional Supervisor annual reservoir management report and supporting information. 1 100 1 100 3 annual revisions ........... 5 ....................................... 60 5 20,175 .............................. 31,800 13 869 platforms ................... 11,297 0.5 60 occurrences ................ 30 Recordkeeping Subtotal 929 ................................... 11,327 Total Burden NEW 1150–1167 ............... 20 1 1 (required by State, MMS gets copy). 1 new develop not State lands. Annual burden hours 21,104 .............................. 43,127 General departure or alternative compliance requests not specifically covered elsewhere in subpart K. Reporting Subtotal 1163(c), (d) ....................... 1163(c) .............................. Maintain records for 6 years detailing gas flaring or venting; maintain meter records and provide copies if requested. Maintain records for 6 years detailing liquid hydrocarbon burning; maintain meter records and provide copies if requested. $9,897,100 cprice-sewell on PROD1PC67 with PROPOSALS * Reporting burden for this form is estimated to average 0.1 to 3 hours per form depending on the number of well tests reported, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. See breakdown for form MMS–128 above. (a) MMS specifically solicits comments on the following questions: (1) Is the proposed collection of information necessary for MMS to properly perform its functions, and will it be useful? (2) Are the estimates of the burden hours of the proposed collection reasonable? (3) Do you have any suggestions that would enhance the quality, clarity, or usefulness of the information to be collected? (4) Is there a way to minimize the information collection burden on those who are to respond, including the use of appropriate automated electronic, mechanical, or other forms of information technology? (b) In addition, the PRA requires agencies to estimate the total annual reporting and recordkeeping ‘‘non-hour cost’’ burden resulting from the collection of information. Other than the cost recovery fees listed in the burden table, and the fee for installing flaring/ venting meters (§ 250.1163), we have not identified any other costs, and we solicit your comments on this item. For reporting and recordkeeping only, your response should split the cost estimate into two components: (1) Total capital and startup cost component and (2) annual operation, maintenance, and purchase of services components. Your estimates should consider the costs to generate, maintain, disclose or provide the information. You should describe VerDate Aug<31>2005 17:43 Mar 05, 2007 Jkt 211001 the methods you use to estimate major cost factors, including system and technology acquisition, expected useful life of capital equipment, discount rate(s), and the period over which you incur costs. Capital and start-up costs include, among other items, computers and software you purchase to prepare for collecting information; monitoring, sampling, drilling, and testing equipment; and record storage facilities. Generally, our estimates should not include equipment or services purchased: before October 1, 1995; to comply with requirements not associated with the information collection; for reasons other than to provide information or keep records for the Government; or as part of customary and usual business or private practices. National Environmental Policy Act (NEPA) of 1969 We analyzed this proposed rule in accordance with the criteria of the NEPA and 516 Departmental Manual 6, Appendix 10.4C, ‘‘issuance, and/or modification of regulations.’’ MMS completed a Categorical Exclusion Review (CER) for this action on May 31, 2005, and concluded: ‘‘The proposed rulemaking does not represent an exception to the established criteria for categorical exclusion. Therefore, preparation of an environmental document will not be required, and further documentation of this CER is not required.’’ PO 00000 Frm 00022 Fmt 4702 Sfmt 4702 Energy Supply, Distribution, or Use (Executive Order 13211) Executive Order 13211 requires the agency to prepare a Statement of Energy Effects when it takes a regulatory action that is identified as a significant energy action. This proposed rule is not a significant energy action, and therefore would not require a Statement of Energy Effects because it: a. Is not a significant regulatory action under E.O. 12866, b. Is not likely to have a significant adverse effect on the supply, distribution, or use of energy, and c. Has not been designated by the Administrator of the Office of Information and Regulatory Affairs, OMB, as a significant energy action. Consultation With Indian Tribes (Executive Order 13175) Under the criteria in E.O. 13175, we have evaluated this proposed rule and determined that it has no potential effects on federally recognized Indian tribes. There are no Indian or tribal lands on the OCS. Clarity of This Regulation (Executive Order 12866) Executive Order 12866 requires each agency to write regulations that are easy to understand. MMS invites your comments on how to make this proposed rule easier to understand, including answers to questions such as the following: E:\FR\FM\06MRP1.SGM 06MRP1 9894 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules (1) Are the requirements in the proposed rule clearly stated? (2) Does the proposed rule contain technical language or jargon that interferes with its clarity? (3) Does the format of the proposed rule (grouping and order of sections, use of headings, paragraphs, etc.) aid or reduce its clarity? (4) Is the description of the proposed rule in the ‘‘Supplementary Information’’ section of this preamble helpful in understanding the rule? Send a copy of any comments that concern how we could make this proposed rule easier to understand to: Office of Regulatory Affairs; Department of the Interior, Room 7229; 1849 C Street, NW., Washington, DC 20240. You may also e-mail the comments to this address: Exsec@ios.doi.gov. protection, Government contracts, Investigations, Oil and gas exploration, Penalties, Pipelines, Public lands— mineral resources, Public lands—rightsof-way, Reporting and recordkeeping requirements, Sulphur. Dated: January 31, 2007. C. Stephen Allred, Assistant Secretary—Land and Minerals Management. For the reasons stated in the preamble, Minerals Management Service (MMS) proposes to revise 30 CFR part 250 as follows: PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF 1. The authority citation for part 250 continues to read as follows: List of Subjects in 30 CFR Part 250 Authority: 43 U.S.C. 1331 et seq.; 31 U.S.C. 9701. Continental shelf, Environmental impact statements, Environmental 2. Amend § 250.105 to revise the definition of ‘‘Sensitive reservoir’’ and add in alphabetical order definitions for ‘‘Flaring’’ and ‘‘Venting’’ to read as follows: § 250.105 Definitions. * * * * * Flaring means the burning of gas in the field as it is released into the atmosphere. * * * * * Sensitive reservoir means a reservoir in which high reservoir production rates will decrease ultimate recovery. * * * * * Venting means the release of gas into the atmosphere without igniting it. This includes gas that is released underwater and bubbles to the atmosphere. * * * * * 3. In § 250.125, revise the table in paragraph (a) to read as follows: § 250.125 Service fees. (a) * * * SERVICE FEE TABLE Service—processing of the following: Fee amount Change in Designation of Operator ................... Suspension of Operations/Suspension of Production (SOO/SOP) Request. Exploration Plan (EP) ......................................... 30 CFR citation § 250.143. § 250.171. $3,250 for each surface location, no fee for revisions. $3,750 for each well proposed, no fee for revisions. § 250.211. $3,150 .............................................................. $24,200 ............................................................ $1,850. § 250.292(p). § 250.296(a). Initial applications only, no fee for revisions Development and Production Plan (DPP) or Development Operations Coordination Document (DOCD). Deepwater Operations Plan ............................... Conservation Information Document .................. Application for Permit to Drill (APD; Form MMS–123). $150 ................................................................. $1,800 .............................................................. § 250.410(d); § 250.411; § 250.460; § 250.513(b); § 250.515; § 250.1605; § 250.1617(a); § 250.1622. § 250.460; § 250.465(b); § 250.513(b); § 250.515; § 250.613(b); § 250.615; § 250.1618(a); § 250.1622; § 250.1704(g). Application for Permit to Modify (APM; Form MMS–124). $110 ................................................................. New Facility Production Safety System Application for facility with more than 125 components. $4,750. New Facility Production Safety System Application for facility with 25–125 components. cprice-sewell on PROD1PC67 with PROPOSALS § 250.241(e). New Facility Production Safety System Application for facility with fewer than 25 components. Production Safety System Application—Modification with more than 125 components reviewed. Production Safety System Application—Modification with 25–125 components reviewed. VerDate Aug<31>2005 17:43 Mar 05, 2007 Jkt 211001 A component is a piece of equipment or ancillary system that is protected by one or more of the safety devices required by API RP 14C (incorporated by reference as specified in § 250.198) (Additional fee of $12,500 will be charged if MMS deems it necessary to visit a facility offshore; and $6,500 to visit a facility in a shipyard) $1,150 .............................................................. (Additional fee of $7,850 will be charged if MMS deems it necessary to visit a facility offshore; and $4,500 to visit a facility in a shipyard) $570 ................................................................. § 250.802(e). $530 ................................................................. § 250.802(e). $190 ................................................................. § 250.802(e). PO 00000 Frm 00023 Fmt 4702 Sfmt 4702 § 250.802(e). § 250.802(e). E:\FR\FM\06MRP1.SGM 06MRP1 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules 9895 SERVICE FEE TABLE—Continued Service—processing of the following: Fee amount Production Safety System Application—Modification with fewer than 25 components reviewed. Platform Application—Installation—under the Platform Verification Program. Platform Application—Installation—Fixed Structure Under the Platform Approval Program. Platform Application—Installation—Caisson/ Well Protector. Platform Application—Modification/Repair ......... New Pipeline Application (Lease Term) ............. Pipeline Application—Modification (Lease Term) Pipeline Application—Modification (ROW) ......... Pipeline Repair Notification ................................ Pipeline Right-of-Way (ROW) Grant Application Pipeline Conversion of Lease Term to ROW ..... Pipeline ROW Assignment ................................. 500 Feet From Lease/Unit Line Production Request. Gas Cap Production Request ............................ Downhole Commingling Request ....................... Complex Surface Commingling and Measurement Application. Simple Surface Commingling and Measurement Application. Voluntary Unitization Proposal or Unit Expansion. Unitization Revision ............................................ Application to Remove a Platform or Other Facility. Application to Decommission a Pipeline (Lease Term). Application to Decommission a Pipeline (ROW) 30 CFR citation $80 ................................................................... § 250.802(e). $19,900 ............................................................ § 250.905(k). $2,850 .............................................................. § 250.905(k). $1,450 .............................................................. § 250.905(k). $3,400 .............................................................. $3,100 .............................................................. $1,800 .............................................................. $3,650 .............................................................. $340 ................................................................. $2,350 .............................................................. $200 ................................................................. $170 ................................................................. $3,300 .............................................................. § 250.905(k). § 250.1000(b). § 250.1000(b). § 250.1000(b). § 250.1008(e). § 250.1015. § 250.1015. § 250.1018. § 250.1156. $4,200 .............................................................. $4,900 .............................................................. $3,550 .............................................................. § 250.1157. § 250.1158. § 250.1202(a); § 250.1203(b); § 250.1204(a). $1,200 .............................................................. § 250.1202(a); § 250.1203(b); § 250.1204(a). $10,700 ............................................................ § 250.1303. $760 ................................................................. $4,100 .............................................................. § 250.1303. § 250.1727. $1,000 .............................................................. § 250.1751(a) or § 250.1752(a). $1,900 .............................................................. § 250.1751(a) or § 250.1752(a). Subpart K—Oil and Gas Production Requirements 250.1157 How do I receive approval to produce gas from an oil reservoir with an associated gas cap? 250.1158 How do I receive approval to downhole commingle hydrocarbons? General Production Rates Sec. 250.1150 What are the general reservoir production requirements? 250.1159 May the Regional Supervisor limit my well or reservoir production rates? Well Tests and Surveys 250.1160 When may I flare or vent gas? 250.1161 When may I flare or vent gas for extended periods of time? 250.1162 When may I burn produced liquid hydrocarbons? 250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes and what records must I maintain? 250.1164 What are the requirements for flaring or venting gas containing H2S? * * * * * 4. Revise subpart K to read as follows: Flaring, Venting, and Burning Hydrocarbons 250.1151 How often must I conduct well production tests? 250.1152 How do I conduct well tests? 250.1153 When must I conduct a static bottomhole pressure survey? Classifying Reservoirs 250.1154 How do I determine if my reservoir is sensitive? 250.1155 What information must I submit for sensitive reservoirs? cprice-sewell on PROD1PC67 with PROPOSALS Approvals Prior to Production 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line? Enhanced Recovery 250.1165 What must I do for enhanced recovery operations? Special Alaska OCS Region Requirements 250.1166 What additional reporting is required for developments in the Alaska OCS Region? Information Needed with Forms and for Approvals 250.1167 What information must I submit with forms and for approvals? Subpart K—Oil and Gas Production Requirements General § 250.1150 What are the general reservoir production requirements? You must produce wells and reservoirs at rates that provide for economic development without harming ultimate recovery and without adversely affecting correlative rights. Well Tests and Surveys § 250.1151 How often must I conduct well production tests? (a) You must conduct well production tests as shown in the following table: You must conduct: And you must submit to the Regional Supervisor: (1) A well-flow potential test on all new, recompleted, or reworked well completions within 30 days of the date of first continuous production. Form MMS–126, Well Potential Test Report, along with the supporting data as listed in the table in § 250.1167, within 15 days after the end of the test period. VerDate Aug<31>2005 17:43 Mar 05, 2007 Jkt 211001 PO 00000 Frm 00024 Fmt 4702 Sfmt 4702 E:\FR\FM\06MRP1.SGM 06MRP1 9896 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules You must conduct: And you must submit to the Regional Supervisor: (2) At least one well test during a calendar half-year for each producing completion. Results on Form MMS–128, Semiannual Well Test Report, of the most recent well test obtained. This must be submitted within 45 days after the end of the calendar half-year (b) You may request an extension from the Regional Supervisor if you cannot submit the results of a semiannual well test within the specified time. (c) You must submit an original and one copy of the form required by paragraph (a) of this section, as listed in the table in § 250.1167. You must include one public information copy with each submittal in accordance with §§ 250.190 and 250.196, and mark that copy ‘‘Public Information.’’ § 250.1152 How do I conduct well tests? (a) When you conduct well tests you must: (1) Recover fluid from the well completion equivalent to the amount of fluid introduced into the formation during completion, recompletion, reworking, or treatment operations before you start a well test; (2) Produce the well completion under stabilized rate conditions for at least 6 consecutive hours before beginning the test period; (3) Conduct the test for at least 4 consecutive hours; (4) Adjust measured gas volumes to the standard conditions of 14.73 pounds per square inch absolute (psia) and 60°F for all tests; and (5) Use measured specific gravity values to calculate gas volumes. (b) You may request approval from the Regional Supervisor to conduct a well test using alternative procedures if you can demonstrate test reliability under those procedures. (c) The Regional Supervisor may also require you to conduct the following tests and complete them within the specified time period: (1) A retest or a prolonged test of a well completion if it is determined to be necessary for the proper establishment of a Maximum Production Rate (MPR) or a Maximum Efficient Rate (MER); and (2) A multipoint back-pressure test to determine the theoretical open-flow potential of a gas well. (d) An MMS representative may witness any well test. Upon request, you must provide advance notice to the Regional Supervisor of the times and dates of well tests. § 250.1153 When must I conduct a static bottomhole pressure survey? (a) You must conduct a static bottomhole pressure survey under the following conditions: If you have: Then you must conduct: (1) A new producing reservoir .................................................................. A static bottomhole pressure survey within 90 days after the date of first continuous production. Annual static bottomhole pressure surveys in a sufficient number of key wells to establish an average reservoir pressure. The Regional Supervisor may require that bottomhole pressure surveys be performed on specific wells. cprice-sewell on PROD1PC67 with PROPOSALS (2) A reservoir with three or more producing completions ...................... (b) Your bottomhole pressure survey must meet the following requirements: (1) You must shut-in the well for a minimum period of 4 hours to ensure stabilized conditions; and (2) The bottomhole pressure survey must consist of a pressure measurement at mid-perforation, and pressure measurements and gradient information for at least four gradient stops coming out of the hole. (c) You must submit to the Regional Supervisor the results of all static bottomhole pressure surveys on Form MMS–140, Bottomhole Pressure Survey Report, within 60 days after the date of the survey. (d) The Regional Supervisor may grant a departure from the requirement to run a static bottomhole pressure survey. You must request a departure by letter, along with Form MMS–140, Bottomhole Pressure Survey Report. You must include sufficient justification to support the departure request. VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 Classifying Reservoirs § 250.1154 How do I determine if my reservoir is sensitive? (a) You must determine whether each reservoir is sensitive. You must classify the reservoir as sensitive if: (1) Under initial conditions it is an oil reservoir with an associated gas cap; (2) At any time there are near-critical fluids; or (3) The reservoir is undergoing secondary or tertiary recovery. (b) For the purposes of this subpart, near-critical fluids are those fluids that occur in high temperature, highpressure reservoirs where it is not possible to define the liquid-gas contact or fluids in reservoirs that are near bubble point or dew point conditions. (c) The Regional Supervisor may reclassify a reservoir when available information warrants reclassification. (d) If available information indicates that a reservoir previously classified as non-sensitive is now sensitive, you must submit a request to the Regional Supervisor to reclassify the reservoir. You must include supporting PO 00000 Frm 00025 Fmt 4702 Sfmt 4702 information, as listed in the table in § 250.1167, with your request. (e) If information indicates that a reservoir previously classified as sensitive is now non-sensitive, you may submit a request to the Regional Supervisor to reclassify the reservoir. You must include supporting information, as listed in the table in § 250.1167, with your request. § 250.1155 What information must I submit for sensitive reservoirs? You must submit an original and three copies of Form MMS–127 and supporting information, as listed in the table in § 250.1167 to the Regional Supervisor. You must include one public information copy with each submittal in accordance with §§ 250.190 and 250.196, and mark that copy ‘‘Public Information.’’ You must submit this information: (a) Within 45 days after beginning production from the reservoir or discovering that it is sensitive; (b) At least once during the calendar year; (c) Within 45 days after you revise reservoir parameters; and E:\FR\FM\06MRP1.SGM 06MRP1 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules (d) Within 45 days after the Regional Supervisor classifies the reservoir as sensitive under § 250.1154(c). Approvals Prior to Production § 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line? (a) You must obtain approval from the Regional Supervisor before you start producing from a well that has any portion of the completed interval less than 500 feet from a unit or lease line. Submit to MMS the service fee listed in § 250.125 and the Regional Supervisor will determine whether approval of your request will maximize ultimate recovery, avoids the waste of natural resources or whether it is necessary to protect correlative rights. You do not need to obtain approval if the adjacent leases or units have the same unit, lease, and royalty interests as the lease or unit you plan to produce. You do not need to obtain approval if the adjacent block is unleased. (b) You must notify the operator(s) of adjacent property(ies) that are within 500 feet of the completion, if the adjacent acreage is a leased block in the Federal OCS. You must provide the Regional Supervisor proof of the date of the notification. The operators of the adjacent properties have 30 days after receiving the notification to provide the Regional Supervisor letters of acceptance or objection. If an adjacent operator does not respond within 30 days, the Regional Supervisor will presume there are no objections and proceed with a decision. The notification must include: (1) The well name; (2) The rectangular coordinates (x, y) of the location of the top and bottom of the completion or target completion reference to the North American Datum 1983, and the subsea depths of the top and bottom of the completion or target completion; (3) The distance from the completion or target completion to the unit or lease line at its nearest point; and (4) A statement indicating whether or not it will be a high-capacity completion having a perforated or open hole interval greater than 150 feet measured depth. § 250.1157 How do I receive approval to produce gas from an oil reservoir with an associated gas cap? You must request and receive written approval from the Regional Supervisor before producing gas from each completion in an oil reservoir that is known to have an associated gas cap. If the oil reservoir is not initially known to have an associated gas cap, but your oil well begins to show characteristics of a gas well, you must request and receive written approval from the Regional Supervisor to continue producing the well. You must include the service fee listed in § 250.125 and the supporting information, as listed in the table in § 250.1167, with your request. § 250.1158 How do I receive approval to downhole commingle hydrocarbons? (a) Before you perforate a well, you must request and receive approval from the Regional Supervisor to commingle hydrocarbons produced from multiple reservoirs within a common wellbore. The Regional Supervisor will determine whether your request maximizes ultimate recovery and avoids the waste of natural resources. You must include the service fee listed in § 250.125 and the supporting information, as listed in the table in § 250.1167, with your request. (b) If one or more of the commingled reservoirs is a competitive reservoir, you must notify the operators of all leases that contain the reservoir that you 9897 intend to downhole commingle the reservoirs. Your request for approval of downhole commingling must include proof of the date of this notification. The notified operators have 30 days after notification to provide the Regional Supervisor with letters of acceptance or objection. If the notified operators do not respond within the specified period, the Regional Supervisor will assume the operators do not object and proceed with a decision. Production Rates § 250.1159 May the Regional Supervisor limit my well or reservoir production rates? (a) The Regional Supervisor may set a Maximum Production Rate (MPR) for a producing well completion, or set a Maximum Efficient Rate (MER) for a reservoir, or both, if the Regional Supervisor determines that an excessive production rate could harm ultimate recovery. An MPR or MER will be based on well tests and any limitations imposed by well and surface equipment, sand production, reservoir sensitivity, gas-oil and water-oil ratios, location of perforated intervals, and prudent operating practices. (b) If the Regional Supervisor sets an MPR for a producing well completion, or an MER for a reservoir, you may not exceed those rates except due to normal variations and fluctuations in production rates, as set by the Regional Supervisor. Flaring, Venting, and Burning Hydrocarbons § 250.1160 When may I flare or vent gas? (a) You must receive approval from the Regional Supervisor to flare or vent oil-well gas or gas-well gas at your facility, except in the following situations: Additional requirements (1) When the gas is lease use gas (produced natural gas which is used on or for the benefit of lease operations such as gas used to operate production facilities) or is used as an additive necessary to burn waste products, such as H2S. (2) During the restart of a facility that was shut in because of weather conditions, such as a hurricane. (3) During the blow down of transportation pipelines downstream of the royalty meter. cprice-sewell on PROD1PC67 with PROPOSALS Condition The volume of gas flared or vented may not exceed the amount necessary for its intended purpose. Burning waste products may require approval under other regulations. (4) During the unloading or cleaning of a well, drill-stem testing, production testing, other well-evaluation testing, or the necessary blow down to perform these procedures. (5) When properly working equipment yields flash gas (natural gas released from liquid hydrocarbons as a result of a decrease in pressure, an increase in temperature, or both) from storage vessels or other low-pressure production vessels, and you cannot economically recover this flash gas. VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 PO 00000 Frm 00026 Fmt 4702 Flaring or venting may not exceed 48 cumulative hours without Regional Supervisor approval. (i) You must report the location, time, flare/vent volume, and reason for flaring/venting to the Regional Supervisor in writing within 72 hours after the incident is over. (ii) Additional approval may be required under subparts H and J of this part. You may not exceed 48 cumulative hours of flaring or venting per testing operation on a single completion without Regional Supervisor approval. You may not flare or vent more than an average 50 MCF per day during any calendar month without Regional Supervisor approval. Sfmt 4702 E:\FR\FM\06MRP1.SGM 06MRP1 9898 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules Condition Additional requirements (6) When the equipment works properly but there is a temporary upset condition, such as a hydrate or paraffin plug. (i) For oil-well gas and gas-well flash gas (natural gas released from condensate as a result of a decrease in pressure, an increase in temperature, or both), you may not exceed 48 continuous hours of flaring or venting without Regional Supervisor approval. (ii) For primary gas-well gas (natural gas from a gas well completion that is at or near its wellhead pressure; this does not include flash gas), you may not exceed 2 continuous hours of flaring or venting without Regional Supervisor approval. (iii) You may not exceed 144 cumulative hours of flaring or venting during a calendar month without Regional Supervisor approval. (i) For oil-well gas and gas-well flash gas, you may not exceed 48 continuous hours of flaring or venting without Regional Supervisor approval. (ii) For primary gas-well gas, you may not exceed 2 continuous hours of flaring or venting without Regional Supervisor approval. (iii) You may not exceed 144 cumulative hours of flaring or venting during a calendar month without Regional Supervisor approval. (iv) The continuous and cumulative hours allowed under this paragraph may be counted separately from the hours under paragraph (a)(6) of this section. cprice-sewell on PROD1PC67 with PROPOSALS (7) When equipment fails to work properly, including equipment maintenance and repair, or when you must relieve system pressures. (b) You must inform the Regional Supervisor and receive approval to flare or vent gas before you exceed the volume specified in your Development and Production Plan submitted under subpart B of this part, even if the flaring or venting does not require approval under paragraph (a) of this section. The Regional Supervisor will determine whether your proposed flaring or venting complies with air emission thresholds under subpart C of this part. (c) The Regional Supervisor may establish alternative approval procedures to cover situations where you cannot contact the MMS office, such as during non-office hours. (d) The Regional Supervisor may specify a volume limit, or a shorter time limit than specified elsewhere in this part, in order to prevent air quality degradation or loss of reserves. (e) The Regional Supervisor will evaluate your request for gas flaring or venting and determine if the loss of hydrocarbons is due to negligence, or could be avoided. (f) If you flare or vent gas without the required approval, or if the Regional Supervisor determines that you were negligent or could have avoided flaring or venting the gas, the hydrocarbons will be considered avoidably lost or wasted. You must pay royalties on the loss or waste, according to part 202 of this title. You must value any gas or liquid hydrocarbons avoidably lost or wasted under the provisions of part 206 of this title. § 250.1161 When may I flare or vent gas for extended periods of time? You may flare or vent oil-well gas and gas-well flash gas for a period that the Regional Supervisor will specify, and which will not exceed 1 year, if the VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 Regional Supervisor approves your request for one of the following reasons: (a) You initiate an action which, when completed, will eliminate flaring and venting; (b) You submit to the Regional Supervisor an evaluation supported by engineering, geologic, and economic data indicating that the oil and gas produced from the well(s) will not economically support the facilities necessary to sell the gas; or to use the gas on or for the benefit of, the lease; or (c) The Regional Supervisor determines that an improperly working valve, pipe fitting, or similar component results in flaring or venting of less than 10 MCF per day, and that it is prudent to repair the leak at a later date. The Regional Supervisor may exempt this flaring or venting from the time limits set in § 250.1160. § 250.1162 When may I burn produced liquid hydrocarbons? (a) You must request and receive approval from the Regional Supervisor to burn any produced liquid hydrocarbons. The Regional Supervisor may allow you to burn condensate if you demonstrate that transporting it to market or re-injecting it is not feasible or poses a significant risk of harm to offshore personnel or the environment. In most cases, the Regional Supervisor will not allow you to burn more than 300 barrels of condensate in total during unloading or cleaning of a well, drillstem testing, production testing, or other well-evaluation testing. (b) The Regional Supervisor will evaluate your request for liquid hydrocarbon burning, and determine if the loss of hydrocarbons is due to negligence or could be avoided. (c) If you burn liquid hydrocarbons without the required approval, or if the PO 00000 Frm 00027 Fmt 4702 Sfmt 4702 Regional Supervisor determines that you were negligent or could have avoided burning liquid hydrocarbons, the hydrocarbons will be considered avoidably lost or wasted. You must pay royalties on the loss or waste, according to part 202 of this title. You must value any liquid hydrocarbons avoidably lost or wasted under the provisions of part 206 of this title. § 250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes and what records must I maintain? (a) If your facility processes more than an average of 2,000 BOPD during [MONTH AND YEAR IN WHICH FINAL RULE IS PUBLISHED], you must install flare/vent meters within 120 days after [THE MONTH AND YEAR IN WHICH THE FINAL RULE IS PUBLISHED]. If your facility processes more than an average of 2,000 BOPD during a calendar month after [MONTH AND YEAR IN WHICH FINAL RULE IS PUBLISHED], you must install flare/ vent meters within 90 days after the end of the month in which the average amount of oil processed exceeds 2,000 BOPD. (1) The flare/vent meters must measure all flared and vented gas within 2 percent accuracy. (2) You must calibrate the meters regularly, in accordance with the manufacturer’s recommendation, or at least once every 6 months, whichever is shorter. (b) You must report all hydrocarbons produced from a well completion, including all gas flared, gas vented, and liquid hydrocarbons burned, to Minerals Revenue Management on Form MMS– 4054 (Oil and Gas Operations Report), in accordance with § 216.53 of this title. E:\FR\FM\06MRP1.SGM 06MRP1 cprice-sewell on PROD1PC67 with PROPOSALS Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules (1) You must report the amount of gas flared and the amount of gas vented separately. (2) You may classify and report gas used to operate equipment on the facility (such as gas used to power engines, gas used as pilot lights, instrument gas, purge gas used to prevent oxygen from entering the flare or vent stack, sparge gas used to regenerate glycol, and blanket gas used to maintain pressure in low pressure vessels) as lease use gas. (3) You must report the amount of gas flared and vented at each facility on a lease or unit basis. Gas flared and vented from multiple facilities on a single lease or unit must be reported separately. (c) You must prepare and maintain records detailing gas flaring, gas venting, and liquid hydrocarbon burning for each facility. You must maintain these records for the period specified in part 212 of this title. You must keep these records on the facility for 2 years and have them available for inspection by MMS representatives. After 2 years, you must maintain the records, allow MMS representatives to inspect the records upon request, and provide copies to the Regional Supervisor upon request, but you are not required to keep them on the facility. The records must include, at a minimum: (1) Daily volumes of gas flared, gas vented, and liquid hydrocarbons burned; (2) Number of hours of gas flaring, gas venting, and liquid hydrocarbon burning, on a daily basis; (3) A list of the wells contributing to gas flaring, gas venting, and liquid hydrocarbon burning, along with gas-oil ratio data; (4) Reasons for gas flaring, gas venting, and liquid hydrocarbon burning; and (5) Documentation of all required approvals. (d) If your facility is required to have flare/vent meters, you must maintain the meter recordings for the period specified in §§ 212.50 and 212.51 of this title. You must keep these recordings on the facility for 2 years and have them available for inspection by MMS representatives. After 2 years, you must maintain the recordings, allow MMS representatives to inspect the recordings upon request, and provide copies to the Regional Supervisor upon request, but are not required to keep them on the facility. These recordings must include the begin times, end times, and volumes for all flaring and venting incidents. (e) If your flaring or venting of gas, or burning of liquid hydrocarbons, VerDate Aug<31>2005 18:26 Mar 05, 2007 Jkt 211001 required written or oral approval, you must submit documentation to the Regional Supervisor summarizing the location, dates, number of hours, and volumes of gas flared, gas vented, and liquid hydrocarbons burned under the approval, as required under § 250.140. § 250.1164 What are the requirements for flaring or venting gas containing H2S? (a) You may not vent gas containing H2S, except for minor releases during maintenance and repair activities that do not result in a 15-minute timeweighted average atmosphere concentration of H2S of 20 ppm or higher anywhere on the platform. (b) You may flare gas containing H2S only if you meet the requirements of §§ 250.1160, 250.1161, 250.1163, and the following additional requirements: (1) You may not emit more than 15 lbs of SO2 per hour per mile from shore, without approval from the Regional Supervisor; (2) For safety or air pollution prevention purposes, the Regional Supervisor may further restrict the flaring of gas containing H2S. The Regional Supervisor will use information provided in the lessee’s H2S Contingency Plan (§ 250.490(f)), Exploration Plan, Development and Production Plan, Development Operations Coordination Document, and associated documents to determine the need for restrictions; and (3) If the Regional Supervisor determines that flaring at a facility or group of facilities may significantly affect the air quality of an onshore area, the Regional Supervisor may require you to conduct an air quality modeling analysis to determine the potential effect of facility emissions. The Regional Supervisor may require monitoring and reporting, or may restrict or prohibit flaring, under §§ 250.303 and 250.304. (c) You must report flared and vented gas containing H2S as required under § 250.1163. In addition, the Regional Supervisor may require you to submit monthly reports of flared and vented gas containing H2S. Each report must contain, on a daily basis: (1) The volume and duration of each flaring and venting occurrence; (2) H2S concentration in the flared or vented gas; and (3) The calculated amount of SO2 emitted. Enhanced Recovery 9899 ultimate recovery of oil or gas under sound engineering and economic principles. (b) Before initiating enhanced recovery operations, you must submit a proposed plan to the Regional Supervisor and receive approval for pressure maintenance, secondary or tertiary recovery, cycling, and similar recovery operations intended to increase the ultimate recovery of oil and gas from a reservoir. The proposed plan must include, for each project reservoir, a brief geologic and engineering overview, structure map, well log section, Form MMS–127, and any additional information required by the Regional Supervisor. (c) You must report to Minerals Revenue Management the volumes of oil, gas, or other substances injected, produced, or produced for a second time under § 216.53 of this title. Special Alaska OCS Region Requirements § 250.1166 What additional reporting is required for developments in the Alaska OCS Region? (a) For any development in the Alaska OCS Region, you must submit an annual reservoir management report to the Regional Supervisor. The report must contain information detailing the activities performed during the previous year and planned for the upcoming year that will provide for: (1) The prevention of waste; (2) The protection of correlative rights; and (3) A greater ultimate recovery of oil and gas. (b) If your development is jointly regulated by MMS and the State of Alaska, MMS and the AOGCC will jointly determine appropriate reporting requirements to minimize or eliminate duplicate reporting requirements. (c) Every time you are required to submit Form MMS–127 under § 250.1155, you must request an MER for each producing sensitive reservoir in the Alaska OCS Region, unless otherwise instructed by the Regional Supervisor. Information Needed With Forms and for Approvals § 250.1165 What must I do for enhanced recovery operations? § 250.1167 What information must I submit with forms and for approvals? (a) You must promptly initiate enhanced oil and gas recovery operations for all reservoirs where these operations would result in increased You must submit the supporting information listed in the following table with the forms and for the approvals required under this subpart: PO 00000 Frm 00028 Fmt 4702 Sfmt 4702 E:\FR\FM\06MRP1.SGM 06MRP1 9900 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules cprice-sewell on PROD1PC67 with PROPOSALS WPT MMS– 126 (a) Maps: (1) Base map with surface, bottomhole, and completion locations with respect to the unit or lease line and the orientation of representative seismic lines or cross sections ............................... (2) Structure maps with penetration point and subsea depth for each well penetrating the reservoirs, highlighting subject wells; reservoir boundaries; and original and current fluid levels .................. (3) Net sand isopach with total net sand penetrated for each well, identified at the penetration point (4) Net hydrocarbon isopach with net feet of pay for each well, identified at the penetration point ........ (b) Seismic data: (1) Representative seismic lines, including strike and dip lines that confirm the structure; indicate polarity ............................................... (2) Time/depth correlation table for seismic data .................................. (3) Amplitude extraction of seismic horizon, if applicable ..................... (c) Logs: (1) Well log sections with tops and bottoms of the reservoir(s) and proposed or existing perforations (2) Structural cross-sections showing the subject well and nearby wells (d) Engineering Data: (1) Estimated recoverable reserves for each well completion in the reservoir; total recoverable reserves for each reservoir; method of calculation; reservoir parameters used in volumetric and decline curve analysis ....................... (2) Well schematics showing current and proposed conditions ............... (3) The drive mechanism of each reservoir ........................................ (4) Pressure data, by date, and whether they are estimated or measured ...................................... (5) Production data and decline curve analysis indicative of the reservoir performance ................... (6) Reservoir simulation with the reservoir parameters used, history matches, and prediction runs (include proposed development scenario) ............................................. (e) General information: (1) Detailed economic analysis ........ (2) Reservoir name and whether or not it is competitive as defined under § 250.105 ............................ (3) Operator name, lessee name(s), block, lease number, royalty rate, and unit number (if applicable) of all relevant leases ......................... (4) Brief geologic overview of project (5) Explanation of why the proposed completion scenario will not harm ultimate recovery ........................... VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 SRI MMS–127 Gas cap production Downhole commingling Reservoir reclassification Production within 500-ft of a Unit or Lease Line ........................ ........................   ........................        ........................    ........................ ........................ ........................    ........................ ........................ ........................ ........................   ........................  ........................ ........................   ........................  ........................            ........................ ........................    ........................ ........................  † † ........................  ........................ ........................   ........................  ........................      ........................ ........................    ........................ ........................ ........................    ........................ ........................ ........................ * * * * ........................ ........................ * * ........................ ........................ ........................      ........................ ........................ ........................ ........................ ........................    ........................    ........................ ........................   ........................  PO 00000 Frm 00029 Fmt 4702 Sfmt 4702 E:\FR\FM\06MRP1.SGM 06MRP1 9901 Federal Register / Vol. 72, No. 43 / Tuesday, March 6, 2007 / Proposed Rules WPT MMS– 126 (6) List of all wells in subject reservoirs that have ever produced or been used for injection .................. SRI MMS–127 Gas cap production Downhole commingling Reservoir reclassification Production within 500-ft of a Unit or Lease Line ........................ ........................     † Each Gas Cap Production request and Downhole Commingling request should include the estimated recoverable reserves for (1) the case where your proposed production scenario is approved, and (2) the case where your proposed production scenario is denied. * Additional items the Regional Supervisor may request. Note: All maps must be at a standard scale and show lease and unit lines. If you have not generated all of the required data for your own purposes, you may submit those data you have available for consideration. the Waterways Safety Branch of Sector San Francisco between 9 a.m. and 4 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Lieutenant Eric Ramos, U.S. Coast Guard Sector San Francisco, at (415) 556–2950 or Sector San Francisco 24hour Command Center at (415) 399– 3547. SUPPLEMENTARY INFORMATION: (f) Depending on the above requirement, you must submit appropriate payment of the service fee(s) listed in § 250.125. [FR Doc. E7–3846 Filed 3–5–07; 8:45 am] BILLING CODE 4310–MR–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [COTP San Francisco Bay 07–003] RIN 1625–AA00 Safety Zone; Liberty Island Conductor Removal, Sacramento River, CA Coast Guard, DHS. Notice of proposed rulemaking. AGENCY: cprice-sewell on PROD1PC67 with PROPOSALS ACTION: SUMMARY: The Coast Guard proposes to establish a safety zone in the navigable waters of the Sacramento River that will prohibit vessels and people from entering into or remaining within close proximity to the deep water channel. Pacific Gas and Electric Company (PG&E) will be removing a conductor from the Liberty Island towers, two of which cross over the deep water channel, on March 28, 2007. The proposed safety zone will close the deep water channel for approximately 30 minutes during the conductor removal. DATES: Comments and related material must reach the Coast Guard on or before March 14, 2007. ADDRESSES: You may mail comments and related material to United States Coast Guard Sector San Francisco, Waterways Safety Branch, Yerba Buena Island, Bldg. 278, San Francisco, California, 94130. The Waterways Safety Branch of Sector San Francisco maintains the public docket for this rulemaking. Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, will become part of this docket and will be available for inspection or copying at VerDate Aug<31>2005 15:32 Mar 05, 2007 Jkt 211001 Request for Comments We encourage you to participate in this rulemaking by submitting comments and related material. If you do so, please include your name and address, identify the docket number for this rulemaking (COTP SF 07–003), indicate the specific section of this document to which each comment applies, and give the reason for each comment. Please submit all comments and related material in an unbound format, no larger than 81⁄2 by 11 inches, suitable for copying. If you would like to know they reached us, please enclose a stamped, self-addressed postcard or envelope. We will consider all comments and material received during the comment period. We may change this proposed rule in view of them. Public Meeting We do not now plan to hold a public meeting. But you may submit a request for a meeting by writing to Coast Guard Sector San Francisco, Waterways Safety Branch at the address under ADDRESSES explaining why one would be beneficial. If we determine that one would aid this rulemaking, we will hold one at a time and place announced by a later notice in the Federal Register. Background and Purpose PG&E will be removing a conductor from the Liberty Island towers on March 28, 2007. Two of the towers cross the Sacramento deep water channel. PG&E will use a helicopter to cut the conductor off of one tower and it will fall into the water. They will then recover the cut conductor and place it on the bank before continuing to remove PO 00000 Frm 00030 Fmt 4702 Sfmt 4702 the rest of the conductors from the remaining towers that are over land. Discussion of Proposed Rule This proposed safety zone will encompass the navigable waters of the Sacramento River from the surface to the sea floor, encompassing a circular area with a 500-yard radius at position 38°17.072′N / 121°39.619′W (NAD 83) for the removal of a conductor from a tower that crosses over the deep water channel. This proposed safety zone is necessary to protect persons and vessels from hazards, injury, and damage associated with the conductor removal. Regulatory Evaluation This proposed rule is not a ‘‘significant regulatory action’’ under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. We expect the economic impact of this proposed rule to be so minimal that a full Regulatory Evaluation is unnecessary. Although this rule will restrict access to the waters encompassed by the proposed safety zone, the effect of this rule is not expected to be significant because the local waterway users will be notified via public broadcast notice to mariners to ensure the proposed safety zone will result in minimum impact. The entities most likely to be affected are pleasure craft engaged in recreational activities. Small Entities Under the Regulatory Flexibility Act (5 U.S.C. 601–612), we have considered whether this proposed rule would have a significant economic impact on a substantial number of small entities. The term ‘‘small entities’’ comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and E:\FR\FM\06MRP1.SGM 06MRP1

Agencies

[Federal Register Volume 72, Number 43 (Tuesday, March 6, 2007)]
[Proposed Rules]
[Pages 9884-9901]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3846]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Minerals Management Service

30 CFR Part 250

RIN 1010-AD12


Oil and Gas and Sulphur Operations on the Outer Continental Shelf 
(OCS)--Oil and Gas Production Requirements

AGENCY: Minerals Management Service (MMS), Interior.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: MMS proposes to amend the regulations regarding oil and 
natural gas production. This is a complete rewrite of these 
regulations, addressing issues such as production rates, burning oil, 
and venting and flaring natural gas. The proposed rule would eliminate 
most restrictions on production rates and clarify flaring and venting 
limits. The proposed rule was written using plain language, so it will 
be easier to read and understand.

DATES: Submit comments by June 4, 2007. MMS may not fully consider 
comments received after this date. Submit comments to the Office of 
Management and Budget on the information collection burden in this rule 
by April 5, 2007.

ADDRESSES: You may submit comments on the rulemaking by any of the 
following methods. Please use the Regulation Identifier Number (RIN) 
1010-AD12 as an identifier in your message. See also Public Comment 
Procedures under Procedural Matters.
     MMS's Public Connect on-line commenting system, https://
ocsconnect.mms.gov. Follow the instructions on the Web site for 
submitting comments.
     Federal eRulemaking Portal: https://www.regulations.gov. 
Follow the instructions on the Web site for submitting comments.
     E-mail MMS at rules.comments@mms.gov. Use RIN 1010-AD12 in 
the subject line.

[[Page 9885]]

     Fax: 703-787-1546. Identify with the RIN, 1010-AD12.
     Mail or hand-carry comments to the Department of the 
Interior; Minerals Management Service; Attention: Rules Processing Team 
(RPT); 381 Elden Street, MS-4024; Herndon, Virginia 20170-4817. Please 
reference ``Oil and Gas Production Requirements, 1010-AD12'' in your 
comments and include your name and return address.
     Send comments on the information collection in this rule 
to: Interior Desk Officer 1010-AD12, Office of Management and Budget; 
202/395-6566 (facsimile); e-mail: oira_docket@omb.eop.gov.

FOR FURTHER INFORMATION CONTACT: Amy C. White, Regulations and 
Standards Branch, 703-787-1665.

SUPPLEMENTARY INFORMATION: This rule proposes to revise subpart K, Oil 
and Gas Production Rates, of 30 CFR 250. The new version of subpart K 
would represent a major change in the structure and readability of the 
regulation with some changes in the requirements. This revision would 
eliminate some requirements that are no longer necessary in today's 
industry and clarify other requirements. Some of these revisions are 
based on a Government Accountability Office (GAO) report on natural gas 
flaring and venting.

GAO Report

    In July 2004, the GAO issued a report on world-wide emissions from 
vented and flared natural gas titled, ``Natural Gas Flaring and 
Venting--Opportunities to Improve Data and Reduce Emissions'' (GAO-04-
809). This report is available on the GAO Web site at: https://
www.gao.gov/new.items/d04809.pdf. This report reviewed the flaring and 
venting data available, the extent of flaring and venting, their 
contributions to greenhouse gas emissions, and opportunities for the 
federal government to reduce flaring and venting. The report found 
that:
     The amount of gas emitted through flaring and venting 
worldwide is small compared with global natural gas production and 
represents a small portion of greenhouse gas emissions.
     Worldwide flaring and venting is estimated to contribute, 
respectively, about 4 percent of the total methane and about 1 percent 
of the total carbon dioxide emissions caused by human activity.
     EIA [Energy Information Administration] estimates that the 
United States flares or vents about 0.4 percent of its production, 
representing only 3 percent of the world's total amount of natural gas 
flared and vented.
     In the United States, there are well-developed natural gas 
markets and infrastructure to reduce the flaring and venting of 
associated natural gas.
     Since 1990, the quantity of oil produced has increased, 
but because of various global reduction initiatives, the quantity of 
natural gas flared and vented has remained constant. Consequently, 
natural gas emissions as a percentage of oil production have decreased.
     Since the impact of methane (venting) on the earth's 
atmosphere is about 23 times greater than that of carbon dioxide 
(flaring), a small change in the ratio of flaring to venting could 
cause a disproportionate change in the impact of emissions.
    The report concluded that more accurate records on flaring and 
venting are needed to determine the amount of the resource that is lost 
and the volume of greenhouse gas emissions these practices contribute 
to the atmosphere each year. The GAO made two recommendations to the 
Secretary of the Interior: (1) ``Consider the cost and benefit of 
requiring that companies flare the natural gas, whenever possible, when 
flaring or venting is necessary,'' and (2) ``consider the cost and 
benefit of requiring that companies use flaring and venting meters to 
improve oversight.'' In addition, there was a recommendation to the 
Secretary of Energy to consider, ``in consultation with EPA 
[Environmental Protection Agency], MMS, and BLM [Bureau of Land 
Management], how to best collect separate statistics on flaring and 
venting.''
    In comments on the draft report, the Department of the Interior 
(DOI) concurred with the report's recommendations and agreed to assess 
the cost effectiveness of requiring the oil and gas industry to 
implement these changes. MMS conducted analyses to assess the costs and 
benefits of requiring flare/vent meters and also of requiring flaring 
instead of venting. The first analysis supported the recommendation to 
require meters provided that the facilities process more than 2,000 
barrels of oil per day (BOPD). This requirement is included in the 
proposed rule.
    The second analysis indicated that a regulatory change to require 
flaring instead of venting may be appropriate. However, the cost of 
implementing this requirement is significant, and input from 
potentially affected parties is necessary to establish a reasonable 
threshold. MMS plans to work directly with interested parties to 
determine the best approach in considering the GAO recommendation to 
require flaring instead of venting natural gas. We are soliciting 
comments on this issue in this proposed rule. We would like comments 
related to additional costs, environmental impacts, and conditions or 
situations where flaring may not be advisable. We are planning a 
workshop to discuss the issue. The workshop would be followed by 
appropriate rulemaking.
    To improve data collection, as the GAO report suggested, MMS is 
proposing that operators report flaring and venting volumes to MMS 
separately. Currently, MMS only collects information on the total 
natural gas flared and vented. Operators do not need to differentiate 
between the two categories. In addition, MMS inspectors currently use 
infrared cameras to verify natural gas venting.

Proposed Rule

Organization

    The proposed rule would completely restructure subpart K. The new 
version is divided into shorter, easier-to-read sections. Each section 
focuses on one topic instead of the arrangement in the current version, 
which covers multiple topics in each section. For example, in the 
current edition of subpart K, the regulations regarding burning liquid 
hydrocarbons, as well as those governing flaring or venting natural 
gas, are in one section. In the proposed rule, these same requirements 
are in five sections, making it easier for an operator to find the 
information that applies to its particular situation. The numbering for 
subpart K would start at Sec.  250.1150 instead of Sec.  250.1100 to 
accommodate other planned rulemaking. The proposed structure is shown 
in the following table:

------------------------------------------------------------------------
              Current rule                        Proposed rule
------------------------------------------------------------------------
Sec.   250.1100 Definitions for          Sec.   250.105 Definitions.
 production rates.
Sec.   250.105 Definitions.
Sec.   250.1101 General requirements     Sec.   250.1150 General
 and classification of reservoirs.        reservoir production
                                          requirements.
                                         Sec.   250.1154 How do I
                                          determine if my reservoir is
                                          sensitive?
                                         Sec.   250.1155 What
                                          information must I submit for
                                          sensitive reservoirs?

[[Page 9886]]

 
                                         Sec.   250.1156 What steps must
                                          I take to receive approval to
                                          produce within 500 feet of a
                                          unit or lease line?
                                         Sec.   250.1157 How do I
                                          receive approval to produce
                                          gas from an oil reservoir with
                                          an associated gas cap?
Sec.   250.1102 Oil and gas production   Requirements for production
 rates.                                   rates are largely eliminated.
                                          Portions retained were
                                          combined with new information
                                          in ``Sec.   250.1159 May the
                                          Regional Supervisor limit my
                                          well or reservoir production
                                          rates?''
Sec.   250.1103 Well production testing  Sec.   250.1151 How often must
                                          I conduct well production
                                          tests?
                                         Sec.   250.1152 How do I
                                          conduct well tests?
Sec.   250.1104 Bottomhole pressure      Sec.   250.1153 When must I
 survey.                                  conduct a static bottomhole
                                          pressure survey?
Sec.   250.1105 Flaring or venting of    Sec.   250.1160 When may I
 gas and burning liquid hydrocarbons.     flare or vent gas?
                                         Sec.   250.1161 When may I
                                          flare or vent gas for extended
                                          periods of time?
                                         Sec.   250.1162 When may I burn
                                          produced liquid hydrocarbons?
                                         Sec.   250.1163 How must I
                                          measure gas flaring or venting
                                          and liquid hydrocarbon burning
                                          volumes and what records must
                                          I maintain?
                                         Sec.   250.1164 What are the
                                          requirements for flaring or
                                          venting gas containing H2S?
Sec.   250.1106 Downhole commingling...  Sec.   250.1158 How do I
                                          receive approval to downhole
                                          commingle hydrocarbons?
Sec.   250.1107 Enhanced oil and gas     Sec.   250.1165 What must I do
 recovery operations.                     for enhanced recovery
                                          operations?
New....................................  Sec.   250.1159 May the
                                          Regional Supervisor limit my
                                          well or reservoir production
                                          rates?
                                         Sec.   250.1166 What additional
                                          reporting is required for
                                          developments in the Alaska
                                          Region?
                                         Sec.   250.1167 What
                                          information must I submit for
                                          approvals?
------------------------------------------------------------------------

    The organization of the proposed rule reflects the actual sequence 
of events that occurs as wells are developed and the resources 
produced. The proposed rule is written in plain language to conform to 
the DOI's standards for rule writing. These changes include 
incorporating tables, using a question format for section headings, and 
using pronouns. These changes would make the rule easier to understand. 
Finally, a table at the end of the rule lists the information that 
operators would have to submit to MMS to receive approvals for various 
operations.

Major Changes to the Rule

    Some requirements from the previous edition of subpart K would be 
eliminated by the proposed rule because they are unnecessary in today's 
petroleum industry. For example, MMS required operators to establish 
maximum production rates (MPR's) for producing well completions, and 
maximum efficient rates (MER's) for producing reservoirs, in OCS Order 
No. 11 in 1974, during a period of oil shortages and energy crises. In 
1988, MMS reduced the MER requirement. Currently, MER's are required 
only on sensitive reservoirs (primarily oil reservoirs with associated 
gas caps). Determining and maintaining production rates imposes a 
significant burden on operators. Based on the past 30 years of 
experience, MMS has concluded that maximum rate requirements and 
production balancing requirements can be largely eliminated without 
significant detriment to efforts for conservation and maximization of 
ultimate recovery. However, the proposed rule would allow the Regional 
Supervisor to set production rates in cases where excessive production 
could harm ultimate recovery from the reservoir.
    The proposed rule would clarify required information submittals to 
MMS, including requirements relating to the documents submitted to MMS 
and the timing of those submissions. For example, there is additional 
guidance on notifying adjoining operators regarding production within 
500 feet of a common lease or unit line. The proposed rule would 
provide more detail as to when the notification must occur, what the 
notice must include, and how to verify the notification with MMS.
    The proposed rule would incorporate several Notices to Lessees and 
Operators (NTLs) that clarify the current regulations. These NTLs would 
be obsolete if the proposed rule becomes final and MMS would withdraw 
all of these NTLs at that time. However, if necessary, MMS would issue 
additional NTLs to provide guidance. The NTLs affected include:
     NTL No. 97-16, ``Production Within 500 Feet of a Unit or 
Lease Line,'' effective August 1, 1997. This NTL clarifies MMS policy 
on issuing approvals for production within 500 feet of a unit or lease 
line, and includes details on what the requesting operator needs to 
provide to MMS for approval. Those details are addressed in the 
proposed rule.
     NTL No. 98-23, ``Interim Reporting Requirements for 30 CFR 
250, subpart K, Oil and Gas Production Rates,'' effective October 15, 
1998. This NTL addressed oral approvals for gas flaring and relaxed 
some of the requirements regarding production rates, including MER and 
MPR in certain circumstances. The NTL clarified the submittal of 
written summary letters on flaring incidents that received oral 
approval. These requirements are addressed in the proposed rule.
     NTL No. 99-G20, ``Downhole Commingling Applications,'' 
effective September 7, 1999. This NTL was issued in conjunction with 
NTL No. 99-G19. It clarifies what information the applicant needs to 
include in downhole commingling applications to ensure that the 
application is processed without delay. These information requirements 
were added to the proposed rule.
     NTL No. 2006-N06, ``Flaring and Venting Approvals,'' 
effective December 19, 2006. This NTL clarifies the definitions of 
flaring and venting, the record-keeping requirements, the 
classification of emitted natural gas, and the MMS policy regarding 
continuous flaring or venting of small volumes of oil-well gas or gas-
well gas from storage vessels or other low-pressure production vessels 
when the gas cannot be economically recovered. These issues are 
addressed in the proposed rule. This NTL also provides contact 
information for each Region and provides sample

[[Page 9887]]

field records. These two items are not addressed in the proposed rule. 
MMS would issue a new NTL to include only this information, after we 
publish the final rule.
    The most significant change, with regard to cost, would be a 
proposed requirement for natural gas flare/vent meters on facilities 
that process significant volumes of oil. The current MMS requirements 
rely heavily on the accuracy of operator calculations and record 
keeping. Recent incidents have shown that these methods are 
insufficient to accurately capture actual flaring and venting volumes. 
The proposed rule would require the installation of meters to 
accurately measure all flared and vented natural gas on facilities that 
process more than 2,000 BOPD. These facilities have the potential to 
flare or vent significant volumes of associated gas.
    MMS estimates the cost of purchasing and installing these meters to 
be $77,000 per facility. Limiting the requirement to facilities that 
process over 2,000 BOPD ensures that the meters are a small expense 
relative to the cost of operating those facilities and relative to the 
income generated by those facilities; and that the requirement would 
not be an unfair burden to small operators. MMS estimates that 34 
operators would have to install the meters on 112 facilities. Of those 
operators that would have to install the meters, nine are considered 
small businesses, according to the North American Industry 
Classification System (NAICS).
    The July 2004 GAO report on world-wide emissions from vented and 
flared natural gas, discussed above, recommended that more accurate 
records on flaring and venting are needed to determine the amount of 
the resource that is wasted, and the volume of greenhouse gas these 
practices contribute to the atmosphere each year. The report 
recommended that DOI consider requiring flare/vent meters to measure 
the gas lost. MMS agrees with that recommendation. However, MMS 
believes installing these meters on facilities that process less than 
2,000 BOPD would not be cost effective, and might be an undue burden on 
smaller operators.
    MMS is also proposing to add new definitions for ``flaring'' and 
``venting'' to 30 CFR part 250 subpart A, and to revise the definition 
for ``sensitive reservoir.''
    The following is a brief section-by-section description of the 
substantive proposed changes to subpart K:
    Sec.  250.105 Definitions. In the current rule, definitions appear 
in subpart A at 30 CFR 250.105 and in subpart K at 30 CFR 250.1100. MMS 
proposes removing the definitions from subpart K because they already 
appear in subpart A.
General
    Sec.  250.1150 What are General Reservoir Production Requirements? 
Because the first section of subpart K would no longer contain the 
definitions, this section would contain the general requirements for 
producing wells and reservoirs.
Well Tests and Surveys
    Sec.  250.1151 How often must I conduct well production tests? Well 
production testing is required for all wells. This proposed section 
defines when an operator must perform the tests and describes the 
conditions for the tests. This section would cover well flow potential 
tests, semi-annual well tests, and any special tests that the Regional 
Supervisor may require. Operators would no longer be required to submit 
Semiannual Well Test Reports within 45 days of the tests. Instead, they 
would submit the reports within 45 days after the end of the calendar 
half-year. This would allow operators to submit all their well tests at 
one time and include the most recent tests for those few completions 
that produced during the 6-month period, but were not tested within the 
last 45 days.
    Sec.  250.1152 How do I conduct well tests? This proposed section 
describes how operators must conduct a well test. The testing 
procedures would be the same as in the current version of the rule. 
However, the section would be reformatted to make the procedures easier 
to follow. This reformatting would include the procedure for ensuring 
that the well is stabilized before conducting the test; the required 
duration of the test; the usage of correction factors and adjustments; 
and an option to use other procedures with approval from the Regional 
Supervisor. It also discusses conducting additional tests that the 
Regional Supervisor may require.
    Sec.  250.1153 When must I conduct a static bottomhole pressure 
survey? Static bottomhole pressure surveys are required on all new 
producing reservoirs, and annually on reservoirs with three or more 
producing completions. This proposed section addresses when operators 
must conduct static bottomhole pressure surveys and what information 
operators must submit to MMS. The proposed new provision would allow 
the operator to request a departure from this requirement from the 
Regional Supervisor, with appropriate justification.
Classifying Reservoirs
    Sec.  250.1154 How do I determine if my reservoir is sensitive? MMS 
requires that operators classify all reservoirs as either sensitive or 
non-sensitive. A sensitive reservoir is a reservoir in which high 
reservoir production rates would decrease ultimate recovery. This 
section would define the requirements for classifying reservoirs; when 
the Regional Supervisor may reclassify a reservoir; and when an 
operator may or must request reclassification of a reservoir. There are 
not substantive changes between the requirements of the current version 
of the rule and the proposed; this section would be reorganized and 
easier to read.
    Sec.  250.1155 What information must I submit for sensitive 
reservoirs? This proposed section defines what information MMS requires 
for sensitive reservoirs and when operators must submit that 
information. The only proposed change is that the Regional Supervisor 
may request that the operator submit Form MMS-127 (Sensitive Reservoir 
Information Report) and supporting information.
Approvals Prior to Production
    Sec.  250.1156 What steps must I take to receive approval to 
produce within 500 feet of a unit or lease line? In the current version 
of subpart K, a number of requirements, including approval for 
producing within 500 feet of a unit or lease line and basic 
classification requirements, are included in one section, 30 CFR 
250.1101. In the proposed rule, each of these issues is addressed in a 
separate section. Title 30 CFR 250.1156 would address only the approval 
and service fee for producing within 500 feet of a lease or unit line.
    The proposed approval requirements are clearer than in the current 
rule, and include issues addressed in NTL 97-16. In addition to 
receiving approval from the Regional Supervisor, operators must notify 
operators of adjacent leases. The requirement to notify adjacent 
operators would be clearer, and there is a list of information the 
notification would have to include.
    Sec.  250.1157 How do I receive approval to produce gas from an oil 
reservoir with an associated gas cap? This section would address how to 
receive approval to produce from an associated gas cap and its service 
fee. The required supporting information is listed in the table at 
proposed 30 CFR 250.1167 at the end of the rule.
    Sec.  250.1158 How do I receive approval to downhole commingle 
hydrocarbons? This section would address how to obtain MMS approval to

[[Page 9888]]

downhole commingle hydrocarbons and the service fee that must accompany 
your request. For downhole commingling in a competitive reservoir, the 
operator would be required to notify the operators of all leases that 
contain the reservoir. The request for approval must document this 
notification. Operators of the other leases would have 30 days after 
the notification to provide the Regional Supervisor with letters of 
acceptance or objection. If the notified operators do not respond 
within the specified period, the Regional Supervisor will assume the 
operators do not object. The Regional Supervisor will consider any 
objections, but may approve the commingling request to protect 
correlative rights. This section would also incorporate issues 
addressed in NTL's No. 99-G19 and 99-G20.
Production Rates
    Sec.  250.1159 May the Regional Supervisor limit my well or 
reservoir production rates? Generally, this proposed rule would 
eliminate MPR's and MER's. However, this section would retain the 
Regional Supervisor's authority to set an MPR for a producing well 
completion or an MER for a sensitive reservoir. If the Regional 
Supervisor sets an MPR or MER, it would be subject to the terms and 
conditions set by the Regional Supervisor. Those terms and conditions 
would include production restrictions that allow for normal variations 
and fluctuations in production rates.
Flaring, Venting, and Burning Hydrocarbons
    Sec.  250.1160 When may I flare or vent gas? The current regulation 
contains all of the flaring, venting, and burning regulations in one 
section. The proposed rule covers these in separate sections, so it is 
easier to find the requirements for a given situation. The new format 
also allows for the inclusion of more detail and clarification of 
flaring and venting situations that are not described in the current 
rule. Since there are many situations under which flaring and venting 
might occur, the table in this section reflects general categories that 
encompass the situations under which MMS would allow flaring or venting 
without approval from the Regional Supervisor. Under most 
circumstances, the proposed rule would allow operators to treat gas 
flashing from gas-well condensate similar to oil-well gas for flaring 
and venting approval purposes.
    The proposed rule would require operators to receive approval 
before flaring or venting gas in volumes higher than those specified in 
their previously-approved plans. This would enable MMS to ensure that 
flaring and venting activities are in compliance with environmental 
laws.
    The proposed rule would also allow the Regional Supervisor to 
specify flaring and venting volume limits (in addition to time limits) 
in order to prevent air quality degradation or the loss of reserves. 
This is sometimes necessary because offshore production facilities are 
now capable of flaring or venting extremely large volumes in a short 
amount of time.
    Sec.  250.1161 When may I flare or vent gas for extended periods of 
time? This section would define when operators must receive approval 
from the Regional Supervisor to flare or vent gas for an extended 
period of time. If there is a need to flare or vent a small amount of 
gas (less than 10 MCF per day) due to improperly working valves or pipe 
fittings and the Regional Supervisor determines that it is prudent to 
postpone the repair until a scheduled facility shutdown occurs, then 
the proposed rule would allow the Regional Supervisor to exempt the 
amount flared or vented from the time limits set in Sec.  250.1160.
    Sec.  250.1162 When may I burn produced liquid hydrocarbons? The 
regulations on burning produced liquid hydrocarbon would not change. 
Operators must receive approval from the Regional Supervisor in all 
cases before burning liquid hydrocarbons.
    Sec.  250.1163 How must I measure gas flaring or venting volumes, 
and liquid hydrocarbon burning volumes; and what records must I 
maintain? Requirements for measuring and keeping records on flaring, 
venting, and burning would change. The proposed rule would require 
vent/flare meters on all facilities that process more than 2,000 BOPD. 
Operators would be required to install these meters within 120 days 
after the final rule is published. This extended time frame is to 
accommodate operators that are required to install meters at multiple 
facilities. Facilities that do not process more than 2,000 BOPD when 
the final rule is published, but increase production above this level 
after the rule is published, would be required to install meters within 
90 days.
    Operators would be required to keep records on flaring, venting, 
and burning for 6 years to comply with 30 CFR Part 212--Records and 
Files Maintenance. The operators would be required to store these 
records on the facility for the first 2 years after the flaring, 
venting, or burning event. After that, the operator would be able to 
keep the records at a separate location, but they must be available for 
MMS review.
    The proposed rule would clarify reporting procedures and require 
operators to report flared and vented volumes separately. The 
previously discussed GAO report concluded that MMS should collect 
flared and vented volumes separately. MMS tentatively agrees with this 
conclusion, and does not believe it will pose a significant burden on 
operators because they already report the volumes of gas flared and 
vented to MMS on Form MMS-4054 (Oil and Gas Operations Report). 
Operators would only need to identify whether the gas volumes were 
flared or vented.
    The proposed rule would require operators to identify the 
facilities where the gas is flared or vented. This would enable MMS to 
directly compare volumes reported on Forms MMS-4054 with field records. 
This requirement would also reduce the burden on operators during 
royalty audits because operators would no longer have to reconstruct 
historical flare/vent allocations for MMS auditors.
    The proposed rule would require operators to retain meter 
recordings on facilities that require flare/vent meters. This would 
allow MMS to compare eyewitness observations with field records and 
ensure that flaring and venting incidents are properly recorded. MMS 
does not believe this would be a significant burden on those facilities 
with flare/vent meters because these meters typically record such 
events automatically and operators usually maintain these electronic 
records for their own purposes.
    In addition, the proposed rule would clarify when royalties are due 
on flared gas, vented gas, and burned liquid hydrocarbons under 30 CFR 
202.100 Royalty on Oil and 30 CFR 202.150 Royalty on Gas. As in the 
current rule, royalties would not be due if the hydrocarbons were 
unavoidably lost. In most cases, MMS will consider hydrocarbons that 
are flared, vented or burned with MMS approval as ``unavoidably lost'' 
and the operator would not be required to pay royalties. However, MMS 
would retain the authority to determine whether or not the loss was 
avoidable or due to negligence, even if approved by MMS. For example, 
if you received MMS approval to flare 100 MCF of gas per day, then 
actually flared 100,000 MCF of gas per day under conditions that would 
not have been approved, MMS might determine that the entire volume 
flared was ``avoidably lost'' and royalties would be due on the entire 
volume. MMS would also be able to

[[Page 9889]]

pursue civil penalties, under 30 CFR 250 subpart N--Outer Continental 
Shelf (OCS) Civil Penalties, if we determine that the loss was 
avoidable or due to negligence.
    Sec.  250.1164 What are the requirements for flaring or venting gas 
containing H2S? The proposed rule would require Regional 
Supervisor approval before emitting more than 15 lbs of SO2 
per hour per mile from shore. This would ensure that flaring activities 
are in compliance with environmental laws. MMS does not believe this 
would create an excessive burden on operators. The proposed regulations 
specify the records that the operator would have to keep. These records 
must be kept for 6 years, meeting the same requirements as in the 
previous section.
Enhanced Recovery
    Sec.  250.1165 What must I do for enhanced recovery operations? 
There are no significant proposed changes to the regulations regarding 
enhanced recovery operations. Operators would still be required to 
initiate enhanced recovery operations; receive Regional Supervisor 
approval for the plans; and submit reports on the substances injected, 
produced, or reproduced.
Special Alaska OCS Region Requirements
    Sec.  250.1166 What additional reporting is required for 
developments in the Alaska Region? This new section addresses special 
proposed reporting requirements for Alaska. This would require 
operators to submit an annual reservoir management report to the 
Regional Supervisor for any development in Alaska. If a development is 
regulated by both the MMS and the State of Alaska, the operator would 
be able to coordinate reporting requirements with MMS and the State of 
Alaska Oil and Gas Conservation Commission. This section would also 
require operators to request an MER for sensitive reservoirs in Alaska.
    This is necessary for the MMS Alaska Region to administer Section 7 
Agreements between the Secretary of the Interior and the Governor of 
the State of Alaska. Under existing Section 7 Agreements, oil and gas 
reserves underlying a common geologic structure must be unitized and 
the allocation of production between Federal and State leases for 
royalty payment must be based on recoverable oil and gas. Under 
agreement with the State, this determination will be based on reservoir 
performance following completion of the development drilling program 
and sustained production. Annual reservoir management plans enable the 
MMS to monitor recoverable oil and assure proper allocation of reserves 
for royalty payment and to be consistent with the State of Alaska 
requirements.
    This provision would also enable the MMS to manage its 
responsibility for conservation of resources on a real time basis. The 
number, type, spacing and sequencing of development wells (producers 
and injectors) will vary from the original approved development and 
production plan as more information on the reservoir is obtained. An 
annual reservoir management plan would enable the MMS to track 
development activities with the approved development and production 
plan and assure maximum recovery based on the most current knowledge of 
the reservoir.
Information Needed With Forms and for Approvals
    Sec.  250.1167 What information must I submit with forms and for 
approvals? This proposed table is designed to be an easy-to-use 
reference to determine the information and supporting documentation to 
submit to the Regional Supervisor and to remind lessees to pay the 
appropriate service fee. Forms MMS-126 (Well Potential Test Report) and 
MMS-127 (Sensitive Reservoir Information Report) would require 
supporting documents. Also, several operations covered under subpart K 
(gas cap production, downhole commingling, reservoir reclassification, 
and production within 500 feet of a unit or lease line), would require 
that the operator submit applications and supporting documents to the 
Regional Supervisor. All of these documents are covered in the table.

Questions

    In addition to comments on these proposed regulations, MMS is 
requesting comments on the following questions.
    1. Are these regulations well organized and easy to read?
    2. Is the submittal table useful?
    3. Is the 2,000 BOPD requirement for installing flare/vent meters 
reasonable? Are the cost estimates accurate?
    4. Would the requirement to install flare/vent meters pose a safety 
hazard by restricting flow during emergency facility blowdowns, or are 
accurate meters (such as ultrasonic meters) available that do not 
impede gas flow?
    5. Should MMS require operators to flare natural gas instead of 
venting it, under approved flaring and venting conditions? This 
question is based on a recommendation from the GAO report on flaring 
and venting natural gas, and reflects concerns about the amount of 
greenhouse gas that is released into the environment by venting. MMS is 
studying this recommendation before proposing any regulatory change. We 
would like comments on this issue, including comments related to 
additional costs, environmental impacts, and conditions or situations 
where flaring may not be advisable.

Procedural Matters

Public Availability of Comments

    Before including your address, phone number, e-mail address, or 
other personal identifying information in your comment, you should be 
aware that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comment to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.

Regulatory Planning and Review (Executive Order (E.O.) 12866)

    This proposed rule is not a significant rule as determined by the 
Office of Management and Budget (OMB) and is not subject to review 
under E.O. 12866.
    (1) The proposed rule would not have an annual economic effect of 
$100 million or more on the economy. It would not adversely affect in a 
material way the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities. A cost-benefit and economic analysis is not 
required.
    This proposed rule revises the requirements for oil and gas 
production. The changes in the rule are not significant enough to have 
an impact on the economy or an economic sector, productivity, jobs, the 
environment, or other units of government. Some of the current 
requirements would be relaxed. For example, limits on production rates 
were eliminated in most cases. This would allow the operators to 
produce the oil and gas at the rates that they determine are best, and 
would not have a significant effect on any sector of the economy.
    (2) The proposed rule would not create a serious inconsistency or 
otherwise interfere with action taken or planned by another agency 
because MMS is the only Federal government agency directly involved in 
setting production requirements for the offshore oil and natural gas 
industry.
    (3) This proposed rule would not alter the budgetary effects of 
entitlements, grants, user fees or loan programs, or the rights and 
obligations of their recipients.

[[Page 9890]]

    (4) This proposed rule would not raise novel legal or policy 
issues. There are some changes in production requirements in this 
proposal, but most of the changes clarify existing MMS requirements. 
Some may require additional paperwork for the operators. Since the 
basic production requirements are not changed, and restrictions on 
production rates are decreased, this proposed rule should not raise 
novel legal or policy issues.

Regulatory Flexibility Act (RFA)

    The Department of the Interior certifies that this proposed rule 
would not have a significant economic effect on a substantial number of 
small entities as defined under the RFA (5 U.S.C. 601 et seq.). An 
initial Regulatory Flexibility Analysis is not required. Accordingly, a 
Small Entity Compliance Guide is not required.
    This rule applies to all lessees operating on the OCS. Lessees fall 
under the Small Business Administration's North American Industry 
Classification System (NAICS) code 211111, Crude Petroleum and Natural 
Gas Extraction. Under this NAICS code, companies with less than 500 
employees are considered small businesses. MMS estimates that 130 
lessees explore for and produce oil and gas on the OCS; approximately 
70 percent of them (91 companies) fall into the small business 
category. The proposed regulation would therefore affect a substantial 
number of small entities. However, we have determined that it would not 
have a significant economic effect on these small entities.
    One new requirement that would impose a cost to operators is a 
requirement to install flaring/venting meters on all facilities that 
process more than 2,000 BOPD. The GAO report on flaring and venting 
natural gas, released in July 2004, recommended that MMS require these 
meters to improve oversight. MMS agrees with this recommendation. MMS 
regulations allow flaring and venting in very limited circumstances. 
These meters would help MMS:
     Verify the amounts of natural gas that operators flare or 
vent into the environment;
     Prevent waste of resources;
     Collect the proper royalties on avoidably flared or vented 
gas;
     Determine if an operator is violating MMS regulations; and
     Assess the impacts on the environment.
    In determining the criteria for which facilities must install the 
meters, MMS considered the cost of the meters and the amount of 
production needed to justify the cost. To ensure that the requirement 
to install flare/vent meters would not produce an undue burden on small 
companies, it was limited to those facilities that process more than an 
average of 2,000 BOPD.
    MMS estimates that 34 companies would have to install meters on 112 
facilities at an average cost of $77,000 per facility and a total cost 
to industry of $8,624,000 (112 x $77,000 = $8,624,000). Of those, nine 
companies are considered small businesses, based on the NAICS. These 
nine companies represent only 7 percent of the 130 operators on the 
OCS. We estimate that seven of these nine companies would need to 
install meters on one facility each; one company would need to install 
meters on two facilities; and one company would need to install meters 
on three facilities. This represents an average cost of $105,875 for 
each of the small companies (11 facilities x $77,000/9 companies). The 
average cost to non small companies would be $311,080 per company (101 
facilities x $77,000/25 companies). In addition, this does not 
represent an unfair burden to small companies because the cost of these 
meters is small in comparison to the revenues generated by the amount 
of oil processed by those facilities.
    Your comments are important. The Small Business and Agriculture 
Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were 
established to receive comments from small businesses about Federal 
agency enforcement actions. The Ombudsman will annually evaluate the 
enforcement activities and rate each agency's responsiveness to small 
business. If you wish to comment on the actions of MMS, call 1-888-734-
3247. You may comment to the Small Business Administration without fear 
of retaliation. Disciplinary action for retaliation by an MMS employee 
may include suspension or termination from employment with the DOI.

Small Business Regulatory Enforcement Fairness Act (SBREFA)

    The proposed rule is not a major rule under SBREFA (5 U.S.C. 
804(2)). This proposed rule:
    a. Would not have an annual effect on the economy of $100 million 
or more. This proposed rule revises the requirements for oil and gas 
production. The changes would not have an impact on the economy or an 
economic sector, productivity, jobs, the environment, or other units of 
government. Most of the new requirements are paperwork requirements, 
and would not add significant time to development and production 
processes. One new requirement would add new costs for some operators. 
Operators would be required to install flare/vent meters on any 
facility that processes more than an average of 2,000 BOPD. MMS 
estimates that 34 companies would have to install meters on 112 
facilities at an average cost of $77,000 per facility and a total cost 
to industry of $8,624,000 (112 x $77,000 = $8,624,000).
    b. Would not cause a major increase in costs or prices for 
consumers, individual industries, Federal, State, or local government 
agencies, or geographic regions.
    In most cases, this proposed rule would eliminate the requirement 
for operators to set limits on production rates, allowing the operators 
to determine the best rate to produce their reservoirs. The limits on 
burning, flaring, and venting are clearer. These limits would encourage 
conservation of our natural resources, without putting undue production 
restrictions on operators. There would be a new requirement to install 
meters on facilities that process more than an average of 2,000 BOPD. 
As discussed above, this requirement would not significantly increase 
the cost of doing business offshore.
    c. Would not have significant adverse effects on competition, 
employment, investment, productivity, innovation, or the ability of 
U.S.-based enterprises to compete with foreign-based enterprises. This 
proposed rule would eliminate the requirement for operators to set 
limits on production rates, allowing the operators to determine the 
best rate to produce their reservoirs. There are clearer limits on 
burning, flaring, and venting, which would encourage conservation of 
our natural resources.

Unfunded Mandates Reform Act (UMRA) of 1995

    This proposed rule would not impose an unfunded mandate on State, 
local, or tribal governments or the private sector of more than $100 
million per year. The proposed rule would not have a significant or 
unique effect on State, local, or tribal governments or the private 
sector. A statement containing the information required by UMRA (2 
U.S.C. 1531 et seq.) is not required. This is because the proposal 
would not affect State, local, or tribal governments, and the effect on 
the private sector is small.

Takings Implication Assessment (Executive Order 12630)

    The proposed rule is not a governmental action capable of 
interference with constitutionally protected property rights. Thus, MMS 
did not need to prepare a Takings Implication Assessment according to

[[Page 9891]]

E.O. 12630, Governmental Actions and Interference with Constitutionally 
Protected Property Rights.

Federalism (Executive Order 13132)

    With respect to E.O. 13132, this proposed rule would not have 
federalism implications. This proposed rule would not substantially and 
directly affect the relationship between the Federal and State 
governments. To the extent that State and local governments have a role 
in OCS activities, this proposed rule would not affect that role.
    MMS has the authority to regulate offshore oil and gas production. 
State governments do not have authority over offshore production in 
Federal waters.

Civil Justice Reform (Executive Order 12988)

    With respect to E.O. 12988, the Office of the Solicitor has 
determined that the proposed rule would not unduly burden the judicial 
system and does not meet the requirements of sections 3(a) and 3(b)(2) 
of the Order. MMS drafted this proposed rule in plain language to 
provide clear standards. We consulted with the Department of the 
Interior's Office of the Solicitor throughout the drafting process for 
the same reasons.

Paperwork Reduction Act (PRA)

    The proposed rule contains a collection of information that has 
been submitted to OMB for review and approval under Sec.  3507(d) of 
the PRA. As part of our continuing effort to reduce paperwork and 
respondent burdens, MMS invites the public and other Federal agencies 
to comment on any aspect of the reporting and recordkeeping burden. You 
may submit your comments on the information collection aspects of this 
proposed rule directly to the Office of Management and Budget (OMB), 
Office of Information and Regulatory Affairs, OMB Attention: Desk 
Officer for the Department of the Interior via OMB e-mail: (OIRA--
DOCKET@omb.eop.gov); or by fax (202) 395-6566; identify with 1010-AD12. 
Send a copy of your comments to the Rules Processing Team (RPT), Attn: 
Rules Comments; 381 Elden Street, MS-4024; Herndon, Virginia 20170-
4817. Please reference ``Oil and Gas Production Requirements--AD12'' in 
your comments. You may obtain a copy of the supporting statement for 
the new collection of information by contacting the Bureau's 
Information Collection Clearance Officer at (202) 208-7744.
    The PRA provides that an agency may not conduct or sponsor, and a 
person is not required to respond to, a collection of information 
unless it displays a currently valid OMB control number. OMB is 
required to make a decision concerning the collection of information 
contained in these proposed regulations 30-60 days after publication of 
this document in the Federal Register. Therefore, a comment to OMB is 
best assured of having its full effect if OMB receives it by April 5, 
2007. This does not affect the deadline for the public to comment to 
MMS on the proposed regulations.
    The title of the collection of information for the rule is ``30 CFR 
250, Subpart K, Oil and Gas Production Requirements.'' The proposed 
regulations concern oil and gas production requirements, and the 
information is used in our efforts to conserve natural resources, 
prevent waste, and protect correlative rights, including the 
government's royalty interest.
    Respondents are the approximately 130 Federal oil and gas and 
sulphur lessees. Responses to this collection are mandatory. The 
frequency of response is on occasion, monthly, semi-annually, annually, 
and as a result of situations encountered depending upon the 
requirement. The information collection (IC) does not include questions 
of a sensitive nature. MMS will protect proprietary information 
according to the Freedom of Information Act (5 U.S.C. 552) and its 
implementing regulations (43 CFR part 2), and 30 CFR 250.196, ``Data 
and information to be made available to the public,'' and 30 CFR part 
252, ``OCS Oil and Gas Information Program.'' Proprietary information 
concerning geological and geophysical data will be protected according 
to 43 U.S.C. 1352.
    The collection of information required by the current subpart K 
regulations is approved under OMB Control Number 1010-0041. The 
proposed rule imposes minor changes to the information collection 
burden. The changes are:
     Report to Minerals Revenue Management (MRM) measured gas 
flaring or venting and liquid hydrocarbon burning. Submit periodic 
reports of volumes of oil, gas, or other substances injected, produced, 
or produced for a second time. Both requirements and burdens are now 
reported to MRM and their respective burdens are covered under OMB 
Control Number 1010-0139 (-154 burden hours);
     Request Regional Supervisor approval for emitting more 
than 15 lbs. of SO2 (+10 burden hours);
     Submit to Regional Supervisor air quality modeling 
analysis report. The proposed burden hours represent an adjustment to a 
current requirement for information that was not previously collected 
(+40 burden hours);
     For Alaska Region Only: Submit to Regional Supervisor 
annual reservoir management report and supporting information. (At this 
time, the state requires the same information and MMS receives a copy). 
Alaska has started producing in state waters. If new development occurs 
in Federal waters, a minimal burden for submitting an annual reservoir 
management report, and burden hours for annual revisions are being 
added (+161 burden hours).
     Maintain meter records for detailing gas flaring or 
venting, and liquid hydrocarbon burning for 6 years. These new burden 
requirements do not add additional burden hours.
     General departure or alternative compliance requests (+5 
burden hours).
    The currently approved information collection for this subpart 
(1010-0041) will be superseded by this collection when final 
regulations take effect.
    Currently, regulations covered under OMB Control Number 1010-0041 
have 43,065 annual burden hours. MMS estimates the total annual 
reporting and recordkeeping ``hour'' burden for the proposed rule to be 
43,127 hours; this is an increase of 62 burden hours. With the 
exception of the recordkeeping requirement changes and the items 
identified as ``new'' in the following chart, the burden estimates 
shown are those that are estimated for the current subpart K 
regulations.

----------------------------------------------------------------------------------------------------------------
                                                                              Fee/non-hour cost
                                          Reporting &       ----------------------------------------------------
       30 CFR 250 Subpart K              recordkeeping                        Average number of    Annual burden
                                          requirement          Hour burden     annual responses        hours
----------------------------------------------------------------------------------------------------------------
1151(a), (c); 1155; 1165;          Submit form MMS-126 and                3  1,325 forms........           3,975
 1166(c); 1167.                     supporting information.
                                   Submit form MMS-127 and              2.2  2,189 forms........           4,816
                                    supporting information.

[[Page 9892]]

 
                                   Submit form MMS-128 and           0.1--3  13,000 GOM forms...          1,336*
                                    supporting information.                  600 POCS forms.....
1151(b)..........................  Request extension of                 0.5  37 requests........              19
                                    time to submit results
                                    of semiannual well test.
1152(b), (c).....................  Obtain Regional                      0.5  37 requests........              19
                                    Supervisor approval to
                                    conduct well testing
                                    using alternative
                                    procedures; conduct
                                    tests/retests to
                                    establish proper MPR or
                                    MER; conduct multipoint
                                    backpressure test for
                                    open flow potential.
1152(d)..........................  Provide advance notice               0.5  10 notices.........               5
                                    of time and date of
                                    well tests.
1153.............................  Submit results of all                 14  1,270 surveys......          17,780
                                    static bottomhole                     1  120 survey waivers.             120
                                    pressure surveys
                                    obtained by lessee
                                    using form MMS-140.
                                    Request departure
                                    requirement w/
                                    justification to
                                    Regional Supervisor;
                                    submit with Form MMS-
                                    140 and supporting
                                    information.
1154; 1167.......................  Request reclassification               6  20 requests........             120
                                    of reservoir for
                                    Regional Supervisor
                                    approval and submit
                                    supporting information.
1156; 1167.......................  Request approval to                    5  50 requests........             250
                                    produce within 500 feet
                                    of a unit or lease line
                                    and submit supporting
                                    information; notify
                                    operators; provide
                                    proof of date to
                                    Regional Supervisor.
                                                            ----------------------------------------------------
                                                                        3,300 x 50 requests = $165,000
                                                            ----------------------------------------------------
1157; 1167.......................  Request approval to                   12  125 requests.......           1,500
                                    produce gas cap of a
                                    sensitive reservoir and
                                    submit supporting
                                    information; obtain
                                    approval to produce gas
                                    from an oil reservoir
                                    with an associated gas
                                    cap.
                                                            ----------------------------------------------------
                                                                       $4,200 x 125 requests = $525,000
                                                            ----------------------------------------------------
1158; 1167.......................  Submit request to                      6  119 applications...             714
                                    downhole commingle
                                    hydrocarbons and
                                    supporting information;
                                    notify operators;
                                    provide proof of date
                                    to Regional Supervisor.
                                                            ----------------------------------------------------
                                                                     $4,900 x 119 applications = $583,100
                                                            ----------------------------------------------------
1160; 1161.......................  Request Regional                     0.5  1,007 requests.....             504
                                    Supervisor approval/
                                    inform to flare or vent
                                    oil-well gas or gas-
                                    well gas/exceed volume;
                                    submit documentation.
                                                            ----------------------------------------------------
1162; 1163(e)....................  Request approval to burn             0.5  60 requests........              30
                                    produced liquid
                                    hydrocarbons; submit
                                    documentation.
NEW 1163.........................  Initial purchase and                   0  112................               0
                                    install gas meters to
                                    measure the amount of
                                    gas flared or vented.
                                    This is a non-hour cost
                                    burden.
                                                            ----------------------------------------------------
                                                                     112 meters @ $77,000 ea = $8,624,000
                                  ------------------------------------------------------------------------------
NEW 1163(b); 1165(c).............  Report to MRM measured gas flaring or venting and liquid                    0
                                    hydrocarbon burning--burden covered under 1010-0139
                                  ------------------------------------------------------------------------------
NEW 1164(b)(1)...................  Request Regional                     0.5  20 requests........              10
                                    Supervisor approval for
                                    emitting more than 15
                                    lbs. of SO2.
                                  ------------------------------------------------------------------------------
1164(b)(2).......................  H2S Contingency, Exploration, or Development and Production                 0
                                    Plans--burden covered under 1010-0141 and 1010-0151
                                  ------------------------------------------------------------------------------
NEW 1164(b)(3)...................  Submit to Regional                    40  1 modeling analysis              40
                                    Supervisor air quality
                                    modeling analysis.
1164(c)..........................  Submit monthly reports                 2  3 operators x 12                 72
                                    of flared or vented gas                   mos. = 36.
                                    containing H2S.
1165.............................  Submit proposed plan for              12  27 plans...........             324
                                    enhanced recovery
                                    operations.
                                  ------------------------------------------------------------------------------
1165(c)..........................  Submit periodic reports of volumes of oil, gas, or other                    0
                                    substances injected, produced, or produced for a second
                                    time--burden covered under OMB approval 1010-0139

[[Page 9893]]

 
NEW 1166.........................  Alaska Region only:                    1  1 (required by                    1
                                    submit to Regional       ..............   State, MMS gets     ..............
                                    Supervisor annual        ..............   copy).              ..............
                                    reservoir management                100  1 new develop not               100
                                    report and supporting                     State lands.
                                    information.
                                  ---------------------------------------------------------------
                                                                         20  3 annual revisions.              60
NEW 1150-1167....................  General departure or                   1  5..................               5
                                    alternative compliance
                                    requests not
                                    specifically covered
                                    elsewhere in subpart K.
----------------------------------------------------------------------------------------------------------------
                             Reporting Subtotal                              20,175.............          31,800
----------------------------------------------------------------------------------------------------------------
1163(c), (d).....................  Maintain records for 6                13  869 platforms......          11,297
                                    years detailing gas
                                    flaring or venting;
                                    maintain meter records
                                    and provide copies if
                                    requested.
1163(c)..........................  Maintain records for 6               0.5  60 occurrences.....              30
                                    years detailing liquid
                                    hydrocarbon burn
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.