Environmental Impacts Statements; Notice of Availability, 9521 [E7-3672]
Download as PDF
Federal Register / Vol. 72, No. 41 / Friday, March 2, 2007 / Notices
Dated: February 27, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–3671 Filed 3–1–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6684–5]
pwalker on PROD1PC71 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 02/19/2007 through 02/23/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070065, Draft EIS, BLM, CA,
Eastern San Diego County Resource
Management Plan, Implementation,
San Diego County, CA, Comment
Period Ends: 05/31/2007, Contact:
Erin Dreyfuss 760–337–4436.
EIS No. 20070066, Final EIS, BLM, AZ,
Arizona Strip Field Office Resource
Management Plan, which includes:
Vermilion Cliffs National Monument,
Grand-Canyon-Parashant National
Monument (Parashant) BLM Portion,
General Management Plan for the
Grand Canyon-Parashant National
Monument NPS Portion of Parashant,
Implementation, AZ, Wait Period
Ends: 04/02/2007, Contact: Diana
Hawks 435–688–3266.
EIS No. 20070067, Draft EIS, SFW, PR,
Vieques National Wildlife Refuge
Comprehensive Conservation Plan,
Implementation, Vieques, PR,
Comment Period Ends: 04/30/2007,
Contact: Jim Oland 410–573–4592.
EIS No. 20070068, Draft EIS, BLM, AZ,
Ironwood Forest National Monument,
Resource Management Plan,
Implementation, Tucson Field Office,
AZ, Comment Period Ends: 05/31/
2007, Contact: Patrick Madigan 520–
258–7200
EIS No. 20070069, Second Final
Supplement, FHW, WV, Appalachian
Corridor H Project, Construction of a
9-mile Long Segment between the
Termini of Parsons and Davis,
Updated Information the Parsons-toDavis Project, Funding and U.S. Army
COE Section 404 Permit Issuance,
Tucker County, WV, Wait Period
Ends: 04/27/2007, Contact: Thomas J.
Smith 304–347–5928.
EIS No. 20070070, Second Draft
Supplement, AFS, CA, Empire
Vegetation Management Project,
VerDate Aug<31>2005
18:44 Mar 01, 2007
Jkt 211001
Supplemental Information to Clarify
Cumulative Effects Analysis, Mount
Hough Ranger District, Plumas
National Forest, Plumas County, CA,
Comment Period Ends: 04/16/2007,
Contact: Gary Rotta 530–283–0555.
EIS No. 20070071, Draft EIS, USA, VA,
Fort Belvoir 2005 Base Realignment
and Closure (BRAC)
Recommendations and Related Army
Actions, Implementation, Fairfax
County, VA, Comment Period Ends:
05/01/2007, Contact:
Karen Wilson 703–602–2861.
Amended Notices
EIS No. 20070044, Draft EIS, AFS, NM,
Surface Management of Gas Leasing
and Development, Proposes to Amend
the Forest Plan include Standard and
Guidelines Related to Gas Leasing and
Development in the Jicarilla Ranger
District, Carson National Forest, Rio
Arriba County, NM, Comment Period
Ends: 04/17/2007, Contact: Audrey
Kuykendall 505–758–6212 Revision
of FR Notice Published 02/16/2007:
Extending Comment Period from 04/
02/2007 to 04/17/2007.
Dated: February 27, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–3672 Filed 3–1–07; 8:45 am]
BILLING CODE 6560–50–P
9521
FOR FURTHER INFORMATION CONTACT:
Carolyn Hubbard, Office of Children’s
Health Protection and Environmental
Education, USEPA, MC 1107A, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, (202) 564–2189,
hubbard.carolyn@epa.gov.
SUPPLEMENTARY INFORMATION: The
meetings of the CHPAC are open to the
public. Task Group meetings will take
place on Tuesday March 13th, 2007 at
RESOLVE from 8:30 a.m. to 5:30 p.m.
The CHPAC plenary will meet on
Wednesday, March 14th from 8:30 a.m.
to 5:45 p.m. and Thursday March 15th
from 8:30 a.m. to 12:30 p.m. Agenda
items include discussion and next steps
from the Emerging Chemicals of
Concern, NAAQS for Lead and Ozone,
and 2007 Anniversary Task Groups and
a presentation on the NIEHS January
2007 workshop. Draft agenda attached.
Access and Accommodations: For
information on access or services for
individuals with disabilities, please
contact Carolyn Hubbard at 202–564–
2189 or hubbard.carolyn@epa.gov. To
request accommodation of a disability,
please contact Carolyn Hubbard
preferably at least 10 days prior to the
meeting, to give EPA as much time as
possible to process your request.
Dated: February 27, 2007.
Carolyn Hubbard,
Designated Federal Official.
U.S Environmental Protection Agency
ENVIRONMENTAL PROTECTION
AGENCY
Children’s Health Protection Advisory
Committee
[FRL–8283–1]
RESOLVE 1255 23rd Street, NW.,
Suite 275, Washington, DC 20037.
Notice of Meeting of the EPA’s
Children’s Health Protection Advisory
Committee (CHPAC)
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
SUMMARY: Pursuant to the provisions of
the Federal Advisory Committee Act,
Public Law 92–463, notice is hereby
given that the next meeting of the
Children’s Health Protection Advisory
Committee (CHPAC) will be held March
13–15th, 2007 at RESOLVE,
Washington, DC. The CHPAC was
created to advise the Environmental
Protection Agency on science,
regulations, and other issues relating to
children’s environmental health.
DATES: Task Groups will meet on
Tuesday March 13th and the CHPAC
Plenary will meet on Wednesday March
14th and Thursday March 15th, 2007 at
RESOLVE.
ADDRESSES: RESOLVE, 1255 23rd Street,
NW., Suite 275 Washington, DC.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Draft Agenda
Tuesday, March 13, 2007
Task Group Meetings
8:30–5:30 Emerging Chemicals of
Concern Task Group (ECOC)
12:15–1:30 Lunch (on your own)
1:30–5:30 Next Decade: 10 Year
Anniversary of the Executive Order
Task Group
1:30–5:30 National Ambient Air
Quality Standard (NAAQS) for
Ozone and Lead Task Group
Wednesday, March 14, 2007
CHPAC Plenary Session
8:30–9:00 Continental Breakfast and
Gathering
9:00–9:15 Welcome, Introductions,
Review Meeting Agenda
9:15–9:30 Highlights of Recent
OCHPEE Activities
9:30–10:30 Report on NIEHS January
Meeting and Vision for Next Decade
of Children’s Environmental Health
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 72, Number 41 (Friday, March 2, 2007)]
[Notices]
[Page 9521]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3672]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 02/19/2007 through 02/23/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070065, Draft EIS, BLM, CA, Eastern San Diego County Resource
Management Plan, Implementation, San Diego County, CA, Comment Period
Ends: 05/31/2007, Contact: Erin Dreyfuss 760-337-4436.
EIS No. 20070066, Final EIS, BLM, AZ, Arizona Strip Field Office
Resource Management Plan, which includes: Vermilion Cliffs National
Monument, Grand-Canyon-Parashant National Monument (Parashant) BLM
Portion, General Management Plan for the Grand Canyon-Parashant
National Monument NPS Portion of Parashant, Implementation, AZ, Wait
Period Ends: 04/02/2007, Contact: Diana Hawks 435-688-3266.
EIS No. 20070067, Draft EIS, SFW, PR, Vieques National Wildlife Refuge
Comprehensive Conservation Plan, Implementation, Vieques, PR, Comment
Period Ends: 04/30/2007, Contact: Jim Oland 410-573-4592.
EIS No. 20070068, Draft EIS, BLM, AZ, Ironwood Forest National
Monument, Resource Management Plan, Implementation, Tucson Field
Office, AZ, Comment Period Ends: 05/31/2007, Contact: Patrick Madigan
520-258-7200
EIS No. 20070069, Second Final Supplement, FHW, WV, Appalachian
Corridor H Project, Construction of a 9-mile Long Segment between the
Termini of Parsons and Davis, Updated Information the Parsons-to-Davis
Project, Funding and U.S. Army COE Section 404 Permit Issuance, Tucker
County, WV, Wait Period Ends: 04/27/2007, Contact: Thomas J. Smith 304-
347-5928.
EIS No. 20070070, Second Draft Supplement, AFS, CA, Empire Vegetation
Management Project, Supplemental Information to Clarify Cumulative
Effects Analysis, Mount Hough Ranger District, Plumas National Forest,
Plumas County, CA, Comment Period Ends: 04/16/2007, Contact: Gary Rotta
530-283-0555.
EIS No. 20070071, Draft EIS, USA, VA, Fort Belvoir 2005 Base
Realignment and Closure (BRAC) Recommendations and Related Army
Actions, Implementation, Fairfax County, VA, Comment Period Ends: 05/
01/2007, Contact:
Karen Wilson 703-602-2861.
Amended Notices
EIS No. 20070044, Draft EIS, AFS, NM, Surface Management of Gas Leasing
and Development, Proposes to Amend the Forest Plan include Standard and
Guidelines Related to Gas Leasing and Development in the Jicarilla
Ranger District, Carson National Forest, Rio Arriba County, NM, Comment
Period Ends: 04/17/2007, Contact: Audrey Kuykendall 505-758-6212
Revision of FR Notice Published 02/16/2007: Extending Comment Period
from 04/02/2007 to 04/17/2007.
Dated: February 27, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-3672 Filed 3-1-07; 8:45 am]
BILLING CODE 6560-50-P