Environmental Impacts Statements; Notice of Availability, 9521 [E7-3672]

Download as PDF Federal Register / Vol. 72, No. 41 / Friday, March 2, 2007 / Notices Dated: February 27, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–3671 Filed 3–1–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6684–5] pwalker on PROD1PC71 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 02/19/2007 through 02/23/2007 Pursuant to 40 CFR 1506.9. EIS No. 20070065, Draft EIS, BLM, CA, Eastern San Diego County Resource Management Plan, Implementation, San Diego County, CA, Comment Period Ends: 05/31/2007, Contact: Erin Dreyfuss 760–337–4436. EIS No. 20070066, Final EIS, BLM, AZ, Arizona Strip Field Office Resource Management Plan, which includes: Vermilion Cliffs National Monument, Grand-Canyon-Parashant National Monument (Parashant) BLM Portion, General Management Plan for the Grand Canyon-Parashant National Monument NPS Portion of Parashant, Implementation, AZ, Wait Period Ends: 04/02/2007, Contact: Diana Hawks 435–688–3266. EIS No. 20070067, Draft EIS, SFW, PR, Vieques National Wildlife Refuge Comprehensive Conservation Plan, Implementation, Vieques, PR, Comment Period Ends: 04/30/2007, Contact: Jim Oland 410–573–4592. EIS No. 20070068, Draft EIS, BLM, AZ, Ironwood Forest National Monument, Resource Management Plan, Implementation, Tucson Field Office, AZ, Comment Period Ends: 05/31/ 2007, Contact: Patrick Madigan 520– 258–7200 EIS No. 20070069, Second Final Supplement, FHW, WV, Appalachian Corridor H Project, Construction of a 9-mile Long Segment between the Termini of Parsons and Davis, Updated Information the Parsons-toDavis Project, Funding and U.S. Army COE Section 404 Permit Issuance, Tucker County, WV, Wait Period Ends: 04/27/2007, Contact: Thomas J. Smith 304–347–5928. EIS No. 20070070, Second Draft Supplement, AFS, CA, Empire Vegetation Management Project, VerDate Aug<31>2005 18:44 Mar 01, 2007 Jkt 211001 Supplemental Information to Clarify Cumulative Effects Analysis, Mount Hough Ranger District, Plumas National Forest, Plumas County, CA, Comment Period Ends: 04/16/2007, Contact: Gary Rotta 530–283–0555. EIS No. 20070071, Draft EIS, USA, VA, Fort Belvoir 2005 Base Realignment and Closure (BRAC) Recommendations and Related Army Actions, Implementation, Fairfax County, VA, Comment Period Ends: 05/01/2007, Contact: Karen Wilson 703–602–2861. Amended Notices EIS No. 20070044, Draft EIS, AFS, NM, Surface Management of Gas Leasing and Development, Proposes to Amend the Forest Plan include Standard and Guidelines Related to Gas Leasing and Development in the Jicarilla Ranger District, Carson National Forest, Rio Arriba County, NM, Comment Period Ends: 04/17/2007, Contact: Audrey Kuykendall 505–758–6212 Revision of FR Notice Published 02/16/2007: Extending Comment Period from 04/ 02/2007 to 04/17/2007. Dated: February 27, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–3672 Filed 3–1–07; 8:45 am] BILLING CODE 6560–50–P 9521 FOR FURTHER INFORMATION CONTACT: Carolyn Hubbard, Office of Children’s Health Protection and Environmental Education, USEPA, MC 1107A, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, (202) 564–2189, hubbard.carolyn@epa.gov. SUPPLEMENTARY INFORMATION: The meetings of the CHPAC are open to the public. Task Group meetings will take place on Tuesday March 13th, 2007 at RESOLVE from 8:30 a.m. to 5:30 p.m. The CHPAC plenary will meet on Wednesday, March 14th from 8:30 a.m. to 5:45 p.m. and Thursday March 15th from 8:30 a.m. to 12:30 p.m. Agenda items include discussion and next steps from the Emerging Chemicals of Concern, NAAQS for Lead and Ozone, and 2007 Anniversary Task Groups and a presentation on the NIEHS January 2007 workshop. Draft agenda attached. Access and Accommodations: For information on access or services for individuals with disabilities, please contact Carolyn Hubbard at 202–564– 2189 or hubbard.carolyn@epa.gov. To request accommodation of a disability, please contact Carolyn Hubbard preferably at least 10 days prior to the meeting, to give EPA as much time as possible to process your request. Dated: February 27, 2007. Carolyn Hubbard, Designated Federal Official. U.S Environmental Protection Agency ENVIRONMENTAL PROTECTION AGENCY Children’s Health Protection Advisory Committee [FRL–8283–1] RESOLVE 1255 23rd Street, NW., Suite 275, Washington, DC 20037. Notice of Meeting of the EPA’s Children’s Health Protection Advisory Committee (CHPAC) Environmental Protection Agency (EPA). ACTION: Notice of meeting. AGENCY: SUMMARY: Pursuant to the provisions of the Federal Advisory Committee Act, Public Law 92–463, notice is hereby given that the next meeting of the Children’s Health Protection Advisory Committee (CHPAC) will be held March 13–15th, 2007 at RESOLVE, Washington, DC. The CHPAC was created to advise the Environmental Protection Agency on science, regulations, and other issues relating to children’s environmental health. DATES: Task Groups will meet on Tuesday March 13th and the CHPAC Plenary will meet on Wednesday March 14th and Thursday March 15th, 2007 at RESOLVE. ADDRESSES: RESOLVE, 1255 23rd Street, NW., Suite 275 Washington, DC. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Draft Agenda Tuesday, March 13, 2007 Task Group Meetings 8:30–5:30 Emerging Chemicals of Concern Task Group (ECOC) 12:15–1:30 Lunch (on your own) 1:30–5:30 Next Decade: 10 Year Anniversary of the Executive Order Task Group 1:30–5:30 National Ambient Air Quality Standard (NAAQS) for Ozone and Lead Task Group Wednesday, March 14, 2007 CHPAC Plenary Session 8:30–9:00 Continental Breakfast and Gathering 9:00–9:15 Welcome, Introductions, Review Meeting Agenda 9:15–9:30 Highlights of Recent OCHPEE Activities 9:30–10:30 Report on NIEHS January Meeting and Vision for Next Decade of Children’s Environmental Health E:\FR\FM\02MRN1.SGM 02MRN1

Agencies

[Federal Register Volume 72, Number 41 (Friday, March 2, 2007)]
[Notices]
[Page 9521]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3672]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6684-5]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 02/19/2007 through 02/23/2007
Pursuant to 40 CFR 1506.9.

EIS No. 20070065, Draft EIS, BLM, CA, Eastern San Diego County Resource 
Management Plan, Implementation, San Diego County, CA, Comment Period 
Ends: 05/31/2007, Contact: Erin Dreyfuss 760-337-4436.
EIS No. 20070066, Final EIS, BLM, AZ, Arizona Strip Field Office 
Resource Management Plan, which includes: Vermilion Cliffs National 
Monument, Grand-Canyon-Parashant National Monument (Parashant) BLM 
Portion, General Management Plan for the Grand Canyon-Parashant 
National Monument NPS Portion of Parashant, Implementation, AZ, Wait 
Period Ends: 04/02/2007, Contact: Diana Hawks 435-688-3266.
EIS No. 20070067, Draft EIS, SFW, PR, Vieques National Wildlife Refuge 
Comprehensive Conservation Plan, Implementation, Vieques, PR, Comment 
Period Ends: 04/30/2007, Contact: Jim Oland 410-573-4592.
EIS No. 20070068, Draft EIS, BLM, AZ, Ironwood Forest National 
Monument, Resource Management Plan, Implementation, Tucson Field 
Office, AZ, Comment Period Ends: 05/31/2007, Contact: Patrick Madigan 
520-258-7200
EIS No. 20070069, Second Final Supplement, FHW, WV, Appalachian 
Corridor H Project, Construction of a 9-mile Long Segment between the 
Termini of Parsons and Davis, Updated Information the Parsons-to-Davis 
Project, Funding and U.S. Army COE Section 404 Permit Issuance, Tucker 
County, WV, Wait Period Ends: 04/27/2007, Contact: Thomas J. Smith 304-
347-5928.
EIS No. 20070070, Second Draft Supplement, AFS, CA, Empire Vegetation 
Management Project, Supplemental Information to Clarify Cumulative 
Effects Analysis, Mount Hough Ranger District, Plumas National Forest, 
Plumas County, CA, Comment Period Ends: 04/16/2007, Contact: Gary Rotta 
530-283-0555.
EIS No. 20070071, Draft EIS, USA, VA, Fort Belvoir 2005 Base 
Realignment and Closure (BRAC) Recommendations and Related Army 
Actions, Implementation, Fairfax County, VA, Comment Period Ends: 05/
01/2007, Contact:
    Karen Wilson 703-602-2861.

Amended Notices

EIS No. 20070044, Draft EIS, AFS, NM, Surface Management of Gas Leasing 
and Development, Proposes to Amend the Forest Plan include Standard and 
Guidelines Related to Gas Leasing and Development in the Jicarilla 
Ranger District, Carson National Forest, Rio Arriba County, NM, Comment 
Period Ends: 04/17/2007, Contact: Audrey Kuykendall 505-758-6212 
Revision of FR Notice Published 02/16/2007: Extending Comment Period 
from 04/02/2007 to 04/17/2007.

    Dated: February 27, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-3672 Filed 3-1-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.