Combined Notice of Filings #1, 8722-8723 [E7-3359]
Download as PDF
8722
Federal Register / Vol. 72, No. 38 / Tuesday, February 27, 2007 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL07–35–000]
Key-Span Ravenswood, LLC,
Complainant v. New York Independent
System Operator, Inc., Respondent;
Notice of Complaint
cprice-sewell on PROD1PC62 with NOTICES
February 21, 2007.
Take notice that on February 15, 2007,
Key-Span Ravenswood, LLC
(Ravenswood) filed a formal complaint
against the New York Independent
System Operator, Inc. (NYISO) pursuant
to Federal Power Act sections 206 and
306, alleging that, under section 5.4 of
the NYISO’s Services Tariff,
Ravenswood is due its full incremental
operating costs, including lost
opportunity costs, incurred in all hours
since May 1, 2006, when Ravenswood
responded to fuel security dispatch
instructions to switch from natural gas
to more expensive fuel oil under Rule I–
R3 of the New York State Reliability
Council.
Ravenswood certifies that copies of
the complaint were served on the
contacts for NYISO as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
VerDate Aug<31>2005
15:22 Feb 26, 2007
Jkt 211001
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 19, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3345 Filed 2–26–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
February 21, 2007.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC07–38–000.
Applicants: NorthWestern
Corporation.
Description: NorthWestern
Corporation submits its response to
FERC, Staffs February 2, 2007 Request
for Additional Information.
Filed Date: 02/20/2007.
Accession Number: 20070220–5082.
Comment Date: 5 p.m. Eastern Time
on Friday, March 2, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER99–4102–005.
Applicants: Milford Power Company,
LLC.
Description: Milford Power Co, LLC
submits a supplement to its 1/31/07,
tariff filing.
Filed Date: 02/16/2007.
Accession Number: 20070221–0037.
Comment Date: 5 p.m. Eastern Time
on Friday, March 9, 2007.
Docket Numbers: ER00–3251–014.
Applicants: Exelon Generating
Company, LLC.
Description: Exelon Generation
Company, LLC submits modification to,
its Market-Based Tariff, Volume 1 to
incorporate the Order, 652 change in
status reporting requirement.
Filed Date: 02/09/2007.
Accession Number: 20070216–0242.
Comment Date: 5 p.m. Eastern Time
on Friday, March 2, 2007.
Docket Numbers: ER03–1159–002.
Applicants: Hershey Chocolate and
Confectionary Corporation.
Description: Hershey Chocolate and
Confectionary Corporation submits a,
First Triennial Market Power Update
Report in support of, continued market
based rate authority.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Filed Date: 02/20/2007.
Accession Number: 20070220–5042.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 13, 2007.
Docket Numbers: ER05–406–003.
Applicants: Williams Power
Company, Inc.
Description: Williams Power
Company, Inc. submits a revised,
Amendment To Amended Offer Of
Settlement of Williams, Power Co.
Filed Date: 01/19/2007.
Accession Number: 20070119–5085.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 28, 2007.
Docket Numbers: ER06–1218–004.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection,
L.L.C. submits a Compliance Filing,
addressing Commission’s mandate in
LTTR Order requiring, PJM to file
administration rules for Section 7.8 of
PJM’s, LTTR Proposal.
Filed Date: 02/16/2007.
Accession Number: 20070216–5032.
Comment Date: 5 p.m. Eastern Time
on Friday, March 9, 2007.
Docket Numbers: ER07–188–004;
ER07–189–004; ER07–190–004; ER07–
191–004; ER07–192–002.
Applicants: Duke Energy Carolinas,
LLC; Duke Energy Indiana, Inc.; Duke
Energy Kentucky, Inc.; Duke Energy
Ohio, Inc.; Duke Energy Shared
Services, Inc.
Description: Duke Energy Corp on
behalf of Duke Energy Carolinas, LLC, et
al refiles its Duke Carolinas Service
Agreement with, Lockhart Power Co et
al.
Filed Date: 02/06/2007.
Accession Number: 20070208–0143.
Comment Date: 5 p.m. Eastern Time
on Tuesday, February 27, 2007.
Docket Numbers: ER07–516–000.
Applicants: Morgan Stanley Capital
Group, Inc.
Description: Morgan Stanley Capital
Group Inc. submits a response to, FERC
Staff’s request regarding certain bilateral
spot, transactions for which it was the
seller in the Western, Electricity
Coordinating Council region etc.
Filed Date: 01/26/2007.
Accession Number: 20070212–0004.
Comment Date: 5 p.m. Eastern Time
on Friday, March 2, 2007.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES07–21–000.
Applicants: Entergy Nuclear
Palisades, LLC.
Description: Entergy Nuclear
Palisades, LLC submits an application
for Authorization to Issue Securities.
E:\FR\FM\27FEN1.SGM
27FEN1
cprice-sewell on PROD1PC62 with NOTICES
Federal Register / Vol. 72, No. 38 / Tuesday, February 27, 2007 / Notices
Filed Date: 02/20/2007.
Accession Number: 20070220–5019.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 13, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. PF07–3–000]
[P–12514–000, Indiana]
Norway-Oakdale Project; Northern
Indiana Public Service Company;
Notice of Availability of Final
Environmental Assessment
February 16, 2007.
In accordance with the National
Environmental Policy Act (NEPA) of
1969, as amended, and Federal Energy
Regulatory Commission (Commission)
regulations (18 CFR part 380),
Commission staff has reviewed the
application for license for the NorwayOakdale Project and have prepared a
final environmental assessment (FEA)
for the project. The project is located on
the Tippecanoe River in Carroll and
White counties, Indiana.
In this FEA, Commission staff
analyzes the probable environmental
effects of implementing the project and
conclude that approval of the project,
with appropriate staff-recommended
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
Copies of the FEA are available for
review in Public Reference Room 2-A of
the Commission’s offices at 888 First
Street, NE., Washington, DC. The FEA
also may be viewed on the
Commission’s Internet Web site (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Additional information about the
project is available from the
Commission’s Office of External Affairs
at (202) 502–6088, or on the
Commission’s website using the
‘‘eLibrary’’ link. For assistance with
eLibrary, contact
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659.
For further information, please
contact Sergiu Serban (202) 502–6211 or
at sergiu.serban@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3346 Filed 2–26–07; 8:45 am]
BILLING CODE 6717–01–P
Magalie R. Salas,
Secretary.
[FR Doc. E7–3359 Filed 2–26–07; 8:45 am]
15:22 Feb 26, 2007
Jkt 211001
Floridian Natural Gas Storage
Company, LLC; Notice of Intent To
Prepare an Environmental Impact
Statement for the Proposed Floridian
Natural Gas Storage Project; Request
for Comments on Environmental
Issues and Notice of a Public Meeting
February 15, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) is in the process of
evaluating the Floridian Natural Gas
Storage Project planned by Floridian
Natural Gas Storage Company, LLC
(FGS). The project would consist of a
natural gas storage facility located in
Martin County, Florida, north of
Indiantown, Florida, and two
approximately 4-mile-long natural gas
pipelines, extending northwest from the
facility to interconnect with the existing
interstate pipeline systems of Florida
Gas Transmission (FGT) and Gulfstream
Natural Gas System, L.L.C. (Gulfstream).
As a part of this evaluation, FERC
staff will prepare an environmental
impact statement (EIS) that will address
the environmental impacts of the
project. Comments on the project may
be submitted in written form or
verbally. Further details on how to
submit written comments are provided
in the Public Participation section of
this NOI. In lieu of sending written
comments, we invite you to attend the
following public scoping meeting and
site visit scheduled as follows:
Wednesday, March 7, 2007, 7 p.m.,
Indiantown Civic Center, 15675 SW
Osceola Street, Indiantown FL 34956,
(772) 597–2886.
FERC will be conducting a site visit
of the proposed project on March 7,
2007, beginning at the Indiantown Civic
Center parking lot at 4 p.m. and
returning to the lot before 6 p.m. Please
note that the applicant will provide a
small bus or allow a caravan of private
vehicles to the project site. The project
pipelines will be viewed from public
rights-of-way from the vehicle.
The Commission will use the EIS in
its decision-making process to
determine whether or not to authorize
the project. This Notice of Intent (NOI)
explains the scoping process we 1 will
use to gather information on the project
from the public and interested agencies.
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
BILLING CODE 6717–01–P
VerDate Aug<31>2005
8723
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 72, Number 38 (Tuesday, February 27, 2007)]
[Notices]
[Pages 8722-8723]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3359]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
February 21, 2007.
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC07-38-000.
Applicants: NorthWestern Corporation.
Description: NorthWestern Corporation submits its response to FERC,
Staffs February 2, 2007 Request for Additional Information.
Filed Date: 02/20/2007.
Accession Number: 20070220-5082.
Comment Date: 5 p.m. Eastern Time on Friday, March 2, 2007.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER99-4102-005.
Applicants: Milford Power Company, LLC.
Description: Milford Power Co, LLC submits a supplement to its 1/
31/07, tariff filing.
Filed Date: 02/16/2007.
Accession Number: 20070221-0037.
Comment Date: 5 p.m. Eastern Time on Friday, March 9, 2007.
Docket Numbers: ER00-3251-014.
Applicants: Exelon Generating Company, LLC.
Description: Exelon Generation Company, LLC submits modification
to, its Market-Based Tariff, Volume 1 to incorporate the Order, 652
change in status reporting requirement.
Filed Date: 02/09/2007.
Accession Number: 20070216-0242.
Comment Date: 5 p.m. Eastern Time on Friday, March 2, 2007.
Docket Numbers: ER03-1159-002.
Applicants: Hershey Chocolate and Confectionary Corporation.
Description: Hershey Chocolate and Confectionary Corporation
submits a, First Triennial Market Power Update Report in support of,
continued market based rate authority.
Filed Date: 02/20/2007.
Accession Number: 20070220-5042.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 13, 2007.
Docket Numbers: ER05-406-003.
Applicants: Williams Power Company, Inc.
Description: Williams Power Company, Inc. submits a revised,
Amendment To Amended Offer Of Settlement of Williams, Power Co.
Filed Date: 01/19/2007.
Accession Number: 20070119-5085.
Comment Date: 5 p.m. Eastern Time on Wednesday, February 28, 2007.
Docket Numbers: ER06-1218-004.
Applicants: PJM Interconnection, LLC.
Description: PJM Interconnection, L.L.C. submits a Compliance
Filing, addressing Commission's mandate in LTTR Order requiring, PJM to
file administration rules for Section 7.8 of PJM's, LTTR Proposal.
Filed Date: 02/16/2007.
Accession Number: 20070216-5032.
Comment Date: 5 p.m. Eastern Time on Friday, March 9, 2007.
Docket Numbers: ER07-188-004; ER07-189-004; ER07-190-004; ER07-191-
004; ER07-192-002.
Applicants: Duke Energy Carolinas, LLC; Duke Energy Indiana, Inc.;
Duke Energy Kentucky, Inc.; Duke Energy Ohio, Inc.; Duke Energy Shared
Services, Inc.
Description: Duke Energy Corp on behalf of Duke Energy Carolinas,
LLC, et al refiles its Duke Carolinas Service Agreement with, Lockhart
Power Co et al.
Filed Date: 02/06/2007.
Accession Number: 20070208-0143.
Comment Date: 5 p.m. Eastern Time on Tuesday, February 27, 2007.
Docket Numbers: ER07-516-000.
Applicants: Morgan Stanley Capital Group, Inc.
Description: Morgan Stanley Capital Group Inc. submits a response
to, FERC Staff's request regarding certain bilateral spot, transactions
for which it was the seller in the Western, Electricity Coordinating
Council region etc.
Filed Date: 01/26/2007.
Accession Number: 20070212-0004.
Comment Date: 5 p.m. Eastern Time on Friday, March 2, 2007.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES07-21-000.
Applicants: Entergy Nuclear Palisades, LLC.
Description: Entergy Nuclear Palisades, LLC submits an application
for Authorization to Issue Securities.
[[Page 8723]]
Filed Date: 02/20/2007.
Accession Number: 20070220-5019.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 13, 2007.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E7-3359 Filed 2-26-07; 8:45 am]