Notice of Jurisdictional Review and Soliciting Comments, Protests and/or Motions To Intervene, 8378 [E7-3224]
Download as PDF
8378
Federal Register / Vol. 72, No. 37 / Monday, February 26, 2007 / Notices
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3218 Filed 2–23–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ycherry on PROD1PC64 with NOTICES
Notice of Jurisdictional Review and
Soliciting Comments, Protests and/or
Motions To Intervene
Take notice that the following review
has been initiated by the Commission:
a. Review Type: Jurisdictional Review.
b. Project No.: 2306–080.
c. Owner: Great Bay Hydro
Corporation.
d. Name of Project: Clyde River
Hydroelectric Project.
e. Location: The project is located on
the Clyde River in Orleans County,
Vermont.
f. Owner Contact: Mr. William
Rodgers, Great Bay Hydro Corporation,
1 New Hampshire Avenue, Suite 125,
Portsmouth, NH 03801. (603) 766–4990.
g. FERC Contact: Any questions on
this notice should be addressed to Chris
Yeakel at (202) 502–8132, or e-mail
address: christopher.yeakel@ferc.gov.
h. Deadline for filing comments,
protests, and/or motions to intervene:
March 20, 2007.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
VerDate Aug<31>2005
16:03 Feb 23, 2007
Jkt 211001
Office. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov.
Please include the docket number
(Project No. 2306–080) on any
comments, protests, and/or motions to
intervene filed.
i. Description: Great Bay Hydro
Corporation filed an application on
January 5, 2006, proposing to amend the
license to, among other things, remove
from the license and project boundary,
the Seymour and Echo reservoirs and
convey them to the state of Vermont,
because they are not needed for project
purposes. Staff will review the
jurisdictional status of the two
reservoirs to determine whether they are
needed for project purposes.
j. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
k. Protests, Comments, and/or
Motions To Intervene—Anyone may
submit comments, a protest, or a motion
to intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests, but only those who file a
motion to intervene in accordance with
the Commission’s Rules may become a
party to the proceeding. Any comments,
protests and/or motions to intervene
must be received on or before the
specified comment date for the
particular application.
l. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Numbers of
the particular review.
m. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described review. If an
agency does not file comments within
the time specified for filing comments,
it will be presumed to have no
comments.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3224 Filed 2–23–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD07–11–000]
Demand Response in Wholesale
Markets; Notice of Technical
Conference on Demand Response in
Wholesale Markets
February 16, 2007.
A technical conference will be held
on Monday, April 23, 2007, at 9 a.m.
(EST), on integrating demand response
in wholesale markets, including items
previously set for conference in a
Commission order.1 The technical
conference will be held in the
Commission Meeting Room at the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. The conference will be open for
the public to attend and advance
registration is not required. The agenda
will be announced in a subsequent
notice.
Transcripts of the conference will be
immediately available from Ace
Reporting Company (202–347–3700 or
1–800–336–6646) for a fee. They will be
available for the public on the
Commission’s eLibrary system seven
calendar days after FERC receives the
transcript.
A free webcast of this event will be
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to www.ferc.gov’s Calendar of
Events and locating this event in the
Calendar. The event will contain a link
to its webcast. The Capitol Connection
provides technical support for the
webcasts. It also offers access to this
event via television in the Washington,
DC area and via phone bridge for a fee.
Visit https://www.CapitolConnection.org
or contact Danelle Perkowski or David
Reininger at the Capitol Connection
703–993–3100 for information about
this service.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an e-mail to accessibility@ferc.gov
or call toll free 866–208–3372 (voice) or
202–208–1659 (TTY), or send a FAX to
202–208–2106 with the required
accommodations.
For further information on the
technical conference, please contact:
David Kathan (Technical Information),
Office of Markets, Tariffs and Rates,
Federal Energy Regulatory
1 PJM Interconnection, L.L.C., 117 FERC ¶ 61,218,
at P 45 (2006).
Frm 00042
Fmt 4703
Sfmt 4703
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 72, Number 37 (Monday, February 26, 2007)]
[Notices]
[Page 8378]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3224]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Jurisdictional Review and Soliciting Comments, Protests
and/or Motions To Intervene
Take notice that the following review has been initiated by the
Commission:
a. Review Type: Jurisdictional Review.
b. Project No.: 2306-080.
c. Owner: Great Bay Hydro Corporation.
d. Name of Project: Clyde River Hydroelectric Project.
e. Location: The project is located on the Clyde River in Orleans
County, Vermont.
f. Owner Contact: Mr. William Rodgers, Great Bay Hydro Corporation,
1 New Hampshire Avenue, Suite 125, Portsmouth, NH 03801. (603) 766-
4990.
g. FERC Contact: Any questions on this notice should be addressed
to Chris Yeakel at (202) 502-8132, or e-mail address:
christopher.yeakel@ferc.gov.
h. Deadline for filing comments, protests, and/or motions to
intervene: March 20, 2007.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and/or
interventions may be filed electronically via the Internet in lieu of
paper. Any questions, please contact the Secretary's Office. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov.
Please include the docket number (Project No. 2306-080) on any
comments, protests, and/or motions to intervene filed.
i. Description: Great Bay Hydro Corporation filed an application on
January 5, 2006, proposing to amend the license to, among other things,
remove from the license and project boundary, the Seymour and Echo
reservoirs and convey them to the state of Vermont, because they are
not needed for project purposes. Staff will review the jurisdictional
status of the two reservoirs to determine whether they are needed for
project purposes.
j. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
k. Protests, Comments, and/or Motions To Intervene--Anyone may
submit comments, a protest, or a motion to intervene in accordance with
the requirements of Rules of Practice and Procedure, 18 CFR 385.210,
.211, .214. In determining the appropriate action to take, the
Commission will consider all protests, but only those who file a motion
to intervene in accordance with the Commission's Rules may become a
party to the proceeding. Any comments, protests and/or motions to
intervene must be received on or before the specified comment date for
the particular application.
l. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', and/
or ``MOTIONS TO INTERVENE'', as applicable, and the Docket Numbers of
the particular review.
m. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described review. If an agency does not file
comments within the time specified for filing comments, it will be
presumed to have no comments.
Magalie R. Salas,
Secretary.
[FR Doc. E7-3224 Filed 2-23-07; 8:45 am]
BILLING CODE 6717-01-P