Entergy Gulf States, Inc.; Notice of Petition for Declaratory Order, 8367 [E7-3190]
Download as PDF
Federal Register / Vol. 72, No. 37 / Monday, February 26, 2007 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EL07–34–000]
[Docket No. CP07–82–000]
Entergy Gulf States, Inc.; Notice of
Petition for Declaratory Order
Florida Gas Transmission Company,
LLC; Notice of Request Under Blanket
Authorization
ycherry on PROD1PC64 with NOTICES
February 15, 2007.
Take notice that on January 24, 2007,
Entergy Gulf States, Inc. (EGSI)
submitted a petition requesting that the
Commission issue a declaratory order
finding that the payment of one or more
dividends out of paid-in capital by EGSI
to its parent, Entergy Corporation, under
the facts and circumstances described in
the petition, will not violate Section
305(a) of the Federal Power Act.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 2, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3190 Filed 2–23–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
16:03 Feb 23, 2007
Jkt 211001
February 16, 2007.
Take notice that on February 6, 2007,
Florida Gas Transmission Company,
LLC (FGT), 5444 Westheimer Road,
Houston, Texas 77056, filed in Docket
No. CP07–82–000, a prior notice request
pursuant to sections 157.205 and
157.210 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act to construct,
own, and operate a 6.64 mile loop of
FGT’s existing 30-inch mainline, located
in Clay County, Florida, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, FGT proposes to
construct approximately 6.64 miles of
30-inch pipeline loop (East Leg
Expansion), and in accordance with the
U.S. Department of Transportation
safety requirements, FGT will install
one new mainline valve, in Clay
County, Florida. FGT states that the
proposed pipeline is an extension of
their existing 30-inch mainline. FGT
estimates the cost of construction to be
$16,000,000. FGT asserts that the East
Leg Expansion project will provide
incremental firm transportation service
capacity of 10,000 MMBtu/d to help
meet gas requirements for a new electric
generation plant that Florida Municipal
Power Agency is constructing in St.
Lucie County, Florida.
Any questions regarding the
application should be directed to
Stephen T. Veatch, Sr. Director,
Certificates and Tariffs, Florida Gas
Transmission Company, LLC, 5444
Westheimer Road, P.O. Box 4967,
Houston, Texas 77210–4967 at (713)
989–2024.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
8367
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E7–3215 Filed 2–23–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–546–000]
ISO New England, Inc.; Notice of Filing
February 20, 2007.
Take notice that on February 15, 2007,
ISO New England, Inc. (ISO–NE) filed a
package of revisions to its Market Rules
to implement the Forward Capacity
Market (FCM) Settlement Agreement
approved by the Commission in Devon
Power LLC, 115 FERC ¶ 61,340, order
on reh’g, 117 FERC ¶ 61,133 (2006).
In the portion of this filing docketed
as Docket No. ER07–546–000, ISO–NE is
filing the following tariff provisions
relating to the FCM:
• Definitions, and those tariff sheets
related to qualification, Section III.13.1
(effective date requested: February 16,
2007).
• Changes to the Installed Capacity
Requirements (ICR) Market Rules
(effective date requested: March 1,
2007).
• Market Rules governing the
Forward Capacity Auction (FCA),
Section III.13.2 (effective date requested:
April 16, 2007)
The remainder of the proposed tariff
provisions filed by ISO–NE have been
docketed as Docket No. ER07–547–000.
Comments, protests and motions to
intervene or notices of intervention in
Docket No. ER07–546–000 will be due
on or before March 8, 2007.
Parties interested only in the matters
to be considered in Docket No. ER07–
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 72, Number 37 (Monday, February 26, 2007)]
[Notices]
[Page 8367]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3190]
[[Page 8367]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL07-34-000]
Entergy Gulf States, Inc.; Notice of Petition for Declaratory
Order
February 15, 2007.
Take notice that on January 24, 2007, Entergy Gulf States, Inc.
(EGSI) submitted a petition requesting that the Commission issue a
declaratory order finding that the payment of one or more dividends out
of paid-in capital by EGSI to its parent, Entergy Corporation, under
the facts and circumstances described in the petition, will not violate
Section 305(a) of the Federal Power Act.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on March 2, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7-3190 Filed 2-23-07; 8:45 am]
BILLING CODE 6717-01-P