Environmental Impact Statements and Regulations; Availability of EPA Comments, 8153-8154 [E7-3113]

Download as PDF Federal Register / Vol. 72, No. 36 / Friday, February 23, 2007 / Notices Dated: February 15, 2007. M.A. Harvison, Lieutenant Commander, Judge Advocate General’s Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. E7–3045 Filed 2–22–07; 8:45 am] BILLING CODE 3810–FF–P DEPARTMENT OF DEFENSE Department of the Navy Notice of Intent To Grant Exclusive Patent License; Hanson Technologies, Inc. Department of the Navy, DoD. Notice. AGENCY: ACTION: SUMMARY: The Department of the Navy hereby gives notice of its intent to grant to Hanson Technologies, Inc., a revocable, nonassignable, exclusive license in the field of detection of pathogens, toxins, prions, and allergens in food for human consumption, and detection of pathogens, toxins, prions, and allergens in food processing for human consumption, including wash liquids and waste products of said process in the United States and certain foreign countries, the Governmentowned invention described in U.S. Patent No. 6,192,168: REFLECTIVELY COATED OPTICAL WAVEGUIDE AND FLUIDICS CELL INTEGRATION, Navy Case No. 79,631 and any continuations, divisionals, or re-issues thereof. DATES: Anyone wishing to object to the grant of this license must file written objections along with supporting evidence, if any, not later than March 12, 2007. ADDRESSES: Written objections are to be filed with the Naval Research Laboratory, Code 1004, 4555 Overlook Avenue, SW., Washington, DC 20375– 5320. Rita Manak, Head, Technology Transfer Office, NRL Code 1004, 4555 Overlook Avenue, SW., Washington, DC 20375– 5320, telephone 202–767–3083. Due to U.S. Postal delays, please fax 202–404– 7920, e-mail: rita.manak@nrl.navy.mil or use courier delivery to expedite response. FOR FURTHER INFORMATION CONTACT: cprice-sewell on PROD1PC61 with NOTICES (Authority: 35 U.S.C. 207, 37 CFR Part 404.) Dated: 15 February 2007. M.A. Harvison, Lieutenant Commander, Judge Advocate General’s Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. E7–3104 Filed 2–22–07; 8:45 am] DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests Department of Education. SUMMARY: The IC Clearance Official, Regulatory Information Management Services, Office of Management, invites comments on the proposed information collection requests as required by the Paperwork Reduction Act of 1995. AGENCY: Interested persons are invited to submit comments on or before April 24, 2007. DATES: Section 3506 of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35) requires that the Office of Management and Budget (OMB) provide interested Federal agencies and the public an early opportunity to comment on information collection requests. OMB may amend or waive the requirement for public consultation to the extent that public participation in the approval process would defeat the purpose of the information collection, violate State or Federal law, or substantially interfere with any agency’s ability to perform its statutory obligations. The IC Clearance Official, Regulatory Information Management Services, Office of Management, publishes that notice containing proposed information collection requests prior to submission of these requests to OMB. Each proposed information collection, grouped by office, contains the following: (1) Type of review requested, e.g. new, revision, extension, existing or reinstatement; (2) Title; (3) Summary of the collection; (4) Description of the need for, and proposed use of, the information; (5) Respondents and frequency of collection; and (6) Reporting and/or Recordkeeping burden. OMB invites public comment. The Department of Education is especially interested in public comment addressing the following issues: (1) Is this collection necessary to the proper functions of the Department; (2) will this information be processed and used in a timely manner; (3) is the estimate of burden accurate; (4) how might the Department enhance the quality, utility, and clarity of the information to be collected; and (5) how might the Department minimize the burden of this collection on the respondents, including through the use of information technology. SUPPLEMENTARY INFORMATION: BILLING CODE 3810–FF–P VerDate Aug<31>2005 15:07 Feb 22, 2007 Jkt 211001 PO 00000 Frm 00005 Fmt 4703 Sfmt 4703 8153 Dated: February 16, 2007. Angela C. Arrington, IC Clearance Official, Regulatory Information Management Services, Office of Management. Institute of Education Sciences Type of Review: New. Title: Impact Evaluation on Student Achievement of Teacher Professional Development in Mathematics. Frequency: On Occasion. Affected Public: State, Local, or Tribal Gov’t, SEAs or LEAs; Individuals or household. Reporting and Recordkeeping Hour Burden: Responses: 3,309. Burden Hours: 1,571. Abstract: Data collection to test a model of math professional development that addresses student misconceptions in foundational topics key to success in algebra and beyond. Requests for copies of the proposed information collection request may be accessed from https://edicsweb.ed.gov, by selecting the ‘‘Browse Pending Collections’’ link and by clicking on link number 3282. When you access the information collection, click on ‘‘Download Attachments’’ to view. Written requests for information should be addressed to U.S. Department of Education, 400 Maryland Avenue, SW., Potomac Center, 9th Floor, Washington, DC 20202–4700. Requests may also be electronically mailed to ICDocketMgr@ed.gov or faxed to 202– 245–6623. Please specify the complete title of the information collection when making your request. Comments regarding burden and/or the collection activity requirements should be electronically mailed to ICDocketMgr@ed.gov. Individuals who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1– 800–877–8339. [FR Doc. E7–3109 Filed 2–22–07; 8:45 am] BILLING CODE 4000–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6684–4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed E:\FR\FM\23FEN1.SGM 23FEN1 8154 Federal Register / Vol. 72, No. 36 / Friday, February 23, 2007 / Notices to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 7, 2006 (71 FR 17845). cprice-sewell on PROD1PC61 with NOTICES Draft EISs EIS No. 20060155, ERP No. D–NPS– J65461–CO, Great Sand Dunes National and Preserve. General Management Plan/Wilderness Study, Implementation, Alamos and Saguache Counties, CO. Summary: EPA does not object to the proposed project. Rating LO. EIS No. 20060203, ERP No. D–BLM– J01081–WY, Maysdorf Coal Lease by Application (LBA) Tract, (Federal Coal Application WYW154432), Implementation, Campbell Counties, WY. Summary: EPA expressed environmental concerns about the potential for adverse impacts to air quality. The Final EIS should include information demonstrating how compliance with national air quality standards for particulate matter will be achieved and as well as a more detailed mitigation plan. Rating EC2. EIS No. 20060380, ERP No. D–AFS– J67033–CO, Robin Redbreast Unpatented Lode Claim Mining Plan of Operations, Implementation, U.S. Army COE Section 404 Permit, Located above the Middle Fork of the Cimarron River within the Uncompahgre Wilderness, Ouray Ranger District, Grand Mesa, Uncompahgre and Gunnison National Forests, Hinsdale County, CO. Summary: EPA expressed environmental concerns about impacts to water quality from acid mine drainage. The Final EIS should include additional analysis of groundwater conditions and flow rates and more information regarding water treatment to meet water quality criteria. Rating EC2. EIS No. 20060526, ERP No. D–AFS– G65102–NM, Canadian River Tamarisk Control, Proposes to Control the Nonnative Invasive Species Tamarisk (also Known as salt cedar) Cibola National Forest, Canadian River, Harding and Mora Counties, New Mexico. Summary: EPA does not object to the selection of the preferred alternative. Rating LO. Final EISs EIS No. 20060513, ERP No. F–AFS– J61109–CO, Arapahoe Basin 2006 Improvement Plan, Enhancing the Recreational Experience Addressing Lifts, Parking, and Terrain Network, Montezuma Bowl, Implementation, U.S. VerDate Aug<31>2005 18:07 Feb 22, 2007 Jkt 211001 Army COE 404 Permit, White River National Forest, Summit County, CO. Summary: The final EIS addressed EPA’s previous concerns related to alternatives, visitation impacts and safety. The Final EIS also included a comprehensive analysis of existing conditions and actions to improve water quality, habitat and mitigation for wetlands impacts. EIS No. 20060516, ERP No. F–AFS– J65423–UT, Reissuance of 10–Year Term Grazing Permits to Continue Authorize Grazing on Eight Cattle Allotments, Permit Reissuing, Beaver Mountain Tushar Range, Millard, Piute, Garfield, Beaver and Iron Counties, UT. Summary: EPA continues to express environmental concerns about the potential for impacts to water quality and aquatic resources. EIS No. 20060520, ERP No. F–AFS– J65449–UT, Fishlake National Forest Off-Highway Vehicle Route Designation Project, Proposes to Designate a System of Motorized Road, Trails, and Areas to Revise and Update the Existing Motorized Travel Plan, UT. Summary: The Final EIS was responsive to EPA’s previous concerns about the cumulative impacts analysis and the analysis of existing conditions by adding summary information from integrated riparian surveys and forest monitoring reports. EIS No. 20060524, ERP No. F–NRC– D03004–VA, Early Site Permit (ESP) at the North Anna Power Station ESP Site (TAC No. MC1128), New and Updated Information, Construction and Operation, NUREG–1811, Louisa County, VA. Summary: EPA’s comments from the Draft EIS and Supplemental EIS were adequately addressed in the Final EIS. EIS No. 20070004, ERP No. F–NOA– L91028–AK, Alaska Groundfish Harvest Specifications Project, Establish Harvest Strategy for the Bering Sea and Aleutian Islands (BSAI) and Gulf of Alaska (GOA) Groundfish Fisheries, AK. Summary: EPA does not object to the proposed action. Dated: February 20, 2007. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. E7–3113 Filed 2–22–07; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00006 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6684–3] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly Receipt of Environmental Impact Statements Filed 02/12/2007 through 02/16/2007 Pursuant to 40 CFR 1506.9 EIS No. 20070052, Draft EIS, NPS, PA, Valley Forge National Historical Park, General Management Plan, Implementation, King of Prussia, PA, Comment Period Ends: 04/09/2007, Contact: Deirdre Gibson 610–783– 1047 EIS No. 20070053, Draft EIS, AFS, ID, Sun Valley Resort (Bald Mountain) 2005 Master Plan—Phase I Project, Implementation, Special-Use-Permits, Sawtooth National Forest, Blaine County, ID, Comment Period Ends: 04/09/2007, Contact: Carol Brown 208–727–5000 EIS No. 20070054, Final EIS, NPS, UT, Utah Museum of Natural History, Construction and Operation, New Museum Facility at University of Utah, Salt Lake City, UT , Wait Period Ends: 03/26/2007, Contact: Roxanne Runkel303–969–2377 EIS No. 20070055, Draft EIS, AFS, ID, Idaho Cobalt Project, Development of Two Underground Mines, a Waste Disposal Site and Associated Facilities, Approval of Plan-ofOperation, Salmon-Cobalt Ranger District, Salmon-Challis National Forest, Lemhi County, ID, Comment Period Ends: 04/24/2007, Contact: Ray Henderson 208–756–5231 EIS No. 20070056, Draft EIS, FHW, LA, I–49 South Project, from Raceland to the Westbank Expressway Route U.S. 90, Funding, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Jefferson, Lafourche, and St. Charles Parishes, LA, Comment Period Ends: 04/09/2007, Contact: Mark Stinson 225–757–7617 EIS No. 20070057, Final EIS, FHW, NC, Winston-Salem Northern Beltway, (Eastern Section) U.S. 52 south to I– 40 Business and I–40 Business south to U.S. 311, Improvements to the Surface Transportation Network, TIP Project Nos. U2579 and U–2579A, Forsyth County, NC (THIS EIS #20070057 AND EIS #20070058 ARE COMBINED IN A SINGLE DOCUMENT.), Wait Period Ends: E:\FR\FM\23FEN1.SGM 23FEN1

Agencies

[Federal Register Volume 72, Number 36 (Friday, February 23, 2007)]
[Notices]
[Pages 8153-8154]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3113]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6684-4]


Environmental Impact Statements and Regulations; Availability of 
EPA Comments

    Availability of EPA comments prepared pursuant to the Environmental 
Review Process (ERP), under section 309 of the Clean Air Act and 
Section 102(2)(c) of the National Environmental Policy Act as amended. 
Requests for copies of EPA comments can be directed

[[Page 8154]]

to the Office of Federal Activities at 202-564-7167.
    An explanation of the ratings assigned to draft environmental 
impact statements (EISs) was published in FR dated April 7, 2006 (71 FR 
17845).

Draft EISs

    EIS No. 20060155, ERP No. D-NPS-J65461-CO, Great Sand Dunes 
National and Preserve. General Management Plan/Wilderness Study, 
Implementation, Alamos and Saguache Counties, CO.
    Summary: EPA does not object to the proposed project. Rating LO.
    EIS No. 20060203, ERP No. D-BLM-J01081-WY, Maysdorf Coal Lease by 
Application (LBA) Tract, (Federal Coal Application WYW154432), 
Implementation, Campbell Counties, WY.
    Summary: EPA expressed environmental concerns about the potential 
for adverse impacts to air quality. The Final EIS should include 
information demonstrating how compliance with national air quality 
standards for particulate matter will be achieved and as well as a more 
detailed mitigation plan. Rating EC2.
    EIS No. 20060380, ERP No. D-AFS-J67033-CO, Robin Redbreast 
Unpatented Lode Claim Mining Plan of Operations, Implementation, U.S. 
Army COE Section 404 Permit, Located above the Middle Fork of the 
Cimarron River within the Uncompahgre Wilderness, Ouray Ranger 
District, Grand Mesa, Uncompahgre and Gunnison National Forests, 
Hinsdale County, CO.
    Summary: EPA expressed environmental concerns about impacts to 
water quality from acid mine drainage. The Final EIS should include 
additional analysis of groundwater conditions and flow rates and more 
information regarding water treatment to meet water quality criteria. 
Rating EC2.
    EIS No. 20060526, ERP No. D-AFS-G65102-NM, Canadian River Tamarisk 
Control, Proposes to Control the Nonnative Invasive Species Tamarisk 
(also Known as salt cedar) Cibola National Forest, Canadian River, 
Harding and Mora Counties, New Mexico.
    Summary: EPA does not object to the selection of the preferred 
alternative. Rating LO.

Final EISs

    EIS No. 20060513, ERP No. F-AFS-J61109-CO, Arapahoe Basin 2006 
Improvement Plan, Enhancing the Recreational Experience Addressing 
Lifts, Parking, and Terrain Network, Montezuma Bowl, Implementation, 
U.S. Army COE 404 Permit, White River National Forest, Summit County, 
CO.
    Summary: The final EIS addressed EPA's previous concerns related to 
alternatives, visitation impacts and safety. The Final EIS also 
included a comprehensive analysis of existing conditions and actions to 
improve water quality, habitat and mitigation for wetlands impacts.
    EIS No. 20060516, ERP No. F-AFS-J65423-UT, Reissuance of 10-Year 
Term Grazing Permits to Continue Authorize Grazing on Eight Cattle 
Allotments, Permit Reissuing, Beaver Mountain Tushar Range, Millard, 
Piute, Garfield, Beaver and Iron Counties, UT.
    Summary: EPA continues to express environmental concerns about the 
potential for impacts to water quality and aquatic resources.
    EIS No. 20060520, ERP No. F-AFS-J65449-UT, Fishlake National Forest 
Off-Highway Vehicle Route Designation Project, Proposes to Designate a 
System of Motorized Road, Trails, and Areas to Revise and Update the 
Existing Motorized Travel Plan, UT.
    Summary: The Final EIS was responsive to EPA's previous concerns 
about the cumulative impacts analysis and the analysis of existing 
conditions by adding summary information from integrated riparian 
surveys and forest monitoring reports.
    EIS No. 20060524, ERP No. F-NRC-D03004-VA, Early Site Permit (ESP) 
at the North Anna Power Station ESP Site (TAC No. MC1128), New and 
Updated Information, Construction and Operation, NUREG-1811, Louisa 
County, VA.
    Summary: EPA's comments from the Draft EIS and Supplemental EIS 
were adequately addressed in the Final EIS.
    EIS No. 20070004, ERP No. F-NOA-L91028-AK, Alaska Groundfish 
Harvest Specifications Project, Establish Harvest Strategy for the 
Bering Sea and Aleutian Islands (BSAI) and Gulf of Alaska (GOA) 
Groundfish Fisheries, AK.
    Summary: EPA does not object to the proposed action.

    Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-3113 Filed 2-22-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.