Environmental Impact Statements and Regulations; Availability of EPA Comments, 8153-8154 [E7-3113]
Download as PDF
Federal Register / Vol. 72, No. 36 / Friday, February 23, 2007 / Notices
Dated: February 15, 2007.
M.A. Harvison,
Lieutenant Commander, Judge Advocate
General’s Corps, U.S. Navy, Federal Register
Liaison Officer.
[FR Doc. E7–3045 Filed 2–22–07; 8:45 am]
BILLING CODE 3810–FF–P
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Intent To Grant Exclusive
Patent License; Hanson Technologies,
Inc.
Department of the Navy, DoD.
Notice.
AGENCY:
ACTION:
SUMMARY: The Department of the Navy
hereby gives notice of its intent to grant
to Hanson Technologies, Inc., a
revocable, nonassignable, exclusive
license in the field of detection of
pathogens, toxins, prions, and allergens
in food for human consumption, and
detection of pathogens, toxins, prions,
and allergens in food processing for
human consumption, including wash
liquids and waste products of said
process in the United States and certain
foreign countries, the Governmentowned invention described in U.S.
Patent No. 6,192,168: REFLECTIVELY
COATED OPTICAL WAVEGUIDE AND
FLUIDICS CELL INTEGRATION, Navy
Case No. 79,631 and any continuations,
divisionals, or re-issues thereof.
DATES: Anyone wishing to object to the
grant of this license must file written
objections along with supporting
evidence, if any, not later than March
12, 2007.
ADDRESSES: Written objections are to be
filed with the Naval Research
Laboratory, Code 1004, 4555 Overlook
Avenue, SW., Washington, DC 20375–
5320.
Rita
Manak, Head, Technology Transfer
Office, NRL Code 1004, 4555 Overlook
Avenue, SW., Washington, DC 20375–
5320, telephone 202–767–3083. Due to
U.S. Postal delays, please fax 202–404–
7920, e-mail: rita.manak@nrl.navy.mil
or use courier delivery to expedite
response.
FOR FURTHER INFORMATION CONTACT:
cprice-sewell on PROD1PC61 with NOTICES
(Authority: 35 U.S.C. 207, 37 CFR Part
404.)
Dated: 15 February 2007.
M.A. Harvison,
Lieutenant Commander, Judge Advocate
General’s Corps, U.S. Navy, Federal Register
Liaison Officer.
[FR Doc. E7–3104 Filed 2–22–07; 8:45 am]
DEPARTMENT OF EDUCATION
Notice of Proposed Information
Collection Requests
Department of Education.
SUMMARY: The IC Clearance Official,
Regulatory Information Management
Services, Office of Management, invites
comments on the proposed information
collection requests as required by the
Paperwork Reduction Act of 1995.
AGENCY:
Interested persons are invited to
submit comments on or before April 24,
2007.
DATES:
Section
3506 of the Paperwork Reduction Act of
1995 (44 U.S.C. Chapter 35) requires
that the Office of Management and
Budget (OMB) provide interested
Federal agencies and the public an early
opportunity to comment on information
collection requests. OMB may amend or
waive the requirement for public
consultation to the extent that public
participation in the approval process
would defeat the purpose of the
information collection, violate State or
Federal law, or substantially interfere
with any agency’s ability to perform its
statutory obligations. The IC Clearance
Official, Regulatory Information
Management Services, Office of
Management, publishes that notice
containing proposed information
collection requests prior to submission
of these requests to OMB. Each
proposed information collection,
grouped by office, contains the
following: (1) Type of review requested,
e.g. new, revision, extension, existing or
reinstatement; (2) Title; (3) Summary of
the collection; (4) Description of the
need for, and proposed use of, the
information; (5) Respondents and
frequency of collection; and (6)
Reporting and/or Recordkeeping
burden. OMB invites public comment.
The Department of Education is
especially interested in public comment
addressing the following issues: (1) Is
this collection necessary to the proper
functions of the Department; (2) will
this information be processed and used
in a timely manner; (3) is the estimate
of burden accurate; (4) how might the
Department enhance the quality, utility,
and clarity of the information to be
collected; and (5) how might the
Department minimize the burden of this
collection on the respondents, including
through the use of information
technology.
SUPPLEMENTARY INFORMATION:
BILLING CODE 3810–FF–P
VerDate Aug<31>2005
15:07 Feb 22, 2007
Jkt 211001
PO 00000
Frm 00005
Fmt 4703
Sfmt 4703
8153
Dated: February 16, 2007.
Angela C. Arrington,
IC Clearance Official, Regulatory Information
Management Services, Office of Management.
Institute of Education Sciences
Type of Review: New.
Title: Impact Evaluation on Student
Achievement of Teacher Professional
Development in Mathematics.
Frequency: On Occasion.
Affected Public: State, Local, or Tribal
Gov’t, SEAs or LEAs; Individuals or
household.
Reporting and Recordkeeping Hour
Burden:
Responses: 3,309.
Burden Hours: 1,571.
Abstract: Data collection to test a
model of math professional
development that addresses student
misconceptions in foundational topics
key to success in algebra and beyond.
Requests for copies of the proposed
information collection request may be
accessed from https://edicsweb.ed.gov,
by selecting the ‘‘Browse Pending
Collections’’ link and by clicking on
link number 3282. When you access the
information collection, click on
‘‘Download Attachments’’ to view.
Written requests for information should
be addressed to U.S. Department of
Education, 400 Maryland Avenue, SW.,
Potomac Center, 9th Floor, Washington,
DC 20202–4700. Requests may also be
electronically mailed to
ICDocketMgr@ed.gov or faxed to 202–
245–6623. Please specify the complete
title of the information collection when
making your request.
Comments regarding burden and/or
the collection activity requirements
should be electronically mailed to
ICDocketMgr@ed.gov. Individuals who
use a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1–
800–877–8339.
[FR Doc. E7–3109 Filed 2–22–07; 8:45 am]
BILLING CODE 4000–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6684–4]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
E:\FR\FM\23FEN1.SGM
23FEN1
8154
Federal Register / Vol. 72, No. 36 / Friday, February 23, 2007 / Notices
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 7, 2006 (71 FR 17845).
cprice-sewell on PROD1PC61 with NOTICES
Draft EISs
EIS No. 20060155, ERP No. D–NPS–
J65461–CO, Great Sand Dunes National
and Preserve. General Management
Plan/Wilderness Study,
Implementation, Alamos and Saguache
Counties, CO.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20060203, ERP No. D–BLM–
J01081–WY, Maysdorf Coal Lease by
Application (LBA) Tract, (Federal Coal
Application WYW154432),
Implementation, Campbell Counties,
WY.
Summary: EPA expressed
environmental concerns about the
potential for adverse impacts to air
quality. The Final EIS should include
information demonstrating how
compliance with national air quality
standards for particulate matter will be
achieved and as well as a more detailed
mitigation plan. Rating EC2.
EIS No. 20060380, ERP No. D–AFS–
J67033–CO, Robin Redbreast
Unpatented Lode Claim Mining Plan of
Operations, Implementation, U.S. Army
COE Section 404 Permit, Located above
the Middle Fork of the Cimarron River
within the Uncompahgre Wilderness,
Ouray Ranger District, Grand Mesa,
Uncompahgre and Gunnison National
Forests, Hinsdale County, CO.
Summary: EPA expressed
environmental concerns about impacts
to water quality from acid mine
drainage. The Final EIS should include
additional analysis of groundwater
conditions and flow rates and more
information regarding water treatment
to meet water quality criteria. Rating
EC2.
EIS No. 20060526, ERP No. D–AFS–
G65102–NM, Canadian River Tamarisk
Control, Proposes to Control the
Nonnative Invasive Species Tamarisk
(also Known as salt cedar) Cibola
National Forest, Canadian River,
Harding and Mora Counties, New
Mexico.
Summary: EPA does not object to the
selection of the preferred alternative.
Rating LO.
Final EISs
EIS No. 20060513, ERP No. F–AFS–
J61109–CO, Arapahoe Basin 2006
Improvement Plan, Enhancing the
Recreational Experience Addressing
Lifts, Parking, and Terrain Network,
Montezuma Bowl, Implementation, U.S.
VerDate Aug<31>2005
18:07 Feb 22, 2007
Jkt 211001
Army COE 404 Permit, White River
National Forest, Summit County, CO.
Summary: The final EIS addressed
EPA’s previous concerns related to
alternatives, visitation impacts and
safety. The Final EIS also included a
comprehensive analysis of existing
conditions and actions to improve water
quality, habitat and mitigation for
wetlands impacts.
EIS No. 20060516, ERP No. F–AFS–
J65423–UT, Reissuance of 10–Year
Term Grazing Permits to Continue
Authorize Grazing on Eight Cattle
Allotments, Permit Reissuing, Beaver
Mountain Tushar Range, Millard, Piute,
Garfield, Beaver and Iron Counties, UT.
Summary: EPA continues to express
environmental concerns about the
potential for impacts to water quality
and aquatic resources.
EIS No. 20060520, ERP No. F–AFS–
J65449–UT, Fishlake National Forest
Off-Highway Vehicle Route Designation
Project, Proposes to Designate a System
of Motorized Road, Trails, and Areas to
Revise and Update the Existing
Motorized Travel Plan, UT.
Summary: The Final EIS was
responsive to EPA’s previous concerns
about the cumulative impacts analysis
and the analysis of existing conditions
by adding summary information from
integrated riparian surveys and forest
monitoring reports.
EIS No. 20060524, ERP No. F–NRC–
D03004–VA, Early Site Permit (ESP) at
the North Anna Power Station ESP Site
(TAC No. MC1128), New and Updated
Information, Construction and
Operation, NUREG–1811, Louisa
County, VA.
Summary: EPA’s comments from the
Draft EIS and Supplemental EIS were
adequately addressed in the Final EIS.
EIS No. 20070004, ERP No. F–NOA–
L91028–AK, Alaska Groundfish Harvest
Specifications Project, Establish Harvest
Strategy for the Bering Sea and Aleutian
Islands (BSAI) and Gulf of Alaska (GOA)
Groundfish Fisheries, AK.
Summary: EPA does not object to the
proposed action.
Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–3113 Filed 2–22–07; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6684–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements Filed 02/12/2007
through 02/16/2007 Pursuant to 40 CFR
1506.9
EIS No. 20070052, Draft EIS, NPS, PA,
Valley Forge National Historical Park,
General Management Plan,
Implementation, King of Prussia, PA,
Comment Period Ends: 04/09/2007,
Contact: Deirdre Gibson 610–783–
1047
EIS No. 20070053, Draft EIS, AFS, ID,
Sun Valley Resort (Bald Mountain)
2005 Master Plan—Phase I Project,
Implementation, Special-Use-Permits,
Sawtooth National Forest, Blaine
County, ID, Comment Period Ends:
04/09/2007, Contact: Carol Brown
208–727–5000
EIS No. 20070054, Final EIS, NPS, UT,
Utah Museum of Natural History,
Construction and Operation, New
Museum Facility at University of
Utah, Salt Lake City, UT , Wait Period
Ends: 03/26/2007, Contact: Roxanne
Runkel303–969–2377
EIS No. 20070055, Draft EIS, AFS, ID,
Idaho Cobalt Project, Development of
Two Underground Mines, a Waste
Disposal Site and Associated
Facilities, Approval of Plan-ofOperation, Salmon-Cobalt Ranger
District, Salmon-Challis National
Forest, Lemhi County, ID, Comment
Period Ends: 04/24/2007, Contact: Ray
Henderson 208–756–5231
EIS No. 20070056, Draft EIS, FHW, LA,
I–49 South Project, from Raceland to
the Westbank Expressway Route U.S.
90, Funding, Coast Guard Bridge
Permit, U.S. Army COE Section 10
and 404 Permits, Jefferson, Lafourche,
and St. Charles Parishes, LA,
Comment Period Ends: 04/09/2007,
Contact: Mark Stinson 225–757–7617
EIS No. 20070057, Final EIS, FHW, NC,
Winston-Salem Northern Beltway,
(Eastern Section) U.S. 52 south to I–
40 Business and I–40 Business south
to U.S. 311, Improvements to the
Surface Transportation Network, TIP
Project Nos. U2579 and U–2579A,
Forsyth County, NC (THIS EIS
#20070057 AND EIS #20070058 ARE
COMBINED IN A SINGLE
DOCUMENT.), Wait Period Ends:
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 72, Number 36 (Friday, February 23, 2007)]
[Notices]
[Pages 8153-8154]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3113]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed
[[Page 8154]]
to the Office of Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 7, 2006 (71 FR
17845).
Draft EISs
EIS No. 20060155, ERP No. D-NPS-J65461-CO, Great Sand Dunes
National and Preserve. General Management Plan/Wilderness Study,
Implementation, Alamos and Saguache Counties, CO.
Summary: EPA does not object to the proposed project. Rating LO.
EIS No. 20060203, ERP No. D-BLM-J01081-WY, Maysdorf Coal Lease by
Application (LBA) Tract, (Federal Coal Application WYW154432),
Implementation, Campbell Counties, WY.
Summary: EPA expressed environmental concerns about the potential
for adverse impacts to air quality. The Final EIS should include
information demonstrating how compliance with national air quality
standards for particulate matter will be achieved and as well as a more
detailed mitigation plan. Rating EC2.
EIS No. 20060380, ERP No. D-AFS-J67033-CO, Robin Redbreast
Unpatented Lode Claim Mining Plan of Operations, Implementation, U.S.
Army COE Section 404 Permit, Located above the Middle Fork of the
Cimarron River within the Uncompahgre Wilderness, Ouray Ranger
District, Grand Mesa, Uncompahgre and Gunnison National Forests,
Hinsdale County, CO.
Summary: EPA expressed environmental concerns about impacts to
water quality from acid mine drainage. The Final EIS should include
additional analysis of groundwater conditions and flow rates and more
information regarding water treatment to meet water quality criteria.
Rating EC2.
EIS No. 20060526, ERP No. D-AFS-G65102-NM, Canadian River Tamarisk
Control, Proposes to Control the Nonnative Invasive Species Tamarisk
(also Known as salt cedar) Cibola National Forest, Canadian River,
Harding and Mora Counties, New Mexico.
Summary: EPA does not object to the selection of the preferred
alternative. Rating LO.
Final EISs
EIS No. 20060513, ERP No. F-AFS-J61109-CO, Arapahoe Basin 2006
Improvement Plan, Enhancing the Recreational Experience Addressing
Lifts, Parking, and Terrain Network, Montezuma Bowl, Implementation,
U.S. Army COE 404 Permit, White River National Forest, Summit County,
CO.
Summary: The final EIS addressed EPA's previous concerns related to
alternatives, visitation impacts and safety. The Final EIS also
included a comprehensive analysis of existing conditions and actions to
improve water quality, habitat and mitigation for wetlands impacts.
EIS No. 20060516, ERP No. F-AFS-J65423-UT, Reissuance of 10-Year
Term Grazing Permits to Continue Authorize Grazing on Eight Cattle
Allotments, Permit Reissuing, Beaver Mountain Tushar Range, Millard,
Piute, Garfield, Beaver and Iron Counties, UT.
Summary: EPA continues to express environmental concerns about the
potential for impacts to water quality and aquatic resources.
EIS No. 20060520, ERP No. F-AFS-J65449-UT, Fishlake National Forest
Off-Highway Vehicle Route Designation Project, Proposes to Designate a
System of Motorized Road, Trails, and Areas to Revise and Update the
Existing Motorized Travel Plan, UT.
Summary: The Final EIS was responsive to EPA's previous concerns
about the cumulative impacts analysis and the analysis of existing
conditions by adding summary information from integrated riparian
surveys and forest monitoring reports.
EIS No. 20060524, ERP No. F-NRC-D03004-VA, Early Site Permit (ESP)
at the North Anna Power Station ESP Site (TAC No. MC1128), New and
Updated Information, Construction and Operation, NUREG-1811, Louisa
County, VA.
Summary: EPA's comments from the Draft EIS and Supplemental EIS
were adequately addressed in the Final EIS.
EIS No. 20070004, ERP No. F-NOA-L91028-AK, Alaska Groundfish
Harvest Specifications Project, Establish Harvest Strategy for the
Bering Sea and Aleutian Islands (BSAI) and Gulf of Alaska (GOA)
Groundfish Fisheries, AK.
Summary: EPA does not object to the proposed action.
Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-3113 Filed 2-22-07; 8:45 am]
BILLING CODE 6560-50-P