Environmental Impacts Statements; Notice of Availability, 8154-8155 [E7-3112]
Download as PDF
8154
Federal Register / Vol. 72, No. 36 / Friday, February 23, 2007 / Notices
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 7, 2006 (71 FR 17845).
cprice-sewell on PROD1PC61 with NOTICES
Draft EISs
EIS No. 20060155, ERP No. D–NPS–
J65461–CO, Great Sand Dunes National
and Preserve. General Management
Plan/Wilderness Study,
Implementation, Alamos and Saguache
Counties, CO.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20060203, ERP No. D–BLM–
J01081–WY, Maysdorf Coal Lease by
Application (LBA) Tract, (Federal Coal
Application WYW154432),
Implementation, Campbell Counties,
WY.
Summary: EPA expressed
environmental concerns about the
potential for adverse impacts to air
quality. The Final EIS should include
information demonstrating how
compliance with national air quality
standards for particulate matter will be
achieved and as well as a more detailed
mitigation plan. Rating EC2.
EIS No. 20060380, ERP No. D–AFS–
J67033–CO, Robin Redbreast
Unpatented Lode Claim Mining Plan of
Operations, Implementation, U.S. Army
COE Section 404 Permit, Located above
the Middle Fork of the Cimarron River
within the Uncompahgre Wilderness,
Ouray Ranger District, Grand Mesa,
Uncompahgre and Gunnison National
Forests, Hinsdale County, CO.
Summary: EPA expressed
environmental concerns about impacts
to water quality from acid mine
drainage. The Final EIS should include
additional analysis of groundwater
conditions and flow rates and more
information regarding water treatment
to meet water quality criteria. Rating
EC2.
EIS No. 20060526, ERP No. D–AFS–
G65102–NM, Canadian River Tamarisk
Control, Proposes to Control the
Nonnative Invasive Species Tamarisk
(also Known as salt cedar) Cibola
National Forest, Canadian River,
Harding and Mora Counties, New
Mexico.
Summary: EPA does not object to the
selection of the preferred alternative.
Rating LO.
Final EISs
EIS No. 20060513, ERP No. F–AFS–
J61109–CO, Arapahoe Basin 2006
Improvement Plan, Enhancing the
Recreational Experience Addressing
Lifts, Parking, and Terrain Network,
Montezuma Bowl, Implementation, U.S.
VerDate Aug<31>2005
18:07 Feb 22, 2007
Jkt 211001
Army COE 404 Permit, White River
National Forest, Summit County, CO.
Summary: The final EIS addressed
EPA’s previous concerns related to
alternatives, visitation impacts and
safety. The Final EIS also included a
comprehensive analysis of existing
conditions and actions to improve water
quality, habitat and mitigation for
wetlands impacts.
EIS No. 20060516, ERP No. F–AFS–
J65423–UT, Reissuance of 10–Year
Term Grazing Permits to Continue
Authorize Grazing on Eight Cattle
Allotments, Permit Reissuing, Beaver
Mountain Tushar Range, Millard, Piute,
Garfield, Beaver and Iron Counties, UT.
Summary: EPA continues to express
environmental concerns about the
potential for impacts to water quality
and aquatic resources.
EIS No. 20060520, ERP No. F–AFS–
J65449–UT, Fishlake National Forest
Off-Highway Vehicle Route Designation
Project, Proposes to Designate a System
of Motorized Road, Trails, and Areas to
Revise and Update the Existing
Motorized Travel Plan, UT.
Summary: The Final EIS was
responsive to EPA’s previous concerns
about the cumulative impacts analysis
and the analysis of existing conditions
by adding summary information from
integrated riparian surveys and forest
monitoring reports.
EIS No. 20060524, ERP No. F–NRC–
D03004–VA, Early Site Permit (ESP) at
the North Anna Power Station ESP Site
(TAC No. MC1128), New and Updated
Information, Construction and
Operation, NUREG–1811, Louisa
County, VA.
Summary: EPA’s comments from the
Draft EIS and Supplemental EIS were
adequately addressed in the Final EIS.
EIS No. 20070004, ERP No. F–NOA–
L91028–AK, Alaska Groundfish Harvest
Specifications Project, Establish Harvest
Strategy for the Bering Sea and Aleutian
Islands (BSAI) and Gulf of Alaska (GOA)
Groundfish Fisheries, AK.
Summary: EPA does not object to the
proposed action.
Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–3113 Filed 2–22–07; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6684–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements Filed 02/12/2007
through 02/16/2007 Pursuant to 40 CFR
1506.9
EIS No. 20070052, Draft EIS, NPS, PA,
Valley Forge National Historical Park,
General Management Plan,
Implementation, King of Prussia, PA,
Comment Period Ends: 04/09/2007,
Contact: Deirdre Gibson 610–783–
1047
EIS No. 20070053, Draft EIS, AFS, ID,
Sun Valley Resort (Bald Mountain)
2005 Master Plan—Phase I Project,
Implementation, Special-Use-Permits,
Sawtooth National Forest, Blaine
County, ID, Comment Period Ends:
04/09/2007, Contact: Carol Brown
208–727–5000
EIS No. 20070054, Final EIS, NPS, UT,
Utah Museum of Natural History,
Construction and Operation, New
Museum Facility at University of
Utah, Salt Lake City, UT , Wait Period
Ends: 03/26/2007, Contact: Roxanne
Runkel303–969–2377
EIS No. 20070055, Draft EIS, AFS, ID,
Idaho Cobalt Project, Development of
Two Underground Mines, a Waste
Disposal Site and Associated
Facilities, Approval of Plan-ofOperation, Salmon-Cobalt Ranger
District, Salmon-Challis National
Forest, Lemhi County, ID, Comment
Period Ends: 04/24/2007, Contact: Ray
Henderson 208–756–5231
EIS No. 20070056, Draft EIS, FHW, LA,
I–49 South Project, from Raceland to
the Westbank Expressway Route U.S.
90, Funding, Coast Guard Bridge
Permit, U.S. Army COE Section 10
and 404 Permits, Jefferson, Lafourche,
and St. Charles Parishes, LA,
Comment Period Ends: 04/09/2007,
Contact: Mark Stinson 225–757–7617
EIS No. 20070057, Final EIS, FHW, NC,
Winston-Salem Northern Beltway,
(Eastern Section) U.S. 52 south to I–
40 Business and I–40 Business south
to U.S. 311, Improvements to the
Surface Transportation Network, TIP
Project Nos. U2579 and U–2579A,
Forsyth County, NC (THIS EIS
#20070057 AND EIS #20070058 ARE
COMBINED IN A SINGLE
DOCUMENT.), Wait Period Ends:
E:\FR\FM\23FEN1.SGM
23FEN1
cprice-sewell on PROD1PC61 with NOTICES
Federal Register / Vol. 72, No. 36 / Friday, February 23, 2007 / Notices
03/26/2007, Contact: John F. Sullivan
919–856–4346
EIS No. 20070058, Second Final
Supplement, FHW, NC, Western
Section of the Winston-Salem
Northern Beltway, Updated
Information, U.S. 158 north to U.S.
52, TIP Project No. R–2247, Forsyth
County, NC (THIS EIS #20070058
AND EIS 20070057 ARE COMBINED
IN A SINGLE DOCUMENT.) , Wait
Period Ends: 03/26/2007, Contact:
John F. Sullivan 919–856–4346
EIS No. 20070059, Final EIS, NPS, NV,
Clean Water Coalition Systems
Conveyance and Operations Program,
(SCOP) Construction, Operation and
Maintenance, Boulder Islands North
is the Selected Alternative, City of Las
Vegas, NV, Wait Period Ends: 03/26/
2007, Contact: Michael Boyles 702–
293–8978
EIS No. 20070060, Final EIS, AFS, WI,
Twentymile Restoration Project Area,
Restore Northern Hardwood Forests to
an Uneven-aged Condition, Great
Divide Ranger District, ChequamegonNicolet National Forest, Ashland and
Bayfield Counties, WI, Wait Period
Ends: 03/26/2007, Contact: Debra
Proctor 715–634–4821
EIS No. 20070061, Draft EIS, BLM, CA,
Mountain View IV Wind Energy
Project, Construction and Operation,
Wind Turbine Generators on Public
Lands in Section 22 and 28 and
Private Land Section 27, Right-of-Way
Grant and Conditional Use Permit in
the City of Palm Springs, CA,
Comment Period Ends: 04/09/2007,
Contact: Greg Hill 760–251–4840
EIS No. 20070062, Final EIS, NPS, NE,
Niobrara National Scenic River
General Management Plan,
Implementation, Brown, Cherry, Keya
Paha and Rock Counties, NE, Wait
Period Ends: 03/26/2007, Contact:
Paul Hedren 402–336–3970
EIS No. 20070063, Draft Supplement,
USN, 00, Introduction of F/A 18 E/F
(Super Hornet) Aircraft, Updated
Information, Construction and
Operation of an Outlying Landing
Field, Naval Air Station (NAS)
Oceana, VA; Marine Corps Air Station
(MCAS) Cherry Point, NC, Comment
Period Ends: 04/24/2007, Contact:
Francine Blend 757–322–4332
EIS No. 20070064, Draft Supplement,
FHW, AR, US 67 Construction, U.S.
67/167 to I–40 West/I–430
Interchange around the North Little
Rock Metropolitan Area, New and
Updated Information, Funding,
Pulaski County, AR, Comment Period
Ends: 04/12/2007, Contact: Randal
Looney 501–324–6430
VerDate Aug<31>2005
18:07 Feb 22, 2007
Jkt 211001
Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–3112 Filed 2–22–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8280–7]
Science Advisory Board Staff Office;
EPA Clean Air Scientific Advisory
Committee (CASAC); CASAC Lead
Review Panel; Notification of a Public
Advisory Committee Meeting
(Teleconference)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The Environmental Protection
Agency (EPA or Agency) Science
Advisory Board (SAB) Staff Office
announces a public teleconference of
the Clean Air Scientific Advisory
Committee (CASAC) Lead Review Panel
(CASAC Panel) to review and approve
the CASAC’s draft letter to the EPA
Administrator resulting from its
February 6–7, 2007 meeting to conduct
a peer review of the Draft Review of the
National Ambient Air Quality Standards
for Lead: Policy Assessment of
Scientific and Technical Information
(1st Draft Lead Staff Paper, December
2006) and a related draft technical
support document, Lead Human
Exposure and Health Risk Assessments
and Ecological Risk Assessment for
Selected Areas: Pilot Phase, Draft
Technical Report (Draft Lead Exposure
and Risk Assessments, December 2006).
DATES: The teleconference meeting will
be held on Friday, March 9, 2007, from
1 to 5 p.m. (Eastern Time).
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wishes to
obtain the teleconference call-in number
and access code; submit a written or
brief oral statement (three minutes or
less); or receive further information
concerning this teleconference meeting,
must contact Mr. Fred Butterfield,
Designated Federal Officer (DFO). Mr.
Butterfield may be contacted at the EPA
Science Advisory Board (1400F), U.S.
Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460; or via
telephone/voice mail: (202) 343–9994;
fax: (202) 233–0643; or e-mail at:
butterfield.fred@epa.gov. General
information concerning the CASAC or
the EPA SAB can be found on the EPA
Web site at https://www.epa.gov/sab.
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
8155
SUPPLEMENTARY INFORMATION:
Background: The CASAC, which is
comprised of seven members appointed
by the EPA Administrator, was
established under section 109(d)(2) of
the Clean Air Act (CAA or Act) (42
U.S.C. 7409) as an independent
scientific advisory committee. The
CASAC provides advice, information
and recommendations on the scientific
and technical aspects of issues related to
air quality criteria and NAAQS under
sections 108 and 109 of the Act. The
CASAC is chartered under the Federal
Advisory Committee Act (FACA), as
amended, 5 U.S.C., App. The CASAC
Lead Review Panel consists of the seven
CASAC members augmented by subjectmatter-experts. The CASAC Panel
provides advice and recommendations
to EPA concerning lead in ambient air.
The Panel complies with the provisions
of FACA and all appropriate SAB Staff
Office procedural policies.
Section 109(d)(1) of the CAA requires
that the Agency periodically review and
revise, as appropriate, the air quality
criteria and the national ambient air
quality standards (NAAQS) for the six
‘‘criteria’’ air pollutants, including Lead.
On February 6–7, 2007, the CASAC
Panel met in a public meeting in
Durham, NC to conduct a peer review of
the Agency’s 1st Draft Lead Staff Paper
and a related Draft Lead Exposure and
Risk Assessments technical support
document. The purpose of this public
teleconference meeting is to review and
approve the CASAC’s draft letter to the
Administrator resulting from its
February 6–7 meeting.
Availability of Meeting Materials: A
copy of the CASAC’s draft letter to the
Administrator, the draft agenda, and
other materials for this CASAC
teleconference will be posted on the
SAB Web Site at
https://www.epa.gov/sab/panels/
casac_lead_review_panel.htm prior to
the meeting.
Procedures for Providing Public Input:
Interested members of the public may
submit relevant written or oral
information for the CASAC Lead Review
Panel to consider during the advisory
process. Oral Statements: In general,
individuals or groups requesting an oral
presentation at a public teleconference
will be limited to three minutes per
speaker, with no more than a total of 30
minutes for all speakers. Interested
parties should contact Mr. Butterfield,
CASAC DFO, in writing (preferably via
e-mail), by March 2, 2007, at the contact
information noted above, to be placed
on the list of public speakers for this
meeting. Written Statements: Written
statements should be received in the
SAB Staff Office by March 6, 2007, so
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 72, Number 36 (Friday, February 23, 2007)]
[Notices]
[Pages 8154-8155]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-3112]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements Filed 02/12/2007
through 02/16/2007 Pursuant to 40 CFR 1506.9
EIS No. 20070052, Draft EIS, NPS, PA, Valley Forge National Historical
Park, General Management Plan, Implementation, King of Prussia, PA,
Comment Period Ends: 04/09/2007, Contact: Deirdre Gibson 610-783-1047
EIS No. 20070053, Draft EIS, AFS, ID, Sun Valley Resort (Bald Mountain)
2005 Master Plan--Phase I Project, Implementation, Special-Use-Permits,
Sawtooth National Forest, Blaine County, ID, Comment Period Ends: 04/
09/2007, Contact: Carol Brown 208-727-5000
EIS No. 20070054, Final EIS, NPS, UT, Utah Museum of Natural History,
Construction and Operation, New Museum Facility at University of Utah,
Salt Lake City, UT , Wait Period Ends: 03/26/2007, Contact: Roxanne
Runkel 303-969-2377
EIS No. 20070055, Draft EIS, AFS, ID, Idaho Cobalt Project, Development
of Two Underground Mines, a Waste Disposal Site and Associated
Facilities, Approval of Plan-of-Operation, Salmon-Cobalt Ranger
District, Salmon-Challis National Forest, Lemhi County, ID, Comment
Period Ends: 04/24/2007, Contact: Ray Henderson 208-756-5231
EIS No. 20070056, Draft EIS, FHW, LA, I-49 South Project, from Raceland
to the Westbank Expressway Route U.S. 90, Funding, Coast Guard Bridge
Permit, U.S. Army COE Section 10 and 404 Permits, Jefferson, Lafourche,
and St. Charles Parishes, LA, Comment Period Ends: 04/09/2007, Contact:
Mark Stinson 225-757-7617
EIS No. 20070057, Final EIS, FHW, NC, Winston-Salem Northern Beltway,
(Eastern Section) U.S. 52 south to I-40 Business and I-40 Business
south to U.S. 311, Improvements to the Surface Transportation Network,
TIP Project Nos. U2579 and U-2579A, Forsyth County, NC (THIS EIS
20070057 AND EIS 20070058 ARE COMBINED IN A SINGLE
DOCUMENT.), Wait Period Ends:
[[Page 8155]]
03/26/2007, Contact: John F. Sullivan 919-856-4346
EIS No. 20070058, Second Final Supplement, FHW, NC, Western Section of
the Winston-Salem Northern Beltway, Updated Information, U.S. 158 north
to U.S. 52, TIP Project No. R-2247, Forsyth County, NC (THIS EIS
20070058 AND EIS 20070057 ARE COMBINED IN A SINGLE DOCUMENT.)
, Wait Period Ends: 03/26/2007, Contact: John F. Sullivan 919-856-4346
EIS No. 20070059, Final EIS, NPS, NV, Clean Water Coalition Systems
Conveyance and Operations Program, (SCOP) Construction, Operation and
Maintenance, Boulder Islands North is the Selected Alternative, City of
Las Vegas, NV, Wait Period Ends: 03/26/2007, Contact: Michael Boyles
702-293-8978
EIS No. 20070060, Final EIS, AFS, WI, Twentymile Restoration Project
Area, Restore Northern Hardwood Forests to an Uneven-aged Condition,
Great Divide Ranger District, Chequamegon-Nicolet National Forest,
Ashland and Bayfield Counties, WI, Wait Period Ends: 03/26/2007,
Contact: Debra Proctor 715-634-4821
EIS No. 20070061, Draft EIS, BLM, CA, Mountain View IV Wind Energy
Project, Construction and Operation, Wind Turbine Generators on Public
Lands in Section 22 and 28 and Private Land Section 27, Right-of-Way
Grant and Conditional Use Permit in the City of Palm Springs, CA,
Comment Period Ends: 04/09/2007, Contact: Greg Hill 760-251-4840
EIS No. 20070062, Final EIS, NPS, NE, Niobrara National Scenic River
General Management Plan, Implementation, Brown, Cherry, Keya Paha and
Rock Counties, NE, Wait Period Ends: 03/26/2007, Contact: Paul Hedren
402-336-3970
EIS No. 20070063, Draft Supplement, USN, 00, Introduction of F/A 18 E/F
(Super Hornet) Aircraft, Updated Information, Construction and
Operation of an Outlying Landing Field, Naval Air Station (NAS) Oceana,
VA; Marine Corps Air Station (MCAS) Cherry Point, NC, Comment Period
Ends: 04/24/2007, Contact: Francine Blend 757-322-4332
EIS No. 20070064, Draft Supplement, FHW, AR, US 67 Construction, U.S.
67/167 to I-40 West/I-430 Interchange around the North Little Rock
Metropolitan Area, New and Updated Information, Funding, Pulaski
County, AR, Comment Period Ends: 04/12/2007, Contact: Randal Looney
501-324-6430
Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-3112 Filed 2-22-07; 8:45 am]