Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests, 6562-6563 [E7-2270]

Download as PDF 6562 Federal Register / Vol. 72, No. 28 / Monday, February 12, 2007 / Notices agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001 (a)(l)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Magalie R. Salas, Secretary. [FR Doc. E7–2260 Filed 2–9–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests sroberts on PROD1PC70 with NOTICES February 2, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 2503–111. c. Date Filed: January 12, 2007. d. Applicant: Duke Energy Carolinas, LLC. e. Name of Project: Keowee-Toxaway Hydroelectric Project. f. Location: The project is located on Lake Keowee in Pickens County, South Carolina. The project does not utilize federal or tribal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Joe Hall, Lake Management Representative, Duke Energy Corporation, P.O. Box 1006, Charlotte, NC 28201–1006. Phone: (704) 382–8576. i. FERC Contact: Any questions on this notice should be addressed to Shana High at (202) 502–8674. j. Deadline for filing comments and/ or motions: March 2, 2007. All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. Please include the project number (P– 2503–111) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site under the ‘‘e-Filing’’ link. The Commission strongly encourages efilings. VerDate Aug<31>2005 19:52 Feb 09, 2007 Jkt 211001 k. Description of Proposal: Duke Energy Carolinas, LLC proposes to lease two parcels of project land to The Highlands on Lake Keowee Owner’s Association for two proposed cluster docks and a courtesy launch for canoes. The two parcels will total 0.711 acre and will provide 19 boat docking locations for access to the reservoir by residents of The Highlands. Two cluster docks, one with nine docking locations and one with ten docking locations, would be on 0.623 acre of project property, and the canoe launch would be on an 0.088 acre parcel of project property. The licensee consulted with, and incorporated comments received from, various Federal and state agencies including the U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, South Carolina Department of Archives and History, South Carolina Department of Natural Resources, South Carolina Department of Parks, Recreation, and Tourism, and the South Carolina Institute of Archaeology and Anthropology. l. Locations of the Application: This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the project number of the particular application to which the PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E7–2261 Filed 2–9–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests February 5, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 2232–531. c. Date Filed: December 18, 2006. d. Applicant: Duke Power, a division of Duke Energy Corporation. e. Name of Project: Catawba-Wateree Project. f. Location: This project is located on the Catawba and Wateree Rivers, in nine counties in North Carolina (Burke, Alexander, McDowell, Iredell, Caldwell, Lincoln, Catawba, Gaston, and Mecklenburg Counties) and five counties in South Carolina (York, Chester, Lancaster, Fairfield and Kershaw Counties). This project does not occupy any Tribal or federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a), 825(r), 799 and 801. h. Applicant Contact: Mr. Kelvin K. Reagan, Senior Lake Services Representative; Duke Energy Corporation; P.O. Box 1006; Charlotte, NC; 28201–1006; 704–382–9386. i. FERC Contact: Any questions on this notice should be addressed to Brian Romanek at (202) 502–6175 or by email: Brian.Romanek@ferc.gov. j. Deadline for filing comments and or motions: March 5, 2007. E:\FR\FM\12FEN1.SGM 12FEN1 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 72, No. 28 / Monday, February 12, 2007 / Notices All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 2232–531) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages efilings. k. Description of Request: Duke Power, licensee for the Catawba-Wateree Hydroelectric Project, has requested Commission authorization to lease to the Diane Shores Homeowners Association, Inc., 1.218 acres of project lands for use as a Commercial/ Residential Marina to serve residents of the Diane Shores Subdivision. The Diane Shores Subdivision is located on Lake Norman in Mecklenburg County, North Carolina. The proposal is to construct 2 cluster docks that would accommodate a total of 22 boats (10 slips are existing). Diane Shores plans to dredge 1,982 cubic yards of lake bottom and haul it off-site. Two hundred and fifty (250) cubic yards of dredged material would be used to construct a berm that would be landscaped. l. Location of the Application: This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. VerDate Aug<31>2005 19:52 Feb 09, 2007 Jkt 211001 o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described applications. A copy of the applications may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E7–2270 Filed 2–9–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Soliciting Comments, Motions To Intervene, and Protests February 5, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No. 487–063. c. Date Filed: January 19, 2007. d. Applicant: PPL Holtwood, LLC. e. Name of Project: Lake Wallenpaupack Hydroelectric Project. f. Location: The project is located within the Delaware River Basin on Wallenpaupack Creek, and the Lackawaxen River in Pike and Wayne Counties, Pennsylvania. The project does not occupy any Federal or tribal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Robert G. Grassi, Esq., PPL Holtwood, LLC, Two North Ninth Street, Allentown, PA 18101, (610) 774–2907. i. FERC Contact: Jade Alvey, jade.alvey@ferc.gov, 202–502–6864. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 6563 j. Deadline for filing comments and or motions: March 5, 2007. All documents (original and eight copies) should be filed with Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Please reference ‘‘Lake Wallenpaupack, FERC Project No. 487– 063’’ on any comments or motions filed. k. Description of Project: PPL Holtwood, LLC requests Commission approval to permit Palmyra Township to use and occupy certain project lands for construction and operation of a visitor center. The center will provide the public with recreational information and be operated by the Hawley Lake Wallenpaupack Chamber of Commerce and the Pocono Mountain Vacation Bureau. l. Locations of the Application: This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘E-library’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 72, Number 28 (Monday, February 12, 2007)]
[Notices]
[Pages 6562-6563]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-2270]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application for Non-Project Use of Project Lands and 
Waters and Soliciting Comments, Motions To Intervene, and Protests

February 5, 2007.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No: 2232-531.
    c. Date Filed: December 18, 2006.
    d. Applicant: Duke Power, a division of Duke Energy Corporation.
    e. Name of Project: Catawba-Wateree Project.
    f. Location: This project is located on the Catawba and Wateree 
Rivers, in nine counties in North Carolina (Burke, Alexander, McDowell, 
Iredell, Caldwell, Lincoln, Catawba, Gaston, and Mecklenburg Counties) 
and five counties in South Carolina (York, Chester, Lancaster, 
Fairfield and Kershaw Counties). This project does not occupy any 
Tribal or federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a), 825(r), 
799 and 801.
    h. Applicant Contact: Mr. Kelvin K. Reagan, Senior Lake Services 
Representative; Duke Energy Corporation; P.O. Box 1006; Charlotte, NC; 
28201-1006; 704-382-9386.
    i. FERC Contact: Any questions on this notice should be addressed 
to Brian Romanek at (202) 502-6175 or by e-mail: 
Brian.Romanek@ferc.gov.
    j. Deadline for filing comments and or motions: March 5, 2007.

[[Page 6563]]

    All documents (original and eight copies) should be filed with: Ms. 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Please include the project 
number (P-2232-531) on any comments or motions filed. Comments, 
protests, and interventions may be filed electronically via the 
internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
The Commission strongly encourages e-filings.
    k. Description of Request: Duke Power, licensee for the Catawba-
Wateree Hydroelectric Project, has requested Commission authorization 
to lease to the Diane Shores Homeowners Association, Inc., 1.218 acres 
of project lands for use as a Commercial/Residential Marina to serve 
residents of the Diane Shores Subdivision. The Diane Shores Subdivision 
is located on Lake Norman in Mecklenburg County, North Carolina. The 
proposal is to construct 2 cluster docks that would accommodate a total 
of 22 boats (10 slips are existing). Diane Shores plans to dredge 1,982 
cubic yards of lake bottom and haul it off-site. Two hundred and fifty 
(250) cubic yards of dredged material would be used to construct a berm 
that would be landscaped.
    l. Location of the Application: This filing is available for review 
at the Commission or may be viewed on the Commission's Web site at 
https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described applications. A copy of the 
applications may be obtained by agencies directly from the Applicant. 
If an agency does not file comments within the time specified for 
filing comments, it will be presumed to have no comments. One copy of 
an agency's comments must also be sent to the Applicant's 
representatives.

Magalie R. Salas,
Secretary.
 [FR Doc. E7-2270 Filed 2-9-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.