Kinder Morgan Louisiana Pipeline, L.L.C.; Notice of Public Meetings To Receive Comments on the Draft Environmental Impact Statement for the Proposed Kinder Morgan Louisiana Pipeline Project, 6560 [E7-2267]
Download as PDF
6560
Federal Register / Vol. 72, No. 28 / Monday, February 12, 2007 / Notices
P–2413) and excluding the last three
digits, in the docket number field to
access the document. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree (866) 208–3676, or for TTY, contact
(202) 502–8659.
DEPARTMENT OF ENERGY
Magalie R. Salas,
Secretary.
[FR Doc. E7–2271 Filed 2–9–07; 8:45 am]
February 2, 2007.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–449–000]
Kinder Morgan Louisiana Pipeline,
L.L.C.; Notice of Public Meetings To
Receive Comments on the Draft
Environmental Impact Statement for
the Proposed Kinder Morgan Louisiana
Pipeline Project
February 2, 2007.
On January 26, 2007, the staff of the
Federal Energy Regulatory Commission
issued a draft Environmental Impact
Statement (EIS) for the proposed Kinder
Morgan Louisiana Pipeline Project. We
will hold two public meetings to receive
comments on the draft EIS.
The public meetings are designed to
provide an opportunity for landowners,
concerned citizens, and other
stakeholders to offer comments on the
draft EIS and environmental issues they
believe should be addressed in the final
EIS. To ensure that every comment is
accurately recorded, a court reporter
will be present to prepare an official
transcript of each meeting. All
interested parties are invited to attend
the following public comment meetings:
Monday, February 26th: 6:30–9:30 p.m.,
Best Western Richmond Suites, Jean
Lafitte Rooms I and II, 2600 Moeling
Street, Lake Charles, LA.
Tuesday, February 27th: 6:30–9:30 p.m.,
Holiday Inn, 603 Holiday Drive,
Jennings, LA.
sroberts on PROD1PC70 with NOTICES
For additional information, contact
the Commission’s Office of External
Affairs at 1–866–208–FERC (3372).
Magalie R. Salas,
Secretary.
[FR Doc. E7–2267 Filed 2–9–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
19:52 Feb 09, 2007
Jkt 211001
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions to
Intervene, Protests, and Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12768–000.
c. Date filed: January 11, 2007.
d. Applicant: Rochester Gas and
Electric Corporation.
e. Name and Location of Project: The
proposed Station No. 2, Unit 2 Project
would be located at the site of the
existing Station No. 2 Hydroelectric
Project (FERC No. 2582) on the Genesee
River in the City of Rochester, Monroe
County, New York and would provide
additional capacity at that site.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Mr. Thomas W.
McCollach, Rochester Gas and Electric
Corporation, 89 East Avenue, Rochester,
NY 14649, (585) 724–8085.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing motions to
intervene, protests and comments: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12768–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Proposed Project: The
proposed project would be located at
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
the site of the licensed Station No. 2
Hydroelectric Project and would have
the following new facilities: (1) A
proposed 235-foot-long, 13-footdiameter penstock which would include
a low-level bifurcation to provide flow
to the proposed powerhouse, (2) a
proposed powerhouse containing one
generating unit with an installed
capacity of 6.0 megawatts, (3) a
proposed one-mile-long transmission
line which would connect to an existing
power line; and (4) appurtenant
facilities. The project would have an
annual generation of 25 gigawatt-hours,
which would be sold to a local utility.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
n. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 72, Number 28 (Monday, February 12, 2007)]
[Notices]
[Page 6560]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-2267]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP06-449-000]
Kinder Morgan Louisiana Pipeline, L.L.C.; Notice of Public
Meetings To Receive Comments on the Draft Environmental Impact
Statement for the Proposed Kinder Morgan Louisiana Pipeline Project
February 2, 2007.
On January 26, 2007, the staff of the Federal Energy Regulatory
Commission issued a draft Environmental Impact Statement (EIS) for the
proposed Kinder Morgan Louisiana Pipeline Project. We will hold two
public meetings to receive comments on the draft EIS.
The public meetings are designed to provide an opportunity for
landowners, concerned citizens, and other stakeholders to offer
comments on the draft EIS and environmental issues they believe should
be addressed in the final EIS. To ensure that every comment is
accurately recorded, a court reporter will be present to prepare an
official transcript of each meeting. All interested parties are invited
to attend the following public comment meetings:
Monday, February 26th: 6:30-9:30 p.m., Best Western Richmond Suites,
Jean Lafitte Rooms I and II, 2600 Moeling Street, Lake Charles, LA.
Tuesday, February 27th: 6:30-9:30 p.m., Holiday Inn, 603 Holiday Drive,
Jennings, LA.
For additional information, contact the Commission's Office of
External Affairs at 1-866-208-FERC (3372).
Magalie R. Salas,
Secretary.
[FR Doc. E7-2267 Filed 2-9-07; 8:45 am]