Notice of Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests, 6561-6562 [E7-2260]
Download as PDF
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 72, No. 28 / Monday, February 12, 2007 / Notices
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
o. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
r. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
VerDate Aug<31>2005
19:52 Feb 09, 2007
Jkt 211001
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E7–2259 Filed 2–9–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of License and Soliciting Comments,
Motions to Intervene, and Protests
February 2, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
License to Change Project Boundary.
b. Project No.: 2333–052.
c. Date Filed: January 9, 2007.
d. Applicant: Rumford Falls Hydro,
LLC.
e. Name of Project: Rumford Falls
Hydroelectric Project.
f. Location: The project is located on
the Androscoggin River, in Rumford,
Oxford County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant contact: Amy S. Koch,
Patton Boggs LLP, 2550 M Street, NW.,
Washington, DC 20037, (202) 457–5618.
i. FERC Contact: Etta Foster, (202)
502–8769.
j. Deadline for filing comments,
protests, and motions to intervene:
February 28, 2007.
k. Description of Request: Rumford
Falls Hydro, LLC filed an amendment to
amend Exhibit G of its license to remove
a parcel of land not necessary for project
purposes.
l. Locations of the Application: A
copy of the application is available for
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
6561
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. Information about this
filing may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rule may become a party
to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. All documents (original
and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
E:\FR\FM\12FEN1.SGM
12FEN1
6562
Federal Register / Vol. 72, No. 28 / Monday, February 12, 2007 / Notices
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001 (a)(l)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E7–2260 Filed 2–9–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Non-Project Use of Project
Lands and Waters and Soliciting
Comments, Motions To Intervene, and
Protests
sroberts on PROD1PC70 with NOTICES
February 2, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2503–111.
c. Date Filed: January 12, 2007.
d. Applicant: Duke Energy Carolinas,
LLC.
e. Name of Project: Keowee-Toxaway
Hydroelectric Project.
f. Location: The project is located on
Lake Keowee in Pickens County, South
Carolina. The project does not utilize
federal or tribal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Joe Hall,
Lake Management Representative, Duke
Energy Corporation, P.O. Box 1006,
Charlotte, NC 28201–1006. Phone: (704)
382–8576.
i. FERC Contact: Any questions on
this notice should be addressed to
Shana High at (202) 502–8674.
j. Deadline for filing comments and/
or motions: March 2, 2007.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2503–111) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
VerDate Aug<31>2005
19:52 Feb 09, 2007
Jkt 211001
k. Description of Proposal: Duke
Energy Carolinas, LLC proposes to lease
two parcels of project land to The
Highlands on Lake Keowee Owner’s
Association for two proposed cluster
docks and a courtesy launch for canoes.
The two parcels will total 0.711 acre
and will provide 19 boat docking
locations for access to the reservoir by
residents of The Highlands. Two cluster
docks, one with nine docking locations
and one with ten docking locations,
would be on 0.623 acre of project
property, and the canoe launch would
be on an 0.088 acre parcel of project
property. The licensee consulted with,
and incorporated comments received
from, various Federal and state agencies
including the U.S. Army Corps of
Engineers, U.S. Fish and Wildlife
Service, South Carolina Department of
Archives and History, South Carolina
Department of Natural Resources, South
Carolina Department of Parks,
Recreation, and Tourism, and the South
Carolina Institute of Archaeology and
Anthropology.
l. Locations of the Application: This
filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the project number of
the particular application to which the
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E7–2261 Filed 2–9–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
February 5, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2232–531.
c. Date Filed: December 18, 2006.
d. Applicant: Duke Power, a division
of Duke Energy Corporation.
e. Name of Project: Catawba-Wateree
Project.
f. Location: This project is located on
the Catawba and Wateree Rivers, in nine
counties in North Carolina (Burke,
Alexander, McDowell, Iredell, Caldwell,
Lincoln, Catawba, Gaston, and
Mecklenburg Counties) and five
counties in South Carolina (York,
Chester, Lancaster, Fairfield and
Kershaw Counties). This project does
not occupy any Tribal or federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a), 825(r), 799 and
801.
h. Applicant Contact: Mr. Kelvin K.
Reagan, Senior Lake Services
Representative; Duke Energy
Corporation; P.O. Box 1006; Charlotte,
NC; 28201–1006; 704–382–9386.
i. FERC Contact: Any questions on
this notice should be addressed to Brian
Romanek at (202) 502–6175 or by email: Brian.Romanek@ferc.gov.
j. Deadline for filing comments and or
motions: March 5, 2007.
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 72, Number 28 (Monday, February 12, 2007)]
[Notices]
[Pages 6561-6562]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-2260]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of License and Soliciting
Comments, Motions to Intervene, and Protests
February 2, 2007.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Amendment of License to Change Project
Boundary.
b. Project No.: 2333-052.
c. Date Filed: January 9, 2007.
d. Applicant: Rumford Falls Hydro, LLC.
e. Name of Project: Rumford Falls Hydroelectric Project.
f. Location: The project is located on the Androscoggin River, in
Rumford, Oxford County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant contact: Amy S. Koch, Patton Boggs LLP, 2550 M Street,
NW., Washington, DC 20037, (202) 457-5618.
i. FERC Contact: Etta Foster, (202) 502-8769.
j. Deadline for filing comments, protests, and motions to
intervene: February 28, 2007.
k. Description of Request: Rumford Falls Hydro, LLC filed an
amendment to amend Exhibit G of its license to remove a parcel of land
not necessary for project purposes.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. Information about this filing
may also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. You may
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rule may
become a party to the proceeding. Any comments, protests, or motions to
intervene must be received on or before the specified comment date for
the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. All documents (original and eight copies)
should be filed with: Magalie R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A
copy of any motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
p. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
[[Page 6562]]
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests, and interventions may be filed
electronically via the Internet in lieu of paper. See, 18 CFR 385.2001
(a)(l)(iii) and the instructions on the Commission's Web site at http:/
/www.ferc.gov under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E7-2260 Filed 2-9-07; 8:45 am]
BILLING CODE 6717-01-P