Public Utility District No. 1 of Douglas County, WA; Notice of Intent To File License Application, Filing of Pre-Application Document, Commencement of Licensing Proceeding, Scoping, Solicitation of Comments on the Pad and Scoping Document, and Identification Issues and Associated Study Requests, 5698-5699 [E7-1912]

Download as PDF 5698 Federal Register / Vol. 72, No. 25 / Wednesday, February 7, 2007 / Notices sroberts on PROD1PC70 with NOTICES requesting cooperating status must do so by April 7, 2007. Comments on the PAD and SD1, study requests, requests for cooperating agency status, and other permissible forms of communications with the Commission may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘efiling’’ link. p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an environmental impact statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the times and places noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: Evening Scoping Meeting: Date: Thursday, March 1, 2007. Time: 7 p.m. to 9 p.m. Location: Quality Inn/Massena, 10 Orvis Street, Massena, NY 13662. Daytime Scoping Meeting: Date: Friday, March 2, 2007. Time: 9 a.m. to 12 p.m. Location: Quality Inn/Massena, 10 Orvis Street, Massena, NY 13662. For Directions: please call Ms. Shirley Williamson at (617) 960–4995, or via email at williamsonsh@pbworld.com. SD1, which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the Web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Follow the directions for accessing information in paragraph n. Depending on the extent of comments received, a Scoping Document 2 may or may not be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. VerDate Aug<31>2005 21:36 Feb 06, 2007 Jkt 211001 Site Visit DEPARTMENT OF ENERGY Massena Electric and commission staff will conduct a site visit of the proposed project site on March 1, 2007, starting at 9 a.m. All participants interested in seeing the proposed project site should meet in the parking lot of the Massena Town Hall building, located at 60 Main Street, Massena, New York. All participants attending the site visit should be prepared to provide their own transportation. Anyone with questions about the site visit (or for directions) should contact Shirley Williamson at 617–960–4995 or via e-mail at williamsonsh@pbworld.com. Federal Energy Regulatory Commission Scoping Meeting Objectives At the scoping meetings, staff will: (1) Present a proposed list of issues to be addressed in the EA; (2) review and discuss existing conditions and resource agency management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of Federal, State, and tribal permitting and certification processes; and (5) discuss requests by any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n of this document. Scoping Meeting Procedures The meetings will be recorded by a stenographer and will become part of the formal Commission record on the project. Magalie R. Salas, Secretary. [FR Doc. E7–1911 Filed 2–6–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 [Project No. 2149–131] Public Utility District No. 1 of Douglas County, WA; Notice of Intent To File License Application, Filing of PreApplication Document, Commencement of Licensing Proceeding, Scoping, Solicitation of Comments on the Pad and Scoping Document, and Identification Issues and Associated Study Requests January 29, 2007. a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Licensing Proceeding. b. Project No.: 2149–131. c. Dated Filed: December 1, 2006. d. Submitted By: Public Utility District No. 1 of Douglas County, Washington (Douglas County PUD). e. Name of Project: Wells Hydroelectric Project. f. Location: The project is located on the Columbia River near the towns of Pateros and Brewster in Okanogan County, Washington. There are 232.7 acres of federal lands located within the project boundary that are administered by the Bureau of Land Management, U.S. Army Corps of Engineers, or the Bureau of Reclamation. g. Filed Pursuant to: 18 CFR Part 5 of the Commission’s Regulations. h. Potential Applicant Contact: William C. Dobbins, Manager, Douglas County PUD, 1151 Valley Mall Parkway, East Wenatchee, WA 98802. i. FERC Contact: Bob Easton at (202) 502–6045 or e-mail at robert.easton@ferc.gov. j. We are asking Federal, State, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in paragraph o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402 and (b) the State Historic Preservation Officer, as required by E:\FR\FM\07FEN1.SGM 07FEN1 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 72, No. 25 / Wednesday, February 7, 2007 / Notices section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Douglas County PUD as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. m. Douglas County PUD filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, of for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https://ferc.gov/ esubscribenow.htm to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. With this notice, we are soliciting comments on the PAD and Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application (original and eight copies) must be filed with the Commission at the following address: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. All filings with the Commission must include on the first page, the project name (Wells Hydroelectric Project) and number (P–2149–131), and bear the heading ‘‘Comments on Pre-Application Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency VerDate Aug<31>2005 21:36 Feb 06, 2007 Jkt 211001 requesting cooperating status must do so by April 2, 2007. Comments on the PAD and SD1, study requests, requests for cooperating agency status, and other permissible forms of communications with the Commission may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-filing’’ link. p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: Daytime Scoping Meeting: Date: Wednesday, February 28, 2007. Time: 9 a.m. Location: Douglas County PUD Auditorium, 1151 Valley Mall Parkway, East Wenatchee, Washington. Evening Scoping Meeting: Date: Wednesday, February 28, 2007. Time: 7 p.m. Location: Columbia Cove Community Center, 601 West Cliff Avenue, Brewster, Washington. SD1, which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the Web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 5699 Site Visit The potential applicant and Commission staff will conduct a site visit of the project on Tuesday, February 27, 2007, starting at 9 a.m. All participants should meet at the Wells Dam Visitors Center off of U.S. Highway 97. All participants are responsible for their own transportation. Anyone with questions about the site visit should contact Ms. Mary Mayo of Douglas County PUD at (509) 881–2488 on or before February 21, 2007. Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of Federal, State, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document. Meeting Procedures The meetings will be recorded by a stenographer and will become part of the formal record of the Commission proceeding on the project. Magalie R. Salas, Secretary. [FR Doc. E7–1912 Filed 2–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests January 30, 2007. a. Type of Application: Application for Non-Project Use of Project Lands and Waters. b. Project Number: P–2686–054. c. Date Filed: January 16, 2007. E:\FR\FM\07FEN1.SGM 07FEN1

Agencies

[Federal Register Volume 72, Number 25 (Wednesday, February 7, 2007)]
[Notices]
[Pages 5698-5699]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1912]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2149-131]


Public Utility District No. 1 of Douglas County, WA; Notice of 
Intent To File License Application, Filing of Pre-Application Document, 
Commencement of Licensing Proceeding, Scoping, Solicitation of Comments 
on the Pad and Scoping Document, and Identification Issues and 
Associated Study Requests

January 29, 2007.
    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Licensing Proceeding.
    b. Project No.: 2149-131.
    c. Dated Filed: December 1, 2006.
    d. Submitted By: Public Utility District No. 1 of Douglas County, 
Washington (Douglas County PUD).
    e. Name of Project: Wells Hydroelectric Project.
    f. Location: The project is located on the Columbia River near the 
towns of Pateros and Brewster in Okanogan County, Washington. There are 
232.7 acres of federal lands located within the project boundary that 
are administered by the Bureau of Land Management, U.S. Army Corps of 
Engineers, or the Bureau of Reclamation.
    g. Filed Pursuant to: 18 CFR Part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: William C. Dobbins, Manager, 
Douglas County PUD, 1151 Valley Mall Parkway, East Wenatchee, WA 98802.
    i. FERC Contact: Bob Easton at (202) 502-6045 or e-mail at 
robert.easton@ferc.gov.
    j. We are asking Federal, State, local, and tribal agencies with 
jurisdiction and/or special expertise with respect to environmental 
issues to cooperate with us in the preparation of the environmental 
document. Agencies who would like to request cooperating status should 
follow the instructions for filing comments described in paragraph o 
below. Cooperating agencies should note the Commission's policy that 
agencies that cooperate in the preparation of the environmental 
document cannot also intervene. See, 94 FERC 61,076 (2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR, Part 402 and (b) the State Historic 
Preservation Officer, as required by

[[Page 5699]]

section 106, National Historical Preservation Act, and the implementing 
regulations of the Advisory Council on Historic Preservation at 36 CFR 
800.2.
    l. With this notice, we are designating Douglas County PUD as the 
Commission's non-federal representative for carrying out informal 
consultation, pursuant to section 7 of the Endangered Species Act and 
section 106 of the National Historic Preservation Act.
    m. Douglas County PUD filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, of for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    Register online at https://ferc.gov/esubscribenow.htm to be notified 
via e-mail of new filing and issuances related to this or other pending 
projects. For assistance, contact FERC Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Scoping Document 1 (SD1), as well as study requests. All comments on 
the PAD and SD1, and study requests should be sent to the address above 
in paragraph h. In addition, all comments on the PAD and SD1, study 
requests, requests for cooperating agency status, and all 
communications to and from Commission staff related to the merits of 
the potential application (original and eight copies) must be filed 
with the Commission at the following address: Magalie R. Salas, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. All filings with the Commission must include on 
the first page, the project name (Wells Hydroelectric Project) and 
number (P-2149-131), and bear the heading ``Comments on Pre-Application 
Document,'' ``Study Requests,'' ``Comments on Scoping Document 1,'' 
``Request for Cooperating Agency Status,'' or ``Communications to and 
from Commission Staff.'' Any individual or entity interested in 
submitting study requests, commenting on the PAD or SD1, and any agency 
requesting cooperating status must do so by April 2, 2007.
    Comments on the PAD and SD1, study requests, requests for 
cooperating agency status, and other permissible forms of 
communications with the Commission may be filed electronically via the 
Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (https://www.ferc.gov) under the ``e-
filing'' link.
    p. Although our current intent is to prepare an environmental 
assessment (EA), there is the possibility that an Environmental Impact 
Statement (EIS) will be required. Nevertheless, this meeting will 
satisfy the NEPA scoping requirements, irrespective of whether an EA or 
EIS is issued by the Commission.

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the time and place noted below. The daytime meeting will 
focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:
    Daytime Scoping Meeting:
    Date: Wednesday, February 28, 2007.
    Time: 9 a.m.
    Location: Douglas County PUD Auditorium, 1151 Valley Mall Parkway, 
East Wenatchee, Washington.
    Evening Scoping Meeting:
    Date: Wednesday, February 28, 2007.
    Time: 7 p.m.
    Location: Columbia Cove Community Center, 601 West Cliff Avenue, 
Brewster, Washington.
    SD1, which outlines the subject areas to be addressed in the 
environmental document, was mailed to the individuals and entities on 
the Commission's mailing list. Copies of SD1 will be available at the 
scoping meetings, or may be viewed on the Web at https://www.ferc.gov, 
using the ``eLibrary'' link. Follow the directions for accessing 
information in paragraph n. Based on all oral and written comments, a 
Scoping Document 2 (SD2) may be issued. SD2 may include a revised 
process plan and schedule, as well as a list of issues, identified 
through the scoping process.

Site Visit

    The potential applicant and Commission staff will conduct a site 
visit of the project on Tuesday, February 27, 2007, starting at 9 a.m. 
All participants should meet at the Wells Dam Visitors Center off of 
U.S. Highway 97. All participants are responsible for their own 
transportation. Anyone with questions about the site visit should 
contact Ms. Mary Mayo of Douglas County PUD at (509) 881-2488 on or 
before February 21, 2007.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
Federal, State, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n. of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will become 
part of the formal record of the Commission proceeding on the project.

Magalie R. Salas,
Secretary.
 [FR Doc. E7-1912 Filed 2-6-07; 8:45 am]
BILLING CODE 6717-01-P