Environmental Impacts Statements; Notice Of Availability, 5049-5050 [E7-1727]

Download as PDF Federal Register / Vol. 72, No. 22 / Friday, February 2, 2007 / Notices sroberts on PROD1PC70 with NOTICES National Wildlife Refuge Complex, Development of a 15-Year Management Plan (Comprehensive Conservation Plan) for Refuge Complex, and Expansion of the Approval Land Acquisition Boundaries (Land Protection Plan) for the Four Refuges: Moody, Anahuac, McFaddin and Texas Point National Wildlife Refuges, Chambers, Jefferson and Galveston Counties, TX. Summary: EPA does not object to the preferred alternative. Rating LO. EIS No. 20060478, ERP No. D–COE– K39102–CA, Success Dam Seismic Remediation Dam Safety Project, Proposes To Remediate Deficiencies in the Dam’s Foundation, Tulare River, Tulare County, CA. Summary: EPA expressed environmental concerns about impacts to air quality and aquatic resources, and requested additional information on the alternatives analysis and mitigation for impacts to water resources and fisheries. Rating EC2. EIS No. 20060494, ERP No. D–DOE– D09801–WV, Western Greenbier CoProduction Demonstration Project, Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, WV. Summary: EPA expressed environmental concerns about water resource impacts, coal refuse pile restoration activity, and ash management. Rating EC2. EIS No. 20060247, ERP No. DS–FTA– E40775–FL, Miami North Corridor Project, Updated Information, Transit Improvement between NW 62 Street at Dr. Martin Luther King Jr. Station and NW 215th Street at the Dade/ Broward Counties Line, Funding, Dade County, FL. Summary: EPA expressed environmental concerns about noise and contamination impacts as well as impacts related to relocations. In addition, EPA recommends that mitigation measures be documented in the FEIS as project commitments. Rating EC2. Final EIS’s EIS No. 20060491, ERP No. F1–FHW– L40194–WA, WA–167 Freeway Project, Construction, from 161 (Meridan Street North) in the City of Puyallup to the WA–509 Freeway in the City of Tacoma, Funding, U.S. Coast Guard, NPDES, U.S. Army COE Section 10 and 404 Permits, Cities of Puyallup, Fife, Edgewood, Milton, and Tacoma, Pierce County, WA. Summary: EPA continues to have environmental concerns about loss of prime farmland, and impacts to listed fish species, water quality, and wildlife habitat connectivity. EPA has VerDate Aug<31>2005 16:13 Feb 01, 2007 Jkt 211001 further concerns about noise, air toxics, and environmental justice and tribal issues. EIS No. 20060433, ERP No. F–NOA– L91027–00, Pacific Coast Groundfish Fishery Management Plan, Proposed Acceptable Biological Catch and Optimum Yield Specifications and Management Measures for the 2007– 2008 Pacific Coast Groundfish Fishery and Amendment 16–4 Rebuilding Plans for Seven Depleted Pacific Coast Groundfish Species, WA, OR and CA. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20060487, ERP No. F–AFS– K65315–CA, South Yuba Canal Maintenance Project, Hazardous Trees Removal, Implementation, Tahoe National Forest, Nevada County, CA. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20060489, ERP No. F–COE– F32198–00, Lock and Dam 3 Mississippi River Navigation Safety and Embankments, To Reduce Related Navigation Safety and Embankment Problems, Upper Mississippi River, Goodhue County, MN and Pierce County, WI. Summary: EPA’s original concerns about proposed mitigation monitoring, water quality, and conclusions with cumulative impact analysis have been adequately addressed; therefore, we do not object to the proposed project. EIS No. 20060504, ERP No. F–IBR– K39095–CA, South Delta Improvements Program, To Improve Water Quality, Water Conveyance, and Fish Habitat Conditions, Central Valley Project, U.S. Army COE Section 404 Permit, South Sacramento-San Joaquin River Delta, Several Counties, CA. Summary: EPA supports the staged decision-making process between Stage 1 physical construction and Stage 2 operational actions. EPA provided recommendations for Stage 2 analyses, and urged undertaking a public process to scope key issues for the Stage 2 document. EPA emphasized the need to evaluate, and avoid, water quality impacts of gate operations and analysis of alternatives that meet the basic project purpose as part of the continuing Clean Water Act permitting process. EIS No. 20060511, ERP No. F–DOE– G03030–00, Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 5049 Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20060527, ERP No. F–AFS– F65065–WI, Long Rail Vegetation and Transportation Management Project, Implementation, Eagle River-Florence Ranger District, Chequamegon-Nicolet National Forest, Florence and Forest Counties, WI. Summary: The Final EIS addressed EPA’s comments relating to consistency with the Forest Management Plan; we support continued monitoring of Regional Forester Sensitive Species as part of the Forest’s environmental management system. EPA does not object to the proposed action. Dated: January 30, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–1728 Filed 2–1–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6683–6] Environmental Impacts Statements; Notice Of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 01/22/2007 Through 01/26/2007 Pursuant to 40 CFR 1506.9. EIS No. 20070019, Draft EIS, FHW, TX, Grand Parkway/State Highway 99 Improvement Project, Segment G, from Interstate Highway (IH) 45 to U.S. 59, Funding, Right-of-Way Grant, U.S. Army COE Section 404 Permit, Harris and Montgomery Counties, TX, Comment Period Ends: 04/27/2007, Contact: Donald Davis 512–536–5960. EIS No. 20070020, Final EIS, AFS, AK, Tuxekan Island Timber Sale(s) Project, Timber Harvesting, Implementation, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Tongas National Forest, Thorne Bay Ranger District, Thorne Bay, AK, Wait Period Ends: 03/05/2007, Contact: Forrest Cole 907–228–6200. EIS No. 20070021, Draft Supplement, BLM, MT, Montana Statewide Oil and Gas, Development Alternative for Coal Bed Natural Gas Production and Amendment of the Powder River and Billings Resource Management Plans, Additional Information Three New E:\FR\FM\02FEN1.SGM 02FEN1 sroberts on PROD1PC70 with NOTICES 5050 Federal Register / Vol. 72, No. 22 / Friday, February 2, 2007 / Notices Alternatives, Implementation, U.S. Army COE Section 404 Permit, NPDES Permit, Several Cos, MT, Comment Period Ends: 05/02/2007, Contact: Mary Bloom 406–233–2852. This document is available on the Internet at: https://www.blm.gov/eis/ mt/milescity_seis/. EIS No. 20070022, Final EIS, AFS, MN, Echo Trail Area Forest Management Project, Forest Vegetation Management and Related Transportation System, Superior National Forest Land and Resource Management Plan, Implementation, Lacroix Ranger District and Kawishiwi Ranger District, St. Louis and Lake Counties, MN, Wait Period Ends: 03/05/2007, Contact: Carol Booth 218–666–0020. EIS No. 20070023, Final EIS, AFS, WA, Buckhorn Access Project, To Utilize the Marias Creek Route to Construct and Reconstruct Roads, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA, Wait Period Ends: 03/05/2007, Contact: Phil Christy 509–486–5137. This document is available on the Internet at: https://www.fs.fed.us/r6/ oka/projects. EIS No. 20070024, Final EIS, AFS, PA, West Branch of Tionesta Project, Multiple Resource Management, Implementation Bradford Ranger District, Allegheny National Forest, Warren County, PA, Wait Period Ends: 03/05/2007 Contact: Ava Turnquist 814–362–4613. EIS No. 20070025, Draft EIS, AFS, OR, Invasive Plant Treatments within the Deschutes and Ochoco National Forests and the Crooked River National Grassland, Reduction of Invasive Plant Infestation and Protection of Uninfested Areas, Implementation, Several Cos. OR, Comment Period Ends: 03/19/2007, Contact: Beth Peer 541–383–5300. This document is available on the Internet at: https://www.fs.fed.us/r6/ invasiveplant-eis/site-specific/DES. EIS No. 20070026, Draft EIS, FRC, LA, Kinder Morgan Louisiana Pipeline Project, Natural Gas Pipeline Facilities, Construction and Operation, U.S. Army COE Section 10 and 404 Permits, Evangeline, Cameron, and Acadia Parishes, LA, Comment Period Ends: 03/19/2007, Contact: Andy Black 1–866–208– 3372. Amended Notices EIS No. 20060414, Draft EIS, USA, CO, Pinon Canyon Maneuver Site (PCMS) Transformation Program, VerDate Aug<31>2005 16:13 Feb 01, 2007 Jkt 211001 Implementation, Base Realignment and Closure Activities, Fort Carson, Las Animas, Otero and Huerfano Counties, CO, Comment Period Ends: 02/16/2007, Contact: Karen Wilson 703–602–2861. Revision to FR Notice Published 10/13/2006: Reopening Comment Period from 01/11/2007 to 02/16/2007. EIS No. 20060505, Draft EIS, NOA, 00, South Atlantic Snapper Grouper Fishery, Amendment 14 to Establish Eight Marine Protected Areas in Federal Waters, Implementation, South Atlantic Region, Comment Period Ends: 02/12/2007, Contact: Roy E. Crabtree 727–824–5305. Revision to FR Notice Published 12/ 15/2006: Extending Comment Period from 01/29/2007 to 02/12/2007. Dated: January 29, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–1727 Filed 2–1–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2007–0037; FRL–8113–1] Pesticide Registration Review; New Dockets Opened for Review and Comment Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: EPA has established registration review dockets for the pesticides listed in the table in Unit III.A. With this document, EPA is opening the public comment period for these registration reviews. Registration review is EPA’s periodic review of pesticide registrations to ensure that each pesticide continues to satisfy the statutory standard for registration, that is, the pesticide can perform its intended function without unreasonable adverse effects on human health or the environment. Registration review dockets contain information that will assist the public in understanding the types of information and issues that the Agency may consider during the course of registration reviews. Through this program, EPA is ensuring that each pesticide’s registration is based on current scientific and other knowledge, including its effects on human health and the environment. This document also announces the Agency’s intent not to open a registration review docket for sulfosate. This pesticide does not currently have any active federally PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 registered pesticide products and is not, therefore, scheduled for review under the registration review program. DATES: Comments must be received on or before May 3, 2007. ADDRESSES: Submit your comments identified by the docket identification (ID) number for the specific pesticide of interest provided in the table in Unit III.A., by one of the following methods: Federal eRulemaking Portal: https:// www.regulations.gov. Follow the on-line instructions for submitting comments. Mail. Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. Delivery. OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S–4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. Deliveries are only accepted during the Docket’s normal hours of operation (8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays). Special arrangements should be made for deliveries of boxed information. The Docket telephone number is (703) 305– 5805. Instructions. Direct your comments to the docket ID numbers listed in the Table in Unit III.A. for the pesticides you are commenting on. EPA’s policy is that all comments received will be included in the docket without change and may be made available on-line at https://www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through regulations.gov or e-mail. The regulations.gov website is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through regulations.gov, your e-mail address will be automatically captured and included as part of the comment that is placed in the docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your E:\FR\FM\02FEN1.SGM 02FEN1

Agencies

[Federal Register Volume 72, Number 22 (Friday, February 2, 2007)]
[Notices]
[Pages 5049-5050]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1727]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6683-6]


Environmental Impacts Statements; Notice Of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements Filed 01/22/2007 
Through 01/26/2007
Pursuant to 40 CFR 1506.9.

EIS No. 20070019, Draft EIS, FHW, TX, Grand Parkway/State Highway 99 
Improvement Project, Segment G, from Interstate Highway (IH) 45 to U.S. 
59, Funding, Right-of-Way Grant, U.S. Army COE Section 404 Permit, 
Harris and Montgomery Counties, TX, Comment Period Ends: 04/27/2007, 
Contact: Donald Davis 512-536-5960.
EIS No. 20070020, Final EIS, AFS, AK, Tuxekan Island Timber Sale(s) 
Project, Timber Harvesting, Implementation, Coast Guard Bridge Permit, 
U.S. Army COE Section 10 and 404 Permits, Tongas National Forest, 
Thorne Bay Ranger District, Thorne Bay, AK, Wait Period Ends: 03/05/
2007, Contact: Forrest Cole 907-228-6200.
EIS No. 20070021, Draft Supplement, BLM, MT, Montana Statewide Oil and 
Gas, Development Alternative for Coal Bed Natural Gas Production and 
Amendment of the Powder River and Billings Resource Management Plans, 
Additional Information Three New

[[Page 5050]]

Alternatives, Implementation, U.S. Army COE Section 404 Permit, NPDES 
Permit, Several Cos, MT, Comment Period Ends: 05/02/2007, Contact: Mary 
Bloom 406-233-2852. This document is available on the Internet at: 
https://www.blm.gov/eis/mt/milescity_seis/.
EIS No. 20070022, Final EIS, AFS, MN, Echo Trail Area Forest Management 
Project, Forest Vegetation Management and Related Transportation 
System, Superior National Forest Land and Resource Management Plan, 
Implementation, Lacroix Ranger District and Kawishiwi Ranger District, 
St. Louis and Lake Counties, MN, Wait Period Ends: 03/05/2007, Contact: 
Carol Booth 218-666-0020.
EIS No. 20070023, Final EIS, AFS, WA, Buckhorn Access Project, To 
Utilize the Marias Creek Route to Construct and Reconstruct Roads, 
Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Okanogan 
and Wenatchee National Forests, Tonasket Ranger District, Okanogan 
County, WA, Wait Period Ends: 03/05/2007, Contact: Phil Christy 509-
486-5137. This document is available on the Internet at: https://www.fs.fed.us/r6/oka/projects.
EIS No. 20070024, Final EIS, AFS, PA, West Branch of Tionesta Project, 
Multiple Resource Management, Implementation Bradford Ranger District, 
Allegheny National Forest, Warren County, PA, Wait Period Ends: 03/05/
2007 Contact: Ava Turnquist 814-362-4613.
EIS No. 20070025, Draft EIS, AFS, OR, Invasive Plant Treatments within 
the Deschutes and Ochoco National Forests and the Crooked River 
National Grassland, Reduction of Invasive Plant Infestation and 
Protection of Uninfested Areas, Implementation, Several Cos. OR, 
Comment Period Ends: 03/19/2007, Contact: Beth Peer 541-383-5300. This 
document is available on the Internet at: https://www.fs.fed.us/r6/invasiveplant-eis/site-specific/DES.
EIS No. 20070026, Draft EIS, FRC, LA, Kinder Morgan Louisiana Pipeline 
Project, Natural Gas Pipeline Facilities, Construction and Operation, 
U.S. Army COE Section 10 and 404 Permits, Evangeline, Cameron, and 
Acadia Parishes, LA, Comment Period Ends: 03/19/2007, Contact: Andy 
Black 1-866-208-3372.

Amended Notices

EIS No. 20060414, Draft EIS, USA, CO, Pinon Canyon Maneuver Site (PCMS) 
Transformation Program, Implementation, Base Realignment and Closure 
Activities, Fort Carson, Las Animas, Otero and Huerfano Counties, CO, 
Comment Period Ends: 02/16/2007, Contact: Karen Wilson 703-602-2861. 
Revision to FR Notice Published 10/13/2006: Reopening Comment Period 
from 01/11/2007 to 02/16/2007.
EIS No. 20060505, Draft EIS, NOA, 00, South Atlantic Snapper Grouper 
Fishery, Amendment 14 to Establish Eight Marine Protected Areas in 
Federal Waters, Implementation, South Atlantic Region, Comment Period 
Ends: 02/12/2007, Contact: Roy E. Crabtree 727-824-5305. Revision to FR 
Notice Published 12/15/2006: Extending Comment Period from 01/29/2007 
to 02/12/2007.

    Dated: January 29, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E7-1727 Filed 2-1-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.