Environmental Impacts Statements; Notice Of Availability, 5049-5050 [E7-1727]
Download as PDF
Federal Register / Vol. 72, No. 22 / Friday, February 2, 2007 / Notices
sroberts on PROD1PC70 with NOTICES
National Wildlife Refuge Complex,
Development of a 15-Year
Management Plan (Comprehensive
Conservation Plan) for Refuge
Complex, and Expansion of the
Approval Land Acquisition
Boundaries (Land Protection Plan) for
the Four Refuges: Moody, Anahuac,
McFaddin and Texas Point National
Wildlife Refuges, Chambers, Jefferson
and Galveston Counties, TX.
Summary: EPA does not object to the
preferred alternative. Rating LO.
EIS No. 20060478, ERP No. D–COE–
K39102–CA, Success Dam Seismic
Remediation Dam Safety Project,
Proposes To Remediate Deficiencies
in the Dam’s Foundation, Tulare
River, Tulare County, CA. Summary:
EPA expressed environmental
concerns about impacts to air quality
and aquatic resources, and requested
additional information on the
alternatives analysis and mitigation
for impacts to water resources and
fisheries. Rating EC2.
EIS No. 20060494, ERP No. D–DOE–
D09801–WV, Western Greenbier CoProduction Demonstration Project,
Construction and Demonstration of a
98 megawatt (MWe) Net Power Plant
and Ash Byproduct Manufacturing
Facility, Rainelle, WV. Summary: EPA
expressed environmental concerns
about water resource impacts, coal
refuse pile restoration activity, and
ash management. Rating EC2.
EIS No. 20060247, ERP No. DS–FTA–
E40775–FL, Miami North Corridor
Project, Updated Information, Transit
Improvement between NW 62 Street
at Dr. Martin Luther King Jr. Station
and NW 215th Street at the Dade/
Broward Counties Line, Funding,
Dade County, FL. Summary: EPA
expressed environmental concerns
about noise and contamination
impacts as well as impacts related to
relocations. In addition, EPA
recommends that mitigation measures
be documented in the FEIS as project
commitments. Rating EC2.
Final EIS’s
EIS No. 20060491, ERP No. F1–FHW–
L40194–WA, WA–167 Freeway
Project, Construction, from 161
(Meridan Street North) in the City of
Puyallup to the WA–509 Freeway in
the City of Tacoma, Funding, U.S.
Coast Guard, NPDES, U.S. Army COE
Section 10 and 404 Permits, Cities of
Puyallup, Fife, Edgewood, Milton,
and Tacoma, Pierce County, WA.
Summary: EPA continues to have
environmental concerns about loss of
prime farmland, and impacts to listed
fish species, water quality, and
wildlife habitat connectivity. EPA has
VerDate Aug<31>2005
16:13 Feb 01, 2007
Jkt 211001
further concerns about noise, air
toxics, and environmental justice and
tribal issues.
EIS No. 20060433, ERP No. F–NOA–
L91027–00, Pacific Coast Groundfish
Fishery Management Plan, Proposed
Acceptable Biological Catch and
Optimum Yield Specifications and
Management Measures for the 2007–
2008 Pacific Coast Groundfish Fishery
and Amendment 16–4 Rebuilding
Plans for Seven Depleted Pacific Coast
Groundfish Species, WA, OR and CA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20060487, ERP No. F–AFS–
K65315–CA, South Yuba Canal
Maintenance Project, Hazardous Trees
Removal, Implementation, Tahoe
National Forest, Nevada County, CA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20060489, ERP No. F–COE–
F32198–00, Lock and Dam 3
Mississippi River Navigation Safety
and Embankments, To Reduce Related
Navigation Safety and Embankment
Problems, Upper Mississippi River,
Goodhue County, MN and Pierce
County, WI. Summary: EPA’s original
concerns about proposed mitigation
monitoring, water quality, and
conclusions with cumulative impact
analysis have been adequately
addressed; therefore, we do not object
to the proposed project.
EIS No. 20060504, ERP No. F–IBR–
K39095–CA, South Delta
Improvements Program, To Improve
Water Quality, Water Conveyance,
and Fish Habitat Conditions, Central
Valley Project, U.S. Army COE
Section 404 Permit, South
Sacramento-San Joaquin River Delta,
Several Counties, CA. Summary: EPA
supports the staged decision-making
process between Stage 1 physical
construction and Stage 2 operational
actions. EPA provided
recommendations for Stage 2
analyses, and urged undertaking a
public process to scope key issues for
the Stage 2 document. EPA
emphasized the need to evaluate, and
avoid, water quality impacts of gate
operations and analysis of alternatives
that meet the basic project purpose as
part of the continuing Clean Water
Act permitting process.
EIS No. 20060511, ERP No. F–DOE–
G03030–00, Strategic Petroleum
Reserve Expansion, Site Selection of
Five New Sites: Chacahoula and
Clovelly, in Lafourche Parish, LA;
Burinsburg, Claiborne County, MS;
Richton, Perry County, MS; and
Stratton Ridge, Brazoria County, TX
and Existing Site Bayou Choctaw,
Iberville Parish, LA, West Hackberry,
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
5049
Cameron and Calcasieu Parishes, LA;
and Big Hill, Jefferson County, TX.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20060527, ERP No. F–AFS–
F65065–WI, Long Rail Vegetation and
Transportation Management Project,
Implementation, Eagle River-Florence
Ranger District, Chequamegon-Nicolet
National Forest, Florence and Forest
Counties, WI. Summary: The Final
EIS addressed EPA’s comments
relating to consistency with the Forest
Management Plan; we support
continued monitoring of Regional
Forester Sensitive Species as part of
the Forest’s environmental
management system. EPA does not
object to the proposed action.
Dated: January 30, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–1728 Filed 2–1–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6683–6]
Environmental Impacts Statements;
Notice Of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 01/22/2007 Through
01/26/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070019, Draft EIS, FHW, TX,
Grand Parkway/State Highway 99
Improvement Project, Segment G,
from Interstate Highway (IH) 45 to
U.S. 59, Funding, Right-of-Way Grant,
U.S. Army COE Section 404 Permit,
Harris and Montgomery Counties, TX,
Comment Period Ends: 04/27/2007,
Contact: Donald Davis 512–536–5960.
EIS No. 20070020, Final EIS, AFS, AK,
Tuxekan Island Timber Sale(s)
Project, Timber Harvesting,
Implementation, Coast Guard Bridge
Permit, U.S. Army COE Section 10
and 404 Permits, Tongas National
Forest, Thorne Bay Ranger District,
Thorne Bay, AK, Wait Period Ends:
03/05/2007, Contact: Forrest Cole
907–228–6200.
EIS No. 20070021, Draft Supplement,
BLM, MT, Montana Statewide Oil and
Gas, Development Alternative for Coal
Bed Natural Gas Production and
Amendment of the Powder River and
Billings Resource Management Plans,
Additional Information Three New
E:\FR\FM\02FEN1.SGM
02FEN1
sroberts on PROD1PC70 with NOTICES
5050
Federal Register / Vol. 72, No. 22 / Friday, February 2, 2007 / Notices
Alternatives, Implementation, U.S.
Army COE Section 404 Permit,
NPDES Permit, Several Cos, MT,
Comment Period Ends: 05/02/2007,
Contact: Mary Bloom 406–233–2852.
This document is available on the
Internet at: https://www.blm.gov/eis/
mt/milescity_seis/.
EIS No. 20070022, Final EIS, AFS, MN,
Echo Trail Area Forest Management
Project, Forest Vegetation
Management and Related
Transportation System, Superior
National Forest Land and Resource
Management Plan, Implementation,
Lacroix Ranger District and
Kawishiwi Ranger District, St. Louis
and Lake Counties, MN, Wait Period
Ends: 03/05/2007, Contact: Carol
Booth 218–666–0020.
EIS No. 20070023, Final EIS, AFS, WA,
Buckhorn Access Project, To Utilize
the Marias Creek Route to Construct
and Reconstruct Roads, Funding,
NPDES Permit and U.S. Army COE
Section 404 Permit, Okanogan and
Wenatchee National Forests, Tonasket
Ranger District, Okanogan County,
WA, Wait Period Ends: 03/05/2007,
Contact: Phil Christy 509–486–5137.
This document is available on the
Internet at: https://www.fs.fed.us/r6/
oka/projects.
EIS No. 20070024, Final EIS, AFS, PA,
West Branch of Tionesta Project,
Multiple Resource Management,
Implementation Bradford Ranger
District, Allegheny National Forest,
Warren County, PA, Wait Period
Ends: 03/05/2007 Contact: Ava
Turnquist 814–362–4613.
EIS No. 20070025, Draft EIS, AFS, OR,
Invasive Plant Treatments within the
Deschutes and Ochoco National
Forests and the Crooked River
National Grassland, Reduction of
Invasive Plant Infestation and
Protection of Uninfested Areas,
Implementation, Several Cos. OR,
Comment Period Ends: 03/19/2007,
Contact: Beth Peer 541–383–5300.
This document is available on the
Internet at: https://www.fs.fed.us/r6/
invasiveplant-eis/site-specific/DES.
EIS No. 20070026, Draft EIS, FRC, LA,
Kinder Morgan Louisiana Pipeline
Project, Natural Gas Pipeline
Facilities, Construction and
Operation, U.S. Army COE Section 10
and 404 Permits, Evangeline,
Cameron, and Acadia Parishes, LA,
Comment Period Ends: 03/19/2007,
Contact: Andy Black 1–866–208–
3372.
Amended Notices
EIS No. 20060414, Draft EIS, USA, CO,
Pinon Canyon Maneuver Site (PCMS)
Transformation Program,
VerDate Aug<31>2005
16:13 Feb 01, 2007
Jkt 211001
Implementation, Base Realignment
and Closure Activities, Fort Carson,
Las Animas, Otero and Huerfano
Counties, CO, Comment Period Ends:
02/16/2007, Contact: Karen Wilson
703–602–2861. Revision to FR Notice
Published 10/13/2006: Reopening
Comment Period from 01/11/2007 to
02/16/2007.
EIS No. 20060505, Draft EIS, NOA, 00,
South Atlantic Snapper Grouper
Fishery, Amendment 14 to Establish
Eight Marine Protected Areas in
Federal Waters, Implementation,
South Atlantic Region, Comment
Period Ends: 02/12/2007, Contact:
Roy E. Crabtree 727–824–5305.
Revision to FR Notice Published 12/
15/2006: Extending Comment Period
from 01/29/2007 to 02/12/2007.
Dated: January 29, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–1727 Filed 2–1–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2007–0037; FRL–8113–1]
Pesticide Registration Review; New
Dockets Opened for Review and
Comment
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: EPA has established
registration review dockets for the
pesticides listed in the table in Unit
III.A. With this document, EPA is
opening the public comment period for
these registration reviews. Registration
review is EPA’s periodic review of
pesticide registrations to ensure that
each pesticide continues to satisfy the
statutory standard for registration, that
is, the pesticide can perform its
intended function without unreasonable
adverse effects on human health or the
environment. Registration review
dockets contain information that will
assist the public in understanding the
types of information and issues that the
Agency may consider during the course
of registration reviews. Through this
program, EPA is ensuring that each
pesticide’s registration is based on
current scientific and other knowledge,
including its effects on human health
and the environment. This document
also announces the Agency’s intent not
to open a registration review docket for
sulfosate. This pesticide does not
currently have any active federally
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
registered pesticide products and is not,
therefore, scheduled for review under
the registration review program.
DATES: Comments must be received on
or before May 3, 2007.
ADDRESSES: Submit your comments
identified by the docket identification
(ID) number for the specific pesticide of
interest provided in the table in Unit
III.A., by one of the following methods:
Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
Mail. Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001.
Delivery. OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S–4400, One
Potomac Yard (South Bldg.), 2777 S.
Crystal Dr., Arlington, VA. Deliveries
are only accepted during the Docket’s
normal hours of operation (8:30 a.m. to
4 p.m., Monday through Friday,
excluding legal holidays). Special
arrangements should be made for
deliveries of boxed information. The
Docket telephone number is (703) 305–
5805.
Instructions. Direct your comments to
the docket ID numbers listed in the
Table in Unit III.A. for the pesticides
you are commenting on. EPA’s policy is
that all comments received will be
included in the docket without change
and may be made available on-line at
https://www.regulations.gov, including
any personal information provided,
unless the comment includes
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute. Do not submit
information that you consider to be CBI
or otherwise protected through
regulations.gov or e-mail. The
regulations.gov website is an
‘‘anonymous access’’ system, which
means EPA will not know your identity
or contact information unless you
provide it in the body of your comment.
If you send an e-mail comment directly
to EPA without going through
regulations.gov, your e-mail address
will be automatically captured and
included as part of the comment that is
placed in the docket and made available
on the Internet. If you submit an
electronic comment, EPA recommends
that you include your name and other
contact information in the body of your
comment and with any disk or CD-ROM
you submit. If EPA cannot read your
comment due to technical difficulties
and cannot contact you for clarification,
EPA may not be able to consider your
E:\FR\FM\02FEN1.SGM
02FEN1
Agencies
[Federal Register Volume 72, Number 22 (Friday, February 2, 2007)]
[Notices]
[Pages 5049-5050]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1727]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6683-6]
Environmental Impacts Statements; Notice Of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 01/22/2007
Through 01/26/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070019, Draft EIS, FHW, TX, Grand Parkway/State Highway 99
Improvement Project, Segment G, from Interstate Highway (IH) 45 to U.S.
59, Funding, Right-of-Way Grant, U.S. Army COE Section 404 Permit,
Harris and Montgomery Counties, TX, Comment Period Ends: 04/27/2007,
Contact: Donald Davis 512-536-5960.
EIS No. 20070020, Final EIS, AFS, AK, Tuxekan Island Timber Sale(s)
Project, Timber Harvesting, Implementation, Coast Guard Bridge Permit,
U.S. Army COE Section 10 and 404 Permits, Tongas National Forest,
Thorne Bay Ranger District, Thorne Bay, AK, Wait Period Ends: 03/05/
2007, Contact: Forrest Cole 907-228-6200.
EIS No. 20070021, Draft Supplement, BLM, MT, Montana Statewide Oil and
Gas, Development Alternative for Coal Bed Natural Gas Production and
Amendment of the Powder River and Billings Resource Management Plans,
Additional Information Three New
[[Page 5050]]
Alternatives, Implementation, U.S. Army COE Section 404 Permit, NPDES
Permit, Several Cos, MT, Comment Period Ends: 05/02/2007, Contact: Mary
Bloom 406-233-2852. This document is available on the Internet at:
https://www.blm.gov/eis/mt/milescity_seis/.
EIS No. 20070022, Final EIS, AFS, MN, Echo Trail Area Forest Management
Project, Forest Vegetation Management and Related Transportation
System, Superior National Forest Land and Resource Management Plan,
Implementation, Lacroix Ranger District and Kawishiwi Ranger District,
St. Louis and Lake Counties, MN, Wait Period Ends: 03/05/2007, Contact:
Carol Booth 218-666-0020.
EIS No. 20070023, Final EIS, AFS, WA, Buckhorn Access Project, To
Utilize the Marias Creek Route to Construct and Reconstruct Roads,
Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Okanogan
and Wenatchee National Forests, Tonasket Ranger District, Okanogan
County, WA, Wait Period Ends: 03/05/2007, Contact: Phil Christy 509-
486-5137. This document is available on the Internet at: https://www.fs.fed.us/r6/oka/projects.
EIS No. 20070024, Final EIS, AFS, PA, West Branch of Tionesta Project,
Multiple Resource Management, Implementation Bradford Ranger District,
Allegheny National Forest, Warren County, PA, Wait Period Ends: 03/05/
2007 Contact: Ava Turnquist 814-362-4613.
EIS No. 20070025, Draft EIS, AFS, OR, Invasive Plant Treatments within
the Deschutes and Ochoco National Forests and the Crooked River
National Grassland, Reduction of Invasive Plant Infestation and
Protection of Uninfested Areas, Implementation, Several Cos. OR,
Comment Period Ends: 03/19/2007, Contact: Beth Peer 541-383-5300. This
document is available on the Internet at: https://www.fs.fed.us/r6/invasiveplant-eis/site-specific/DES.
EIS No. 20070026, Draft EIS, FRC, LA, Kinder Morgan Louisiana Pipeline
Project, Natural Gas Pipeline Facilities, Construction and Operation,
U.S. Army COE Section 10 and 404 Permits, Evangeline, Cameron, and
Acadia Parishes, LA, Comment Period Ends: 03/19/2007, Contact: Andy
Black 1-866-208-3372.
Amended Notices
EIS No. 20060414, Draft EIS, USA, CO, Pinon Canyon Maneuver Site (PCMS)
Transformation Program, Implementation, Base Realignment and Closure
Activities, Fort Carson, Las Animas, Otero and Huerfano Counties, CO,
Comment Period Ends: 02/16/2007, Contact: Karen Wilson 703-602-2861.
Revision to FR Notice Published 10/13/2006: Reopening Comment Period
from 01/11/2007 to 02/16/2007.
EIS No. 20060505, Draft EIS, NOA, 00, South Atlantic Snapper Grouper
Fishery, Amendment 14 to Establish Eight Marine Protected Areas in
Federal Waters, Implementation, South Atlantic Region, Comment Period
Ends: 02/12/2007, Contact: Roy E. Crabtree 727-824-5305. Revision to FR
Notice Published 12/15/2006: Extending Comment Period from 01/29/2007
to 02/12/2007.
Dated: January 29, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-1727 Filed 2-1-07; 8:45 am]
BILLING CODE 6560-50-P