Combined Notice of Filings #1, 4256-4257 [E7-1375]

Download as PDF 4256 Federal Register / Vol. 72, No. 19 / Tuesday, January 30, 2007 / Notices intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E7–1371 Filed 1–29–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 ycherry on PROD1PC64 with NOTICES January 23, 2007. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG06–15–000. Applicants: Twin Buttes Wind LLC. Description: Twin Buttes Wind LLC submits an errata to its Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 01/17/2007. Accession Number: 20070118–0186. Comment Date: 5 p.m. Eastern Time on Wednesday, February 7, 2007. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER06–22–003. VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits a Large Generator Interconnection Agreement among Endeavor Power Partners LLC Co et al. Filed Date: 01/18/2007. Accession Number: 20070119–0202. Comment Date: 5 p.m. Eastern Time on Thursday, February 8, 2007. Docket Numbers: ER06–864–005; ER06–1543–003; ER00–2885–013; ER01–2765–012; ER02–1582–011; ER02–1785–008; ER02–2102–012; ER97–2414–008; ER03–1283–005. Applicants: Bear Energy LP; Brush Cogeneration Partners; Cedar Brakes I, L.L.C.; Cedar Brakes II, L.L.C.; Mohawk River Funding IV, L.L.C.; Thermo Cogeneration Partnership L.P.; Utility Contract Funding, L.L.C.; Lowell Cogeneration Company Limited Partnership; Vineland Energy LLC. Description: Bear Energy LP et al submits a notice of a change in their status resulting from the acquisition by Central Power Holding LP etc. Filed Date: 01/18/2007. Accession Number: 20070122–0196. Comment Date: 5 p.m. Eastern Time on Thursday, February 8, 2007. Docket Numbers: ER06–1545–002. Applicants: North American Electric Reliability Council. Description: North American Electric Reliability Council And North American Reliability Corporation submit a compliance filing, pursuant to the Commission’s order issued 111/30/06. Filed Date: 12/22/2006. Accession Number: 20061222–5002. Comment Date: 5 p.m. Eastern Time on Friday, February 2, 2007. Docket Numbers: ER07–205–001. Applicants: Central Illinois Public Service Company; Central Illinois Light Company; Illinois Power Company; Union Electric Company; Ameren Energy Marketing Company. Description: Central Illinois Public Service Company, et al, submit a Notice of Withdrawal of its Nov. 9, 2006 application. Filed Date: 01/19/2007. Accession Number: 20070119–5027. Comment Date: 5 p.m. Eastern Time on Friday, February 9, 2007. Docket Numbers: ER07–445–000. Applicants: Duke Energy Indiana, Inc. Description: Duke Energy Indiana, Inc submits Notice of Termination of Rate Schedule 234, the Power Coordination Agreement between PSI Energy, Inc, Cinergy Services, Inc and Indiana Municipal Power Agency, effective 6/1/07. Filed Date: 01/19/2007. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Accession Number: 20070122–0211. Comment Date: 5 p.m. Eastern Time on Friday, February 9, 2007. Docket Numbers: ER07–446–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits revisions to Rate Schedule 5 of its Open Access Transmission Tariff concerning the Allocation of Operating Reserve Costs. Filed Date: 01/19/2007. Accession Number: 20070122–0212. Comment Date: 5 p.m. Eastern Time on Friday, February 9, 2007. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance E:\FR\FM\30JAN1.SGM 30JAN1 Federal Register / Vol. 72, No. 19 / Tuesday, January 30, 2007 / Notices with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E7–1375 Filed 1–29–07; 8:45 am] toll-free at (866) 208–3676; for TTY contact (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E7–1365 Filed 1–29–07; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. AD07–5–000] [Project No. 2153–012 California] United Water Conservation District; Notice of Availability of Environmental Assessment ycherry on PROD1PC64 with NOTICES January 23, 2007. In accordance with the National Environmental Policy Act of 1969, as amended, and Federal Energy Regulatory Commission (Commission or FERC) regulations (18 CFR Part 380), Commission staff reviewed the application for a minor license for the Santa Felicia Hydroelectric Project and prepared this final environmental assessment (EA). The project is located on Piru Creek in Ventura County, California. The project occupies 174.5 acres of U.S. land that is administered by the U.S. Department of Agriculture, Forest Service (Forest Service) in the Los Padres and Angeles National Forests. Specifically, the project licensee, United Water Conservation District, requested Commission approval of the Santa Felicia Project for hydroelectric generation purposes. In the final EA, Commission staff analyze the probable environmental effects of relicensing the project and conclude that approval of the project, with appropriate staffrecommended environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. Copies of the final EA are available for review in Public Reference Room 2–A of the Commission’s offices at 888 First Street, NE., Washington, DC. The EA also may be viewed on the Commission’s Internet Web site (www.ferc.gov) using the ‘‘eLibrary’’ link. Additional information about the project is available from the Commission’s Office of External Affairs at (202) 502–6088, or on the Commission’s Web site using the eLibrary link. For assistance with eLibrary, contact FERCOnlineSupport@ferc.gov or call VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 Seismic Design Guidelines for LNG Facilities; Notice of Availability of ‘‘Draft Seismic Design Guidelines and Data Submittal Requirements for LNG Facilities’’ and Request for Comments January 23, 2007. The Federal Energy Regulatory Commission’s Office of Energy Projects has updated its prior guidelines and is making available for public comment a document entitled ‘‘Seismic Design Guidelines and Data Submittal Requirements for LNG Facilities’’. These draft guidelines apply to all proposed new LNG facilities and proposed significant changes to existing LNG facilities under the jurisdiction of the Federal Energy Regulatory Commission. The new guidelines update, replace and supersede ‘‘Data Requirements for the Seismic Review of LNG Facilities, NBSIR 84–2833’’ (18 CFR 380.12(h)(5) and (o)(15)). Federal regulations applicable to seismic design of LNG facilities are identified and summarized, and guidance is provided in a number of areas that may be subject to interpretation by technical experts. The guidelines provide a basis for uniform reviews of various LNG terminal structures, components and systems under FERC jurisdiction. This guidance is intended for those facilities to be constructed on land and is not intended for floating or offshore facilities. The scope of the guidelines includes all portions of the facility located within the facility security fence including loading docks. The document may be downloaded from the FERC Web site at: https:// www.ferc.gov/industries/lng.asp. A limited number of paper copies are available from the Commission’s Public Reference Room, or by contacting the FERC Project Manager identified below. Comments on this draft version of the guidelines are requested by March 9, 2007, and will be considered in preparation of the final document. Please submit your comments electronically if possible by visiting the PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 4257 Commission’s Web site at https:// www.ferc.gov; look under the ‘‘e-Filing’’ link and the link to User’s Guide. Before you can file comments electronically you will need to create a free account which can be done on-line. Comments may also be submitted in writing to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please be sure to identify Docket No. AD07–5–000 in your filing. Questions may be directed to Lonnie Lister, Program Manager, at 202–502–8587, or by e-mail (lonnie.lister@ferc.gov). Depending upon the nature and extent of comments, upon closure of the comment period, if necessary, FERC Staff may prepare a comment response summary to be made available to the public when the final guidelines are issued. Magalie R. Salas, Secretary. [FR Doc. E7–1374 Filed 1–29–07; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8273–6] Notice of Broadly Applicable Alternative Test Methods Environmental Protection Agency (EPA). ACTION: Notice of availability. AGENCY: SUMMARY: This notice announces broadly applicable alternative test method approval decisions that the Environmental Protection Agency has made under and in support of the New Source Performance Standards and the National Emission Standards for Hazardous Air Pollutants. Although we have made both site-specific and broadly applicable alternative test method approvals in the past, most recently we have issued only site- or facility-specific approvals. This notice announces our plan to issue broadly applicable alternative test method approvals in the future. We will post these broadly applicable approvals on our technology transfer network Web site as well as announce them in the Federal Register. The publication of these broadly applicable alternative test method approvals on our Web site will provide information about options and flexibility for the regulated community. In addition, this information may reduce the burden on source owners and operators in making site-specific alternative test method requests and the permitting authorities and the EPA E:\FR\FM\30JAN1.SGM 30JAN1

Agencies

[Federal Register Volume 72, Number 19 (Tuesday, January 30, 2007)]
[Notices]
[Pages 4256-4257]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1375]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

January 23, 2007.
    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG06-15-000.
    Applicants: Twin Buttes Wind LLC.
    Description: Twin Buttes Wind LLC submits an errata to its Notice 
of Self-Certification of Exempt Wholesale Generator Status.
    Filed Date: 01/17/2007.
    Accession Number: 20070118-0186.
    Comment Date: 5 p.m. Eastern Time on Wednesday, February 7, 2007.
    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER06-22-003.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc 
submits a Large Generator Interconnection Agreement among Endeavor 
Power Partners LLC Co et al.
    Filed Date: 01/18/2007.
    Accession Number: 20070119-0202.
    Comment Date: 5 p.m. Eastern Time on Thursday, February 8, 2007.

    Docket Numbers: ER06-864-005; ER06-1543-003; ER00-2885-013; ER01-
2765-012; ER02-1582-011; ER02-1785-008; ER02-2102-012; ER97-2414-008; 
ER03-1283-005.
    Applicants: Bear Energy LP; Brush Cogeneration Partners; Cedar 
Brakes I, L.L.C.; Cedar Brakes II, L.L.C.; Mohawk River Funding IV, 
L.L.C.; Thermo Cogeneration Partnership L.P.; Utility Contract Funding, 
L.L.C.; Lowell Cogeneration Company Limited Partnership; Vineland 
Energy LLC.
    Description: Bear Energy LP et al submits a notice of a change in 
their status resulting from the acquisition by Central Power Holding LP 
etc.
    Filed Date: 01/18/2007.
    Accession Number: 20070122-0196.
    Comment Date: 5 p.m. Eastern Time on Thursday, February 8, 2007.

    Docket Numbers: ER06-1545-002.
    Applicants: North American Electric Reliability Council.
    Description: North American Electric Reliability Council And North 
American Reliability Corporation submit a compliance filing, pursuant 
to the Commission's order issued 111/30/06.
    Filed Date: 12/22/2006.
    Accession Number: 20061222-5002.
    Comment Date: 5 p.m. Eastern Time on Friday, February 2, 2007.

    Docket Numbers: ER07-205-001.
    Applicants: Central Illinois Public Service Company; Central 
Illinois Light Company; Illinois Power Company; Union Electric Company; 
Ameren Energy Marketing Company.
    Description: Central Illinois Public Service Company, et al, submit 
a Notice of Withdrawal of its Nov. 9, 2006 application.
    Filed Date: 01/19/2007.
    Accession Number: 20070119-5027.
    Comment Date: 5 p.m. Eastern Time on Friday, February 9, 2007.

    Docket Numbers: ER07-445-000.
    Applicants: Duke Energy Indiana, Inc.
    Description: Duke Energy Indiana, Inc submits Notice of Termination 
of Rate Schedule 234, the Power Coordination Agreement between PSI 
Energy, Inc, Cinergy Services, Inc and Indiana Municipal Power Agency, 
effective 6/1/07.
    Filed Date: 01/19/2007.
    Accession Number: 20070122-0211.
    Comment Date: 5 p.m. Eastern Time on Friday, February 9, 2007.

    Docket Numbers: ER07-446-000.
    Applicants: New York Independent System Operator, Inc.
    Description: New York Independent System Operator, Inc submits 
revisions to Rate Schedule 5 of its Open Access Transmission Tariff 
concerning the Allocation of Operating Reserve Costs.
    Filed Date: 01/19/2007.
    Accession Number: 20070122-0212.
    Comment Date: 5 p.m. Eastern Time on Friday, February 9, 2007.
    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5:00 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance

[[Page 4257]]

with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E7-1375 Filed 1-29-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.