Tennessee Gas Pipeline Company; Notice of Compliance Filing, 3826-3827 [E7-1250]

Download as PDF 3826 Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices America, Inc. (SENA), Chehalis Power Generating, LLC, et al., filed an amendment to the section 203 application filed November 9, 2006 in the above referenced docket, requesting the Commission to make appropriate substitutions and corrections necessary to identify each of SENA’s jurisdictional subsidiaries as an applicant and incorporate certain changes to the language contained in Exhibit M. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 23, 2007. sroberts on PROD1PC70 with NOTICES Magalie R. Salas, Secretary. [FR Doc. E7–1170 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 17:19 Jan 25, 2007 Jkt 211001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER07–342–000] Telocaset Wind Power Partners, LLC; Notice of Issuance of Order January 22, 2006. Telocaset Wind Power Partners, LLC (Telocaset) filed an application for market-based rate authority, with an accompanying rate tariff. The proposed market-based rate tariff provides for the sale of energy and capacity at marketbased rates. Telocaset also requested waivers of various Commission regulations. In particular, Telocaset requested that the Commission grant blanket approval under 18 CFR Part 34 of all future issuances of securities and assumptions of liability by Telocaset. On January 22, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—West, granted the requests for blanket approval under Part 34. The Director’s order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard or to protest the blanket approvals of issuances of securities or assumptions of liability by Telocaset should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR. 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protest is February 21, 2007. Absent a request to be heard in opposition by the deadline above, Telocaset is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Telocaset, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Telocaset’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https:// www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E7–1240 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–13–001] Tennessee Gas Pipeline Company; Notice of Compliance Filing January 22, 2007. Take notice that on January 11, 2007, Tennessee Gas Pipeline Company (Tennessee) tendered for filing as part of its FERC Gas Tariff, Fifth Revised Volume No. 1, the following tariff sheets, with an effective date of February 1, 2007: Thirteenth Revised Sheet No. 22.01, Fifteenth Revised Sheet No. 23F, Seventh Revised Sheet No. 25A, Fifth Revised Sheet No. 367. Tennessee states that the filing is being made in compliance with the Commission’s December 21, 2006 Order Approving Abandonment and Issuing Certificate in Docket Nos. CP07–13–000 and CP07–15–000. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated below. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory E:\FR\FM\26JAN1.SGM 26JAN1 Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 2, 2007. Magalie R. Salas, Secretary. [FR Doc. E7–1250 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–132–000] Texas Eastern Transmission, LP; Notice of Proposed Changes in FERC Gas Tariff sroberts on PROD1PC70 with NOTICES January 17, 2007. Take notice that on January 12, 2007, Texas Eastern Transmission, LP (Texas Eastern) tendered for filing as a part of its FERC Gas Tariff, Seventh Revised Volume No. 1, the revised tariff sheets listed on Appendix A to the filing, to reflect a corporate identity change effective January 1, 2007. This effective date coincides with the date Texas Eastern’s new parent corporation, Spectra Energy Corp was divested from Texas Eastern’s former parent company, Duke Energy Corporation. Texas Eastern states that copies of its filing have been served upon all affected customers of Texas Eastern and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance VerDate Aug<31>2005 17:19 Jan 25, 2007 Jkt 211001 with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E7–1148 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER07–331–000] TransCanada Energy Marketing, Ltd.; Notice of Issuance of Order January 22, 2006. TransCanada Energy Marketing, Ltd. (TCEM) filed an application for marketbased rate authority, with an accompanying rate schedule. The proposed market-based rate schedule provides for the sale of energy, capacity and ancillary services at market-based rates. TCEM also requested waivers of various Commission regulations. In particular, TCEM requested that the Commission grant blanket approval under 18 CFR Part 34 of all future issuances of securities and assumptions of liability by TCEM. On January 22, 2007, pursuant to delegated authority, the Director, PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 3827 Division of Tariffs and Market Development—West, granted the requests for blanket approval under Part 34. The Director’s order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard or to protest the blanket approvals of issuances of securities or assumptions of liability by TCEM should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protest is February 21, 2007. Absent a request to be heard in opposition by the deadline above, TCEM is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of TCEM, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of TCEM’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, N.E., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https:// www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E7–1239 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 72, Number 17 (Friday, January 26, 2007)]
[Notices]
[Pages 3826-3827]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1250]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-13-001]


Tennessee Gas Pipeline Company; Notice of Compliance Filing

January 22, 2007.
    Take notice that on January 11, 2007, Tennessee Gas Pipeline 
Company (Tennessee) tendered for filing as part of its FERC Gas Tariff, 
Fifth Revised Volume No. 1, the following tariff sheets, with an 
effective date of February 1, 2007: Thirteenth Revised Sheet No. 22.01, 
Fifteenth Revised Sheet No. 23F, Seventh Revised Sheet No. 25A, Fifth 
Revised Sheet No. 367.
    Tennessee states that the filing is being made in compliance with 
the Commission's December 21, 2006 Order Approving Abandonment and 
Issuing Certificate in Docket Nos. CP07-13-000 and CP07-15-000.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before the date as indicated below. Anyone filing a 
protest must serve a copy of that document on all the parties to the 
proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory

[[Page 3827]]

Commission, 888 First Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on February 2, 2007.

Magalie R. Salas,
Secretary.
 [FR Doc. E7-1250 Filed 1-25-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.