Download as PDF sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. p. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. q. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. r. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, and ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. VerDate Aug<31>2005 17:19 Jan 25, 2007 Jkt 211001 s. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E7–1244 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 946–007] Hyrum City; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions January 22, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: A Subsequent License. (Minor Project). b. Project No.: 946–007. c. Date filed: April 28, 2006. d. Applicant: Hyrum City. e. Name of Project: Hyrum City Hydroelectric Project. f. Location: On the Blacksmith Fork River in Hyrum City, Cache County, Utah. The project affects about 17.03 acres of federal lands within the Wasatch Cache National Forest. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Dean Howard, Mayor, Hyrum City 83 West Main Street, Hyrum Utah 84319; (435) 245– 6033, or Ken Tuttle or Mike Wilcox, Sunrise Engineering, Inc., 25 East 500 North, Fillmore, UT 84631; (435) 743– 6151. i. FERC Contact: Gaylord Hoisington, (202) 502–6032 or gaylord.hoisington@FERC.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 3843 The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Comments, recommendations, terms and conditions, and prescriptions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘eFiling’’ link. k. This application has been accepted, and is ready for environmental analysis at this time. l. The existing Hyrum City’s Hydropower Project was initially constructed in 1930–1931, after receiving an original license on November 27, 1929. The project has been licensed since that time with one amendment in 1977, and one renewal in 1981. The current license expires on April 30, 2008. The run-of-river, baseload plant operates on 85-cubic-footper-second of water diverted by a diversion dam located in Blacksmith Fork Canyon. The 3,419-foot-by-passed reach is not de-watered because the flows in the river exceeds the capacity of the plant, and during low flows, Hyrum City operates the plant at less than maximum flow to maintain a continuous flow throughout the river channel for aesthetic enjoyment in the city park that adjoins the powerhouse. The project includes the following constructed facilities: (1) a 15-foot-high, 70-foot-long earth-fill concrete core embankment to the north, a 14-foothigh, 65-foot-long concrete spillway section, a 15-foot-high, 125-foot-long earth-fill concrete core embankment to the north which makes the total length of the dam approximately 260-foot-long; (2) a 16-foot-high, 8-foot-wide concrete intake structure with a 20-foot-high, 8foot-wide trash rack and fish ladder; (3) a 60-inch-diameter concrete penstock inlet with head gate; (4) a 3,470-footlong, 48-inch-diameter concrete penstock going into a 130-foot-long, 42inch-diameter steel penstock; (5) a 37acre-foot de-silting pond; (6) a 26-footwide, 39-foot-long, 20-foot-high brick powerhouse; (7) a 400-kilowatt Leffel horizontal shaft scroll case turbine; (8) a 100-foot, 2.4-kV underground transmission line and; (9) appurtenant facilities. E:\FR\FM\26JAN1.SGM 26JAN1 3844 Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices The average annual generation of the project is approximately 3,083,000 kilowatt-hours and there are no proposed changes to the facilities or the current mode of operation at this time. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Magalie R. Salas, Secretary. [FR Doc. E7–1245 Filed 1–25–07; 8:45 am] sroberts on PROD1PC70 with NOTICES BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2007–0038; FRL–8113–3] ICF, International and Dynamac Corporation and Tetrahedron Staff; Transfer of Data Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: This notice announces that pesticide related information submitted to EPA’s Office of Pesticide Programs (OPP) pursuant to the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Federal Food, Drug, and Cosmetic Act (FFDCA), including information that may have been claimed as Confidential Business Information (CBI) by the submitter, will be transferred to ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff, in accordance with 40 CFR 2.307(h)(3) and 2.308(i)(2). ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff, have been awarded a contract to perform work for OPP, and access to this information will enable ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff, to fulfill the obligations of the contract. DATES: ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff , will be given access to this information on or before January 31, 2007. FOR FURTHER INFORMATION CONTACT: Felicia Croom, Information Technology and Resources Management Division (7502P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460-0001; telephone number: (703) 305-0786; e-mail address: croom.felicia@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? This action applies to the public in general. As such, the Agency has not attempted to describe all the specific entities that may be affected by this action. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. How Can I Get Copies of this Document and Other Related Information? 1. Docket. EPA has established a docket for this action under docket VerDate Aug<31>2005 17:19 Jan 25, 2007 Jkt 211001 PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 identification (ID) number EPA–HQ– OPP–2007–0038. Publicly available docket materials are available either in the electronic docket at https:// www.regulations.gov, or, if only available in hard copy, at the Office of Pesticide Programs (OPP) Regulatory Public Docket in Rm. S-4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. The hours of operation of this Docket Facility are from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The Docket Facility telephone number is (703) 305-5805. 2. Electronic access. You may access this Federal Register document electronically through the EPA Internet under the ‘‘Federal Register’’ listings at https://www.epa.gov/fedrgstr. II. Contractor Requirements Under Contract No. EP-W-06-091, ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff, will perform reviews of toxicology (including acute, chronic, and subchronic), chemistry, human exposure, environmental fate, residue and product chemistry, and ecological data packages to enable OPPs’ Antimicrobials Division (AD) to complete registration and reregistration initiatives. Conduct data research and retrieval of toxicology, chemistry ecological effects, environmental fate and exposure, and human exposure data from databases, as well as scientific databases in support of AD’s reregistration effort. Provide support in the preparation of the final reregistration eligibility decision (RED) draft under the guidance of AD. AD will use the results of these human exposures assessments used in making regulatory decisions, specifically those related to reregistration and special review of antimicrobial pesticides. OPP has determined that access by ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff, to information on all pesticide chemicals is necessary for the performance of this contract. Some of this information may be entitled to confidential treatment. The information has been submitted to EPA under sections 3, 4, 6, and 7 of FIFRA and under sections 408 and 409 of FFDCA. In accordance with the requirements of 40 CFR 2.307(h)(2), the contract with ICF, International and its subcontractor, Dynamac Corporation and Tetrahedron Staff, prohibits use of the information for any purpose not specified in the contract; prohibits disclosure of the information to a third party without prior written approval from the Agency; and requires that each official and E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 72, Number 17 (Friday, January 26, 2007)]
[Notices]
[Pages 3843-3844]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1245]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 946-007]


Hyrum City; Notice of Application Ready for Environmental 
Analysis and Soliciting Comments, Recommendations, Terms and 
Conditions, and Prescriptions

January 22, 2007.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: A Subsequent License. (Minor Project).
    b. Project No.: 946-007.
    c. Date filed: April 28, 2006.
    d. Applicant: Hyrum City.
    e. Name of Project: Hyrum City Hydroelectric Project.
    f. Location: On the Blacksmith Fork River in Hyrum City, Cache 
County, Utah. The project affects about 17.03 acres of federal lands 
within the Wasatch Cache National Forest.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Dean Howard, Mayor, Hyrum City 83 West Main 
Street, Hyrum Utah 84319; (435) 245-6033, or Ken Tuttle or Mike Wilcox, 
Sunrise Engineering, Inc., 25 East 500 North, Fillmore, UT 84631; (435) 
743-6151.
    i. FERC Contact: Gaylord Hoisington, (202) 502-6032 or 
gaylord.hoisington@FERC.gov.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions is 60 days from the issuance of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    All documents (original and eight copies) should be filed with: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Comments, recommendations, terms and conditions, and prescriptions 
may be filed electronically via the Internet in lieu of paper. The 
Commission strongly encourages electronic filings. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov) under the ``e-Filing'' link.
    k. This application has been accepted, and is ready for 
environmental analysis at this time.
    l. The existing Hyrum City's Hydropower Project was initially 
constructed in 1930-1931, after receiving an original license on 
November 27, 1929. The project has been licensed since that time with 
one amendment in 1977, and one renewal in 1981. The current license 
expires on April 30, 2008. The run-of-river, base-load plant operates 
on 85-cubic-foot-per-second of water diverted by a diversion dam 
located in Blacksmith Fork Canyon. The 3,419-foot-by-passed reach is 
not de-watered because the flows in the river exceeds the capacity of 
the plant, and during low flows, Hyrum City operates the plant at less 
than maximum flow to maintain a continuous flow throughout the river 
channel for aesthetic enjoyment in the city park that adjoins the 
powerhouse.
    The project includes the following constructed facilities: (1) a 
15-foot-high, 70-foot-long earth-fill concrete core embankment to the 
north, a 14-foot-high, 65-foot-long concrete spillway section, a 15-
foot-high, 125-foot-long earth-fill concrete core embankment to the 
north which makes the total length of the dam approximately 260-foot-
long; (2) a 16-foot-high, 8-foot-wide concrete intake structure with a 
20-foot-high, 8-foot-wide trash rack and fish ladder; (3) a 60-inch-
diameter concrete penstock inlet with head gate; (4) a 3,470-foot-long, 
48-inch-diameter concrete penstock going into a 130-foot-long, 42-inch-
diameter steel penstock; (5) a 37-acre-foot de-silting pond; (6) a 26-
foot-wide, 39-foot-long, 20-foot-high brick powerhouse; (7) a 400-
kilowatt Leffel horizontal shaft scroll case turbine; (8) a 100-foot, 
2.4-kV underground transmission line and; (9) appurtenant facilities.

[[Page 3844]]

    The average annual generation of the project is approximately 
3,083,000 kilowatt-hours and there are no proposed changes to the 
facilities or the current mode of operation at this time.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.

Magalie R. Salas,
Secretary.
[FR Doc. E7-1245 Filed 1-25-07; 8:45 am]
BILLING CODE 6717-01-P