TransCanada Energy Marketing, Ltd.; Notice of Issuance of Order, 3827 [E7-1239]
Download as PDF
Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 2, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7–1250 Filed 1–25–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–132–000]
Texas Eastern Transmission, LP;
Notice of Proposed Changes in FERC
Gas Tariff
sroberts on PROD1PC70 with NOTICES
January 17, 2007.
Take notice that on January 12, 2007,
Texas Eastern Transmission, LP (Texas
Eastern) tendered for filing as a part of
its FERC Gas Tariff, Seventh Revised
Volume No. 1, the revised tariff sheets
listed on Appendix A to the filing, to
reflect a corporate identity change
effective January 1, 2007. This effective
date coincides with the date Texas
Eastern’s new parent corporation,
Spectra Energy Corp was divested from
Texas Eastern’s former parent company,
Duke Energy Corporation.
Texas Eastern states that copies of its
filing have been served upon all affected
customers of Texas Eastern and
interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
VerDate Aug<31>2005
17:19 Jan 25, 2007
Jkt 211001
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E7–1148 Filed 1–25–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–331–000]
TransCanada Energy Marketing, Ltd.;
Notice of Issuance of Order
January 22, 2006.
TransCanada Energy Marketing, Ltd.
(TCEM) filed an application for marketbased rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. TCEM also requested waivers of
various Commission regulations. In
particular, TCEM requested that the
Commission grant blanket approval
under 18 CFR Part 34 of all future
issuances of securities and assumptions
of liability by TCEM.
On January 22, 2007, pursuant to
delegated authority, the Director,
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
3827
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
TCEM should file a motion to intervene
or protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is February 21, 2007.
Absent a request to be heard in
opposition by the deadline above,
TCEM is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of TCEM, compatible with the
public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of TCEM’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, N.E., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E7–1239 Filed 1–25–07; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 72, Number 17 (Friday, January 26, 2007)]
[Notices]
[Page 3827]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1239]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER07-331-000]
TransCanada Energy Marketing, Ltd.; Notice of Issuance of Order
January 22, 2006.
TransCanada Energy Marketing, Ltd. (TCEM) filed an application for
market-based rate authority, with an accompanying rate schedule. The
proposed market-based rate schedule provides for the sale of energy,
capacity and ancillary services at market-based rates. TCEM also
requested waivers of various Commission regulations. In particular,
TCEM requested that the Commission grant blanket approval under 18 CFR
Part 34 of all future issuances of securities and assumptions of
liability by TCEM.
On January 22, 2007, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development--West, granted the requests
for blanket approval under Part 34. The Director's order also stated
that the Commission would publish a separate notice in the Federal
Register establishing a period of time for the filing of protests.
Accordingly, any person desiring to be heard or to protest the blanket
approvals of issuances of securities or assumptions of liability by
TCEM should file a motion to intervene or protest with the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest is February 21, 2007.
Absent a request to be heard in opposition by the deadline above,
TCEM is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
TCEM, compatible with the public interest, and is reasonably necessary
or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of TCEM's issuance of securities or assumptions of
liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, N.E.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E7-1239 Filed 1-25-07; 8:45 am]
BILLING CODE 6717-01-P