Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices
employee of the contractor sign an
agreement to protect the information
from unauthorized release and to handle
it in accordance with the FIFRA
Information Security Manual. In
addition, ICF, International and its
subcontractor, Dynamac Corporation
and Tetrahedron Staff, are required to
submit for EPA approval a security plan
under which any CBI will be secured
and protected against unauthorized
release or compromise. No information
will be provided to ICF, International
and its subcontractor, Dynamac
Corporation and Tetrahedron Staff, until
the requirements in this document have
been fully satisfied. Records of
information provided to ICF,
International and its subcontractor,
Dynamac Corporation and Tetrahedron
Staff, will be maintained by EPA Project
Officers for this contract. All
information supplied to ICF,
International and its subcontractor,
Dynamac Corporation and Tetrahedron
Staff, by EPA for use in connection with
this contract will be returned to EPA
when ICF, International and its
subcontractor, Dynamac Corporation
and Tetrahedron Staff, have completed
their work.
List of Subjects
Environmental protection, Business
and industry, Government contracts,
Government property, Security
measures.
Dated: January 23, 2007.
Robert A. Forrest,
Acting Director, Office of Pesticide Programs.
[FR Doc. E7–1334 Filed 1–25–07; 8:45 am]
BILLING CODE 6560–50–S
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6683–5]
sroberts on PROD1PC70 with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 7, 2006 (71 FR 17845).
VerDate Aug<31>2005
17:19 Jan 25, 2007
Jkt 211001
Draft EISs
EIS No. 20060298, ERP No. D–AFS–
J61109–CO, Arapahoe Basin 2006
Improvement Plan, Enhancing the
Recreational Experience Addressing
Lifts, Parking, and Terrain Network,
Montezuma Bowl, Implementation,
U.S. Army COE 404 Permit, White
River National Forest, Summit
County, CO
Summary: EPA expressed
environmental concerns about adverse
impacts to high-altitude wetlands and
the lack of sufficient information to
determine whether less damaging
alternatives might exist.
Rating EC2
EIS No. 20060360, ERP No. D–AFS–
L65522–WA, Gifford-Pinchot National
Forest and Columbia River Gorge
National Scenic Area (Washington
Portion) Site-Specific Invasive Plant
Treatment Project, Implementation,
Skamania, Cowlitz, Lewis, Clark,
Klickitat Counties, WA
Summary: EPA does not object to the
proposed project.
Rating LO
EIS No. 20060427, ERP No. D–BLM–
G65101–NM, Special Status Species
Resource Management Plan
Amendment, Managing Public Land
and Federal Minerals in Portions of
Chaves, Eddy, Lea and Roosevelt
Counties, NM
Summary: EPA does not object to the
proposed action as described in the
DEIS.
Rating LO
EIS No. 20060430, ERP No. D–BLM–
J65473–WY, Eagle Butte West Coal
Lease Application, Issuance of Lease
for a Tract of Federal Coal, Wyoming
Powder River Basin, Campbell
County, WY
Summary: EPA expressed
environmental and human health
concerns about the potential for
cumulative air quality impacts to exceed
NAAQS thresholds for PM10. In
addition, we have concerns about the
proximity of the mining operation to
homes and an elementary school. EPA
recommended the FEIS include an
implementation plan for mitigation and
monitoring measures to minimize
exposure to particulates and NO2 for
children at the elementary school.
Rating EC2
EIS No. 20060457, ERP No. D–COE–
G32060–TX, Brazos Harbor
Navigation District Project, Proposed
Port Freeport Channel Widening to
the Entrance and Jetty Reach of the
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
3845
Freeport Harbor Jetty Channel and
Entrance, Brazoria County, TX
Summary: EPA does not object to the
implementation of the preferred
alternative.
Rating LO
EIS No. 20060434, ERP No. DS–AFS7–
L65508–AK, Kenai Winter Access
Project, Updated Information on New
Alternative, Develop a Winter Access
Management Plan for 2006/2007
Winter Season, Implementation,
Seward Ranger District, Chugach
National Forest, Located on the Kenai
Peninsula in South Central, AK
Summary: EPA has no additional
comments on the Supplement to the
Draft EIS.
Rating LO
Final EISs
EIS No. 20060466, ERP No. F–BLM–
J01080–WY, Pit 14 Coal Lease-byApplication Project, Black Butte Coal
Mine, Surface Mining Operations,
Federal Coal Lease Application
WYW160394, Sweetwater County,
WY
Summary: The Final EIS adequately
addressed EPA’s concerns about moving
the coal hopper and quantifying the
mercury content of Black Butte coal in
relation to other WY and U.S. coal.
While mitigation strategies for the
control of fugitive dust from mining
operations and roads were discussed,
we encourage the use of adaptive
management to further reduce fugitive
dust.
EIS No. 20060497, ERP No. F–FRC–
E03015–MS, Clean Energy Liquefied
Natural Gas (LNG) Import Terminal
and Natural Gas Pipeline Facilities,
Construction and Operation, U.S.
Army COE Section 10 and 404
Permits (FERC/EIS–0192D), Port of
Pascagoula, Jackson County, MS
Summary: EPA expressed
environmental concerns about potential
impacts to air quality, and
recommended additional analyses that
fully considers all existing and
proposed air emission sources in the air
quality modeling, as well as the Breton
Class I area visibility study. EPA also
recommended that additional analyses
regarding thermal radiation and
flammable vapor hazard scenarios be
provided to more clearly demonstrate
the conclusion of insignificant risk.
EIS No. 20060519, ERP No. F–AFS–
J65444–MT, Gallatin National Forest,
Proposed Travel Management Plan,
Implementation, Forest Land and
Resource Management, Madison,
E:\FR\FM\26JAN1.SGM
26JAN1
3846
Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices
Gallatin, Park, Meagher, Sweetgrass
and Carbon Counties, MT
Summary: EPA continues to express
environmental concerns about potential
effects to water quality, fisheries,
wildlife and other resources from roads
and motorized uses.
EIS No. 20060529, ERP No. F–AFS–
L65517–0R, Maury Mountains
Allotment Management Plan, To
Implement or Eliminate Livestock
Grazing in Six Allotments in the
Maury Mountains of the Ochoco
National Forest, Prineville, OR
Summary: No formal comment letter
was sent to the preparing agency.
Dated: January 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–1236 Filed 1–25–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–66834]
sroberts on PROD1PC70 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 01/15/2007 Through 1/19/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070012, Final EIS, FHW, CA,
Campus Parkway Project,
Construction of a New Expressway
from Mission Avenue Interchange to
Yosemite Avenue/Lake Road, US
Army COE Section 404 Permit, City of
Merced, Merced County, CA, Wait
Period Ends: 02/26/2007, Contact:
Maiser Khaled 916–498–5020.
EIS No. 20070013, Final EIS, DOE, FL,
Orlando Gasification Project (DOE/
EIS–0383), To Provide Cost-Shared
Funding for Construction, Design, and
Operation a New Plant, Orlando, FL,
Wait Period Ends: 02/26/2007,
Contact: Richard A. Hasgis, Jr. 412–
386–6065.
EIS No. 20070014, Draft EIS, FHW, WI,
WI–15 Expansion, from New London
to Greenville, Funding, US Army COE
404 Permit, Outagamie County, WI,
Comment Period Ends: 03/23/2007,
Contact: Johnny Gerbitz 608–829–
7500.
EIS No. 20070015, Draft EIS, CDB, NY,
East River Waterfront Esplanade and
Piers Project, Revitalization,
Connecting Whitehall Ferry Terminal
VerDate Aug<31>2005
17:19 Jan 25, 2007
Jkt 211001
and Peter Minuit Plaza to East River
Park, Funding New York, NY,
Comment Period Ends: 03/19/2007,
Contact Victor Gallo 212–962–2300.
This document is available on the
Internet at: https://www.renewnyc.com.
EIS No. 20070016, Draft EIS, COE, OH,
Dover Dam Safety Assurance Program
Project, Modifications and Upgrades,
Funding, Muskingum River Basin,
Tscarawas County, OH, Comment
Period Ends: 03/12/2007, Contact:
Rodney Cremeans 304–399–5170.
EIS No. 20070017, Final EIS, NRC, NJ,
GENERIC—License Renewal of
Nuclear Plants (GEIS) Regarding
Oyster Creek Nuclear Generating
Station Supplement 28 to NUREG–
1437, Located adjacent to Barnegat
Bay, Lacy and Ocean Townships,
Ocean County, NJ, Wait Period Ends:
02/26/2007, Contact: Michael Masnik
301–415–191.
EIS No. 20070018, Draft EIS, RUS, MO,
Norborne Baseload Power Plant,
Proposed Construction and Operation
of a 660-megawatt Net Coal-Fired
Power Plant, Carroll County, MO,
Comment Period Ends: 03/12/2007,
Contact: Stephanie A. Strength 202–
720–0468.
Amended Notices
EIS No. 20060500, Draft EIS, AFS, CA,
Little Doe and Low Gulch Timber Sale
Project, Proposes to Harvest
Commercial Timber, Six Rivers
National Forest, Mad River Ranger
District, Trinity County, CA,
Comment Period Ends: 03/12/2007,
Contact: Ruben Escatell 707–574–
6233.
Revision of FR Notice Published 12/
08/2006: Extending Comment Period
from 01/22/2007 to 03/12/2007.
Dated: January 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 07–336 Filed 1–25–07; 8:45 am]
BILLING CODE 6560–50–M
FEDERAL COMMUNICATIONS
COMMISSION
[WT Docket No. 06–220; DA 06–2487]
Joseph W. Hartmann, Jr., Application
for New License in the Amateur Radio
Service
Federal Communications
Commission.
ACTION: Notice.
AGENCY:
SUMMARY: In this document, the
Commission initiates a hearing
proceeding before a Commission
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
Administrative Law Judge to determine
whether an application for a new
license in the Amateur Radio Service
filed by Joseph W. Hartmann, Jr. should
be granted.
DATES: The document was mailed to the
party on December 12, 2006.
ADDRESSES: Federal Communications
Commission, 445 12th St., SW.,
Washington, DC 20554.
FOR FURTHER INFORMATION CONTACT: Gary
Schonman, Enforcement Bureau, at
Gary.Schonman@fcc.gov or (202) 418–
1795 or TTY (202) 418–1152.
SUPPLEMENTARY INFORMATION: This is a
summary of the Hearing Designation
Order in WT Docket No. 06–220, DA
06–2487, adopted and released by the
Commission’s Wireless
Telecommunications Bureau on
December 11, 2006. The full text of this
document is available for inspection
and copying during normal business
hours in the FCC Reference Center, 445
12th Street, SW., Washington, DC
20554. The complete text may be
purchased from the Commission’s copy
contractor, Best Copy and Printing, Inc.,
445 12th Street, SW., Room CY–B402,
Washington, DC 20554. The full text
may also be downloaded at: https://
www.fcc.gov. Alternative formats are
available to persons with disabilities by
sending an e-mail to fcc504@fcc.gov or
by calling the Consumer &
Governmental Affairs Bureau at 202–
418–0530 (voice), 202–418–0432 (tty).
Synopsis of the Order
1. In this Hearing Designation Order
the Commission initiates a hearing
proceeding before a Commission
Administrative Law Judge to determine
whether an application for a new
license in the Amateur Radio Service
filed by Joseph W. Hartmann, Jr. should
be granted. The record before the
Commission suggests that Joseph W.
Hartmann, Jr. of Ohio submitted
fraudulent administrative updates to
obtain the privileges associated with
Amateur Radio Service General Class
License K3GUX that belongs to Joseph
V. Hartman, Sr. of Delaware, which
raises a substantial and material
question of fact as to whether Hartmann,
Jr. possesses the requisite character
qualification to be a Commission
licensee. Because we are unable to make
a determination on the record currently
before us that grant of Hartmann, Jr.’s
application for a new amateur license
would serve the public interest,
convenience, and necessity, we hereby
designate the application for hearing, as
required by 47 U.S.C. 309(e) of the
Communications Act of 1934, as
amended.
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 72, Number 17 (Friday, January 26, 2007)]
[Notices]
[Pages 3845-3846]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1236]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6683-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 7, 2006 (71 FR
17845).
Draft EISs
EIS No. 20060298, ERP No. D-AFS-J61109-CO, Arapahoe Basin 2006
Improvement Plan, Enhancing the Recreational Experience Addressing
Lifts, Parking, and Terrain Network, Montezuma Bowl, Implementation,
U.S. Army COE 404 Permit, White River National Forest, Summit County,
CO
Summary: EPA expressed environmental concerns about adverse impacts
to high-altitude wetlands and the lack of sufficient information to
determine whether less damaging alternatives might exist.
Rating EC2
EIS No. 20060360, ERP No. D-AFS-L65522-WA, Gifford-Pinchot National
Forest and Columbia River Gorge National Scenic Area (Washington
Portion) Site-Specific Invasive Plant Treatment Project,
Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA
Summary: EPA does not object to the proposed project.
Rating LO
EIS No. 20060427, ERP No. D-BLM-G65101-NM, Special Status Species
Resource Management Plan Amendment, Managing Public Land and Federal
Minerals in Portions of Chaves, Eddy, Lea and Roosevelt Counties, NM
Summary: EPA does not object to the proposed action as described in
the DEIS.
Rating LO
EIS No. 20060430, ERP No. D-BLM-J65473-WY, Eagle Butte West Coal Lease
Application, Issuance of Lease for a Tract of Federal Coal, Wyoming
Powder River Basin, Campbell County, WY
Summary: EPA expressed environmental and human health concerns
about the potential for cumulative air quality impacts to exceed NAAQS
thresholds for PM10. In addition, we have concerns about the proximity
of the mining operation to homes and an elementary school. EPA
recommended the FEIS include an implementation plan for mitigation and
monitoring measures to minimize exposure to particulates and
NO2 for children at the elementary school.
Rating EC2
EIS No. 20060457, ERP No. D-COE-G32060-TX, Brazos Harbor Navigation
District Project, Proposed Port Freeport Channel Widening to the
Entrance and Jetty Reach of the Freeport Harbor Jetty Channel and
Entrance, Brazoria County, TX
Summary: EPA does not object to the implementation of the preferred
alternative.
Rating LO
EIS No. 20060434, ERP No. DS-AFS7-L65508-AK, Kenai Winter Access
Project, Updated Information on New Alternative, Develop a Winter
Access Management Plan for 2006/2007 Winter Season, Implementation,
Seward Ranger District, Chugach National Forest, Located on the Kenai
Peninsula in South Central, AK
Summary: EPA has no additional comments on the Supplement to the
Draft EIS.
Rating LO
Final EISs
EIS No. 20060466, ERP No. F-BLM-J01080-WY, Pit 14 Coal Lease-by-
Application Project, Black Butte Coal Mine, Surface Mining Operations,
Federal Coal Lease Application WYW160394, Sweetwater County, WY
Summary: The Final EIS adequately addressed EPA's concerns about
moving the coal hopper and quantifying the mercury content of Black
Butte coal in relation to other WY and U.S. coal. While mitigation
strategies for the control of fugitive dust from mining operations and
roads were discussed, we encourage the use of adaptive management to
further reduce fugitive dust.
EIS No. 20060497, ERP No. F-FRC-E03015-MS, Clean Energy Liquefied
Natural Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities,
Construction and Operation, U.S. Army COE Section 10 and 404 Permits
(FERC/EIS-0192D), Port of Pascagoula, Jackson County, MS
Summary: EPA expressed environmental concerns about potential
impacts to air quality, and recommended additional analyses that fully
considers all existing and proposed air emission sources in the air
quality modeling, as well as the Breton Class I area visibility study.
EPA also recommended that additional analyses regarding thermal
radiation and flammable vapor hazard scenarios be provided to more
clearly demonstrate the conclusion of insignificant risk.
EIS No. 20060519, ERP No. F-AFS-J65444-MT, Gallatin National Forest,
Proposed Travel Management Plan, Implementation, Forest Land and
Resource Management, Madison,
[[Page 3846]]
Gallatin, Park, Meagher, Sweetgrass and Carbon Counties, MT
Summary: EPA continues to express environmental concerns about
potential effects to water quality, fisheries, wildlife and other
resources from roads and motorized uses.
EIS No. 20060529, ERP No. F-AFS-L65517-0R, Maury Mountains Allotment
Management Plan, To Implement or Eliminate Livestock Grazing in Six
Allotments in the Maury Mountains of the Ochoco National Forest,
Prineville, OR
Summary: No formal comment letter was sent to the preparing agency.
Dated: January 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-1236 Filed 1-25-07; 8:45 am]