Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests, 3838-3839 [E7-1165]
Download as PDF
3838
Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E7–1133 Filed 1–25–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application and Soliciting
Comments, Motions To Intervene, and
Protests
sroberts on PROD1PC70 with NOTICES
January 17, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Shoreline
Management Plan.
b. Project No.: 619–134.
c. Date Filed: December 29, 2006.
d. Applicant: Pacific Gas and Electric
Company.
e. Name of Project: Bucks Creek
Hydroelectric Project.
VerDate Aug<31>2005
17:19 Jan 25, 2007
Jkt 211001
f. Location: The project is located on
Bucks Creek and Grizzly Creek,
tributaries of the North Fork Feather
River, in Plumas County, California, and
on lands of the Plumas National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Bill Zemke,
Senior License Coordinator, Pacific Gas
and Electric Company, Mail Code N
11C, P.O. Box 770000, San Francisco,
CA, (415) 973–1646.
i. FERC Contact: Any questions on
this notice should be addressed to
Lesley Kordella at (202) 502–6406, or by
e-mail: lesley.kordella@ferc.gov.
j. Deadline for filing comments and/
or motions: February 19, 2007.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, DHAC,
PJ–12.1, 888 First Street, NE.,
Washington, DC 20426. Please include
the project number (P–619–134) on any
comments or motions filed. Comments,
protests and interventions may be filed
electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the ‘‘eFiling’’ link. The Commission strongly
encourages electronic filings.
k. Description of Proposal: The
licensee submitted a Shoreline
Management Plan (SMP) as required by
article 103. The SMP was developed in
consultation with the Plumas National
Forest, Plumas County, and board
members of the Bucks Lake
Homeowners Association. Its purpose is
to provide guidance for the management
of the shoreline at Bucks Lake. The SMP
addresses shoreline uses and issues
relating to public recreation, shoreline
alteration, vegetation management, and
commercial development. It also
includes rules and regulations for
residential use and boat docking
facilities, and a natural hazard safety
plan.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free 1–866–208–3676, or for TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E7–1137 Filed 1–25–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Transfer of
License, and Soliciting Comments,
Motions To Intervene, and Protests
January 18, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
License.
b. Project No.: 10228–039.
c. Date Filed: December 21, 2006.
d. Applicants: Cannelton
Hydroelectric Project, L.P. (transferor)
and American Municipal Power-Ohio
(Transferee).
E:\FR\FM\26JAN1.SGM
26JAN1
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices
e. Name and Location of Project: The
Cannelton Project is located on the
Cannelton Lock and Dam on the Ohio
River in Hancock County, Kentucky.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicant Contacts: For the
transferor: Donald H. Clarke, Law
Offices of GKRSE, 1500 K Street, NW.,
Washington, DC 20005, (202) 408–5400.
For the transferee: Michael Swiger,
Van Ness Feldman, PC, 1050 Thomas
Jefferson Street, NW., Washington, DC
20007, (202) 298–1891.
h. FERC Contact: Robert Bell at (202)
502–6062.
i. Deadline for filing comments,
protests, and motions to intervene:
February 2, 2007.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application:
Applicants seek Commission approval
to transfer the license for the Cannelton
Project from Cannelton Hydroelectric
Project, L.P. to American Municipal
Power-Ohio.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
Enter the docket number (P–10228–039)
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
VerDate Aug<31>2005
17:19 Jan 25, 2007
Jkt 211001
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, OR ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and eight copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. A copy of any motion to
intervene must also be served upon each
representative of the Applicants
specified in the particular application.
o. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E7–1165 Filed 1–25–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Transfer of
License, and Soliciting Comments,
Motions To Intervene, and Protests
January 18, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
License.
b. Project No.: 6641–068.
c. Date Filed: December 21, 2006.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
3839
d. Applicants: Smithland
Hydroelectric Partner, Ltd and the City
of Marion, Ohio (transferors) and
American Municipal Power-Ohio
(Transferee).
e. Name and Location of Project: The
Smithland Project is located on the
Smithland Lock and Dam on the Ohio
River in Livingston County, Kentucky.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicant Contacts: For the
transferor: Donald H. Clarke, Law
Offices of GKRSE, 1500 K Street, NW.,
Washington, DC 20005, (202) 408–5400.
For the transferee: Michael Swiger,
Van Ness Feldman, PC, 1050 Thomas
Jefferson Street, NW., Washington, DC
20007, (202) 298–1891.
h. FERC Contact: Robert Bell at (202)
502–6062.
i. Deadline for filing comments,
protests, and motions to intervene:
February 2, 2007.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application:
Applicants seek Commission approval
to transfer the license for the Smithland
Project from Smithland Hydroelectric
Partner, Ltd and the City of Marion,
Ohio to American Municipal PowerOhio.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
Enter the docket number (P–6641–068)
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 72, Number 17 (Friday, January 26, 2007)]
[Notices]
[Pages 3838-3839]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1165]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Transfer of License, and Soliciting
Comments, Motions To Intervene, and Protests
January 18, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Transfer of License.
b. Project No.: 10228-039.
c. Date Filed: December 21, 2006.
d. Applicants: Cannelton Hydroelectric Project, L.P. (transferor)
and American Municipal Power-Ohio (Transferee).
[[Page 3839]]
e. Name and Location of Project: The Cannelton Project is located
on the Cannelton Lock and Dam on the Ohio River in Hancock County,
Kentucky.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Applicant Contacts: For the transferor: Donald H. Clarke, Law
Offices of GKRSE, 1500 K Street, NW., Washington, DC 20005, (202) 408-
5400.
For the transferee: Michael Swiger, Van Ness Feldman, PC, 1050
Thomas Jefferson Street, NW., Washington, DC 20007, (202) 298-1891.
h. FERC Contact: Robert Bell at (202) 502-6062.
i. Deadline for filing comments, protests, and motions to
intervene: February 2, 2007.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the Project
Number on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing a document with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the documents on that resource agency.
j. Description of Application: Applicants seek Commission approval
to transfer the license for the Cannelton Project from Cannelton
Hydroelectric Project, L.P. to American Municipal Power-Ohio.
k. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the eLibrary link. Enter the docket number
(P-10228-039) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the addresses in item
g above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and eight
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. A copy of any motion to
intervene must also be served upon each representative of the
Applicants specified in the particular application.
o. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicants.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicants'
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E7-1165 Filed 1-25-07; 8:45 am]
BILLING CODE 6717-01-P