Southwest Power Pool, Inc.; Notice of Filing, 3825 [E7-1163]

Download as PDF Federal Register / Vol. 72, No. 17 / Friday, January 26, 2007 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 6, 2007. Magalie R. Salas, Secretary. [FR Doc. E7–1142 Filed 1–25–07; 8:45 am] Magalie R. Salas, Secretary. [FR Doc. E7–1163 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 2696–000] [Docket No. EL07–6–000] Southwest Power Pool, Inc.; Notice of Filing sroberts on PROD1PC70 with NOTICES January 18, 2007. Take notice that on January 16, 2007, Southwest Power Pool, Inc. filed a response in compliance to the Commission’s order issued October 25, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Aug<31>2005 17:19 Jan 25, 2007 Jkt 211001 Town of Stuyvesant, NY, Albany Engineering Corporation; Notice Establishing Revised Schedule for Filing License Application January 17, 2007. On August 2, 2005, the Commission issued a Notice of Intent to File an Application for a New License for the Stuyvesant Falls Hydroelectric Project.1 The notice established January 31, 2007, as the date for filing the new license application and competing applications. On December 19, 2006, the Town of Stuyvesant and Albany Engineering Corporation, co-licensees for the project, requested an extension of time until January 31, 2009, to file an application. The licensees state that they have been unable to acquire the property rights necessary to access the project site, which they are pursuing in eminent domain proceedings. Thus, they have been unable to complete studies needed to prepare an adequate application. The licensees estimate that inspection and repairs will take between 12 and 18 months to complete after ownership of the project property is conveyed. Approximately one year is reportedly needed to conduct the studies. At least one of the studies, the Instream Flow Incremental Methodology study, requires the project to be in operating condition to be conducted. By letter filed October 26, 2006, the U.S. Fish and Wildlife Service supports extending the deadline. 1 Pursuant to special legislation (sections 315(b) and (d) of Pub. L. 108–137), the project’s original license, which had been surrendered, was reinstated and transferred to Stuyvesant Falls Hydro Corporation and the Town of Stuyvesant Falls, New York, on December 30, 2003. 105 FERC ¶ 62,231 (2003). On December 20, 2006, the Commission approved the transfer of the license to the Town of Stuyvesant Falls and Albany Engineering Corporation. 117 FERC ¶ 62,254 (2006). Noting that the original license had been surrendered prior to the statutory deadline for filing notices of intent to relicense the project, and would be reinstated after the statutory deadline for filing relicensing applications, the order reinstating the license stated that the Commission would issue a special relicensing schedule, which was set forth in the August 2, 2005 notice. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 3825 While the basis for licensees’ request for additional time to file their relicensing application appears reasonable, their requested two-year extension of the filing deadline may not ultimately be required and therefore may unduly delay the relicensing proceeding. Therefore, a one-year extension of the deadline for filing applications (to January 31, 2008) is granted. In order to keep the Commission apprised of the licensees’ progress the licensees must file quarterly progress reports on steps taken to successfully complete the eminent domain proceeding, conduct necessary studies, and file a licensee application (a report is due three-months following the issuance of this notice and every three months thereafter until the licensee’s application is filed). Magalie R. Salas, Secretary. [FR Doc. E7–1136 Filed 1–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EC07–17–000] SUEZ S.A.; SUEZ Energy North America, Inc.; Chehalis Power Generating, LLC; Hot Spring Power Company, LLC; SUEZ Energy Marketing NA, Inc.; Choctaw Gas Generation LLC; Choctaw Generation Limited Partnership; Tractebel Choctaw Operations, Inc.; Hopewell Cogeneration Limited Partnership; Northeast Energy Associates; North Jersey Energy Associates; Northeastern Power Company; Pinetree Power Fitchburg, Inc.; Pinetree Power, Inc.; Pinetree PowerTamworth, Inc.; Ryegate Associates; SUEZ Energy Generation NA, Inc.; Winooski One Partnership; Energy Equipment Leasing LLC; SUEZ–DEGS of Silver Grove, LLC; SUEZ–DEGS of Ashtabula LLC; SUEZ–DEGS of Rochester LLC; SUEZ–DEGS of Tuscola LLC; Colorado-Golden Energy Corporation; Trigen-Nassau Energy Corporation; Colorado Energy Nations Company, LLLP; Revere Energy Corporation; Syracuse Energy Corporation; Viking Energy of Lincoln, Inc.; Viking Energy of McBain, Inc.; Viking Energy of Northumberland A Limited Partnership; Gaz de France SA; Notice of Filing January 19, 2007. Take notice that on January 16, 2007, SUEZ S.A., SUEZ Energy North E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 72, Number 17 (Friday, January 26, 2007)]
[Notices]
[Page 3825]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-1163]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL07-6-000]


Southwest Power Pool, Inc.; Notice of Filing

January 18, 2007.
    Take notice that on January 16, 2007, Southwest Power Pool, Inc. 
filed a response in compliance to the Commission's order issued October 
25, 2006.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on February 6, 2007.

Magalie R. Salas,
Secretary.
 [FR Doc. E7-1163 Filed 1-25-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.