Sara Lee Bakery Goods; Notice of Filing of Self-Certification of Qualifying Status of Cogeneration Facility, 2505-2506 [E7-665]
Download as PDF
Federal Register / Vol. 72, No. 12 / Friday, January 19, 2007 / Notices
2505
Comment Date: 5 pm eastern time on
January 18, 2007.
Comment Date: 5 pm eastern time on
February 5, 2007.
Comment Date: 5 p.m. Eastern Time
on January 17, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7–662 Filed 1–18–07; 8:45 am]
Magalie R. Salas,
Secretary.
[FR Doc. E7–663 Filed 1–18–07; 8:45 am]
Magalie R. Salas,
Secretary.
[FR Doc. E7–664 Filed 1–18–07; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EL07–31–000]
[Docket No. ER07–233–001]
[Docket No. QF06–239–000]
Occidental Power Services, Inc.;
Notice of Filing
DTE Pontiac North LLC; Notice of
Filing
sroberts on PROD1PC70 with NOTICES
January 11, 2007.
Take notice that on January 4, 2007,
DTE Pontiac North LLC filed a request
for declaratory order regarding exempt
wholesale generator status, pursuant to
section 366.1 of the Commission’s
regulations, 18 CFR 366.1 (2006).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
VerDate Aug<31>2005
18:10 Jan 18, 2007
Jkt 211001
Sara Lee Bakery Goods; Notice of
Filing of Self-Certification of Qualifying
Status of Cogeneration Facility
January 11, 2007.
January 11, 2007.
Take notice that on January 10, 2007,
Occidental Power Services, Inc.
tendered for filing an amendment to its
November 17, 2006 rate schedule
amendment filing.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Take notice that on May 19, 2006, as
completed on December 22, 2006, Sara
Lee Bakery Goods filed a notice of selfcertification of qualifying status of a
cogeneration facility, pursuant to 18
CFR 292.207(a) of the Commission’s
regulations.
Take notice that on December 26,
2006, Sara Lee Bakery Goods, 110 Sara
Lee Road, Tarboro, NC 27886 filed with
the Federal Energy Regulatory
Commission a notice of self-certification
of a facility as a qualifying cogeneration
facility pursuant to 18 CFR 292.207(a) of
the Commission’s regulations.
This qualifying cogeneration facility
consists of an 1825 kW packaged diesel
engine generator set operating on #2 fuel
oil. The package is set on concrete pads.
The unit is self-contained, including all
necessary switchgear and controls. The
electricity is generated at 480 V, 3
phase, 60 Hz. The facility is located at
110 Sara Lee Road, Tarboro, NC 27886.
This qualifying facility interconnects
with the Town of Tarboro’s electric
distribution system. The facility will
provide standby power and occasionally
supplementary power to Sara Lee
Bakery Goods.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making filing has determined the
Facility meets the applicable criteria to
be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
E:\FR\FM\19JAN1.SGM
19JAN1
2506
Federal Register / Vol. 72, No. 12 / Friday, January 19, 2007 / Notices
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E7–665 Filed 1–18–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EF07–4081–000]
Southwestern Power Administration,
Robert Douglas Willis Hydropower
Project; Notice of Filing
sroberts on PROD1PC70 with NOTICES
January 11, 2007.
Take notice that on December 22,
2006, the Deputy Secretary, U.S.
Department of Energy, pursuant to the
authority vested on the Deputy
Secretary by sections 301(b), 302(a),
402(e), 641, 642, 643 and 644 of the
Department of Energy Organization Act
(Pub. L. 95–91) and by Delegation Order
Nos. 00–037.00, effective December 6,
2001, and 00–001.00B, effective July 28,
2005, submitted the final confirmation
and approval, on an interim basis, the
annual rate of $815,580 for the sale of
power and energy by the Southwestern
Power Administration from the Robert
Douglas Will Hydropower Project to the
Sam Rayburn Municipal Power Agency,
under Contract No. DE–PM–75–
85SW00117, as amended, effective for
the period of January 1, 2007 through
September 30, 2010. This rate
supersedes the annual rate which was
confirmed and approved on a final basis
by the Commission on June 21, 2006 for
the period of January 1, 2006 through
September 30, 2009, in Docket No.
EF06–4081–000.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
VerDate Aug<31>2005
18:10 Jan 18, 2007
Jkt 211001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm eastern time on
January 22, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E7–661 Filed 1–18–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 1
January 11, 2007.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC06–140–000;
EL06–86–000.
Applicants: E.ON U.S. LLC.
Description: E.ON US LLC’s formal
notice that seeks to join and be included
in the Spare Transformer Sharing
Agreement.
Filed Date: 12/21/2006.
Accession Number: 20070109–0076.
Comment Date: 5 p.m. Eastern Time
on Thursday, January 11, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER98–2782–011.
Applicants: AG-Energy, LP.
Description: Power City Partners, LP
notifies FERC of a change in facts
regarding its upstream ownership.
Filed Date: 01/09/2007.
Accession Number: 20070110–0140.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 30, 2007.
Docket Numbers: ER99–1435–013.
Applicants: Avista Corporation.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Description: Avista Corp submits its
report on activities in the ancillary
services markets conducted pursuant to
FERC Electric Tariff, Volume No. 9.
Filed Date: 01/09/2007.
Accession Number: 20070110–0142.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 30, 2007.
Docket Numbers: ER06–120–002.
Applicants: Duke Power Company
LLC.
Description: Duke Energy Carolinas,
LLC submits Explanatory Statement in
support of Offer of Settlement re Duke
Energy Corporation.
Filed Date: 01/08/2007.
Accession Number: 20070109–0079.
Comment Date: 5 p.m. Eastern Time
on Monday, January 29, 2007.
Docket Numbers: ER07–109–003.
Applicants: BTEC Southaven LLC.
Description: BTEC Southaven, LLC
submits its Third Substitute Original
Sheet No. 2 to its FERC Electric Tariff.
Filed Date: 01/05/2007.
Accession Number: 20070108–0377.
Comment Date: 5 p.m. Eastern Time
on Friday, January 26, 2007.
Docket Numbers: ER07–148–002.
Applicants: San Diego Gas & Electric
Company.
Description: San Diego Gas and
Electric Co submits an errata to the 12/
19/06 submittal of the revised Service
Agreement 18 to FERC Electric Tariff,
Second Revised Volume No. 11
correcting typographic errors.
Filed Date: 01/08/2007.
Accession Number: 20070109–0078.
Comment Date: 5 p.m. Eastern Time
on Monday, January 29, 2007.
Docket Numbers: ER07–174–003.
Applicants: Osceola Windpower, LLC.
Description: Osceola Windpower, LLC
submits an amendment to its marketbased rate tariff to remove the
duplicative provision on the
reassignment of transmission capacity
inadvertently included in the 12/8/06
filing.
Filed Date: 01/05/2007.
Accession Number: 20070108–0255.
Comment Date: 5 p.m. Eastern Time
on Friday, January 26, 2007.
Docket Numbers: ER07–410–001.
Applicants: Oklahoma Gas and
Electric Company.
Description: Oklahoma Gas and
Electric Company submits a cover sheet
canceling Rate Schedule FERC No. 147.
Filed Date: 01/09/2007.
Accession Number: 20070110–0141.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 30, 2007.
Docket Numbers: ER07–412–000.
Applicants: ECP Energy I, LLC.
Description: ECP Energy I, LLC
submits an application for Order
E:\FR\FM\19JAN1.SGM
19JAN1
Agencies
[Federal Register Volume 72, Number 12 (Friday, January 19, 2007)]
[Notices]
[Pages 2505-2506]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-665]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. QF06-239-000]
Sara Lee Bakery Goods; Notice of Filing of Self-Certification of
Qualifying Status of Cogeneration Facility
January 11, 2007.
Take notice that on May 19, 2006, as completed on December 22,
2006, Sara Lee Bakery Goods filed a notice of self-certification of
qualifying status of a cogeneration facility, pursuant to 18 CFR
292.207(a) of the Commission's regulations.
Take notice that on December 26, 2006, Sara Lee Bakery Goods, 110
Sara Lee Road, Tarboro, NC 27886 filed with the Federal Energy
Regulatory Commission a notice of self-certification of a facility as a
qualifying cogeneration facility pursuant to 18 CFR 292.207(a) of the
Commission's regulations.
This qualifying cogeneration facility consists of an 1825 kW
packaged diesel engine generator set operating on 2 fuel oil.
The package is set on concrete pads. The unit is self-contained,
including all necessary switchgear and controls. The electricity is
generated at 480 V, 3 phase, 60 Hz. The facility is located at 110 Sara
Lee Road, Tarboro, NC 27886.
This qualifying facility interconnects with the Town of Tarboro's
electric distribution system. The facility will provide standby power
and occasionally supplementary power to Sara Lee Bakery Goods.
A notice of self-certification does not institute a proceeding
regarding qualifying facility status; a notice of self-certification
provides notice that the entity making filing has determined the
Facility meets the applicable criteria to be a qualifying facility. Any
person seeking to challenge such qualifying facility status may do so
by filing a motion pursuant to 18 CFR 292.207(d)(iii).
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a
[[Page 2506]]
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E7-665 Filed 1-18-07; 8:45 am]