Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, L.P.; Notice of Informational Meetings for the Proposed Jordan Cove LNG and Pacific Connector Gas Pipeline Projects, 1719 [E7-437]

Download as PDF Federal Register / Vol. 72, No. 9 / Tuesday, January 16, 2007 / Notices sroberts on PROD1PC70 with NOTICES Authorization Under Section 204(A) to Issue Short Term Debt and Request for Shortened Notice Period and Expedited Action. Filed Date: 01/08/2007. Accession Number: 20070108–5036. Comment Date: 5 p.m. Eastern Time on Monday, January 22, 2007. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call VerDate Aug<31>2005 15:23 Jan 12, 2007 Jkt 211001 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E7–450 Filed 1–12–07; 8:45 am] BILLING CODE 6717–01–P 1719 along with other related information. For additional information, please contact the Commission’s Office of External Affairs at (202) 502–8004. Magalie R. Salas, Secretary. [FR Doc. E7–437 Filed 1–12–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory [Docket No. PF06–25–000; Docket No. PF06–26–000] [Docket No. CP07–10–000] Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, L.P.; Notice of Informational Meetings for the Proposed Jordan Cove LNG and Pacific Connector Gas Pipeline Projects Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed TL–263 Expansion Project and Request for Comments on Environmental Issues January 8, 2007. The staff of the Federal Energy Regulatory Commission (FERC or Commission) is preparing an environmental assessment (EA) that will describe the impacts of constructing and operating the proposed natural gas pipeline TL–263 Expansion Project (Project) sponsored by Dominion Transmission Inc. (DTI).1 The proposed Project would include the construction, replacement, installation, modification and operation of natural gas pipeline facilities in Boone and Wyoming Counties, West Virginia to increase the capacity, improve the efficiency and maintain the integrity of DTI’s existing natural gas delivery system. Specifically, DTI is seeking authority to undertake the following activities: • Construct approximately 6.43 miles of 12-inch-diameter natural gas pipeline and associated facilities (TL–570); • Replace six 12-inch-diameter pipeline sections along the existing TL– 263 natural gas pipeline (a total of approximately 601 feet of pipeline); • Install overpressure protection; and • Modify the existing Loup Creek Compressor Station. A map indicating the general locations of the proposed Project facilities is provided in Appendix 1.2 Construction of the new 12-inchdiameter natural gas pipeline which would be known as TL–570 would be The staff of the Federal Energy Regulatory Commission (FERC or Commission) is issuing this notice to announce the time, dates, and locations of a series of public informational meetings to discuss the environmental review process for the liquefied natural gas (LNG) import terminal proposed by Jordan Cove Energy Project, L.P. in Coos County, Oregon, and the associated 223mile-long 36-inch-diameter sendout pipeline proposed by Pacific Connector Gas Pipeline, L.P. extending from the LNG terminal, across Coos, Douglas, Jackson, and Klamath Counties, to an interconnection with Pacific Gas and Electric Company facilities near Malin, Oregon. Also participating in the meetings will be staff from agencies that are cooperating with the FERC in the production of an environmental impact statement for the projects, including the U.S. Department of Agriculture Forest Service and the U.S. Department of the Interior Bureau of Land Management. The meetings will all begin promptly at 6:30 p.m., (PST) (doors will open at about 6 p.m. for sign-in), on the dates below at the following locations: Tuesday, January 23, 2007 Umpqua Community College, Campus Center Dining Room/Timber Room, 1140 Umpqua College Rd., Roseburg, OR 97470. 541–440–4600. Wednesday, January 24, 2007 North Bend Community Center, 2222 Broadway St., North Bend, OR 97459. 541– 756–8500. Thursday, January 25, 2007 Red Lion Inn, 200 N. Riverside Ave., Medford, OR 97501. 541–779–5811. These events are posted on the Commission’s calendar located at https:// www.ferc.gov/EventCalendar/EventsList.aspx PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 January 9, 2007. 1 DTI’s application was filed with the Commission under section 7 of the Natural Gas Act and Part 157 of the Commission’s regulations. 2 The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices, other than Appendix 1 (maps), are available on the Commission’s website at the ‘‘eLibrary’’ link or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary refer to the last page of this notice. E:\FR\FM\16JAN1.SGM 16JAN1

Agencies

[Federal Register Volume 72, Number 9 (Tuesday, January 16, 2007)]
[Notices]
[Page 1719]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-437]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF06-25-000; Docket No. PF06-26-000]


Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, 
L.P.; Notice of Informational Meetings for the Proposed Jordan Cove LNG 
and Pacific Connector Gas Pipeline Projects

January 8, 2007.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) is issuing this notice to announce the time, dates, and 
locations of a series of public informational meetings to discuss the 
environmental review process for the liquefied natural gas (LNG) import 
terminal proposed by Jordan Cove Energy Project, L.P. in Coos County, 
Oregon, and the associated 223-mile-long 36-inch-diameter sendout 
pipeline proposed by Pacific Connector Gas Pipeline, L.P. extending 
from the LNG terminal, across Coos, Douglas, Jackson, and Klamath 
Counties, to an interconnection with Pacific Gas and Electric Company 
facilities near Malin, Oregon. Also participating in the meetings will 
be staff from agencies that are cooperating with the FERC in the 
production of an environmental impact statement for the projects, 
including the U.S. Department of Agriculture Forest Service and the 
U.S. Department of the Interior Bureau of Land Management.

    The meetings will all begin promptly at 6:30 p.m., (PST) (doors 
will open at about 6 p.m. for sign-in), on the dates below at the 
following locations:

Tuesday, January 23, 2007

    Umpqua Community College, Campus Center Dining Room/Timber Room, 
1140 Umpqua College Rd., Roseburg, OR 97470. 541-440-4600.

Wednesday, January 24, 2007

    North Bend Community Center, 2222 Broadway St., North Bend, OR 
97459. 541-756-8500.

Thursday, January 25, 2007

    Red Lion Inn, 200 N. Riverside Ave., Medford, OR 97501. 541-779-
5811.
    These events are posted on the Commission's calendar located at 
https://www.ferc.gov/EventCalendar/EventsList.aspx along with other 
related information. For additional information, please contact the 
Commission's Office of External Affairs at (202) 502-8004.

Magalie R. Salas,
Secretary.
 [FR Doc. E7-437 Filed 1-12-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.