GTN states that these substitute tariff
sheets reflect (1) Tariff modifications
which were made subsequent to GTN’s
original filing and (2) the removal of the
costs of facilities that will not be in
service by the end of the test period, as
required by the July 31, 2006 Order.
Suspended sheets that were modified
subsequent to GTN’s original filing are
referenced in Appendix A of GTN’s
motion filing. Sheets that will become
effective without change are referenced
in Appendix C of GTN’s motion filing.
GTN moved to place the sheets in both
Appendix A and C into effect on
January 1, 2007.
GTN further states that a copy of this
filing has been served on GTN’s
jurisdictional customers and interested
state regulatory agencies.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E7–287 Filed 1–11–07; 8:45 am]
15:41 Jan 11, 2007
Federal Energy Regulatory
Commission
[Project No. 2306–098]
Great Bay Hydro Corporation; Notice
Dismissing Rehearing Requests as
Moot
January 5, 2007.
On August 29, 2006, the license for
the Great Bay Hydro Corporation’s
(Great Bay) 4.80-megawatt Clyde River
Hydroelectric Project No. 2306 was
amended to authorize the licensee to
remove from the project boundary
certain impoundments, structures, and
lands and to convey in fee a portion of
the lands to the Vermont Agency of
Natural Resources (ANR), as well as to
convey to the Vermont ANR a
conservation easement on certain lands
remaining within the project boundary.1
On September 28, 2006, Great Bay
and Vermont ANR filed timely requests
for rehearing and or clarification of the
August 29 order. However, upon
consideration of the record in the
proceeding, the August 29 order was
rescinded and the proceeding was
remanded to Commission staff for
further action.2 Accordingly, the
requests for rehearing filed on
September 28, 2006, by Great Bay Hydro
Corporation and by Vermont Agency of
Natural Resources are dismissed as
moot.
Magalie R. Salas,
Secretary.
[FR Doc. E7–286 Filed 1–11–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–51–000]
Gulfstream Natural Gas System, L.L.C.;
Notice of Application
January 5, 2007.
On December 22, 2006, in Docket No.
CP07–51–000, Gulfstream Natural Gas
System, L.L.C. (Gulfstream), pursuant to
section 7(c) of the Natural Gas Act, as
amended, and section 157 Subpart A of
the Federal Energy Regulatory
Commission’s (Commission)
regulations, filed for authorization to
install, construct, own, operate and
maintain certain pipeline facilities,
consisting primarily of the installation
1 See
2 See
BILLING CODE 6717–01–P
VerDate Aug<31>2005
DEPARTMENT OF ENERGY
Jkt 211001
PO 00000
116 FERC ¶ 62,169 (2006).
117 FERC ¶ 61,329 (2006).
Frm 00015
Fmt 4703
Sfmt 4703
of approximately 17.74 miles of 20-inch
diameter pipeline and additional
compression totaling 45,000 horsepower
to be installed at Stations 410 and 420,
as more fully described in the
application ( Phase IV Project).
Gulfstream further requests that the
Commission grant a preliminary
determination on the nonenvironmental aspects of this
Application by May 31, 2007, with a
final order granting the requested
authorizations and related approvals by
September 1, 2007. Gulfstream states
that issuing orders by these dates will
help to ensure that the Phase IV
facilities are available to meet the timing
needs of the Phase IV shipper and to
give the Phase IV shipper and
Gulfstream the economic assurance
needed to go forward with their
respective projects.
Questions concerning the application
should be directed to: P. Martin Teague,
Associate General Counsel at Gulfstream
Natural Gas System, L.L.C., 5400
Westheimer Court, P.O. Box 1642,
Houston, Texas 77251–1642, or by
calling (713) 627–5242.
On November 21, 2006, the
Commission staff granted Gulfstreams’
request to utilize the Pre-Filing process
and assigned Docket No. PF06–29–000
to staff activities involving the Phase IV
Project. As of the filing of this
application on December 29, 2006, the
Pre-Filing Process for this project has
ended. From this time forward,
Gulfstreams’ proceedings will be
conducted in Docket No. CP07–51–000.
Pursuant to Section 157.9 of the
Commission rules, 18 CFR 157.9 and to
ensure compliance with the Energy
Policy Act of 2005, upon completion of
the Commission staff’s environmental
review for Gulfstreams’ proposal, the
environmental document will be placed
into the record on the Commission’s
eLibrary system. The action of the
document’s placement in the record
alerts the other agencies of the
requirement to complete necessary
reviews and authorizations within 90
days of the date of the Commission
staff’s environmental document.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date,
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 72, Number 8 (Friday, January 12, 2007)]
[Notices]
[Page 1500]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-286]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2306-098]
Great Bay Hydro Corporation; Notice Dismissing Rehearing Requests
as Moot
January 5, 2007.
On August 29, 2006, the license for the Great Bay Hydro
Corporation's (Great Bay) 4.80-megawatt Clyde River Hydroelectric
Project No. 2306 was amended to authorize the licensee to remove from
the project boundary certain impoundments, structures, and lands and to
convey in fee a portion of the lands to the Vermont Agency of Natural
Resources (ANR), as well as to convey to the Vermont ANR a conservation
easement on certain lands remaining within the project boundary.\1\
---------------------------------------------------------------------------
\1\ See 116 FERC ] 62,169 (2006).
---------------------------------------------------------------------------
On September 28, 2006, Great Bay and Vermont ANR filed timely
requests for rehearing and or clarification of the August 29 order.
However, upon consideration of the record in the proceeding, the August
29 order was rescinded and the proceeding was remanded to Commission
staff for further action.\2\ Accordingly, the requests for rehearing
filed on September 28, 2006, by Great Bay Hydro Corporation and by
Vermont Agency of Natural Resources are dismissed as moot.
---------------------------------------------------------------------------
\2\ See 117 FERC ] 61,329 (2006).
Magalie R. Salas,
Secretary.