Gulfstream Natural Gas System, L.L.C.; Notice of Application, 1500-1501 [E7-282]

Download as PDF 1500 Federal Register / Vol. 72, No. 8 / Friday, January 12, 2007 / Notices rmajette on PROD1PC67 with NOTICES Third Substitute Ninth Revised Sheet No. 4 Substitute Fourth Revised Sheet No. 5 Substitute Fourth Revised Sheet No. 12 GTN states that these substitute tariff sheets reflect (1) Tariff modifications which were made subsequent to GTN’s original filing and (2) the removal of the costs of facilities that will not be in service by the end of the test period, as required by the July 31, 2006 Order. Suspended sheets that were modified subsequent to GTN’s original filing are referenced in Appendix A of GTN’s motion filing. Sheets that will become effective without change are referenced in Appendix C of GTN’s motion filing. GTN moved to place the sheets in both Appendix A and C into effect on January 1, 2007. GTN further states that a copy of this filing has been served on GTN’s jurisdictional customers and interested state regulatory agencies. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E7–287 Filed 1–11–07; 8:45 am] 15:41 Jan 11, 2007 Federal Energy Regulatory Commission [Project No. 2306–098] Great Bay Hydro Corporation; Notice Dismissing Rehearing Requests as Moot January 5, 2007. On August 29, 2006, the license for the Great Bay Hydro Corporation’s (Great Bay) 4.80-megawatt Clyde River Hydroelectric Project No. 2306 was amended to authorize the licensee to remove from the project boundary certain impoundments, structures, and lands and to convey in fee a portion of the lands to the Vermont Agency of Natural Resources (ANR), as well as to convey to the Vermont ANR a conservation easement on certain lands remaining within the project boundary.1 On September 28, 2006, Great Bay and Vermont ANR filed timely requests for rehearing and or clarification of the August 29 order. However, upon consideration of the record in the proceeding, the August 29 order was rescinded and the proceeding was remanded to Commission staff for further action.2 Accordingly, the requests for rehearing filed on September 28, 2006, by Great Bay Hydro Corporation and by Vermont Agency of Natural Resources are dismissed as moot. Magalie R. Salas, Secretary. [FR Doc. E7–286 Filed 1–11–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–51–000] Gulfstream Natural Gas System, L.L.C.; Notice of Application January 5, 2007. On December 22, 2006, in Docket No. CP07–51–000, Gulfstream Natural Gas System, L.L.C. (Gulfstream), pursuant to section 7(c) of the Natural Gas Act, as amended, and section 157 Subpart A of the Federal Energy Regulatory Commission’s (Commission) regulations, filed for authorization to install, construct, own, operate and maintain certain pipeline facilities, consisting primarily of the installation 1 See 2 See BILLING CODE 6717–01–P VerDate Aug<31>2005 DEPARTMENT OF ENERGY Jkt 211001 PO 00000 116 FERC ¶ 62,169 (2006). 117 FERC ¶ 61,329 (2006). Frm 00015 Fmt 4703 Sfmt 4703 of approximately 17.74 miles of 20-inch diameter pipeline and additional compression totaling 45,000 horsepower to be installed at Stations 410 and 420, as more fully described in the application ( Phase IV Project). Gulfstream further requests that the Commission grant a preliminary determination on the nonenvironmental aspects of this Application by May 31, 2007, with a final order granting the requested authorizations and related approvals by September 1, 2007. Gulfstream states that issuing orders by these dates will help to ensure that the Phase IV facilities are available to meet the timing needs of the Phase IV shipper and to give the Phase IV shipper and Gulfstream the economic assurance needed to go forward with their respective projects. Questions concerning the application should be directed to: P. Martin Teague, Associate General Counsel at Gulfstream Natural Gas System, L.L.C., 5400 Westheimer Court, P.O. Box 1642, Houston, Texas 77251–1642, or by calling (713) 627–5242. On November 21, 2006, the Commission staff granted Gulfstreams’ request to utilize the Pre-Filing process and assigned Docket No. PF06–29–000 to staff activities involving the Phase IV Project. As of the filing of this application on December 29, 2006, the Pre-Filing Process for this project has ended. From this time forward, Gulfstreams’ proceedings will be conducted in Docket No. CP07–51–000. Pursuant to Section 157.9 of the Commission rules, 18 CFR 157.9 and to ensure compliance with the Energy Policy Act of 2005, upon completion of the Commission staff’s environmental review for Gulfstreams’ proposal, the environmental document will be placed into the record on the Commission’s eLibrary system. The action of the document’s placement in the record alerts the other agencies of the requirement to complete necessary reviews and authorizations within 90 days of the date of the Commission staff’s environmental document. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A E:\FR\FM\12JAN1.SGM 12JAN1 rmajette on PROD1PC67 with NOTICES Federal Register / Vol. 72, No. 8 / Friday, January 12, 2007 / Notices person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link at https://www.ferc.gov. The Commission strongly encourages intervenors to file electronically. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 31, 2007. Magalie R. Salas, Secretary. [FR Doc. E7–282 Filed 1–11–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 15:41 Jan 11, 2007 Jkt 211001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP07–57–000, CP97–238–012, RP04–360–009] 1501 docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 16, 2007. Maritimes & Northeast Pipeline L.L.C., Portland Natural Gas Transmission System; Notice of Filing Magalie R. Salas, Secretary. [FR Doc. E7–283 Filed 1–11–07; 8:45 am] January 5, 2007. BILLING CODE 6717–01–P Take notice that on December 18, 2006, Maritimes & Northeast Pipeline L.L.C. and Portland Natural Gas Transmission System (Settling Parties) submitted a Settlement Agreement for Commission approval. The principal effect of the Settlement Agreement is to modify certain agreements between the Settling Parties relating to their ownership of certain jointly-owned facilities approved by the Commission in a November 4, 1997 order.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed 1 Maritimes & Northeast Pipeline, L.L.C. and Portland Natural Gas Transmission System, 80 FERC ¶ 61,136, order on reh’g and approving agreements, 81 FERC ¶ 61,166 (1997). PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP99–176–121] Natural Gas Pipeline Company of America; Notice Of Negotiated Rate January 5, 2007. Take notice that on December 28, 2006, Natural Gas Pipeline Company of America (Natural) tendered for filing Amendment No. 1 dated December 8, 2006 to Transportation Rate Schedule FTS Agreement dated September 26, 2005, to be effective January 1, 2007. Natural states that the purpose of this filing is to implement an amendment to an existing negotiated rate agreement entered into by Natural and Nicor Gas Company under Natural’s Rate Schedule FTS and Section 49 of the General Terms and Conditions of its Tariff. Natural states that copies of the filing are being mailed to all parties set out on the Commission’s official service list in Docket No. RP99–176. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the E:\FR\FM\12JAN1.SGM 12JAN1

Agencies

[Federal Register Volume 72, Number 8 (Friday, January 12, 2007)]
[Notices]
[Pages 1500-1501]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-282]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-51-000]


Gulfstream Natural Gas System, L.L.C.; Notice of Application

January 5, 2007.
    On December 22, 2006, in Docket No. CP07-51-000, Gulfstream Natural 
Gas System, L.L.C. (Gulfstream), pursuant to section 7(c) of the 
Natural Gas Act, as amended, and section 157 Subpart A of the Federal 
Energy Regulatory Commission's (Commission) regulations, filed for 
authorization to install, construct, own, operate and maintain certain 
pipeline facilities, consisting primarily of the installation of 
approximately 17.74 miles of 20-inch diameter pipeline and additional 
compression totaling 45,000 horsepower to be installed at Stations 410 
and 420, as more fully described in the application ( Phase IV 
Project). Gulfstream further requests that the Commission grant a 
preliminary determination on the non-environmental aspects of this 
Application by May 31, 2007, with a final order granting the requested 
authorizations and related approvals by September 1, 2007. Gulfstream 
states that issuing orders by these dates will help to ensure that the 
Phase IV facilities are available to meet the timing needs of the Phase 
IV shipper and to give the Phase IV shipper and Gulfstream the economic 
assurance needed to go forward with their respective projects.
    Questions concerning the application should be directed to: P. 
Martin Teague, Associate General Counsel at Gulfstream Natural Gas 
System, L.L.C., 5400 Westheimer Court, P.O. Box 1642, Houston, Texas 
77251-1642, or by calling (713) 627-5242.
    On November 21, 2006, the Commission staff granted Gulfstreams' 
request to utilize the Pre-Filing process and assigned Docket No. PF06-
29-000 to staff activities involving the Phase IV Project. As of the 
filing of this application on December 29, 2006, the Pre-Filing Process 
for this project has ended. From this time forward, Gulfstreams' 
proceedings will be conducted in Docket No. CP07-51-000.
    Pursuant to Section 157.9 of the Commission rules, 18 CFR 157.9 and 
to ensure compliance with the Energy Policy Act of 2005, upon 
completion of the Commission staff's environmental review for 
Gulfstreams' proposal, the environmental document will be placed into 
the record on the Commission's eLibrary system. The action of the 
document's placement in the record alerts the other agencies of the 
requirement to complete necessary reviews and authorizations within 90 
days of the date of the Commission staff's environmental document.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date, file with the Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426, a motion to 
intervene in accordance with the requirements of the Commission's Rules 
of Practice and Procedure (18 CFR 385.214 or 385.211) and the 
Regulations under the NGA (18 CFR 157.10). A

[[Page 1501]]

person obtaining party status will be placed on the service list 
maintained by the Secretary of the Commission and will receive copies 
of all documents filed by the applicant and by all other parties. A 
party must submit 14 copies of filings made with the Commission and 
must mail a copy to the applicant and to every other party in the 
proceeding. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding. However, a person does not have to 
intervene in order to have comments considered.
    The second way to participate is by filing with the Secretary of 
the Commission, as soon as possible, an original and two copies of 
comments in support of or in opposition to this project. The Commission 
will consider these comments in determining the appropriate action to 
be taken, but the filing of a comment alone will not serve to make the 
filer a party to the proceeding. The Commission's rules require that 
persons filing comments in opposition to the project provide copies of 
their protests only to the party or parties directly involved in the 
protest.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link at https://www.ferc.gov. The Commission strongly encourages 
intervenors to file electronically. Persons unable to file 
electronically should submit an original and 14 copies of the protest 
or intervention to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on January 31, 2007.

Magalie R. Salas,
Secretary.
[FR Doc. E7-282 Filed 1-11-07; 8:45 am]
BILLING CODE 6717-01-P