Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update to Materials Incorporated by Reference, 200-245 [E6-22284]

Download as PDF 200 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [PA200–4201; FRL–8249–6] Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update to Materials Incorporated by Reference Environmental Protection Agency (EPA). ACTION: Final rule; Notice of administrative change. sroberts on PROD1PC70 with RULES AGENCY: SUMMARY: EPA is updating the materials submitted by Pennsylvania that are incorporated by reference (IBR) into the State implementation plan (SIP). The regulations affected by this update have been previously submitted by the Pennsylvania Department of Environmental Protection and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, DC, and the Regional Office. EFFECTIVE DATE: This action is effective January 3, 2007. ADDRESSES: SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and Radiation Docket and Information Center, EPA Headquarters Library, Room Number 3334, EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566– 1742; or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: https://www.archives.gov/ federal_register/ code_of_federal_regulations/ ibr_locations.html. FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814–2108 or by e-mail at frankford.harold@epa.gov. SUPPLEMENTARY INFORMATION: The SIP is a living document which the State revises as necessary to address the unique air pollution problems. Therefore, EPA, from time to time must VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference Federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and ‘‘Identification of plan’’ format are discussed in further detail in the May 22, 1997 Federal Register document. On February 25, 2005 (70 FR 9450), EPA published a Federal Register beginning the new IBR procedure for Pennsylvania. In this document, EPA is doing the following: 1. Announcing the update to the IBR material as of November 1, 2006. 2. Making corrections to the following entries listed in the paragraph 52.2020(c)(1) chart, as described below: a. Title 25, Sections 121.1 and 145.42—In the ‘‘Additional explanation/ § 52.2063 citation’’ column, text is added referring to the SIP-effective date of the revised rules. b. Title 25, Sections 129.201 through 129.205 and Chapter 145, subsections B and C—In the ‘‘Additional explanation/ § 52.2063 citation’’ column, text is added referring to the SIP-effective date of the new rules. c. Title 25, Sections 129.54, 129.59, 129.60, 129.61, and 129.68—In the ‘‘EPA approval date’’ column, the EPA approval date and Federal Register page citation are revised. d. Title 25, Chapter 130, Subchapters A and B—In the ‘‘Additional explanation/§ 52.2063 citation’’ column, the text referring to the SIP-effective date is removed from all entries. e. Title 67, Chapters 175 and 177—In the State citation column, the word ‘‘Section’’ is added before all numerical entries. 3. Making corrections to the paragraph 52.2020(d)(1) chart, as described below: a. The title of the second column is revised from ‘‘Permit no.’’ to ‘‘Permit number.’’ b. Entry for the Hercules Cement Company—The permit number is revised. Pennsylvania Power and Light Co. (PP&L)–Montour—The permit number is revised. c. Entries for the Tennessee Gas Pipeline Company, Stations 321 and 219–In the ‘‘Additional explanation/ § 52.2063 citation’’ column, the text referring to the SIP-effective date is removed. d. Entry for the Tennessee Gas Pipeline Corporation—Buck Township—The entry in the ‘‘Name of PO 00000 Frm 00002 Fmt 4701 Sfmt 4700 source’’ column is revised to read, ‘‘Transcontinental Gas Pipeline Corporation-Buck Township.’’ e. Entry for Alcoa Extrusion, Inc.— The state effective date is revised. f. Entry for Stoney Creek Technologies, LLC—The permit number is revised. g. Entry for Texas Eastern Transmission Corporation (Dauphin County)—The permit number is revised. h. Entry for United Refining Company—The state effective date is revised. i. Entries for Waste Management Disposal Services of Pennsylvania (Pottstown Landfill), Waste Management Disposal Services of PA, Inc., and Armstrong World Industries, Inc.—The citation in the ‘‘Additional explanation/§ 52.2063 citation’’ column is revised. 4. Making corrections to the following entries listed in the paragraph 52.2020(e)(1) chart, as described below: a. Entry for Mobile Budgets for Post1996 and 2005 attainment plans for the Philadelphia-Wilmington-Trenton 1– Hour Ozone Nonattaiment Area—The revised entry adds a date and Federal Register citation, inadvertently omitted in the February 25, 2005 Federal Register document, in which EPA approved revisions to these mobile budgets. b. Entry for Ozone Maintenance Plan, Reading Area (Berks County)—The revised entry adds a date and Federal Register citation, inadvertently omitted in the February 25, 2005 Federal Register document, in which EPA approved revisions to this ozone maintenance plan. EPA has determined that today’s rule falls under the ‘‘good cause’’ exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon finding ‘‘good cause,’’ authorizes agencies to dispense with public participation, and section 553(d)(3) which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). Today’s rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are ‘‘impractical, unnecessary, or contrary to the public interest.’’ Public comment is ‘‘unnecessary’’ and ‘‘contrary to the public interest’’ since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries. E:\FR\FM\03JAR2.SGM 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations III. Statutory and Executive Order Reviews sroberts on PROD1PC70 with RULES A. General Requirements Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a ‘‘significant regulatory action’’ and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, ‘‘Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use’’ (66 FR 28355, May 22, 2001). This action merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves pre-existing requirements under state law and does not impose any additional enforceable duty beyond that required by state law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Public Law 104–4). This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a Federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 ‘‘Protection of Children from Environmental Health Risks and Safety Risks’’ (62 FR 19885, April 23, 1997), because it is not economically significant. In reviewing SIP submissions, EPA’s role is to approve VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). B. Submission to Congress and the Comptroller General The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). C. Petitions for Judicial Review EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Pennsylvania SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this ‘‘Identification of plan’’ reorganization update action for Pennsylvania. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, PO 00000 Frm 00003 Fmt 4701 Sfmt 4700 201 Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: November 21, 2006. William T. Wisniewski, Acting Regional Administrator, Region III. I 40 CFR part 52 is amended as follows: PART 52—[AMENDED] 1. The authority for citation for part 52 continues to read as follows: I Authority: 42.U.S.C. 7401 et seq. Subpart NN—Pennsylvania 2. Section 52.2020 is amended by revising paragraphs (b), (c), (d), and (e) to read as follows: I § 52.2020 Identification of plan. * * * * * (b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after November 1, 2006 will be incorporated by reference in the next update to the SIP compilation. (2) EPA Region III certifies that the rules/regulations provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/ regulations which have been approved as part of the State implementation plan as of November 1, 2006. (3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103; the EPA, Air and Radiation Docket and Information Center, EPA West Building, 1301 Constitution Avenue, NW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: https://www.archives.gov/ federal_register/ code_of_federal_regulations/ ibr_locations.html. (c) EPA-Approved Regulations E:\FR\FM\03JAR2.SGM 03JAR2 202 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS State citation State effective date Title/subject EPA approval date Additional explanation/§ 52.2063 citation Title 25.—Environmental Protection Article III.—Air Resources Chapter 121—General Provisions Section 121.1 ................. Definitions .......................................... 12/11/04 9/29/06, 71 FR 57428 ... Section 121.2 ................. Section 121.3 ................. Section 121.4 ................. 3/20/72 3/20/72 5/23/92 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... 12/22/94, 59 FR 65971 Section 121.7 ................. Section 121.8 ................. Purpose ............................................. Applicability ........................................ Regional Organization of the Department. Prohibition of Air Pollution ................. Compliance responsibilities ............... 3/20/72 8/13/77 5/31/72, 37 FR 10842 ... 12/17/79, 44 FR 73031 Section 121.9 ................. Section 121.10 ............... Section 121.11 ............... Circumvention .................................... Existing orders ................................... Severability clause ............................ 3/20/72 3/20/72 3/20/72 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... Revised; SIP-effective date is 10/30/ 06. (c)(1). (c)(1). (c)(94). (c)(1). (c)(21); correction published 8/22/80, (45 FR 56060). (c)(1). (c)(1). (c)(1); no longer in PA DEP rules. Chapter 123—Standards for Contaminants Fugitive Emissions Section 123.1(a) through (c). Section 123.2 ................. Prohibition of certain fugitive emissions. Fugitive particulate matter ................. 8/29/77 12/17/79, 44 FR 73031 8/13/83 7/27/84, 49 FR 30183 ... (c)(21); Paragraph 123.1(d) is not in the SIP. (c)(60). Particulate Matter Emissions Section 123.11 ............... Appendix A [Graph] ....... Section 123.12 ............... Section 123.13(a) through (c). Appendix B [Graph] ....... Appendix C [Graph] ....... Combustion units ............................... Particulate Matter—Combustion Units. Incinerators ........................................ Processes .......................................... Particulate Matter—Processes Listed in Table 1. Particulate Matter—Processes Not Listed in Table 1. 3/20/72 3/20/72 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... (c)(1). (c)(1). 3/20/72 8/27/80 5/31/72, 37 10842 ......... 11/13/81, 46 FR 55971 3/20/72 5/31/72, 37 FR 10842 ... (c)(1). (c)(39); paragraph 123.13(d) is not in the SIP. (c)(1). 3/20/72 5/31/72, 37 FR 10842 ... (c)(1). Sulfur Compound Emissions Section 123.21 ............... Section 123.22 ............... 3/20/72 3/20/72 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... (c)(1). (c)(1). Section 123.22(a) .......... General .............................................. Combustion units [General provisions—air basins and non-air basins]. Combustion units—non air basins .... 8/1/79 8/18/81, 46 FR 43423 ... Section 123.22(b) .......... Combustion units—Erie Air Basin ..... 8/1/79 Section 123.22(c) ........... Combustion units—Southeast PA Air Basin. Combustion units—Upper Beaver Valley Air Basin. Combustion units—Lower Beaver Valley Air Basin. Sulfur Oxides—Combustion Units ..... Primary zinc smelters ........................ Monitoring requirements .................... 10/1/78 8/8/79, ............................ 44 FR 46465 ................. 6/4/79, 44 FR 31980 ..... (c)(36); approved as part of the control strategy for the Armstrong County sulfur dioxide nonattainment area. (c)(20); correction published 1/23/80, (45 FR 5303). (c)(18). 8/21/82 7/5/83, 48 FR 30630 ..... (c)(53). 12/16/81, 46 FR 61267 (c)(40). 5/31/72, 37 FR 10842 ... 4/30/76, 41 FR 18077 ... 6/30/93, 58 FR 34911 ... (c)(1). (c)(14). (c)(81). Section 123.22(c) ........... Section 123.22(d) .......... Figure 4 [Graph] ............ Section 123.24 ............... Section 123.25 ............... 1/1/81 3/20/72 8/11/75 10/27/90 sroberts on PROD1PC70 with RULES Odor Emissions Section 123.31 ............... Limitations ......................................... 3/20/72 5/31/72, 37 FR 10842 ... (c)(1); SIP version of Section 123.31 is different from State version. Visible Emissions Section 123.41 ............... VerDate Aug<31>2005 Limitations ......................................... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00004 3/20/72 Fmt 4701 5/31/72, 37 FR 10842 ... Sfmt 4700 E:\FR\FM\03JAR2.SGM (c)(1). 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 203 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject EPA approval date Additional explanation/§ 52.2063 citation Section 123.42 (Except 123.42(4). Exceptions ......................................... 3/20/72 5/31/72, 37 FR 10842 ... Section 123.43 ............... Section 123.44 ............... Measuring Techniques ...................... Limitations of visible fugitive air contaminants from operation of any coke oven battery. Alternative opacity limitations ............ Alternate Opacity Limitation—Application. Monitoring requirements .................... 3/20/72 12/27/97 5/31/72, 37 FR 10842 ... 6/11/02, 67 FR 39854 ... (c)(1); Paragraph is paragraph declared not 123.42(4)) in SIP at (c)(21). (c)(1). (c)(189). 6/20/81 6/20/81 1/19/83, 48 FR 2319 ..... 1/19/83, 48 FR 2319 ..... (c)(48). (c)(48). 6/20/81 1/19/83, 48 FR 2319 ..... (c)(48). Section 123.45 ............... Appendix D [Chart] ........ Section 123.46 ............... Nitrogen Compound Emissions Section 123.51 ............... Monitoring requirements .................... 10/20/90 9/23/92, 57 FR 43905 ... (c)(74). NOX Allowance Requirements Section 123.101 ............. Section 123.102 ............. Section 123.103 ............. Section 123.104 ............. Section Section Section Section 123.105 123.106 123.107 123.108 ............. ............. ............. ............. Section 123.109 ............. Section 123.110 ............. Section 123.111 ............. Section 123.112 ............. Section 123.113 ............. Section 123.114 ............. Section 123.115 ............. Section 123.116 ............. Section 123.117 ............. Section 123.118 ............. Section 123.119 ............. Section 123.120 ............. Appendix E [Chart] ........ Purpose ............................................. Source NOX allowance requirements and NOX allowance control period. General NOX allowance provisions ... Source authorized account representative requirements. NATS provisions ................................ NOX allowance transfer protocol ....... NOX allowance transfer procedures Source emissions monitoring requirements. Source emissions reporting requirements. Source compliance requirements ...... Failure to meet source compliance requirements. Source operating permit provision requirements. Source recordkeeping requirements General NOX allocation provisions ... Initial NOX allowance NOX allocations. Source opt-in provisions .................... New NOX affected source provisions Emission reduction credit provisions Bonus NOX allowance awards .......... Audit .................................................. Appendix E [NOX Allowances Chart] 11/1/97 11/1/97 6/6/00, 65 FR 35840 ..... 6/6/00, 65 FR 35840 ..... (c)(145). (c)(145). 11/1/97 11/1/97 6/6/00, 65 FR 35840 ..... 6/6/00, 65 FR 35840 ..... (c)(145). (c)(145). 11/1/97 11/1/97 11/1/97 11/1/97 6/6/00, 6/6/00, 6/6/00, 6/6/00, ..... ..... ..... ..... (c)(145). (c)(145). (c)(145). (c)(145). 11/1/97 6/6/00, 65 FR 35840 ..... (c)(145). 11/1/97 11/1/97 6/6/00, 65 FR 35840 ..... 6/6/00, 65 FR 35840 ..... (c)(145). (c)(145). 11/1/97 6/6/00, 65 FR 35840 ..... (c)(145). 11/1/97 11/1/97 3/11/00 6/6/00, 65 FR 35840 ..... 6/6/00, 65 FR 35840 ..... 6/6/00, 65 FR 35840 ..... (c)(145). (c)(145). (c)(145). 11/1/97 11/1/97 11/1/97 11/1/97 11/1/97 3/11/00 6/6/00, 6/6/00, 6/6/00, 6/6/00, 6/6/00, 6/6/00, ..... ..... ..... ..... ..... ..... (c)(145). (c)(145). (c)(145). (c)(145). (c)(145). (c)(145). 12/17/99, 64 FR 70589 2/17/99, 64 FR 70589 ... 12/17/99, 64 FR 70589 12/17/99, 64 FR 70589 (c)(142). (c)(142). (c)(142). (c)(142). 65 65 65 65 65 65 65 65 65 65 FR FR FR FR FR FR FR FR FR FR 35840 35840 35840 35840 35840 35840 35840 35840 35840 35840 Chapter 126—Standard for Motor Fuels Subchapter A.—Oxygenate Content of Gasoline Section Section Section Section 126.101 126.102 126.103 126.104 ............. ............. ............. ............. General .............................................. Sampling and testing ......................... Recordkeeping and reporting ............ Labeling requirements ....................... 8/19/95 8/19/95 8/19/95 8/19/95 Subchapter C.—Gasoline Volatility Requirements sroberts on PROD1PC70 with RULES Section 126.301 (a) through (c). Section 126.302 (Except Paragraph (a)(6) pertaining to RFG). Section 126.303(a) ........ Compliant fuel requirement ............... 11/1/97 6/8/98, 63 FR 31116 ..... (c)(131). Recordkeeping and reporting ............ 11/1/97 6/8/98, 63 FR 31116 ..... (c)(131). Compliance and test methods .......... 11/1/97 6/8/98, 63 FR 31116 ..... (c)(131). Subchapter D.—Motor Vehicle Emissions Control Program General Provisions Section 126.401 ............. VerDate Aug<31>2005 Purpose ............................................. 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00005 12/5/98 Fmt 4701 12/28/99, 64 FR 72564 Sfmt 4700 E:\FR\FM\03JAR2.SGM (c)(141)(i)(C). 03JAR2 204 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State effective date State citation Title/subject Section 126.402 ............. NLEV scope and applicability ........... 12/5/98 Additional explanation/§ 52.2063 citation EPA approval date 12/28/99, 64 FR 72564 (c)(141)(i)(C). Pennsylvania Clean Vehicles Program Section 126.411 ............. Section 126.412 ............. Section 126.413 ............. General requirements ........................ Emission requirements ...................... Exemptions ........................................ 12/5/98 12/5/98 12/5/98 12/28/99, 64 FR 72564 12/28/99, 64 FR 72564 12/28/99, 64 FR 72564 (c)(141)(i)(C). (c)(141)(i)(C). (c)(141)(i)(C). Applicable Motor Vehicle Testing Section 126.421 ............. Section 126.422 ............. Section 126.423 ............. Section 126.424 ............. Section 126.425 ............. New motor vehicle certification testing. New motor vehicle compliance testing. Assembly line testing ........................ In-use motor vehicle enforcement testing. In-use surveillance testing ................. 12/5/98 12/28/99, 64 FR 72564 (c)(141)(i)(C). 12/5/98 12/28/99, 64 FR 72564 (c)(141)(i)(C). 12/5/98 12/5/98 12/28/99, 64 FR 72564 12/28/99, 64 FR 72564 (c)(141)(i)(C). (c)(141)(i)(C). 12/5/98 12/28/99, 64 FR 72564 (c)(141)(i)(C). Motor Vehicle Manufacturers’s Obligations Section 126.431 ............. Section 126.432 ............. Warranty and recall ........................... Reporting requirements ..................... 12/5/98 12/5/98 12/28/99, 64 FR 72564 12/28/99, 64 FR 72564 (c)(141)(i)(C). (c)(141)(i)(C). Motor Vehicle Dealer Responsibilities Section 126.441 ............. Responsibilities dealers. of motor vehicle 12/5/98 12/28/99, 64 FR 72564 (c)(141)(i)(C). Chapter 127—Construction, Modification, Reactivation, and Operation of Sources Subchapter A.—General Section 127.1 ................. Section 127.3 ................. Purpose ............................................. Operational flexibility ......................... 11/26/94 11/26/94 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). (c)(110)(i)(C). Subchapter B.—Plan Approval Requirements Section Section Section Section Section Section Section Section Section Section 127.11 ............... 127.11a. ............ 127.12 ............... 127.12a ............. 127.12b ............. 127.12c ............. 127.13 ............... 127.13a ............. 127.13b ............. 127.13c ............. Section Section Section Section 127.14 127.25 127.32 127.35 ............... ............... ............... ............... sroberts on PROD1PC70 with RULES Section 127.36 ............... Section Section Section Section Section Section Section Section 127.44 127.45 127.46 127.47 127.48 127.49 127.50 127.51 ............... ............... ............... ............... ............... ............... ............... ............... Plan approval requirements .............. Reactivation of sources ..................... Content of applications ...................... Compliance review ............................ Plan approval terms and conditions .. Plan approval reporting requirements Extensions ......................................... Plan approval changes for cause ..... Denial of Plan approval application .. Notice of basis for certain plan approval decisions. Exemptions ........................................ Compliance requirement ................... Transfer of plan approvals ................ Maximum achievable control technology standards for hazardous air pollutants. Health risk-based emission standards and operating practice requirements. Public Notice ..................................... Contents of notice ............................. Filing protests .................................... Consideration of protests .................. Conferences and hearings ................ Conference or hearing procedure ..... Conference or hearing record ........... Plan approval disposition .................. 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 61 61 61 61 61 61 61 61 61 61 FR FR FR FR FR FR FR FR FR FR 39497 39497 39497 39497 39497 39497 39497 39497 39497 39497 ... ... ... ... ... ... ... ... ... ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 11/26/94 11/26/94 11/26/94 7/30/96, 7/30/96, 7/30/96, 7/30/96, 61 61 61 61 FR FR FR FR 39497 39497 39497 39497 ... ... ... ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). 11/26/94 11/26/94 8/13/83 11/26/94 8/13/83 11/26/94 11/26/94 11/26/94 7/30/96, 7/30/96, 7/27/84, 7/30/96, 7/27/84, 7/30/96, 7/30/96, 7/30/96, (c)(110)(i)(C). (c)(110)(i)(C). (c)(60). (c)(110)(i)(C). (c)(60). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 61 61 49 61 49 61 61 61 FR FR FR FR FR FR FR FR 39497 39497 30183 39497 30183 39497 39497 39497 ... ... ... ... ... ... ... ... Subchapter D.—Prevention of Significant Deterioration of Air Quality Section 127.81 ............... Section 127.82 ............... VerDate Aug<31>2005 Purpose ............................................. Scope ................................................ 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00006 6/18/83 6/18/83 Fmt 4701 8/21/84, 49 FR 33127 ... 8/21/84 49, FR 33127 ... Sfmt 4700 E:\FR\FM\03JAR2.SGM (c)(57). (c)(57). 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 205 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State effective date State citation Title/subject Section 127.83 ............... Adoption of Program ......................... 6/18/83 Additional explanation/§ 52.2063 citation EPA approval date 8/21/84, 49 FR 33127 ... (c)(57). Subchapter E.—New Source Review Section 127.201 ............. Section 127.202 ............. Section 127.203 ............. Section Section Section Section Section Section Section Section Section Section Section Section Section Section 127.204 127.205 127.206 127.207 127.208 127.209 127.210 127.211 127.212 127.213 127.214 127.215 127.216 127.217 ............. ............. ............. ............. ............. ............. ............. ............. ............. ............. ............. ............. ............. ............. General requirements ........................ Effective date ..................................... Facilities subject to special permit requirements. Emissions subject to this subchapter Special permit requirements ............. ERC general requirements ................ ERC generation and creation ............ ERC use and transfer requirements ERC registry system ......................... Offset ratios ....................................... Applicability determination ................. Portable facilities ............................... Construction and demolition .............. Exemption .......................................... Reactivation ....................................... Circumvention .................................... Clean Air Act Titles III–V applicability 1/15/94 1/15/94 1/15/94 12/9/97, 62 FR 64722 ... 12/9/97, 62 FR 64722 ... 12/9/97, 62 FR 64722 ... (c)(107). (c)(107). (c)(107). 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 1/15/94 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, 12/9/97, (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). (c)(107). 62 62 62 62 62 62 62 62 62 62 62 62 62 62 FR FR FR FR FR FR FR FR FR FR FR FR FR FR 64722 64722 64722 64722 64722 64722 64722 64722 64722 64722 64722 64722 64722 64722 ... ... ... ... ... ... ... ... ... ... ... ... ... ... Subchapter F.—Operating Permit Requirements General Section 127.401 ............. Section 127.402 ............. Section 127.403 ............. Section 127.404 ............. Scope ................................................ General provisions ............................ Permitting of sources operating lawfully without a permit. Compliance schedule for repermitting 11/26/94 11/26/94 11/26/94 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). Permit Applications Section Section Section Section 127.411 127.412 127.413 127.414 ............. ............. ............. ............. Content of applications ...................... Compliance review forms .................. Municipal notification ......................... Supplemental information .................. 11/26/94 11/26/94 11/26/94 11/26/94 7/30/96, 7/30/96, 7/30/96, 7/30/96, 61 61 61 61 FR FR FR FR 39497 39497 39497 39497 ... ... ... ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 11/26/94 11/26/94 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 11/26/94 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, 7/30/96, ... ... ... ... ... ... ... ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). 11/26/94 11/26/94 11/26/94 11/26/94 7/30/96, 7/30/96, 7/30/96, 7/30/96, ... ... ... ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 11/26/94 11/26/94 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). Review of Applications Section 127.421 ............. Section 127.422 ............. Section 127.423 ............. Section Section Section Section Section Section Section Section 127.424 127.425 127.426 127.427 127.428 127.429 127.430 127.431 ............. ............. ............. ............. ............. ............. ............. ............. Review of Applications ...................... Denial of permits ............................... Notice of basis for certain operating permit decisions. Public notice ...................................... Contents of notice ............................. Filing protests .................................... Consideration of protest .................... Conferences and hearings ................ Conference or hearing procedure ..... Conference or hearing record ........... Operating permit disposition ............. 61 61 61 61 61 61 61 61 FR FR FR FR FR FR FR FR 39497 39497 39497 39497 39497 39497 39497 39497 Operating Permit Conditions Section 127.441 ............. sroberts on PROD1PC70 with RULES Section Section Section Section 127.442 127.443 127.444 127.445 ............. ............. ............. ............. Section 127.446 ............. Section 127.447 ............. Section 127.448 ............. Section 127.449 ............. VerDate Aug<31>2005 Operating permit terms and conditions. Reporting requirements ..................... Operating permit requirements ......... Compliance requirements ................. Operating permit compliance schedules. Operating permit duration ................. Alternate operating scenarios ........... Emissions trading at facilities with Federally enforceable emissions cap. De minimis emission increases ......... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00007 Fmt 4701 Sfmt 4700 61 61 61 61 FR FR FR FR 39497 39497 39497 39497 E:\FR\FM\03JAR2.SGM 03JAR2 206 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation Section 127.450 ............. State effective date Title/subject Administrative operating amendments. permit 11/26/94 Additional explanation/§ 52.2063 citation EPA approval date 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). Operating Permit Modifications Section 127.461 ............. Section 127.462 ............. Section 127.463 ............. Section 127.464 ............. Operating permit changes for cause Minor operating permit modifications Operating permit revisions to incorporate applicable standards. Transfer of operating permits ............ 11/26/94 11/26/94 11/26/94 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). Subchapter H.—General Plan Approvals and Operating Permits General Section 127.601 ............. Scope ................................................ 11/26/94 7/30/96, 61 FR 39494 ... (c)(111). Issuance of General Plan Approvals and General Operating Permits Section 127.611 ............. Section 127.612 ............. General plan approval and general operating permits. Public notice and review period ........ 11/26/94 7/30/96, 61 FR 39494 ... (c)(111). 11/26/94 7/30/96, 61 FR 39494 ... (c)(111). Use of General Plan Approvals and Permits Section 127.621 ............. Section 127.622 ............. Application for use of general plan approvals and general operating permits. Compliance with general plan approvals and general operating permits. 11/26/94 7/30/96, 61 FR 39494 ... (c)(111). 11/26/94 7/30/96, 61 FR 39494 ... (c)(111). Subchapter I.—Plan Approval and Operating Permit Fees Section 127.701 ............. Section 127.702 ............. Section 127.703 ............. Section 127.707 ............. General provisions ............................ Plan approval fees ............................ Operating permit fees under Subchapter F. Failure to pay fee .............................. 11/26/94 11/26/94 11/26/94 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). (c)(110)(i)(C). (c)(110)(i)(C). 11/26/94 7/30/96, 61 FR 39497 ... (c)(110)(i)(C). Subchapter J.—General Conformity Section 127.801 ............. Section 127.802 ............. Purpose ............................................. Adoption of Standards ....................... 11/9/96 11/9/96 9/29/97, 62 FR 50870 ... 9/29/97, 62 FR 50870 ... (c)(126). (c)(126). Chapter 129—Standards for Sources Miscellaneous Sources Section 129.11 ............... Section 129.12 ............... Section 129.13 ............... APPENDIX A ................. Section 129.14 ............... Section 129.15 ............... Section 129.16 ............... Section 129.18 ............... Nitric acid plants ................................ Sulfuric acid plants ............................ Sulfur recovery plants ....................... Allowable emissions, sulfur oxides— sulfur recovery plants. Open burning operations ................... Coke pushing operations .................. Door maintenance, adjustment and replacement practices. Municipal waste incinerators ............. 3/20/72 3/20/72 3/20/72 4/23/94 5/31/72, 5/31/72, 5/31/72, 3/23/98, 37 37 37 63 FR FR FR FR 10842 10842 10842 13789 ... ... ... ... (c)(1). (c)(1). (c)(1). (c)(129). 8/9/76 8/29/77 12/31/77 12/12/77 8/19/80, 45 FR 55178 ... 12/17/79, 44 FR 73031 7/17/79, 44 FR 41429 ... (c)(33). (c)(21); correction published 8/22/80 45 FR 56060. (c)(19). 10/27/90 6/30/93, 58 FR 34911 ... (c)(81). sroberts on PROD1PC70 with RULES Sources of VOCs Section 129.52 ............... Section 129.54 ............... Section 129.55 ............... Section 129.56 ............... VerDate Aug<31>2005 Surface coating processes ................ Seasonal operation of auxiliary incineration equipment. Petroleum refineries—specific sources. Storage tanks greater than 40,000 gallons capacity containing VOCs. 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00008 6/10/00 8/3/91 7/20/01, 66 FR 37908 ... 5/13/93, 58 FR 28362 ... (c)(152). (c)(79). 6/20/81 1/19/83, 48 FR 2319 ..... (c)(48). 9/5/98 7/26/00, 65 FR 45920 ... (c)(147). Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 207 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State effective date State citation Title/subject Section 129.57 ............... Storage tanks less than or equal to 40,000 gallons capacity containing VOCs. Petroleum refineries-fugitive sources Bulk gasoline terminals ..................... Bulk gasoline plants .......................... Small gasoline storage tank control (Stage I control). General standards for bulk gasoline terminals, bulk gasoline plants, and small gasoline storage tanks. Degreasing operations ...................... Cutback asphalt paving ..................... Ethylene production plants ................ Compliance schedules and final compliance dates. Graphic arts systems. ....................... Manufacture of synthesized pharmaceutical products. Manufacture of pneumatic rubber tires. Synthetic organic chemical and polymer manufacturing—fugitive sources. Manufacture of surface active agents Aerospace manufacturing and rework. Mobile equipment repair and refinishing. Section Section Section Section 129.58 129.59 129.60 129.61 ............... ............... ............... ............... Section 129.62 ............... Section Section Section Section 129.63 129.64 129.65 129.66 ............... ............... ............... ............... Section 129.67 ............... Section 129.68 ............... Section 129.69 ............... Section 129.71 ............... Section 129.72 ............... Section 129.73 ............... Section 129.75 ............... Additional explanation/§ 52.2063 citation EPA approval date 6/20/81 1/19/83, 48 FR 2319 ..... (c)(48). 8/13/83 8/3/91 8/3/91 8/3/91 7/27/84, 5/13/93, 5/13/93, 5/13/93, (c)(60). (c)(79). (c)(79). (c)(79). 5/23/94 12/22/94, 59 FR 65971 (c)(94). 12/22/01 8/13/83 8/1/79 5/23/92 1/16/03, 68 FR 2208 ..... 7/27/84, 49 FR 30183 ... 5/20/80 ........................... 12/22/94, 59 FR 65971 (c)(195)(i)(B)(2). (c)(60). (c)(22). (c)(94). 9/5/98 8/3/91 7/26/00, 65 FR 45920 ... 5/13/93, 58 FR 28362 ... (c)(147). (c)(79). 5/23/92 12/22/94, 59 FR 65971 (c)(94). 5/23/92 12/22/94, 59 FR 65971 (c)(94). 5/23/92 4/10/99 12/22/94, 59 FR 65971 6/25/01, 66 FR 33645 ... (c)(94). (c)(155). 11/27/99 8/14/00, 65 FR 49501 ... (c)(148). 49 58 58 58 FR FR FR FR 30183 28362 28362 28362 ... ... ... ... Mobile Sources Section 129.81 ............... Section 129.82 ............... Organic liquid cargo vessel loading and ballasting. Control of VOCs from gasoline dispensing facilities (Stage II). 9/28/91 9/28/93, 58 FR 50517 ... (c)(84). 4/10/99 5/21/01, 66 FR 27875 ... (c)(153). Stationary Sources of NOX and VOCs Section 129.91 ............... Section 129.92 ............... Section 129.93 [Except for 129.93(c)(6 & 7)]. Section 129.94 ............... Section 129.95 ............... Control of major sources of NOX and VOCs. RACT proposal requirements ............ Presumptive RACT emission limitations. NOX RACT emission averaging general requirements. Recordkeeping. ................................. 6/10/00 7/20/01, 66 FR 37908 ... (c)(152). 4/23/94 4/23/94 3/23/98, 63 FR 13789 ... 3/23/98, 63 FR 13789 ... (c)(129). (c)(129). 4/23/94 3/23/98, 63 FR 13789 ... (c)(129). 4/23/94 3/23/98, 63 FR 13789 ... (c)(129). Wood Furniture Manufacturing Operations Section Section Section Section 129.101 129.102 129.103 129.104 ............. ............. ............. ............. Section 129.105 ............. Section 129.106 ............. Section 129.107 ............. General provisions and applicability Emission standards ........................... Work practice standards ................... Compliance procedures and monitoring requirements. Recordkeeping requirements ............ Reporting requirements ..................... Special provisions for facilities using an emissions averaging approach. 6/10/00 6/10/00 6/10/00 6/10/00 7/20/01, 7/20/01, 7/20/01, 7/20/01, 66 66 66 66 FR FR FR FR 37908 37908 37908 37908 ... ... ... ... (c)(152). (c)(152). (c)(152). (c)(152). 6/10/00 6/10/00 6/10/00 7/20/01, 66 FR 37908 ... 7/20/01, 66 FR 37908 ... 7/20/01, 66 FR 37908 ... (c)(152). (c)(152). (c)(152). sroberts on PROD1PC70 with RULES Additional NOX Requirements Section 129.201 ............. Section 129.202 ............. Section 129.203 ............. Section 129.204 ............. Section 129.205 ............. VerDate Aug<31>2005 Boilers ................................................ Stationary combustion turbines ......... Stationary internal combustion engines. Emission accountability ..................... Zero emission renewable energy production credit. 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00009 12/11/04 12/11/04 12/11/04 9/29/06, 71 FR 57428 ... 9/29/06, 71 FR 57428 ... 9/29/06, 71 FR 57428 ... SIP-effective date is 10/30/06. SIP-effective date is 10/30/06. SIP-effective date is 10/30/06. 12/11/04 12/11/04 9/29/06, 71 FR 57428 ... 9/29/06, 71 FR 57428 ... SIP-effective date is 10/30/06. SIP-effective date is 10/30/06. Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 208 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject Additional explanation/§ 52.2063 citation EPA approval date Chapter 130—Standards for Products Subchapter A.—Portable Fuel Containers Section 130.101 ............. Section 130.102 ............. Section 130.103 ............. Section Section Section Section Section 130.104 130.105 130.106 130.107 130.108 ............. ............. ............. ............. ............. Applicability ........................................ Definitions .......................................... Performance Standards for portable fuel containers and spill-proof spouts. Exemptions ........................................ Innovative products ........................... Administrative requirements .............. Variances ........................................... Test procedures ................................ 10/5/02 10/5/02 10/5/02 12/8/04, 69 FR 70893 ... 12/8/04, 69 FR 70893 ... 12/8/04, 69 FR 70893 ... (c)(229). (c)(229). (c)(229). 10/5/02 10/5/02 10/5/02 10/5/02 10/5/02 12/8/04, 12/8/04, 12/8/04, 12/8/04, 12/8/04, ... ... ... ... ... (c)(229). (c)(229). (c)(229). (c)(229). (c)(229). 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). 10/5/02 10/5/02 10/5/02 10/5/02 12/8/04, 12/8/04, 12/8/04, 12/8/04, ... ... ... ... (c)(230). (c)(230). (c)(230). (c)(230). 10/5/02 10/5/02 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). 10/5/02 10/5/02 10/5/02 10/5/02 10/5/02 10/5/02 12/8/04, 12/8/04, 12/8/04, 12/8/04, 12/8/04, 12/8/04, ... ... ... ... ... ... (c)(230). (c)(230). (c)(230). (c)(230). (c)(230). (c)(230). 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). 69 69 69 69 69 FR FR FR FR FR 70893 70893 70893 70893 70893 Subchapter B.—Consumer Products General Provisions Section 130.201. ............ Section 130.202. ............ Applicability ........................................ Definitions .......................................... 10/5/02 10/5/02 Standard Section Section Section Section 130.211. 130.212. 130.213. 130.214. ............ ............ ............ ............ Section 130.215. ............ Section 130.216. ............ Table of standards ............................ Products diluted prior to use ............. Products registered under FIFRA ..... Requirements for charcoal lighter materials. Requirements for aerosol adhesives Requirements for floor wax strippers 69 69 69 69 FR FR FR FR 70895 70895 70895 70895 Exemptions Section 130.331. ............ Section Section Section Section Section Section 130.332. ............ 130.333. ............ 130.334. ............ 130.335. ............ 130.336 ............. 130.337 ............. Products for shipment and use outside this Commonwealth. Antiperspirants and deodorants ........ LVP–VOC .......................................... Products registered under FIFRA ..... Air fresheners .................................... Adhesives .......................................... Bait station insecticides ..................... 69 69 69 69 69 69 FR FR FR FR FR FR 70895 70895 70895 70895 70895 70895 Innovative Products Section 130.351 ............. Section 130.352 ............. Innovative products exemption ......... Request for exemption ...................... 10/5/02 10/5/02 Administrative Requirements Section 130.371 ............. Section 130.372 ............. Section 130.373 ............. Code-dating ....................................... Most restrictive limit ........................... Additional labeling requirements for aerosol adhesives. 10/5/02 10/5/02 10/5/02 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). (c)(230). Reporting Requirements Section 130.391 ............. Section 130.392 ............. Required reporting of information to the Department. Confidentiality .................................... 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). 12/8/04, 12/8/04, 12/8/04, 12/8/04, ... ... ... ... (c)(230). (c)(230). (c)(230). (c)(230). 12/8/04, 69 FR 70895 ... (c)(230). sroberts on PROD1PC70 with RULES Variances Section Section Section Section 130.411 130.412 130.413 130.414 ............. ............. ............. ............. Application for variance ..................... Variance orders ................................. Termination of variance ..................... Modification of variance .................... 10/5/02 10/5/02 10/5/02 10/5/02 69 69 69 69 FR FR FR FR 70895 70895 70895 70895 Test Methods Section 130.431 ............. VerDate Aug<31>2005 Testing for compliance ...................... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00010 10/5/02 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 209 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject Additional explanation/§ 52.2063 citation EPA approval date ACP for Consumer Products Section Section Section Section Section 130.451 130.452 130.453 130.454 130.455 ............. ............. ............. ............. ............. Section 130.456 ............. Section 130.457 ............. Section 130.458 ............. Section 130.459 ............. Section 130.460 ............. Section 130.461 ............. Section 130.462 ............. Section 130.463 ............. Section 130.464 ............. Section 130.465 ............. Alternative methods of compliance ... Exemption .......................................... Request for exemption ...................... Application for an ACP ...................... Recordkeeping and availability of requested information. Surplus reductions and surplus trading. Limited-use surplus reduction credits for early reformulations of ACP products. Reconciliation of shortfalls ................ Notification of modifications to an ACP by the responsible ACP party. Modifications that require Department preapproval. Other modifications ........................... Modification of an ACP by the Department. Cancellation of an ACP ..................... Treatment of information ................... Other applicable requirements .......... 10/5/02 10/5/02 10/5/02 10/5/02 10/5/02 12/8/04, 12/8/04, 12/8/04, 12/8/04, 12/8/04, 69 69 69 69 69 FR FR FR FR FR 70895 70895 70895 70895 70895 ... ... ... ... ... (c)(230). (c)(230). (c)(230). (c)(230). (c)(230). 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). 10/5/02 10/5/02 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). 10/5/02 10/5/02 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). 10/5/02 10/5/02 10/5/02 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... 12/8/04, 69 FR 70895 ... (c)(230). (c)(230). (c)(230). Public Hearing Requirements Section 130.471 ............. Public hearings .................................. 10/5/02 12/8/04, 69 FR 70895 ... (c)(230). Subchapter C—Architectural and Industrial Maintenance Coatings Section Section Section Section Section Section Section Section Section 130.601 130.602 130.603 130.604 130.605 130.606 130.607 130.608 130.609 ............. ............. ............. ............. ............. ............. ............. ............. ............. Section 130.610 ............. Section 130.611 ............. Applicability ........................................ Definitions .......................................... Standards .......................................... Container labeling requirements ....... Reporting requirements ..................... Application for variance ..................... Variance orders ................................. Termination of variance ..................... Extension, modification or revocation of variance. Public hearings .................................. Compliance provisions and test methods. 10/25/03 10/25/03 10/25/03 10/25/03 10/25/03 10/25/03 10/25/03 10/25/03 10/25/03 11/23/04, 11/23/04, 11/23/04, 11/23/04, 11/23/04, 11/23/04, 11/23/04, 11/23/04, 11/23/04, 69 69 69 69 69 69 69 69 69 FR FR FR FR FR FR FR FR FR 68080 68080 68080 68080 68080 68080 68080 68080 68080 (c)(227). (c)(227). (c)(227). (c)(227). (c)(227). (c)(227). (c)(227). (c)(227). (c)(227). 10/25/03 10/25/03 11/23/04, 69 FR 68080 11/23/04, 69 FR 68080 (c)(227). (c)(227). Chapter 131—Ambient Air Quality Standards Section 131.1 ................. Section 131.2 ................. Section 131.3 ................. Section 131.4 ................. Purpose ............................................. National Ambient Air Quality Standards. Ambient air quality standards ............ 3/20/72 3/20/72 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... (c)(1). (c)(1). 8/13/83 7/27/84, 49 FR 30183 ... Application of ambient air quality standards. 3/20/72 5/31/72, 37 FR 10842 ... (c)(60); Amendment removed a lead standard provision. The remaining standards are not SIP-related. (c)(1). Chapter 135—Reporting of Sources sroberts on PROD1PC70 with RULES General Section Section Section Section Section 135.1 135.2 135.3 135.4 135.5 ................. ................. ................. ................. ................. Definitions .......................................... Applicability [of sources] .................... Reporting ........................................... Reporting forms and guides .............. Recordkeeping .................................. 3/20/72 3/20/72 3/20/72 3/20/72 10/10/92 5/31/72, 5/31/72, 5/31/72, 5/31/72, 1/12/95, 37 37 37 37 60 FR FR FR FR FR 10842 ... 10842 ... 10842 ... 10842 ... 2081 ..... (c)(1). (c)(1). (c)(1). (c)(1). (c)(96). 1/12/95 ........................... (c)(96) Emission Statements Section 135.21 ............... VerDate Aug<31>2005 Emission statements ......................... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00011 10/10/92 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 210 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject Additional explanation/§ 52.2063 citation EPA approval date Chapter 137—Air Pollution Episodes General Section Section Section Section Section 137.1 137.2 137.3 137.4 137.5 ................. ................. ................. ................. ................. Purpose ............................................. Monitoring facilities ............................ Episode criteria .................................. Standby plans .................................... Implementation of emission reduction procedures. 1/28/72 1/28/72 6/9/90 12/27/97 1/28/72 5/31/72, 5/31/72, 6/16/93, 6/11/02, 5/31/72, 37 37 58 67 37 FR FR FR FR FR 10842 10842 33203 39854 10842 ... ... ... ... ... (c)(1). (c)(1). (c)(75). (c)(189). (c)(1). 5/31/72, 5/31/72, 5/31/72, 5/31/72, 37 37 37 37 FR FR FR FR 10842 10842 10842 10842 ... ... ... ... (c)(1). (c)(1). (c)(1). (c)(1). Level Actions Section Section Section Section 137.11 137.12 137.13 137.14 ............... ............... ............... ............... Forecast level actions ....................... Alert level actions .............................. Warning level actions ........................ Emergency level actions ................... 1/28/72 1/28/72 1/28/72 1/28/72 Chapter 139—Sampling and Testing Subchapter A.—Sampling and Testing Methods and Procedures General Section 139.1 ................. Section 139.2 ................. Section 139.3 ................. Sampling facilities .............................. Sampling by others ........................... General requirements ........................ 3/20/72 3/20/72 8/1/79 5/31/72, 37 FR 10842 ... 5/31/72, 37 FR 10842 ... 8/8/79, 44 FR 46465 ..... Section 139.4 ................. Section 139.5 ................. References ........................................ Revisions to the source testing manual and continuous source monitoring manual. 6/10/00 11/26/94 7/20/01 ........................... 7/30/96, .......................... 61 FR 39497 ................. (c)(1). (c)(1). (c)(20); Correction published 1/23/80 (45 FR 5303). (c)(152). (c)(110)(i)(D). Stationary Sources Section 139.11 ............... Section 139.12 ............... Section 139.13 (Except Provisions applicable to H2S and TRS). Section 139.14 ............... Section 139.16 ............... Section 139.17 ............... Section 139.18 ............... General requirements ........................ Emissions of particulate matter ......... Emissions of SO2, H2S, TRS and NO2. 3/20/72 3/7/98 11/26/94 Emissions of VOCs ........................... Sulfur in fuel oil ................................. General requirements ........................ Calculation of Alternative opacity limitations. 6/10/00 8/13/83 6/20/81 6/20/81 5/31/72, 37 FR 10842 ... 6/11/02, 67 FR 39854 ... 7/30/96, 61 FR 39497 ... (c)(1). (c)(189). (c)(110)(i)(D). 7/20/01, 7/27/84, 1/19/83, 1/19/83, (c)(152). (c)(60). (c)(48). (c)(48). 66 49 48 48 FR FR FR FR 37908 ... 30183 ... 2319 ..... 2319 ..... Ambient Levels of Air Contaiminants Section 139.21 ............... Section 139.32 ............... Section 139.33 ............... General .............................................. Sampling and analytical procedures Incorporation of Federal procedures 3/20/72 11/26/94 3/20/72 5/31/72, 3 FR 10842 ..... 7/30/96 61, FR 39491 ... 5/31/72, 37 FR 10842 ... (c)(1). (c)(110)(i)(D). (c)(1). Subchapter B.—Monitoring Duties of Certain Sources General Section 139.51 ............... Section 139.52 ............... Section 139.53 ............... Purpose ............................................. Monitoring methods and techniques Filing monitoring reports .................... 8/29/77 8/29/77 8/13/83 7/17/79, 44 FR 41429 ... 7/17/79, 44 FR 41429 ... 7/27/84, 49 FR 30183 ... (c)(19). (c)(19). (c)(60). sroberts on PROD1PC70 with RULES Subchapter C.—Requirements for Continuous In-Stack Monitoring for Stationary Sources Section Section Section Section 139.101 ............. 139.102 ............. 139.103 ............. 139.11 ............... VerDate Aug<31>2005 General Requirements ...................... References ........................................ Opacity monitoring requirements ...... Waste incinerator monitoring requirements. 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00012 3/7/98 11/26/94 11/26/94 12/27/97 Fmt 4701 6/11/02, 7/30/96, 7/30/96, 6/11/02, Sfmt 4700 67 61 61 67 FR FR FR FR 39854 39497 39497 39854 E:\FR\FM\03JAR2.SGM ... ... ... ... (c)(189). (c)(110)(i)(D). (c)(110)(i)(D). (c)(189). 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 211 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject Additional explanation/§ 52.2063 citation EPA approval date Chapter 141—Alternate Standards Section 141.1 ................. Imposing alternate standards authorized. 5/14/88 9/17/92, 57 FR 42894 ... (c)(73). Chapter 145—Interstate Pollution Transport Reduction Subchapter A—NOX Budget Trading Program General Provisions Section 145.1 ................. Section 145.2 ................. Section 145.3 ................. Section Section Section Section 145.4 145.5 145.6 145.7 ................. ................. ................. ................. Purpose ............................................. Definitions .......................................... Measurements, abbreviations and acronyms. Applicability ........................................ Retired unit exemption ...................... Standard requirements ...................... Computation of time .......................... 9/23/00 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... 8.21.01, 66 FR 43795 ... (c)(168). (c)(168). (c)(168). 9/23/00 9/23/00 9/23/00 9/23/00 8/21/01, 8/21/01, 8/21/01, 8/21/01, ... ... ... ... (c)(168). (c)(168). (c)(168). (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). 66 66 66 66 FR FR FR FR 43795 43795 43795 43795 NOX Account Section 145.10 ............... Section 145.11 ............... Section 145.12 ............... Section 145.13 ............... Section 145.14 ............... Authorization and responsibilities of the NOX authorized account representative. Alternate NOX authorized account representative. Changing the NOX authorized account representative; and changes in the Alternate NOX authorized account representative; changes in the owners and operators. Account certificate of representation Objections concerning the NOX authorized account representative. Compliance Certification Section 145.30 ............... Section 145.31 ............... Compliance certification report .......... Department’s action on compliance certifications. 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). NOX Allowance Allocations Section 145.40 ............... Section 145.41 ............... 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). Section 145.42 ............... State Trading Program budget .......... Timing Requirements for NOX allowance allocations. NOX Allowance allocations ............... 12/11/04 9/29/06, 71 FR 57428 ... Section 145.43 ............... Compliance supplement pool ............ 9/23/00 8/21/01, 66 FR 43795 ... Revised; SIP-effective date is 10/30/ 06 (c)(168). Accounting Process for Deposit Use and Transfer of Allowances Section 145.50 ............... Section 145.51 ............... Section 145.52 ............... Section 145.53 ............... sroberts on PROD1PC70 with RULES Section Section Section Section 145.54 145.55 145.56 145.57 ............... ............... ............... ............... NOX Allowance Tracking System accounts. Establishment of accounts ................ NOX Allowance Tracking System responsibilities of NOX authorized account representative. Recordation of NOX allowance allocations. Compliance ........................................ Banking .............................................. Account error ..................................... Closing of general accounts .............. 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168.) 9/23/00 9/23/00 9/23/00 9/23/00 8/21/01, 8/21/01, 8/21/01, 8/21/01, ... ... ... ... (c)(168). (c)(168). (c)(168). (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 66 66 66 66 FR FR FR FR 43795 43795 43795 43795 NOX Allowance Transfers Section 145.60 ............... Section 145.61 ............... VerDate Aug<31>2005 Submission of NOX allowance transfers. NOX transfer recordation ................... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00013 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 212 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State effective date State citation Title/subject Section 145.62 ............... Notification ......................................... 9/23/00 Additional explanation/§ 52.2063 citation EPA approval date 8/21/01, 66 FR 43795 ... (c)(168). Recording and Recordkeeping Requirements Section 145.70 ............... Section 145.71 ............... Section Section Section Section Section 145.72 145.73 145.74 145.75 145.76 ............... ............... ............... ............... ............... General monitoring requirements ...... Initial certification and recertification procedures. Out of control periods ........................ Notifications ....................................... Recordkeeping and reporting ............ Petitions ............................................. Additional requirements to provide heat input data. 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). 9/23/00 9/23/00 9/23/00 9/23/00 9/23/00 8/21/01, 8/21/01, 8/21/01, 8/21/01, 8/21/01, ... ... ... ... ... (c)(168). (c)(168). (c)(168). (c)(168). (c)(168). 9/23/00 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 9/23/00 8/21/01, 66 FR 43795 ... 8/21/01, 66 FR 43795 ... (c)(168). (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). 66 66 66 66 66 FR FR FR FR FR 43795 43795 43795 43795 43795 Opt-In Process Section 145.80 ............... Section 145.81 ............... Section 145.82 ............... Section 145.83 ............... Section 145.84 ............... Section 145.85 ............... Section 145.86 ............... Section 145.87 ............... Section 145.88 ............... Applicability for opt-in sources .......... Opt-in source general provisions ...... NOX authorized account representative for opt-in sources. Applying for a NOX budget opt-in approval. Opt-in process ................................... NOX budget opt-in application contents. Opt-in source withdrawal from NOX Budget Trading Program. Opt-in unit change in regulatory status. NOX allowance allocations to opt-in units. Emission Reduction Credit Provisions Section 145.90 ............... Emission reduction credit provisions 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). Interstate Pollution Transport Reduction Requirements Section 145.100 ............. Applicability to upwind states ............ 9/23/00 8/21/01, 66 FR 43795 ... (c)(168). Subchapter B.—Emissions of NOX From Stationary Internal Combustion Engines Section 145.111 ............. Applicability ........................................ 12/11/04 9/29/06, 71 FR 57428 ... Section 145.112 ............. Definitions .......................................... 12/11/04 9/29/06, 71 FR 57428 ... Section 145.113 ............. Standard requirements ...................... 12/11/04 New Section SIP-effective date is 10/ 30/06. New Section SIP-effective date is 10/ 30/06. New Section SIP-effective date is 10/ 30/06. 9/29/06, 71 FR 57428 ... Subchapter C.—Emissions of NOX From Cement Manufacturing Applicability ........................................ 12/11/04 9/29/06, 71 FR 57428 ... Section 145.142 ............. Definitions .......................................... 12/11/04 9/29/06, 71 FR 57428 ... Section 145.143 ............. sroberts on PROD1PC70 with RULES Section 145.141 ............. Standard requirements ...................... 12/11/04 9/29/06, 71 FR 57428 ... VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00014 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM New Section SIP-effective date is 10/ 30/06. New Section SIP-effective date is 10/ 30/06. New Section SIP-effective date is 10/ 30/06. 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 213 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject EPA approval date Additional explanation/§ 52.2063 citation Title 67.—Transportation Part I.—Department of Transportation Subpart A.—Vehicle Code Provisions Article VII.—Vehicle Characteristics Chapter 175—Vehicle Equipment and Inspection Subchapter A.—General Provisions Section 175.2 ................. Definitions .......................................... 9/27/97 6/17/99, 64 FR 32411 ... Section 175.2 ................. Definitions .......................................... 12/3/88 10/6/05, 70 FR 58313 ... Section 175.3 ................. Application of equipment rules .......... 12/3/88 10/6/05, 70 FR 58313 ... Section 175.4 ................. Vehicles required to be inspected ..... 12/3/88 10/6/05, 70 FR 58313 ... Section 175.6 ................. Annual inspection .............................. 12/3/88 10/6/05, 70 FR 58313 ... Section 175.7 ................. Inspection of vehicle reentering this Commonwealth. Newly purchased vehicles ................. 12/3/88 10/6/05, 70 FR 58313 ... 2/9/94 10/6/05, 70 FR 58313 ... Coordination of safety and emission in inspection. 9/27/97 6/17/99 64 FR 32411 .... Section 175.8 ................. Section 175.11 ............... ‘‘Temporary Inspection Approval Indicator’’ only. Definitions which apply to safety inspection program in non-I/M counties. Applies to safety inspection program in non-I/M counties. Applies to safety inspection program in non-I/M counties. Applies to safety inspection program in non-I/M counties. Applies to safety inspection program in non-I/M counties. Applies to safety inspection program in non-I/M counties. (c)(139). Subchapter B.—Official Inspection Stations Section 175.21 ............... Appointment ...................................... 12/3/88 10/6/05, 70 FR 58313 ... Section 175.22 ............... Making application ............................. 12/3/88 10/6/05, 70 FR 58313 ... Section 175.23(a) and (c). Section 175.24 ............... Approval ............................................ 12/3/88 10/6/05, 70 FR 58313 ... Required certificates and station signs. Inspection area .................................. 12/3/88 10/6/05, 70 FR 58313 ... 12/3/88 10/6/05, 70 FR 58313 ... Tools and equipment ......................... 9/28/88 10/6/05, 70 FR 58313 ... Hours ................................................. 12/3/88 10/6/05, 70 FR 58313 ... Certified Inspection Mechanics ......... 12/3/88 10/6/05, 70 FR 58313 ... Applies to safety inspection program in non-I/M counties. Applies to safety inspection program in non-I/M counties. 9/27/97 6/17/99 64 FR 32411 .... (c)(139). Section 175.29 ............... Obligations and responsibilities of stations. Obligations and responsibilities of stations. 9/27/97 10/6/05, 70 FR 58313 ... Section 175.31 ............... Fleet inspection stations .................... 12/3/88 10/6/05, 70 FR 58313 ... Applies to safety inspection program in non-I/M counties (except for (f)(4), which applies to I/M and non-I/M programs). Applies to safety inspection program in non-I/M counties. Section 175.25(a), (b)(1), (b)(3), and (c). Section 175.26(a) introductory sentence and (a)(3). Section 175.27 ............... Section 175.28 [Except for (c)(2), (g)(2), (g)(3), and (g)(5)–(9)]. Section 175.29(f)(4) ....... Applies to safety inspection in non-I/M counties. Applies to safety inspection in non-I/M counties. Applies to safety inspection in non-I/M counties. Applies to safety inspection in non-I/M counties. Applies to safety inspection in non-I/M counties. Applies to safety inspection in non-I/M counties. program program program program program program sroberts on PROD1PC70 with RULES Subchapter C.—Certificate of Inspection Section 175.41(a), (b)(3), (c), (d)(2)(ii), (d)(2)(iii), (e)(5), (f)(4). Section 175.41(a), (b)(1), (b)(3), (c), (d), (e)(1), (e)(3), (e)(5), and (f)(4). Section 175.42 ............... Section 175.43 ............... Section 175.44 ............... VerDate Aug<31>2005 Procedure .......................................... 9/27/97 6/27/99 64 FR 32411 .... (c)(139). Procedure .......................................... 9/27/97 10/6/05, 70 FR 58313 ... Applies statewide to I/M program and non-I/M safety inspection program. Recording inspection ......................... Security .............................................. Ordering certificates of inspection ..... 9/27/97 9/27/97 9/27/97 6/17/99 64 FR 32411 .... 6/17/99, 64 FR 32411 ... 6/17/99, 64 FR 32411 ... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00015 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 214 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State effective date State citation Title/subject Section 175.45 ............... Violation of use of certificate of inspection. 9/27/97 Additional explanation/§ 52.2063 citation EPA approval date 6/17/99, 64 FR 32411 ... Subchapter D.—Schedule of Penalties and Suspensions: Official Inspection Stations and Certified Mechanics Section 175.51 ............... Cause for suspension ....................... 2/19/94 10/6/05, 70 FR 58313 ... Section 175.52 ............... Reapplication ..................................... 12/3/88 New section; Applies spection program in ties. New section; Applies spection program in ties. 10/6/05, 70 FR 58313 ... to safety innon-I/M coun- New section; Applies spection program in ties. New section; Applies spection program in ties. New section; Applies spection program in ties to safety innon-I/M coun- to safety innon-I/M coun- Subchapter E.—Passenger Cars and Light Trucks Section 175.61 ............... Application of subchapter .................. 12/3/88 10/6/05, 70 FR 58313 ... Section 175.72(d) .......... Fuel systems ..................................... 12/3/88 10/6/05, 70 FR 58313 ... Section 175.80(d) .......... Inspection procedure ......................... 5/13/99 10/6/05, 70 FR 58313 ... to safety innon-I/M counto safety innon-I/M coun- Subchapter H.—Motorcycles Section 175.141 ............. Application of subchapter .................. 12/3/88 10/6/05, 70 FR 58313 ... New section; Applies to safety inspection program in non-I/M counties. Subchapter J.—Motor-Driven Cycles and Motorized Pedalcycles Section 175.171 ............. Application ......................................... 12/3/88 10/6/05, 70 FR 58313 ... New section; Applies to safety inspection program in non-I/M counties. Subchapter K.—Street Rods, Spedially Constructed and Reconstructed Vehicles Section 175.201 ............. Application of subchapter .................. 12/3/88 10/6/05, 70 FR 58313 ... New section; Applies to safety inspection program in non-I/M counties. Section 175.202 ............. Conditions .......................................... 12/3/88 10/6/05, 70 FR 58313 ... Applies to safety inspection program in non-I/M counties. Section 175.220(d) [introductory sentence only]. Inspection procedure ......................... 5/13/99 10/6/05, 70 FR 58313 ... Applies to safety inspection program in non-I/M counties. Subchapter L.—Animal-Drawn Vehicles, Implemetns of Husbandry and Special Mobile Equipment Section 175.221 ............. Application ......................................... 12/3/88 10/6/05, 70 FR 58313 ... Chapter 177—Enhanced Emission Inspection Program Subchapter A.—General Provisions Section 177.1 ................. Section 177.2 ................. Section 177.3 ................. Purpose ............................................. Application of equipment rules .......... Definitions .......................................... 10/1/97 10/1/97 11/22/03 6/17/99, 64 FR 32411 ... 6/17/99, 64 FR 32411 ... 10/6/05, 70 FR 58313 ... (c)(139). (c)(139). sroberts on PROD1PC70 with RULES Implementation of Emission Inspection Program Section 177.22 ............... Section 177.23 ............... Section 177.24 ............... VerDate Aug<31>2005 Commencement of inspections ......... Notification of requirement for emission inspection. Program evaluation ........................... 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00016 11/22/03 11/22/03 10/6/05, 70 FR 58313 ... 10/6/05, 70 FR 58313 ... 11/22/03 10/6/05, 70 FR 58313 ... Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM Retitled and revised. 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 215 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject EPA approval date Additional explanation/§ 52.2063 citation Excludes paragraphs (c)(1), (c)(2), and (c)(3), and reference to those paragraphs. I/M Program Section 177.51 ............... Program requirements ....................... 11/22/03 10/6/05, 70 FR 58313 ... Section 177.52 ............... Section 177.53 ............... Emission inspection prerequisites ..... Vehicle inspection process ................ 11/22/03 11/22/03 10/6/05, 70 FR 58313 ... 10/6/05, 70 FR 58313 ... Subchapter B.—Subject Vehicles Section 177.101 ............. Section 177.102 ............. Section 177.103 ............. Section 177.104 ............. Section 177.105 ............. Subject vehicles ................................ Inspection of vehicles reentering this Commonwealth. Used vehicles after sale or resale .... Vehicles registered in nondesignated areas or other states. Vehicles requiring emission inspection due to change of address. 11/22/03 9/27/97 10/6/05, 70 FR 58313 ... 6/17/99, 64 FR 32411 ... (c)(139). 9/27/97 9/27/97 6/17/99, 64 FR 32411 ... 6/17/99, 64 FR 32411 ... (c)(139). (c)(139). 11/22/03 10/6/05, 70 FR 58313. Subchapter C.—Emission Test Procedures and Emission Standards General Section Section Section Section 177.201 ............. 177.202 ............. 177.202a ........... 177.202b ........... Section 177.203 ............. Section 177.204 ............. General requirements ........................ Emission test equipment ................... OBD–I/M check equipment ............... Equipment for gas cap test and visual inspection. Test procedures ................................ Basis for failure ................................. 11/22/03 11/22/03 11/22/03 11/22/03 10/6/05, 10/6/05, 10/6/05, 10/6/05, 70 70 70 70 FR FR FR FR 58313 58313 58313 58313 ... ... ... ... 11/22/03 11/22/03 10/6/05, 70 FR 58313 ... 10/6/05, 70 FR 58313 ... New section. New section. Retitled and revised. Recall Provisions Section 177.231 ............. Section 177.232 ............. Section 177.233 ............. Requirements regarding manufacturer recall notices. Compliance with recall notices .......... Failure to comply ............................... 9/27/97 6/17/99, 64 FR 32411 ... (c)(139). 9/27/97 9/27/97 6/17/99, 64 FR 32411 ... 6/17/99, 64 FR 32411 ... (c)(139). (c)(139). Emission Inspection Report Section 177.251 ............. Section 177.252 ............. Section 177.253 ............. Record of test results ........................ Emission inspection report ................ Responsibility of the station owner for vehicles which fail the emission inspection. 9/27/97 11/22/03 11/22/03 6/17/99, 64 FR 32411 ... 10/06/05, 70 FR 58313 10/06/05, 70 FR 58313 (c)(139). Retitled and revised. Retitled and revised. 10/06/05, 10/06/05, 10/06/05, 10/06/05, 10/06/05, New section. Retest Section Section Section Section Section 177.271 177.272 177.273 177.274 177.275 ............. ............. ............. ............. ............. Procedure .......................................... Prerequisites ...................................... Content of repair data form ............... Retest fees ........................................ Repair technician training and certification. 11/22/03 11/22/03 11/22/03 11/22/03 11/22/03 70 70 70 70 70 FR FR FR FR FR 58313 58313 58313 58313 58313 Issuance of Waiver sroberts on PROD1PC70 with RULES Section 177.281 ............. Section 177.282 ............. Issuance of waiver ............................ Annual adjustment of minimum waiver expenditure for emission inspections. 11/22/03 11/22/03 10/06/05, 70 FR 58313 10/06/05, 70 FR 58313 Excludes/removes the sentence and partial sentence, ‘‘The minimum expenditure for the first 2 years after commencement of the program in an affected area is $150. Beginning with the 3rd year of the program in an affected area’’. Procedures Relating to Certificates of Emission Inspection Section 177.291 ............. VerDate Aug<31>2005 Procedures Relating to Certificates of emission inspection. 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00017 11/22/03 Fmt 4701 10/06/05, 70 FR 58313 Sfmt 4700 E:\FR\FM\03JAR2.SGM Retitled and revised 03JAR2 216 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State effective date State citation Title/subject Section 177.292 ............. Recording inspection ......................... 11/22/03 Additional explanation/§ 52.2063 citation EPA approval date 10/06/05, 70 FR 58313 On-Road Testing Section 177.301 ............. Section 177.302 ............. Section 177.304 ............. Section 177.305 ............. Authorization to conduct on-road emission testing. On-road testing devices .................... Failure of on-road emission test ....... Failure to produce proof of correction of on-road emission test failure. 9/27/97 6/17/99, 64 FR 32411 ... (c)(139). 9/27/97 11/22/03 9/27/97 6/17/99, 64 FR 32411 ... 10/06/05, 70 FR 58313 6/17/99, 64 FR 32411 ... (c)(139). (c)(139). Subchapter D.—Official Emission Inspection Station Requirements Section 177.401 ............. Section 177.402 ............. Section 177.403 ............. Section 177.404 ............. Section Section Section Section 177.405 177.406 177.407 177.408 ............. ............. ............. ............. Appointment ...................................... Application ......................................... Approval of emission inspection station. Required certificates and station signs. Emission inspection areas ................ Equipment ......................................... Hours of operation ............................. Certified emission inspectors ............ 11/22/03 9/27/97 9/27/97 10/06/05, 70 FR 58313 6/17/99, 64 FR 32411 ... 6/17/99, 64 FR 32411 ... 11/22/03 10/6/05, 70 FR 58313 ... 11/22/03 11/22/03 11/22/03 11/22/03 10/6/05, 10/6/05, 10/6/05, 10/6/05, 70 70 70 70 FR FR FR FR 58313 58313 58313 58313 ... ... ... ... (c)(139). (c)(139). Retitled and revised. Obligations and Responsibilities of Station Owners/Agents Section 177.421 ............. Section 177.422 ............. Section Section Section Section 177.423 177.424 177.425 177.426 ............. ............. ............. ............. Section 177.427 ............. Obligations and responsibilities of station owners/agents. Commonwealth emission inspection stations. Fleet emission inspection stations .... General emission inspection stations Security .............................................. Ordering certificates of emission inspection. Violations of use of certificate of emission inspection. 11/22/03 10/6/05, 70 FR 58313 ... 11/22/03 10/6/05, 70 FR 58313 ... Retitled and revised. 11/22/03 11/22/03 11/22/03 9/27/97 10/6/05, 10/6/05, 10/6/05, 6/17/99, Retitled and revised. 9/27/97 70 70 70 64 FR FR FR FR 58313 58313 58313 32411 ... ... ... ... (c)(139). 6/17/99, 64 FR 32411 ... (c)(139). Quality Assurance Section 177.431 ............. Quality assurance .............................. 11/22/03 10/6/05, 70 FR 58313. Subchapter E.—Equipment Manufacturers’ and Contractors’ Requirements and Obligations Equipment Manufacturers’ Requirements Section Section Section Section 177.501 177.502 177.503 177.504 ............. ............. ............. ............. Equipment approval procedures ....... Service commitment .......................... Performance commitment ................. Revocation of approval ..................... 11/22/03 11/22/03 11/22/03 9/27/97 10/6/05, 10/6/05, 10/6/05, 6/17/99, 70 70 70 64 FR FR FR FR 58313. 58313. 58313. 32411 ... (c)(139). Contractor Obligations Section 177.521 ............. Contractor obligations and responsibilities. 11/22/03 10/6/05, 70 FR 58313. Subchapter F.—Schedule of Penalties and Hearing Procedure Schedule of Penalties and Suspensions Section 177.601 ............. Section 177.602 ............. sroberts on PROD1PC70 with RULES Section 177.603 ............. Definitions .......................................... Schedule of penalties for emission inspection stations. Schedule of penalties for emission inspectors. 11/22/03 11/22/03 10/6/05, 70 FR 58313 ... 10/6/05, 70 FR 58313. 11/22/03 New section. 10/6/05, 70 FR 58313. Additional Violations Section 177.605 ............. Section 177.606 ............. VerDate Aug<31>2005 Subsequent violations ....................... Multiple violations .............................. 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00018 11/22/03 9/27/97 Fmt 4701 10/6/05, 70 FR 58313. 6/17/99, 64 FR 32411 ... Sfmt 4700 E:\FR\FM\03JAR2.SGM (c)(139). 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 217 (1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued State citation State effective date Title/subject Additional explanation/§ 52.2063 citation EPA approval date Departmental Hearing Procedure Section 177.651 ............. Section 177.652 ............. Notice of alleged violation and opportunity to be heard prior to immediate suspension. Official documents ............................. 11/22/03 10/6/05, 70 FR 58313 ... Retitled and revised. 9/27/97 6/17/99, 64 FR 32411 ... (c)(139). Restoration After Suspension Section 177.671 ............. Section 177.672 ............. Section 177.673 ............. Restoration of certification of an emission inspector after suspension. Restoration of certification of an emission inspection station after suspension. Restoration of certification of certified repair technician after suspension. 9/27/97 6/17/99, 64 FR 32411 ... (c)(139). 9/27/97 6/17/99, 64 FR 32411 ... (c)(139). 9/27/97 6/17/99, 64 FR 32411 ... (c)(139). Registration Recall Procedure for Violation of §§ 177.301–177.305 (Relating to On-Road Resting) Section 177.691 ............. Appendix A .................... Appendix B .................... Registration Recall Committee .......... Acceleration Simulation Mode: Pennsylvania Procedures, Standards, Equipment Specifications and Quality Control Requirements. Department Procedures and Specifications. 11/22/03 11/22/03 10/6/05, 70 FR 58313. 10/6/05, 70 FR 58313 ... Replaces previous Appendix A. 11/22/03 10/6/05, 70 FR 58313 ... Replaces previous Appendix B. (2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS Article XX or XXI Citation State effective date Title/subject EPA approval date Additional explanation/ § 52.2063 citation In SIP at 52.2020(c)(92); citation change only at (c)(192) (c)(192) Part A—General 2101.01 .................................... Short Titles .............................. 10/20/95 11/14/02 67 FR 68935 ............ 2101.02.a, 02.c ........................ Declaration of Policy and Purpose. Effective Date and Repealer ... 10/20/95 11/14/02 67 FR 68935 ............ 10/20/95 11/14/02 67 FR 68935 ............ Existing Orders ........................ Existing Permits and Licenses Construction and Interpretation Administration and Organization. Ambient Air Quality Standards (Except: PM10—County & Free silica portion; Pb (1-hr & 8-hr avg.); settled particulates, beryllium, sulfates, fluorides, and hydrogen sulfide). Prohibition of Air Pollution ....... Interstate Air Pollution ............. Nuisances ................................ Circumvention ......................... Definitions ................................ Definitions related to gasoline volatility. Definitions ................................ 10/20/95 3/31/98 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 8/30/04 69 FR 52831 .............. 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ In SIP at (c)(92); citation change only at (c)(192) (c)(192) 52.2420(c)(209) (c)(192) (c)(192) 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) 10/20/95 10/20/95 10/20/95 10/20/95 10/20/95 5/15/98 9/ 1/99 7/10/03 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 4/17/01 66 FR 19724 .............. (c)(192) (c)(192) (c)(192) (c)(192) (c)(192) (c)(151) 2101.03 .................................... 2101.04 .................................... 2101.05 .................................... 2101.06 .................................... 2101.07 (Except paragraphs .07.c.2 and c.8). 2101.10 .................................... 2101.11 2101.12 2101.13 2101.14 2101.20 2101.20 .................................... .................................... .................................... .................................... .................................... .................................... sroberts on PROD1PC70 with RULES 2101.20 .................................... 6/24/05 70 FR 36511 .............. Part B—Permits Generally 2102.01 .................................... 2102.02 .................................... 2102.03.a through .k ................ 2102.04 .................................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Certification ............................. Applicability ............................. Permits Generally .................... Installation Permits .................. Jkt 211001 PO 00000 Frm 00019 10/20/95 10/20/95 10/20/95 10/20/95 Fmt 4701 11/14/02 11/14/02 11/14/02 11/14/02 Sfmt 4700 67 67 67 67 FR FR FR FR 68935 68935 68935 68935 ............ ............ ............ ............ E:\FR\FM\03JAR2.SGM 03JAR2 (c)(192) (c)(192) (c)(192) (c)(192) 218 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS—Continued State effective date Article XX or XXI Citation Title/subject 2102.05 .................................... Installation Permits for New and Modified Major Sources. Major Sources Locating in or Impacting a Nonattainment Area. Emission Offset Registration ... Installation Permit Application and Administration Fees. 2102.06 .................................... 2102.08 .................................... 2102.10 .................................... EPA approval date .................. 11/14/02 67 FR 68935 ............ (c)(192) 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) 10/20/95 .................. 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) Additional explanation/ § 52.2063 citation Part C—Operating Permits 2103.01 .................................... Transition ................................. 10/20/95 8/30/04 69 FR 52831 .............. (c)(209) Subpart 1—Operating Permits (All Major and Minor Permits) 2103.10.a., b. ........................... 2103.11 .................................... 2103.12 .................................... 2103.13 .................................... 2103.14 .................................... 2103.15 .................................... Applicability, Prohibitions, Records. Applications ............................. Issuance, Standard Conditions Expiration, Renewals, Reactivation. Revisions, Amendments, Modifications. Reopenings, Revocations ....... 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) 10/20/95 3/31/98 10/20/95 8/30/04 69 FR 52831 .............. 8/30/04 69 FR 52831 .............. 8/30/04 69 FR 52831 .............. (c)(209) (c)(209) (c)(209) 1/12/01 8/30/04 69 FR 52831 .............. (c)(209) 10/20/95 8/30/04 69 FR 52831 .............. (c)(209) Subpart 2—Additional Requirements for Major Permits 2103.20.b.4 .............................. Applicability, Prohibitions, Records. 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) Part D—Pollutant Emission Standards 2104.01 .................................... 2104.02 .................................... Visible Emissions .................... Particualte Mass Emissions .... 10/20/95 8/15/97 11/14/02 67 FR 68935 ............ 6/12/98 63 FR 32126 .............. 2104.03 2104.05 2104.06 2104.07 Sulfur Oxide Emissions ........... Materials Handling .................. Violations ................................. Stack Heights .......................... 7/10/03 10/20/95 10/20/95 10/20/95 7/21/04 69 FR 43522 .............. 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ .................................... .................................... .................................... .................................... (c)(192) (c)(133)(i)(B)(); Citation changes approved on 11/12/ 02 (67 FR 68935) at (c)(192) (c)(216)(i)(C) (c)(192) (c)(192) (c)(192) Part E—Source Emission and Operating Standards 2105.01 .................................... 2105.02 .................................... 2105.03 .................................... 2105.04 .................................... 2105.06 .................................... Equivalent Compliance Techniques. Other Requirements Not Affected. Operation and Maintenance .... Temporary Shutdown of Incineration Equipment. Major Sources of Nitrogen Oxides and Volatile Organic Compounds. 7/10/03 6/24/05 70 FR 36511 .............. 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) 10/20/95 10.7.02 67 FR 62389 .............. (c)(157) Subpart 1—VOC Sources sroberts on PROD1PC70 with RULES 2105.10 .................................... 2105.11 .................................... 2105.12 .................................... 2105.13 2105.14 2105.15 2105.16 2105.17 .................................... .................................... .................................... .................................... .................................... Article XX, Section 532 ............ VerDate Aug<31>2005 20:27 Dec 29, 2006 Surface coating Processes ..... Graphic Arts Systems ............. Volatile Organic Compound Storage Tanks. Gasoline Loading Facilities ..... Gasoline Dispensing Facilities Degreasing Operations ........... Cutback Asphalt Paving .......... Ethylene Production Processes. Dry Cleaning Facilities ............ Jkt 211001 PO 00000 Frm 00020 7/10/03 10/20/95 10/20/95 6/24/05 70 FR 36511 .............. .................................................. 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) 10/20/95 10/20/95 10/20/95 10/20/95 10/20/95 11/14/02 11/14/02 11/14/02 11/14/02 11/14/02 (c)(192) (c)(192) (c)(192) (c)(192) (c)(192) Fmt 4701 1/1/82 67 67 67 67 67 FR FR FR FR FR 68935 68935 68935 68935 68935 ............ ............ ............ ............ ............ 1/21/83 48 FR 2768 ................ Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(49) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 219 (2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS—Continued State effective date Article XX or XXI Citation Title/subject 2105.19 .................................... Synthetic Organic Chemical & Polymer Manufacturing-Fugitive Sources. 10/20/95 EPA approval date 11/14/02 67 FR 68935 ............ Additional explanation/ § 52.2063 citation (c)(192) Subpart 2—Slag, Coke, and Miscellaneous Sulfur Sources 2105.20 .................................... 2105.21 .................................... Slag Quenching ....................... Coke Ovens and Coke Oven Gas. 10/20/95 8/15/97 11/14/02 67 FR 68935 ............ 6/12/98 63 FR 32126 .............. 2105.22 .................................... Miscellaneous Sulfur Emitting Processes. 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) (c)(133); 1. EPA approved Revisions effective 7/11/95 on 9/8/98 (63 FR 47434) at (c)(135). 2. EPA approved revisions effective 10/20/95 on 11/14/02 (67 FR 68935) at (c)(192). (c)(192) Subpart 3—Incineration and Combustion Sources 2105.30 (except paragraphs .b.3. and .f). Incinerators .............................. 10/20/95 11/14/02 67 FR 68935 ............ (c)(192); Section 2105.30.f. is Federally enforceable as part of the applicable section 111(d) plan Subpart 4—Miscellaneous Fugitive Sources 2105.40 2105.41 2105.42 2105.43 2105.44 2105.45 .................................... .................................... .................................... .................................... .................................... .................................... 2105.46 .................................... 2105.47 .................................... 2105.48 .................................... 2105.49.a, .b ............................ Permit Source Premises ......... Non-permit Premises .............. Parking Lots and Roadways ... Permit Source Transport ......... Non-Permit Source Transport Construction and Land Clearing. Mining ...................................... Demolition ............................... Areas Subject to Sections 2105.40 Through 2105.47. Fugitive Emissions .................. 10/20/95 10/20/95 10/20/95 10/20/95 10/20/95 10/20/95 11/14/02 11/14/02 11/14/02 11/14/02 11/14/02 11/14/02 67 67 67 67 67 67 FR FR FR FR FR FR 68935 68935 68935 68935 68935 68935 ............ ............ ............ ............ ............ ............ (c)(192) (c)(192) (c)(192) (c)(192) (c)(192) (c)(192) 10/20/95 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) (c)(192) 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) Subpart 5—Open Burning and Abrasive Blasting Sources 2105.50 (except paragraph .50.d). Article XX, Section 533 ............ Open Burning .......................... 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) Abrasive Blasting .................... 10/9/86 10/19/87 51 FR 38758 ............ (c)(69) Subpart 7—Miscellaneous VOC Sources 2105.70 .................................... 2105.71 .................................... 2105.72 .................................... 2105.74 .................................... 2105.75 .................................... 2105.76 .................................... Petroleum Refineries ............... Pharmaceutical Products ........ Manufacturer of Pneumatic Rubber Tires. Aerospace Manufacturing and Rework. Mobile Equipment Repair and Refinishing. Wood Furniture Manufacturing Operations. 10/20/95 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 7/10/03 6/24/05 70 FR 36511 .............. 7/10/03 6/24/05 70 FR 36511 .............. 7/10/03 (c)(192) (c)(192) (c)(192) 6/24/05 70 FR 36511 .............. Subpart 9—Transportation Related Sources 2105.90 .................................... Gasoline Volatility .................... 5/15/98 9/ 1/99 4/17/01 66 FR 19724 .............. (c)(151) sroberts on PROD1PC70 with RULES Part F—Air Pollution Episodes 2106.01 .................................... 2106.02 .................................... 2106.03 .................................... 2106.04 .................................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Air Pollution Episode System .. Air Pollution Source Curtailment Plans. Episode Criteria ....................... Episode Actions ...................... Jkt 211001 PO 00000 Frm 00021 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 220 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS—Continued State effective date Article XX or XXI Citation Title/subject 2106.05 .................................... USX-Clairton Works PM–10 Self Audit Emergency Action Plan. 8/15/97 EPA approval date 6/12/98 63 FR 32126 .............. Additional explanation/ § 52.2063 citation (c)(133)(i)(B)(3) Part G—Methods 2107.01 .................................... 2107.02 .................................... 2107.03 .................................... 2107.04 (except paragraph .04.h). 2107.05 .................................... 2107.06 .................................... 2107.07 .................................... 2107.08 .................................... 2107.10 .................................... 2107.11 .................................... 2107.15 .................................... 2107.20.c, .g through .j, .m and .n. General .................................... Particulate Matter .................... Sulfur Oxides ........................... Volatile Organic Compounds .. 10/20/95 10/20/95 10/20/95 10/20/95 11/14/02 11/14/02 11/14/02 11/14/02 67 67 67 67 FR FR FR FR 68935 68935 68935 68935 ............ ............ ............ ............ (c)(192) (c)(192) (c)(192) (c)(192) Nitrogen Oxides ...................... Incinerator Temperatures ........ Coke Oven Emissions ............. Coke Oven Gas ...................... Sulfur Content of Coke ........... Visible Emissions .................... Gasoline Volatility and RFG .... Ambient Measurements .......... 10/20/95 10/20/95 10/20/95 10/20/95 10/20/95 10/20/95 5/15/98 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 4/17/01 66 FR 19724 .............. 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) (c)(192) (c)(192) (c)(192) (c)(192) (c)(151) (c)(192) Part H—Reporting, Testing & Monitoring 2108.01 .................................... 2109.01.a. ................................ 2108.01.b ................................. 2108.01.c .................................. 2108.01.d. ................................ 2108.01.e (Except paragraphs e.1.A & .B). 2108.01.f .................................. 2108.01.g ................................. 2108.02 .................................... 2108.03 .................................... 2108.04 .................................... Reports Required .................... Termination of Operation ........ Shutdown of Control Equipment. Breakdowns ............................. Cold Start ................................ Emissions Inventory Statements. Orders ..................................... Violations ................................. Emissions Testing ................... Continuous Emissions Monitoring. Ambient Monitoring ................. 10/20/95 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) (c)(192) 10/20/95 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) (c)(192) 10/20/95 10/20/95 10/20/95 10/20/95 11/14/02 11/14/02 11/14/02 11/14/02 ............ ............ ............ ............ (c)(192) (c)(192) (c)(192) (c)(192) 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) 67 67 67 67 FR FR FR FR 68935 68935 68935 68935 Part I—Enforcement 2109.01 .................................... 2109.02 (except paragraph .02.a.7). 2109.03a. (introductory sentence), b. through f. 2109.04 .................................... 2109.05 .................................... 2109.06 (Except paragraphs .06a.a.2, .a.3, and .a.4). 2109.10 .................................... 2109.20 .................................... Inspections .............................. Remedies ................................ 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) Enforcement Orders ................ 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) Orders Establishing an Additional or More Restrictive Standard. Emergency Orders .................. Civil Proceedings .................... 10/20/95 11/14/02 67 FR 68935 ............ (c)(192) 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) Appeals ................................... General Federal Conformity .... 10/20/95 10/20/95 11/14/02 67 FR 68935 ............ 11/14/02 67 FR 68935 ............ (c)(192) (c)(192) (3) EPA-APPROVED PHILADELPHIA AMS REGULATIONS Rule citation State effective date Title/subject EPA approval date Additional explanation/ § 52.2063 citation sroberts on PROD1PC70 with RULES Title 3—Air Management Code Chapter 3–100 ......................... Chapter 3–200 (Except § 3– 207(4)). Chapter 3–300 ......................... General Provisions .................. Prohibited Conduct .................. 10/20/69 10/4/76 5/31/72 37 FR 10842 .............. 6/4/79 44 FR 31980 ................ (c)(1) (c)(18) Administrative Provisions ........ 9/21/72 3/12/79 44 FR 13480 .............. (c)(15) Regulation I—General Provisions Section I ................................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Definitions ................................ Jkt 211001 PO 00000 Frm 00022 4/29/70 Fmt 4701 5/31/72 37 FR 10842 .............. Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(1) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 221 (3) EPA-APPROVED PHILADELPHIA AMS REGULATIONS—Continued State effective date Rule citation Title/subject Section II (Except portions of paragraph II.B). Section III ................................. Section IV ................................. Section V .................................. Section VI ................................. Section VII ................................ Section VIII ............................... Section IX ................................. Section XI.D ............................. Source Registration and Emission Reporting. Testing and Test Methods ...... Availability of Technology ....... Improvement and Plan ............ Pre-existing Regulations ......... Circumvention ......................... Severability .............................. Effective Date .......................... Compliance with Federal Regulations—Stack Height Regulations. 5/4/74 4/29/70 4/29/70 4/29/70 4/29/70 4/29/70 4/29/70 4/29/70 3/27/86 Additional explanation/ § 52.2063 citation EPA approval date 9/9/75 40 FR 41787 ................ (c)(12) 5/31/72 5/31/72 5/31/72 5/31/72 5/31/72 5/31/72 5/31/72 1/23/89 (c)(1) (c)(1) (c)(1) (c)(1) (c)(1) (c)(1) (c)(1) (c)(70) 37 37 37 37 37 37 37 54 FR FR FR FR FR FR FR FR 10842 .............. 10842 .............. 10842 .............. 10842 .............. 10842 .............. 10842 .............. 10842 .............. 3029 ................ Regulation II—Air Contaminant and Particulate Matter Emissions Section Section Section Section I ................................... II .................................. IV ................................. V .................................. Section VI ................................. Section VII ................................ Section VIII ............................... Table 1 ..................................... No Title [General Provisions] .. Open Fires .............................. Visible Emissions .................... Particulate Matter Emissions from the Burning of Fuels. Selection of Fuel for Particulate Matter Emission Control. Particulate Matter Emissions from Chemical, Metallurgical, Mechanical and Other Processes. Fugitive Dust ........................... No Title [Allowable Process Weight Emissions]. 4/29/70 4/29/70 5/4/74 8/27/81 5/31/72 37 FR 10842 .............. 5/31/72 37 FR 10842 .............. 9/9/75 40 FR 41787 ................ 4/16/82 47 FR 16325 .............. (c)(1) (c)(1) (c)(12) (c)(43) 4/29/70 5/31/72 37 FR 10842 .............. (c)(1) 4/29/70 5/31/72 37 FR 10842 .............. (c)(1) 4/29/70 4/29/70 5/31/72 37 FR 10842 .............. 5/31/72 37 FR 10842 .............. (c)(1) (c)(1) Regulation III—The Control of Emissions of Oxides and Sulfur Compounds Section I ................................... Section II .................................. Section III ................................. No Title [General Provisions] .. Control of Emission of Sulfur Compounds. Control of Sulfur in Fuels ........ 4/29/70 5/10/80 5/31/72 37 FR 10842 .............. 9/17/81 46 FR 46133 .............. (c)(1) (c)(37) 8/27/81 4/16/82 47 FR 16325 .............. (c)(43) Regulation IV—Governing Air Pollution Control Measures During High Air Pollution Episodes Section Section Section Section I ................................... II .................................. III ................................. IV ................................. Section V .................................. Section VI ................................. Section VII ................................ Section VIII ............................... Table I ...................................... Table II ..................................... Table III .................................... sroberts on PROD1PC70 with RULES Table IV .................................... Definitions ................................ Declaration of Conditions ........ Termination of Conditions ....... Alert and Notification System by the Health Commissioner and the Emergency Coordinator. Advance Preparation for High Air Pollution Episodes. Actions and Restrictions ......... Severability .............................. Effective Date .......................... Minimum Abatement Strategies for Emission Reduction Plans—Stage I Condition. Minimum Abatement Strategies for Emission Reduction Plans—Emergency Condition. Minimum Abatement Strategies for Emission Reduction Plans—Emergency Condition. Emergency Business and Establishment List. 2/5/71 2/5/71 2/5/71 2/5/71 5/31/72 5/31/72 5/31/72 5/31/72 37 37 37 37 .............. .............. .............. .............. (c)(1) (c)(1) (c)(1) (c)(1) 2/5/71 5/31/72 37 FR 10842 .............. (c)(1) 2/5/71 2/5/71 2/5/71 2/5/71 5/31/72 5/31/72 5/31/72 5/31/72 .............. .............. .............. .............. (c)(1) (c)(1) (c)(1) (c)(1) 2/5/71 5/31/72 37 FR 10842 .............. (c)(1) 2/5/71 5/31/72 37 FR 10842 .............. (c)(1) 2/5/71 5/31/72 37 FR 10842 .............. (c)(1) 37 37 37 37 FR FR FR FR FR FR FR FR 10842 10842 10842 10842 10842 10842 10842 10842 Regulation V—Control of Emissions of Organic Substances From Stationary Sources Section I (Except for definitions related to paragraphs V.C. & V.D.). Section I ................................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Definitions ................................ 11/28/86 6/16/93 58 FR 33200 .............. (c)(83) Definitions ................................ 5/23/88 4/6/93 48 FR 17778 ................ (c)(78) Jkt 211001 PO 00000 Frm 00023 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 222 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (3) EPA-APPROVED PHILADELPHIA AMS REGULATIONS—Continued State effective date Additional explanation/ § 52.2063 citation Rule citation Title/subject Section II .................................. Section III ................................. Section IV ................................. Section V (Except paragraphs V.C. and V.D.). Section VI ................................. Section VII ................................ Storage Tanks ......................... Oil-Effluent Water Separator ... Pumps and Compressors ....... Organic Material Loading ........ 7/10/71 7/10/71 7/10/71 7/10/71 5/31/72 5/31/72 5/31/72 5/31/72 .............. .............. .............. .............. (c)(1) (c)(1) (c)(1) (c)(1) 7/10/71 7/10/71 5/31/72 37 FR 10842 .............. 5/31/72 37 FR 10842 .............. (c)(1) (c)(1) 7/10/71 7/10/71 11/28/86 5/31/72 37 FR 10842 .............. 5/31/72 37 FR 10842 .............. 6/16/93 58 FR 33192 .............. (c)(1) (c)(1) (c)(82) 11/28/86 4/12/93 58 FR 19066 .............. (c)(77) Section XII ................................ Section XIII ............................... Section XXII ............................. Solvents ................................... Processing of Photochemically Reactive Materials. Architectural Coatings ............. Disposal of Solvents ............... Compliance with Pennsylvania Standards for Volatile Organic Compounds (VOC). Petroleum Solvent Dry Cleaning. Pharmaceutical Tablet Coating Process Equipment Leaks ...... Circumvention ......................... 6/16/93 58 FR 33200 .............. 4/6/93 58 FR 17778 ................ 5/31/72 37 FR 10842 .............. (c)(83) (c)(78) (c)(1) Section XXIII ............................ Severability .............................. 5/31/72 37 FR 10842 .............. (c)(1) Section XXIV ............................ Effective Date .......................... 11/28/86 5/23/98 7/10/71 recodified 7/10/71 recodified 5/23/88 7/10/71 recodified 5/23/88 5/31/72 37 FR 10842 .............. (c)(1) Section VIII ............................... Section IX ................................. Section X .................................. Section XI ................................. EPA approval date 37 37 37 37 FR FR FR FR 10842 10842 10842 10842 Regulation VII—Control of Emissions of Nitrogen Oxides From Stationary Sources Section Section Section Section Section Section Section I ................................... II .................................. III ................................. IV ................................. V .................................. VI ................................. VII ................................ Definitions ................................ Fuel Burning Equipment ......... Nitric Acid Plants ..................... Emissions Monitoring .............. Circumvention ......................... Severability .............................. Effective Date .......................... 7/1/72 11/20/85 7/1/72 7/1/72 7/1/72 7/1/72 7/1/72 5/14/73 1/14/87 5/14/73 5/14/73 5/14/73 5/14/73 5/14/73 38 52 38 38 38 38 38 FR FR FR FR FR FR FR 12696 .............. 1456 ................ 12696 .............. 12696 .............. 12696 .............. 12696 .............. 12696 .............. (c)(7) (c)(65) (c)(7) (c)(7) (c)(7) (c)(7) (c)(7) Regulation VIII—Control of Emissions of Carbon Monoxide From Stationary Sources Section Section Section Section Section Section I ................................... II .................................. III ................................. IV ................................. V .................................. VI ................................. Definitions ................................ General .................................... Emissions Monitoring .............. Circumvention ......................... Severability .............................. Effective Date .......................... 8/20/72 8/20/72 8/20/72 8/20/72 8/20/72 8/20/72 5/14/73 5/14/73 5/14/73 5/14/73 5/14/73 5/14/73 38 38 38 38 38 38 FR FR FR FR FR FR 12696 12696 12696 12696 12696 12696 .............. .............. .............. .............. .............. .............. (c)(7) (c)(7) (c)(7) (c)(7) (c)(7) (c)(7) Regulation XI—Control of Emissions From Incinerators Section I ................................... Section II .................................. Section III (Except paragraph III.E. (odors)). Section IV ................................. Section V .................................. Section VI ................................. Section VII ................................ Section VIII ............................... Section IX ................................. Definitions ................................ General Provisions .................. Emissions Limitations .............. 5/4/74 5/4/74 5/4/74 9/9/75 40 FR 41787 ................ 9/9/75 40 FR 41787 ................ 9/9/75 40 FR 41787 ................ (c)(12) (c)(12) (c)(12) Design ..................................... Operation ................................. Permits and Licenses .............. Circumvention ......................... Severability .............................. Effective Date .......................... 5/4/74 5/4/74 5/4/74 5/4/74 5/4/74 5/4/74 9/9/75 9/9/75 9/9/75 9/9/75 9/9/75 9/9/75 (c)(12) (c)(12) (c)(12) (c)(12) (c)(12) (c)(12) 40 40 40 40 40 40 FR FR FR FR FR FR 41787 41787 41787 41787 41787 41787 ................ ................ ................ ................ ................ ................ Regulation XIII Construction, Modification, Reactivation and Operation of Sources sroberts on PROD1PC70 with RULES Section I ................................... Section II .................................. Introduction .............................. Program Adoption ................... 10/30/95 10/30/95 3/28/03 68 FR 15059 .............. 3/28/03 68 FR 15059 .............. (d) EPA-approved source-specific requirements. VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00024 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(203) (c)(203) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 223 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX) Name of source Permit number County State effective date EPA approval date Additional explanation/ § 52.2063 citation For exceptions, see the applicable paragraphs in 40 CFR § 52.2063(c) 04–313–052 .......... Beaver .................. 12/9/86 IMC Chemical Group ........................... 39–313–014 .......... Lehigh ................... 12/10/86 Aristech Chemical Corp ....................... 86–I–0024–P ........ Allegheny .............. The Knoll Group ................................... 46–326–001A ....... Montgomery .......... 8/28/86 3/3/87 3/24/93 ESSROC Materials .............................. PA–48–0004A ....... Northampton ......... 12/20/94 Pennsylvania Power and Light Co. (PP&L)—Brunner Island. PPG Industries, Inc.—South Middleton PA–67–2005 ......... York ...................... 12/22/94 OP–21–2002 ......... Cumberland .......... 12/22/94 Stroehmann Bakeries—Dauphin County. General Electric Transportation Systems—Erie. J. E. Baker Co. (Refractories)—York .. PA–22–2003 ......... Dauphin ................ 12/22/94 OP–25–025 ........... Erie ....................... 12/21/94 OP–67–2001 ......... York ...................... 12/22/94 Lafarge Corp. ....................................... OP–39–0011 ......... Lehigh ................... 12/23/94 Lafarge Corp. ....................................... PA–39–0011A ....... Lehigh ................... 12/23/94 West Penn Power—Armstrong ............ PA–03–000–023 ... Armstrong ............. 12/29/94 West Penn Power—Armstrong ............ PA–03–306–004 ... Armstrong ............. 3/28/94 West Penn Power—Armstrong ............ PA–03–306–006 ... Armstrong ............. 11/22/94 Plain and Fancy Kitchens, Inc ............. PA–38–318–019C Lebanon ................ 12/23/94 Stroehmann Bakeries—Bradford County. Stroehmann Bakeries—Bradford County. Stroehmann Bakeries—Lycoming County. Stroehmann Bakeries—Lycoming County. Philadelphia Electric Co. (PECO)— Eddystone. Philadelphia Electric Co. (PECO)— Eddystone. Gilberton Power Co.—John Rich Memorial. Bethlehem Steel—Coke and Chemical Production. Bethlehem Steel—Foundry .................. PA–08–0001 ......... Bradford ................ 2/9/95 OP–08–0001A ...... Bradford ................ 2/9/95 PA–41–0001 ......... Lycoming .............. 2/9/95 OP–41–0001A ...... Lycoming .............. 2/9/95 OP23–0017 ........... Delaware ............... 12/28/94 PA23–0017 ........... Delaware ............... 12/28/94 OP–54–0004 ......... Schuylkill ............... 12/20/94 OP–48–0013 ......... Northampton ......... 12/20/94 OP–48–0014 ......... Northampton ......... 12/20/94 Bethlehem Steel—Structural Products OP–48–0010 ......... Northampton ......... 12/20/94 Bethlehem Steel—Forging ................... OP–48–0015 ......... Northampton ......... 12/20/94 Westwood Energy Properties, Inc. (CRS Sirrine, Inc.). PECO Energy Co.—Front Street ......... sroberts on PROD1PC70 with RULES ARCO Chemical Company .................. OP–54–000–6 ....... Schuylkill ............... 12/27/94 OP–46–0045 ......... Montgomery .......... 3/31/95 Crawford Furniture Manufacturing Corp.—Clarion County. Schuylkill Energy Resources ............... OP–16–021 ........... Clarion .................. 3/27/95 OP–54–0003 ......... Schuylkill ............... 5/19/95 Columbia Gas Transmission Corp.— Milford Compressor Station. Texas Eastern Transmission Corp.— Entriken Compressor Station. OP–52–0001 ......... Pike ....................... 4/21/95 OP–31–2003 ......... Huntingdon ........... 5/16/95 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00025 Fmt 4701 Sfmt 4700 5/16/90 .................. 55 FR 20267 5/16/90 .................. 55 FR 20267 6/16/93 .................. 58 FR 33197 10/19/93 ................ 58 FR 53885 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/08/95 ................ 60 FR 40292 08/10/95 ................ 60 FR 40758 08/10/95 ................ 60 FR 40758 08/10/95 ................ 60 FR 40758 08/10/95 ................ 60 FR 40758 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(71) (c)(72) (c)(80) (c)(87) (c)(98)(i)(B)(1) (c)(98)(i)(B)(2) (c)(98)(i)(B)(3) (c)(98)(i)(B)(4) (c)(98)(i)(B)(5) (c)(98)(i)(B)(6) (c)(98)(i)(B)(7 ) (c)(98)(i)(B)(7 ) (c)(98)(i)(B)(8) (c)(98)(i)(B)(8) (c)(98)(i)(B)(8) (c)(98)(i)(B)(9) (c)(101)(i)(B) (c)(101)(i)(B) (c)(101)(i)(B) (c)(101)(i)(B) (c)(102)(i)(B)(1) (c)(102)(i)(B)(1) (c)(102)(i)(B)(2) (c)(102)(i)(B)(3) (c)(102)(i)(B)(3) (c)(102)(i)(B)(3) (c)(102)(i)(B)(3) (c)(102)(i)(B)(4) (c)(102)(i)(B)(5) (c)(102)(i)(B)(6) (c)(102)(i)(B)(7 ) (c)(102)(i)(B)(9) (c)(102)(i)(B)(10) 224 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Name of source Permit number County Columbia Gas Transmission Corp.— Greencastle Compressor Station. Lord Corporation—Aerospace Div ....... OP–28–2003 ......... Franklin ................. 4/21/95 OP–25–095 ........... Erie ....................... 3/30/95 PA–53–0001 ......... OP–53–0001 CP–53–0001 OP–14–0003 ......... Potter .................... 11/27/95 Centre ................... 12/27/94 OP–14–309–009C Centre ................... 5/5/94 OP–14–309–010A Centre ................... 8/18/94 OP–14–309–037A Centre ................... 5/5/94 OP–48–0001 ......... PA–48–0001A OP–05–2007 ......... Northampton ......... 5/19/95 Bedford ................. 5/16/95 PA–36–2025 ......... Lancaster .............. 5/16/95 OP–48–0005 ......... PA–48–0005A OP–48–0007 ......... Northampton ......... 12/23/94 Northampton ......... 12/29/94 Tennessee Gas Pipeline Co. (TENNECO)—Station 313. Corning Asahi Video Products—State College. Corning Asahi Video Products—State College. Corning Asahi Video Products—State College. Corning Asahi Video Products—State College. Columbia Gas Transmission Corp.— Easton Compressor Station. Texas Eastern Transmission Corp.— Bedford Compressor Station. Texas Eastern Transmission Corp.— Marietta Compressor Station. Hercules Cement Co. .......................... ESSROC (formerly Lone Star Industries, Inc.). Pennsylvania Power and Light Co. (PP&L)—Montour. Pennsylvania Electric Co. (PENELEC)—Shawville. Zinc Corp. of America—Potter Twp. .... Montour ................. 12/27/94 Clearfield ............... 12/27/94 OP–04–000–044 ... Beaver .................. 12/29/94 The Proctor and Gamble Paper Products Company Mehoopany. Columbia Gas Transmission Corp.— Union City Compressor Station. James River Corp.—Chambersburg .... OP–66–0001 ......... PA–66–0001A OP–25–892 ........... Wyoming ............... 12/20/94 Erie ....................... 4/11/95 OP–28–2006 ......... Franklin ................. 6/14/95 Appleton Papers, Inc.—Harrisburg ...... OP–21–2004 ......... Cumberland .......... 5/24/95 Air Products and Chemicals, Inc.— Corporate R & D. Elf Atochem North America, Inc.—King of Prussia. York City Sewer Authority (Wastewater Treatment Plant). Glasgow, Inc.—Ivy Rock ...................... OP–39–0008 ......... Lehigh ................... 5/25/95 OP–46–0022 ......... Montgomery .......... 6/27/95 OP–67–2013 ......... York ...................... 3/1/95 OP–46–0043 ......... Montgomery .......... 6/7/95 Glasgow, Inc.—Spring House .............. OP–46–0029 ......... Montgomery .......... 6/7/95 Glasgow, Inc.—Catanach .................... OP–15–0021 ......... Chester ................. 6/7/95 Glasgow, Inc.—Freeborn ..................... OP–23–0026 ......... Delaware ............... 6/7/95 UGI Utilities—Hunlock Creek ............... sroberts on PROD1PC70 with RULES OP–47–0001 ......... PA–47–0001A PA–17–0001 ......... OP–40–0005 ......... PA–40–0005A PA–67–2009 ......... Luzerne ................. 12/20/94 York ...................... 8/17/95 CP–67–2009 ......... York ...................... 8/17/95 OP–18–0001 ......... PA–18–0001 OP–53–0007 ......... PA–53–0007A PA–67–2006 ......... Clinton ................... 7/18/95 Potter .................... 7/17/95 York ...................... 8/25/95 PA–06–1036 ......... Berks ..................... 5/12/95 PA–06–315–001 ... Berks ..................... 6/4/92 Solar Turbines, Inc. (York Cogeneration Facility). Solar Turbines, Inc. (York Cogeneration Facility). Columbia Gas Transmission Corp.— Renovo Compressor Station. National Fuel Gas Supply Corp.—East Fork Compressor Station. York County Solid Waste & Refuse Authority (Y.C.R.R.C.). W. R. Grace and Co.—FORMPAC Div.. W. R. Grace and Co.—Reading Plant VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00026 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 09/08/95 ................ 60 FR 46768 09/08/95 ................ 60 FR 46768 04/09/96 ................ 61 FR 15709 (c)(102)(i)(B)(11) 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 04/09/96 ................ 61 FR 15709 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 02/12/96 ................ 61 FR 05303 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(102)(i)(B)(12) (c)(103)(i)(B)(1) (c)(103)(i)(B)(2) (c)(103)(i)(B)(2) (c)(103)(i)(B)(2) (c)(103)(i)(B)(2) (c)(103)(i)(B)(3) (c)(103)(i)(B)(4) (c)(103)(i)(B)(5) (c)(103)(i)(B)(6) (c)(103)(i)(B)(7 ) (c)(103)(i)(B)(8) (c)(103)(i)(B)(9) (c)(103)(i)(B)(10) (c)(103)(i)(B)(11) (c)(103)(i)(B)(12) (c)(104)(i)(C)(1) (c)(104)(i)(C)(2) (c)(104)(i)(C)(3) (c)(104)(i)(C)(4) (c)(104)(i)(C)(5) (c)(104)(i)(C)(6) (c)(104)(i)(C)(7 ) (c)(104)(i)(C)(8) (c)(104)(i)(C)(9) (c)(108)(i)(B)(1) (c)(108)(i)(B)(2) (c)(108)(i)(B)(2) (c)(108)(i)(B)(3) (c)(108)(i)(B)(4) (c)(108)(i)(B)(5) (c)(108)(i)(B)(6) (c)(108)(i)(B)(6) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 225 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Name of source Permit number County CNG Transmission Corp.—Cherry Tree Sta.. EPC Power Corp. of Bethlehem (Crozer Chester CoGen). C–P Converters, Inc.—York ................ PA–32–000–303 ... Indiana .................. 7/5/95 OP–23–0007 ......... Delaware ............... 6/8/95 OP–67–2030 ......... York ...................... 8/30/95 Fisher Scientific Co. International—Indiana. Adelphi Kitchens, Inc.—Robesonia Factory. Birchcraft Kitchens, Inc.—Reading Factory. Glasgow, Inc.—Bridgeport Asphalt Plant. Caparo Steel Co.—Farrell ................... OP–32–000–100 ... Indiana .................. 7/18/95 OP–06–1001 ......... Berks ..................... 4/4/95 OP–06–1005 ......... Berks ..................... 4/4/95 OP–46–0044 ......... Montgomery .......... 6/7/95 OP–43–285 ........... Mercer ................... 11/3/95 Sharon Steel Corp.—Farrell ................ OP–43–017 ........... Mercer ................... 11/3/95 DMi Furniture, Inc.—Timely Plant #7 (Gettysburg). R. R. Donnelley and Sons Co.—Lancaster West Plant. International Paper Company— Hammermill Papers Division. Lucent Technology (formerly AT&T Corp.)—Reading. Garden State Tanning, Inc.— Fleetwood Plant. Glidden Co., The—Reading ................. OP–01–2001 ......... Adams ................... 6/13/95 OP–36–2026 ......... Lancaster .............. 7/14/95 OP–18–0005 ......... Clinton ................... 12/27/94 PA–06–1003 ......... Berks ..................... 6/26/95 PA–06–1014 ......... Berks ..................... 6/21/95 OP–06–1035 ......... Berks ..................... 2/15/96 Maier’s Bakery—Reading Plant ........... PA–06–1023 ......... Berks ..................... 9/20/95 Morgan Corp.—Morgantown Plant ...... OP–06–1025 ......... Berks ..................... 8/31/95 Allentown Cement Co., Inc.—Evansville Plant. Quaker Maid (Schrock Cabinet Group)—Leesport. Brentwood Industries, Inc.—Reading Plant. Metropolitan Edison Co. (MetEd)— Titus Station. ICI Fluoropolymers—Downingtown ..... PA–06–1002 ......... Berks ..................... 10/11/95 OP–06–1028 ......... Berks ..................... 10/27/95 PA–06–1006 ......... Berks ..................... 2/12/96 PA–06–1024 ......... Berks ..................... 3/9/95 PA–15–0009 ......... CP–15–0009 PA–39–0007A ....... Chester ................. 10/3/95 Lehigh ................... 8/10/95 OP–36–2022 ......... Lancaster .............. 9/27/95 OP–19–0003 ......... Columbia ............... 11/27/95 OP–15–0006 ......... Chester ................. 11/30/95 OP–06–1033 ......... Berks ..................... 1/31/97 OP–06–1034 ......... Berks ..................... 1/31/97 OP–06–1007 ......... Berks ..................... 9/27/96 06–1026 ................ CP–06–1026 PA–53–0004A ....... Berks ..................... Potter .................... 4/19/95 6/1/95 2/29/96 OP–53–0004 ......... Potter .................... 2/29/96 CP–53–0004A ...... Potter .................... 2/29/96 PA–53–0003A ....... Potter .................... 12/18/95 sroberts on PROD1PC70 with RULES Synthetic Thread Co., Inc.—Bethlehem. Bird-in-Hand Woodwork, Inc. (Childcraft Education Corp.). Heinz Pet Products—Bloomsburg ....... Graco Children’s Products, Inc.— Elverson. Texas Eastern Transmission Corp.— Bernville. Texas Eastern Transmission Corp.— Bechtelsville. Carpenter Technology Corp.—Reading Plant. North American Fluoropolymers Co. (NAFCO). CNG Transmission Corp.—Ellisburg Compressor Station. CNG Transmission Corp.—Ellisburg Compressor Station. CNG Transmission Corp.—Ellisburg Compressor Station. CNG Transmission Corp.—Greenlick Compressor Station. VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00027 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 05/16/96 ................ 61 FR 24706 12/20/96 ................ 61 FR 67229 12/20/96 ................ 61 FR 67229 (c)(108)(i)(B)(7 ) 03/12/97 ................ 62 FR 11079 03/12/97 ................ 62 FR 11079 01/29/97 ................ 62 FR 04167 04/18/97 ................ 62 FR 19051 04/18/97 ................ 62 FR 19051 04/18/97 ................ 62 FR 19051 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 04/18/97 ................ 62 FR 19047 08/21/97 ................ 62 FR 44413 08/21/97 ................ 62 FR 44413 04/18/97 ................ 62 FR 19049 04/18/97 ................ 62 FR 19049 04/18/97 ................ 62 FR 19049 04/18/97 ................ 62 FR 19049 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(108)(i)(B)(8) (c)(108)(i)(B)(9) (c)(108)(i)(B)(10) (c)(108)(i)(B)(11) (c)(108)(i)(B)(12) (c)(108)(i)(B)(13) (c)(113)(i)(B)(1) 52.2037(g) (c)(113)(i)(B)(2); 52.2036(f); 52.2037(e) (c)(114)(i)(B)(1) (c)(114)(i)(B)(2) (c)(115)(i)(B) (c)(117)(i)(B)(1) (c)(117)(i)(B)(2) (c)(117)(i)(B)(3) (c)(118)(i)(B)(1) (c)(118)(i)(B)(2) (c)(118)(i)(B)(3) (c)(118)(i)(B)(4) (c)(118)(i)(B)(5) (c)(118)(i)(B)(6) (c)(118)(i)(B)(7 ) (c)(118)(i)(B)(8) (c)(118)(i)(B)(9) (c)(119)(i)(B)(1) (c)(119)(i)(B)(2) (c)(120)(i)(B)(1) (c)(120)(i)(B)(2) (c)(120)(i)(B)(3), (ii)(B) (c)(120)(i)(B)(4), (ii)(B) (c)(121)(i)(B)(1) (c)(121)(i)(B)(1) (c)(121)(i)(B)(1) (c)(121)(i)(B)(2) 226 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County CNG Transmission Corp.—Greenlick Station. CNG Transmission Corp.—Greenlick Compressor Station. CNG Transmission Corp.—Crayne Station. CNG Transmission Corp.—State Line Station. CNG Transmission Corp.—Big Run Station. Medusa Cement Company .................. CP–53–0003A ...... Potter .................... 12/18/95 OP–53–0003 ......... Potter .................... 12/18/95 30–000–089 .......... Greene .................. 12/22/95 OP–53–0008 ......... Potter .................... 1/10/96 PA–33–147 ........... Jefferson ............... 6/27/95 OP–37–013 ........... Lawrence .............. 7/27/95 Keystone Cement Co. .......................... OP–48–0003 ......... Northampton ......... 5/25/95 Lehigh Portland Cement Company ..... OP–67–2024 ......... York ...................... 5/26/95 Mercer Lime and Stone Company ....... OP–10–023 ........... Butler .................... 5/31/95 Con-Lime, Inc. ...................................... OP–14–0001 ......... Centre ................... 6/30/95 Pennzoil Products Co.—Rouseville ..... PA–61–016 ........... Venango ............... 9/8/95 R. R. Donnelley & Sons Co.—Lancaster East Plant. Panther Creek Partners ....................... OP–36–2027 ......... Lancaster .............. 7/14/95 OP–13–0003 ......... Carbon .................. 12/2/96 Allegro Microsystems, W.G., Inc.—Willow Grove. Hale Products, Inc.—Conshohocken ... OP–46–0006 ......... Montgomery .......... 12/19/97 OP–46–0057 ......... Montgomery .......... 11/21/97 Con-Lime, Inc.—Bellefonte .................. OP–14–0001 ......... Centre ................... 1/7/98 Coastal Aluminum Rolling Mills, Inc.— Williamsport. ABP/International Envelope Co. .......... OP–41–0007 ......... Lycoming .............. 11/21/97 OP–15–0023 ......... Chester ................. 11/2/95 Brown Printing Company ..................... CP–46–0018 ......... Montgomery .......... Fibre-Metal Products Company ........... OP–23–0025 ......... Delaware ............... 9/26/96 10/27/97 2/20/98 Finnaren & Haley, Inc. ......................... OP–46–0070 ......... Montgomery .......... 3/5/98 Fres-co System USA, Inc. ................... OP–09–0027 ......... Bucks .................... 3/5/98 Graphic Packaging Corporation ........... OP–15–0013 ......... Chester ................. 2/28/98 Montour Oil Service Company, a division of Sun Company, Inc.. Atlantic Refining and Marketing Corp. (Sun Co., Inc. (R&M)). Transwall Corporation .......................... sroberts on PROD1PC70 with RULES Name of source OP–41–0013 ......... Lycoming .............. 3/19/98 OP–49–0015 ......... Northampton ......... 3/19/98 OP–15–0025 ......... Chester ................. 3/10/98 Tavo Packaging (formerly Mead Packaging Company). CNG Transmission Corp.—Harrison Compressor Station. CNG Transmission Corp.—Harrison Compressor Station. CNG Transmission Corp.—Harrison Station. CNG Transmission Corp.—Leidy Station. CNG Transmission Corp.—Leidy Compressor Station. CNG Transmission Corp.—Leidy Station. CNG Transmission Corp.—Sabinsville Compressor Station. OP–09–0008 ......... Bucks .................... 11/8/95 PA–53–0005A ....... Potter .................... 4/16/96 OP–53–0005 ......... Potter .................... 4/16/96 CP–53–0005A ...... Potter .................... 4/16/96 PA–18–0004A ....... Clinton ................... 3/25/96 OP–18–0004 ......... Clinton ................... 2/29/96 CP–18–0004A ...... Clinton ................... 3/25/96 PA–59–0002A ....... Tioga ..................... 12/18/95 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00028 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 06/11/97 ................ 62 FR 31732 06/03/97 ................ 62 FR 30250 06/03/97 ................ 62 FR 30250 06/03/97 ................ 62 FR 30250 06/03/97 ................ 62 FR 30250 06/03/97 ................ 62 FR 30250 06/11/97 ................ 62 FR 31738 07/21/97 ................ 62 FR 33891 09/29/97 ................ 62 FR 50871 03/09/98 ................ 63 FR 11370 03/09/98 ................ 63 FR 11370 03/09/98 ................ 63 FR 11370 03/09/98 ................ 63 FR 11370 03/09/98 ................ 63 FR 11370 03/09/98 ................ 63 FR 11370 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 06/29/98 ................ 63 FR 35145 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 (c)(121)(i)(B)(2) E:\FR\FM\03JAR2.SGM 03JAR2 (c)(121)(i)(B)(2) (c)(121)(i)(B)(3) (c)(121)(i)(B)(4) (c)(121)(i)(B)(5) (c)(122)(i)(B)(1) (c)(122)(i)(B)(2) (c)(122)(i)(B)(3) (c)(122)(i)(B)(4) (c)(122)(i)(B)(5) (c)(124)(i)(B) (c)(125)(i)(B); 52.2036j (c)(128)(i)(B) (c)(130)(i)(B)(1) (c)(130)(i)(B)(2) (c)(130)(i)(B)(3) (c)(130)(i)(B)(4) (c)(130)(i)(B)(5) (c)(130)(i)(B)(6) (c)(132)(i)(B)(1) (c)(132)(i)(B)(2) (c)(132)(i)(B)(3) (c)(132)(i)(B)(4) (c)(132)(i)(B)(5) (c)(132)(i)(B)(6) (c)(132)(i)(B)(7 ) (c)(132)(i)(B)(8) (c)(134)(i)(B)(1) (c)(134)(i)(B)(1) (c)(134)(i)(B)(1) (c)(134)(i)(B)(2) (c)(134)(i)(B)(2) (c)(134)(i)(B)(2) (c)(134)(i)(B)(3) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 227 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County CNG Transmission Corp.—Sabinsville Compressor Station. CNG Transmission Corp.—Sabinsville Station. CNG Transmission Corp.—Tioga Station. Eldorado Properties Corp.—Northumberland Terminal. Endura Products, Inc. .......................... OP–59–0002 ......... Tioga ..................... 12/18/95 CP–59–0002A ...... Tioga ..................... 12/18/95 OP–59–0006 ......... Tioga ..................... 1/16/96 OP–49–0016 ......... Northumberland .... 5/1/98 OP–09–0028 ......... Bucks .................... 5/13/98 Ford Electronics & Refrigeration Company. H & N Packaging, Inc. (formerly Paramount Packaging Corp.) Lancaster County Solid Waste Management Authority. Monsey Products Co.—Kimberton ...... OP–46–0036 ......... Montgomery .......... 4/30/98 OP–09–0038 ......... Bucks .................... 6/8/98 36–02013 .............. Lancaster .............. 6/3/98 OP–15–0031 ......... Chester ................. 6/4/98 Ortho–McNeil Pharmaceutical—Spring House. Piccari Press, Inc. ................................ OP–46–0027 ......... Montgomery .......... 6/4/98 OP–09–0040 ......... Bucks .................... 4/29/98 Pierce and Stevens Corp.—Kimberton OP–15–0011 ......... Chester ................. 3/27/98 PQ Corporation—Chester .................... OP–23–0016 ......... Delaware ............... 6/16/98 Reynolds Metals Company Downington. Rhone–Poulenc Rorer Pharmaceutical, Inc.. Superior Tube Company ...................... OP–15–0004 ......... Chester ................. 5/8/98 OP–46–0048B ...... Montgomery .......... 4/2/98 OP–46–0020 ......... Montgomery .......... 4/17/98 Uniform Tubes Inc. .............................. OP–46–0046A ...... Montgomery .......... 3/26/98 U.S. Air Force—Willow Grove Air Reserve Station. Naval Air Station, Joint Reserve Base—Willow Grove. Columbia Gas Transmission Corp.— Artemas Compressor Station. Columbia Gas Transmission Corp.— Donegal Compressor Station. Columbia Gas Transmission Corp.— Gettysburg Compressor Station. Columbia Gas Transmission Corp.— Eagle Compressor. Columbia Gas Transmission Corp.— Downingtown. GKN Sinter Metals, Inc. ....................... OP–46–0072 ......... Montgomery .......... 5/1/98 OP–46–0079 ......... Montgomery .......... 5/4/98 05–2006 ................ Bedford ................. 4/19/95 63–000–631 .......... Washington ........... 7/10/95 01–2003 ................ Adams ................... 4/21/95 OP–15–0022 ......... Chester ................. 2/1/96 CP–15–0020 ......... Chester ................. 9/15/95 OP–12–0002 ......... Cameron ............... 10/30/98 Cabinet Industries, Inc.—Water Street Plant. Springs Window Fashions Division, Inc.. Centennial Printing Corp. ..................... OP–47–0005 ......... Montour ................. 9/21/98 OP–41–0014 ......... Lycoming .............. 9/29/98 OP–46–0068 ......... Montgomery .......... Strick Corp.—Danville .......................... sroberts on PROD1PC70 with RULES Name of source OP–47–0002 ......... Montour ................. 10/31/96 5/11/98 8/28/96 Handy and Harmon Tube Co.—Norristown. Boeing Defense & Space Group—Helicopters Div.. Delaware County Regional Authority’s Western Regional Treatment Plant (DELCORA WRTP). Delbar Products, Inc.—Perkasie .......... OP–46–0016 ......... Montgomery .......... 9/25/95 CP–23–0009 ......... Delaware ............... 9/3/97 OP–23–0032 ......... Delaware ............... 3/12/97 5/16/97 OP–09–0025 ......... Bucks .................... 2/1/96 Department of Public Welfare (NSH)— Norristown. OP–46–0060 ......... Montgomery .......... 1/21/98 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00029 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 10/08/98 ................ 63 FR 54050 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 11/06/98 ................ 63 FR 59884 12/03/98 ................ 63 FR 66755 12/03/98 ................ 63 FR 66755 12/03/98 ................ 63 FR 66755 12/03/98 ................ 63 FR 66755 12/03/98 ................ 63 FR 66755 04/16/99 ................ 64 FR 18821 04/16/99 ................ 64 FR 18821 04/16/99 ................ 64 FR 18821 04/16/99 ................ 64 FR 18821 04/16/99 ................ 64 FR 18821 04/16/99 ................ 64 FR 18821 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 (c)(134)(i)(B)(3) 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(134)(i)(B)(3) (c)(134)(i)(B)(4) (c)(136)(i)(B)(1) (c)(136)(i)(B)(2) (c)(136)(i)(B)(3) (c)(136)(i)(B)(4) (c)(136)(i)(B)(5) (c)(136)(i)(B)(6) (c)(136)(i)(B)(7 ) (c)(136)(i)(B)(8) (c)(136)(i)(B)(9) (c)(136)(i)(B)(10) (c)(136)(i)(B)(11) (c)(136)(i)(B)(12) (c)(136)(i)(B)(13) (c)(136)(i)(B)(14) (c)(136)(i)(B)(15) (c)(136)(i)(B)(16) (c)(137)(i)B)(1) (c)(137)(i)B)(2) (c)(137)(i)B)(3) (c)(137)(i)B)(4) (c)(137)(i)B)(5) (c)(138)(i)(B)(1) (c)(138)(i)(B)(2) (c)(138)(i)(B)(3) (c)(138)(i)(B)(4) (c)(138)(i)(B)(5) (c)(138)(i)(B)(6) (c)(143)(i)(B)(1) (c)(143)(i)(B)(2) (c)(143)(i)(B)(3) (c)(143)(i)(B)(4) 228 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Dopaco, Inc.—Downingtown ................ CP–15–0029 ......... Chester ................. 3/6/96 Garlock, Inc. (Plastomer Products) ...... PA–09–0035 ......... Bucks .................... 3/12/97 Interstate Brands Corporation (for- PLID (51–)5811 .... merly, Continental Baking Company). J. B. Slevin Company Inc.— OP–23–0013 ......... Lansdowne. Laclede Steel Co.—Fairless ................ OP–09–0023 ......... Philadelphia .......... 4/10/95 Delaware ............... 9/3/96 Bucks .................... 7/17/95 LNP Engineering Plastics, Inc.— Thorndale. Lukens Steel Co.—Coatesville ............ OP–15–0035 ......... Chester ................. 10/31/97 OP–15–0010 ......... Chester ................. 5/6/99 Nabisco Biscuit Co. .............................. PLID (51–)3201 .... Philadelphia .......... 4/10/95 PECO Energy Co.—Croydon Generating Station. PECO Energy Co.—Limerick Generating Station. PECO Energy Co.—USX Fairless Works Powerhouse. PECO Energy Co.—West Conshohocken Plant. Pennsylvania Electric Co.—Front Street Station. American Inks and Coatings Corp.— Valley Forge. Avery Dennison Co. (Fasson Roll Division)—Quakertown. Cabot Performance Materials— Boyertown. Cleveland Steel Container Corp.— Quakertown. CMS Gilbreth Packaging Systems— Bristol. CMS Gilbreth Packaging Systems— Bensalem. Congoleum Corp.—Marcus Hook ........ OP–09–0016A ...... Bucks .................... 12/20/96 OP–46–0038 ......... Montgomery .......... 7/25/95 OP–09–0066 ......... Bucks .................... OP–46–0045A ...... Montgomery .......... 12/31/98 4/6/99 12/4/97 25–0041 ................ Erie ....................... 2/25/99 OP–15–0026A ...... Chester ................. 1/10/97 OP–09–0001A ...... Bucks .................... 10/2/97 OP–46–0037 ......... Montgomery .......... 4/13/99 OP–09–0022 ......... Bucks .................... 9/30/96 OP–09–0036 ......... Bucks .................... 1/7/97 OP–09–0037 ......... Bucks .................... 4/10/97 OP–23–0021 ......... Delaware ............... 12/31/98 Epsilon Products Co.—Marcus Hook .. OP–23–0012 ......... Delaware ............... 2/15/96 Foamex International,—Eddystone ...... OP–23–0006A ...... Delaware ............... 3/30/99 Forms, Inc., Spectra Graphics Willow Grove. Global Packaging, Inc. (formerly BG Packaging—Oaks). Jefferson Smurfit Corp. (Container Corp. of Amer.)—Oaks. Jefferson Smurfit Corp. (Container Corp. of Amer.)—North Wales. Lonza, Inc.—Conshohocken ................ OP–46–0023 ......... Montgomery .......... OP–46–0026 ......... Montgomery .......... OP–46–0041 ......... Montgomery .......... 11/9/95 3/25/98 8/30/96 12/24/97 4/18/97 OP–46–0062 ......... Montgomery .......... 7/15/96 OP–46–0025 ......... Montgomery .......... Markel Corporation .............................. OP–46–0081 ......... Montgomery .......... 4/22/97 6/16/98 4/9/99 McCorquodale Security Cards, Inc.— West Whiteland. Mike-Rich, Inc. (MRI)—Newtown ......... sroberts on PROD1PC70 with RULES Name of source OP–15–0037 ......... Chester ................. 9/3/96 OP–09–0021 ......... Bucks .................... 12/20/96 Minnesota Mining and Manufacturing (3M) Company—Bristol. MM Biogas Power LLC (formerly O’Brien Environmental Energy, Inc.). Norwood Industries, Inc.—Frazer ........ CP–09–0005 ......... Bucks .................... 8/8/96 CP–46–0067 ......... Montgomery .......... 10/31/97 OP–15–0014A ...... Chester ................. NVF Company ..................................... OP–15–0030 ......... Chester ................. 12/20/96 12/2/99 4/13/99 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00030 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR78418 12/15/00 ................ 65 FR78418 12/15/00 ................ 65 FR78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 (c)(143)(i)(B)(5) E:\FR\FM\03JAR2.SGM 03JAR2 (c)(143)(i)(B)(6) (c)(143)(i)(B)(7 ) (c)(143)(i)(B)(8) (c)(143)(i)(B)(9) (c)(143)(i)(B)(10) (c)(143)(i)(B)(11) (c)(143)(i)(B)(12) (c)(143)(i)(B)(13) (c)(143)(i)(B)(14) (c)(143)(i)(B)(15) (c)(143)(i)(B)(16) (c)(143)(i)(B)(17 ) (c)(143)(i)(B)(18) (c)(143)(i)(B)(19) (c)(143)(i)(B)(20) (c)(143)(i)(B)(21) (c)(143)(i)(B)(22) (c)(143)(i)(B)(23) (c)(143)(i)(B)(24) (c)(143)(i)(B)(25) (c)(143)(i)(B)(26) (c)(143)(i)(B)(27 ) (c)(143)(i)(B)(28) (c)(143)(i)(B)(29) (c)(143)(i)(B)(30) (c)(143)(i)(B)(31) (c)(143)(i)(B)(32) (c)(143)(i)(B)(33) (c)(143)(i)(B)(34) (c)(143)(i)(B)(35) (c)(143)(i)(B)(36) (c)(143)(i)(B)(37 ) (c)(143)(i)(B)(38) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 229 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Occidental Chemical Corp. (Vinyls Div.)—Pottstown. Philadelphia Newspapers, Inc. (Schuylkill Printing Plant). The Proctor and Gamble Paper Products Co.. Quebecor Printing Atglen, Inc.—Atglen OP–46–0015 ......... Montgomery .......... 11/7/96 OP–46–0012 ......... Montgomery .......... OP–66–0001 ......... Wyoming ............... 8/30/96 3/15/00 4/4/97 OP–15–0002 ......... Chester ................. 12/10/96 Sartomer Company, Inc. ...................... OP–15–0015 ......... Chester ................. Silberline Manufacturing Co. ................ OP–54–0041 ......... Schuylkill ............... 1/17/96 3/25/98 4/19/99 SmithKline Beecham Research Co. (formerly Sterling Winthrop, Inc.). Sullivan Graphics, Inc.—York .............. OP–46–0031 ......... Montgomery .......... OP–67–2023 ......... York ...................... 10/31/97 5/1/98 8/22/95 Sun Company, Inc (R&M) (formerly Chevron USA)—Tinicum. Sun Company, Inc (R&M) (formerly Chevron USA)—Darby. Universal Packaging Corporation ........ OP–23–0010 ......... Delaware ............... 10/31/96 OP–23–0011 ......... Delaware ............... 10/31/96 OP–46–0156 ......... Montgomery .......... 4/8/99 Zenith Products Corp.—Aston ............. OP–23–0008 ......... Delaware ............... 4/7/97 Budd Company .................................... PLID 51–1564 ....... Philadelphia .......... 12/28/95 Bellevue Cogeneration Plant ............... PLID (51–) 6513 ... Philadelphia .......... 4/10/95 MSC PreFinish Metals, Inc.—Morrisville. Temple University, Health Sciences Center. TRIGEN—Schuylkill Station ................. OP–09–0030 ......... Bucks .................... PLID (51–) 8906 ... Philadelphia .......... 11/7/96 3/31/98 5/27/95 PLID (51–)4942 .... Philadelphia .......... 5/29/95 TRIGEN—Edison Station ..................... PLID (51–)4902 .... Philadelphia .......... 5/29/95 Advanced Glassfiber Yarns LLC (formerly Owens Corning)—Huntingdon. Armstrong World Industries, Inc.— Beech Creek. Bemis Company, Film Division ............ OP–31–02002 ....... Huntingdon ........... 4/13/99 OP–18–0002 ......... Clinton ................... 7/6/95 OP–40–0007A ...... Luzerne ................. 10/10/95 Brentwood Industries, Inc .................... PA–06–1006A ....... Berks ..................... 6/3/99 Certainteed Corp.—Mountaintop ......... OP–40–0010 ......... Luzerne ................. 5/31/96 CNG Transmission Corp.—Ardell Station. CNG Transmission Corp.—Finnefrock Station. Consol Pennsylvania Coal Company— Bailey Prep Plant. Consolidated Rail Corp. (CONRAIL)— Hollidaysburg Car Shop. Consolidated Rail Corp. (CONRAIL)— Juniata. Containment Solutions, Inc. (formerly called Fluid Containment—Mt. Union). Cooper Energy Systems, Grove City .. OP–24–120 ........... Elk ......................... 9/30/95 PA–18–0003A ....... Clinton ................... 2/29/96 OP–30–000–072 ... Greene .................. 3/23/99 OP–07–2002 ......... Blair ....................... 8/29/95 OP–07–2003 ......... Blair ....................... 8/29/95 OP–31–02005 ....... Huntingdon ........... 4/9/99 OP–43–003 ........... Mercer ................... 7/25/96 Cyprus Cumberland Resources Corp. sroberts on PROD1PC70 with RULES Name of source OP–30–000–040 ... Greene .................. 3/26/99 Defense Distribution—Susquehanna ... OP–67–02041 ....... York ...................... 2/1/00 EMI Company ...................................... OP–25–070 ........... Erie ....................... 10/24/96 Empire Sanitary Landfill, Inc. ............... OP–35–0009 ......... Lackawanna .......... 10/17/96 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00031 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 12/15/00 ................ 65 FR 78418 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 (c)(143)(i)(B)(39) 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(143)(i)(B)(40) (c)(143)(i)(B)(41) (c)(143)(i)(B)(42) (c)(143)(i)(B)(43) (c)(143)(i)(B)(44) (c)(143)(i)(B)(45) (c)(143)(i)(B)(46) (c)(143)(i)(B)(47 ) (c)(143)(i)(B)(48) (c)(143)(i)(B)(49) (c)(143)(i)(B)(50) (c)(143)(i)(B)(51) (c)(143)(i)(B)(52) (c)(143)(i)(B)(53) (c)(143)(i)(B)(54) (c)(143)(i)(B)(55) (c)(143)(i)(B)(56) (c)(149)(i)(B)(1) (c)(149)(i)(B)(2) (c)(149)(i)(B)(3) (c)(149)(i)(B)(4) (c)(149)(i)(B)(5) (c)(149)(i)(B)(6) (c)(149)(i)(B)(7 ) (c)(149)(i)(B)(8) (c)(149)(i)(B)(9) (c)(149)(i)(B)(10) (c)(149)(i)(B)(11) (c)(149)(i)(B)(12) (c)(149)(i)(B)(13) (c)(149)(i)(B)(14) (c)(149)(i)(B)(15) (c)(149)(i)(B)(16) 230 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Name of source Permit number County Equitrans, Inc.—Rogersville Station .... (OP)30–000–109 .. Greene .................. 7/10/95 Equitrans, Inc.—Pratt Station .............. (OP)30–000–110 .. Greene .................. 7/10/95 Erie Coke Corporation—Erie ............... OP–25–029 ........... Erie ....................... 6/27/95 Fleetwood Folding Trailers, Inc.— Somerset. Gichner Systems Group, Inc. .............. (OP)56–000–151 .. Somerset .............. 2/28/96 (OP)67–2033 ........ York ...................... 8/5/97 Offset Paperback Manufacturers, Inc.—Dallas. Overhead Door Corporation—Mifflin County. SANYO Audio Manufacturing (USA) Corp. Stroehmann Bakeries—Luzerne County. Merck and Co., Inc.—West Point Facility. Amerada Hess Corp. ........................... (OP)40–0008 ........ Luzerne ................. 4/16/99 (OP)44–2011 ........ Mifflin .................... 6/4/97 (OP)44–2003 ........ Mifflin .................... 6/30/95 (OP)40–0014A ...... Luzerne ................. 5/30/95 OP–46–0005 ......... Montgomery .......... PA–PLID (51–) 5009. PA–PLID (51–) 5011. OP–09–0076 ......... Philadelphia .......... 1/13/97 6/23/00 5/29/95 Philadelphia .......... 5/29/95 Bucks .................... 4/9/99 Philadelphia .......... 5/29/95 Philadelphia .......... 5/29/95 Hatfield Quality Meats, Inc.—Hatfield .. PA–PLID (51–) 5008. PA–PLID (51–) 5003. OP–46–0013A ...... Montgomery .......... J. L. Clark, Inc. ..................................... OP–36–02009 ....... Lancaster .............. 1/9/97 10/1/98 4/16/99 Johnson Matthey, Inc.—Wayne ........... OP–15–0027 ......... Chester ................. Kurz Hastings, Inc. ............................... Philadelphia .......... Philadelphia .......... 6/11/97 Philadelphia .......... 4/10/95 Philadelphia .......... 5/29/95 PPG Industries, Inc. (BASF) ................ PA–PLID (51–) 1585. PA–PLID (51–) 2074. PA–PLID (51–) 3048. PA–PLID (51–)– 4921. OP–23–0005 ......... 8/3/98 4/15/99 5/29/95 Delaware ............... 6/4/97 SmithKline Beecham Pharmaceuticals OP–46–0035 ......... Montgomery .......... Teva Pharmaceuticals USA (formerly Lemmon Company). The Philadelphian Condominium Building. Warner Company ................................. OP–09–0010 ......... Bucks .................... 3/27/97 10/20/98 4/9/99 PA–PLID (51–) 6512. OP–15–0001 ......... Philadelphia .......... 5/29/95 Chester ................. 7/17/95 Webcraft Technologies, Inc. ................ PO–09–0009 ......... Bucks .................... Latrobe Steel Company—Latrobe ....... PO–65–000–016 ... Westmoreland ....... 4/18/96 10/15/98 12/22/95 Allegheny Ludlum Corporation— Brackenridge. Kosmos Cement Co.—Neville Island Facility. Armstrong Cement and Supply Company—Cabot. Duquesne Light Company—Cheswick Power Station. Duquesne Light Company—Elrama Plant. CO–260 ................ Allegheny .............. 12/19/96 EO–208 ................. Allegheny .............. 12/19/96 OP–10–028 ........... Butler .................... 3/31/99 CO–217 ................ Allegheny .............. 3/8/96 (PA)63–000–014 ... Washington ........... 12/29/94 Amoco Oil Company ............................ Cartex Corporation ............................... Exxon Company, USA ......................... GATX Terminals Corporation .............. Lawrence McFadden, Inc. ................... Philadelphia Baking Company ............. sroberts on PROD1PC70 with RULES Philadelphia Gas Works—Passyunk ... VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00032 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 08/06/01 ................ 66 FR 40891 04/18/01 ................ 66 FR 19858 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/31/01 ................ 66 FR 54936 10/16/01 ................ 66 FR 52517 10/18/01 ................ 66 FR 52851 10/18/01 ................ 66 FR 52857 10/18/01 ................ 66 FR 52857 10/18/01 ................ 66 FR 52867 10/18/01 ................ 66 FR 52867 (c)(149)(i)(B)(17 ) E:\FR\FM\03JAR2.SGM 03JAR2 (c)(149)(i)(B)(18) (c)(149)(i)(B)(19) (c)(149)(i)(B)(20) (c)(149)(i)(B)(21) (c)(149)(i)(B)(22) (c)(149)(i)(B)(23) (c)(149)(i)(B)(24) (c)(149)(i)(B)(25) (c)(154)(i)(D) (c)(156)(i)(B)(1) (c)(156)(i)(B)(2) (c)(156)(i)(B)(3) (c)(156)(i)(B)(4) (c)(156)(i)(B)(5) (c)(156)(i)(B)(6) (c)(156)(i)(B)(7 ) (c)(156)(i)(B)(8) (c)(156)(i)(B)(9) (c)(156)(i)(B)(10) (c)(156)(i)(B)(11) (c)(156)(i)(B)(12) (c)(156)(i)(B)(13) (c)(156)(i)(B)(14) (c)(156)(i)(B)(15) (c)(156)(i)(B)(16) (c)(156)(i)(B)(17 ) (c)(156)(i)(B)(18) (c)(158)(i)(B) (c)(159)(i)(B) (c)(160)(i)(B)(1) (c)(160)(i)(B)(2) (c)(161)(i)(B)(1) (c)(161)(i)(B)(2) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 231 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date EPA approval date Additional explanation/ § 52.2063 citation 12/29/94 10/18/01 ................ 66 FR 52867 (c)(161)(i)(B)(3) Allegheny .............. 7/18/96 (c)(162)(i)(B)(1) CO–252 ................ Allegheny .............. 12/19/96 U.S. Air, Inc. ......................................... CO–255 ................ Allegheny .............. 1/14/97 Lukens Steel Corporation Houston Plant. Allegheny Ludlum Steel Corporation— West Leechburg Plant. (Allegheny Ludlum Corporation) Jessop Steel Company—Washington Plant. Koppel Steel Corporation—Koppel Plant. Consolidated Natural Gas (CNG) Transmission Corp.—Beaver Station. Consolidated Natural Gas (CNG) Transmission Corp.—Oakford Compressor Station. Consolidated Natural Gas (CNG) Transmission Corp.—South Oakford Station. Consolidated Natural Gas (CNG) Transmission Corp.—Tonkin Compressor Station. Consolidated Natural Gas (CNG) Transmission Corp.—Jeannette Station. Carnegie Natural Gas Co.—Creighton Station. Texas Eastern Transmission Corp.— Uniontown Station. Consolidated Natural Gas (CNG) Transmission Corp.—South Bend Station. Pruett Schaffer Chemical Company .... (OP)63–000–080 .. Washington ........... 2/22/99 (OP)65–000–183 .. Westmoreland ....... 3/23/99 (OP)63–000–027 .. Washington ........... 3/26/99 10/18/01 ................ 66 FR 52862 10/18/01 ................ 66 FR 52862 10/18/01 ................ 66 FR 52862 10/16/01 ................ 66 FR 52522 10/16/01 ................ 66 FR 52522 10/16/01 ................ 66 FR 52522 (OP)04–000–059 .. Beaver .................. 3/23/01 (c)(163)(i)(D) OP–04–000–490 ... Beaver .................. 6/23/95 PO–65–000–837 ... Westmoreland ....... 10/13/95 10/16/01 ................ 66 FR 52522 10/12/01 ................ 66 FR 52055 10/12/01 ................ 66 FR 52055 (OP)65–000–840 .. Westmoreland ....... 10/13/95 10/12/01 ................ 66 FR 52055 (c)(164)(i)(B)(3) (OP)65–000–634 .. Westmoreland ....... 10/13/95 10/12/01 ................ 66 FR 52055 (c)(164)(i)(B)(4) (OP)65–000–852 .. Westmoreland ....... 10/13/95 10/12/01 ................ 66 FR 52055 (c)(164)(i)(B)(5) EO–213 ................. Allegheny .............. 5/14/96 (c)(164)(i)(B)(6) (OP)26–000–413 .. Fayette .................. 12/20/96 OP–03–000–180 ... Armstrong ............. 12/2/98 10/12/01 ................ 66 FR 52055 10/12/01 ................ 66 FR 52055 10/12/01 ................ 66 FR 52055 CO–266 ................ Allegheny .............. 9/2/98 (c)(165)(i)(B)(1) PPG Industries, Inc.—Springdale ........ CO–254 ................ Allegheny .............. 12/19/96 Reichhold Chemicals, Inc.—Bridgeville CO–218 ................ Allegheny .............. 12/19/96 Reichhold Chemicals, Inc.—Bridgeville CO–219 ................ Allegheny .............. 2/21/96 Valspar Corporation—Pittsburgh ......... CO–209 ................ Allegheny .............. 3/8/96 Ashland Chemical Corporation ............ CO–227 ................ Allegheny .............. 12/30/96 Hercules, Inc.—West Elizabeth ........... EO216 ................... Allegheny .............. 3/8/96 Hercules, Inc.—West Elizabeth ........... CO–257 ................ Allegheny .............. Neville Chemical Company .................. CO–230 ................ Allegheny .............. 1/14/97 11/1/99 12/13/96 Anchor Glass Container Corp.—Plant 5. Anchor Hocking Specialty Glass Co.— Phoenix Glass Plant. Corning Consumer Products Co.— Charleroi Plant. General Electric Company ................... (PA)26–000–119 ... Fayette .................. 12/20/96 (OP)04–000–084 .. Beaver .................. 10/13/95 (PA)63–000–110 ... Washington ........... 1/4/96 CO–251 ................ Allegheny .............. 12/19/96 Glenshaw Glass Company, Inc. .......... CO–270 ................ Allegheny .............. 3/10/00 Guardian Industries Corp. .................... CO–242 ................ Allegheny .............. 8/27/96 10/12/01 ................ 66 FR 52050 10/12/01 ................ 66 FR 52050 10/12/01 ................ 66 FR 52050 10/12/01 ................ 66 FR 52050 10/12/01 ................ 66 FR 52050 10/16/01 ................ 66 FR 52506 10/16/01 ................ 66 FR 52506 10/16/01 ................ 66 FR 52506 10/16/01 ................ 66 FR 52506 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 Permit number County Pennsylvania Electric Co. (PENELEC)— Keystone Generating Station. IDL, Incorporated ................................. (PA)03–000–027 ... Armstrong ............. CO–225 ................ Oakmont Pharmaceutical, Inc. ............. sroberts on PROD1PC70 with RULES Name of source VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00033 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(162)(i)(B)(2) (c)(162)(i)(B)(3) (c)(163)(i)(B)(1) (c)(163)(i)(B)(2) (c)(163)(i)(B)(3) (c)(164)(i)(B)(1) (c)(164)(i)(B)(2) (c)(164)(i)(B)(7 ) (c)(164)(i)(B)(8) (c)(165)(i)(B)(2) (c)(165)(i)(B)(3) [NOX RACT] (c)(165)(i)(B)(4) [VOC RACT] (c)(165)(i)(B)(5) (c)(166)(i)(B)(1) (c)(166)(i)(B)(2) (c)(166)(i)(B)(3) (c)(166)(i)(B)(4) (c)(167)(i)(B)(1) (c)(167)(i)(B)(2) (c)(167)(i)(B)(3) (c)(167)(i)(B)(4) (c)(167)(i)(B)(5) (c)(167)(i)(B)(6) 232 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Name of source Permit number County Allegheny County Sanitary Authority ... CO–222 ................ Allegheny .............. 5/14/96 Browning-Ferris Industries, .................. CO–231A .............. Allegheny .............. 4/28/97 Chambers Development Company— Monroeville Borough Landfill. Kelly Run Sanitation, Forward Township Landfill. Stroehmann Bakeries—Montgomery County (Norristown). Schlosser Steel, Inc. ............................ CO–253 ................ Allegheny .............. 12/30/96 CO–236 ................ Allegheny .............. 1/23/97 PA–46–0003 ......... Montgomery .......... 5/4/95 OP–46–0051 ......... Montgomery .......... 2/1/96 Perkasie Industries Corp.—Perkasie ... OP–09–0011 ......... Bucks .................... 8/14/96 Quaker Chemical Corporation— Conshohocken. Worthington Steel Company ................ OP–46–0071 ......... Montgomery .......... 9/26/96 OP–15–0016 ......... Chester ................. 7/23/96 Transcontinental Gas Pipeline Corp.— Sta. 200, Frazer. Rohm and Haas Company, Bucks County Plant. SEPTA-Berridge/Courtland Maintenance Shop. Southwest Water Pollution Control Plant/Biosolids Recycling Center. Rohm and Haas Company Philadelphia Plant. Sunoco Inc. (R&M)—Philadelphia Division. SBF Communications (owned by Avant Garde Ent.). Smith-Edwards-Dunlap Company ........ PA–15–0017 ......... Chester ................. 6/5/95 OP–09–0015 ......... Bucks .................... 4/20/99 PA–51–4172 ......... Philadelphia .......... 7/27/99 PA–51–9515 ......... Philadelphia .......... 7/27/99 PA–51–1531 ......... Philadelphia .......... 7/27/99 PA(51–)1501 ......... PA(51–)1517 PA(51–)2197 ......... Philadelphia .......... 8/1/00 Philadelphia .......... 7/21/00 PA–(51–)2255 ....... Philadelphia .......... 7/14/00 PLID ...................... (51–)2054 (OP)04–000–108 .. Philadelphia .......... 4/9/95 Beaver .................. 5/29/96 CO–263 ................ Allegheny .............. 10/10/97 Bakerstown Container Corporation ...... CO–221 ................ Allegheny .............. 5/14/96 Chestnut Ridge Foam, Inc.—Latrobe .. (OP)65–000–181 .. Westmoreland ....... 12/29/95 Flexsys America LP, Monongahela Plant. Haskell of Pittsburgh, Inc. .................... (OP)63–000–015 .. Washington ........... 3/23/01 CO–224 ................ Allegheny .............. 12/19/96 Three Rivers Aluminum Company (TRACO). Tuscarora Plastics, Inc. ....................... OP–10–267 ........... Butler .................... 3/1/01 (OP)04–000–497 .. Beaver .................. 4/3/96 Witco Corporation ................................ CO–210 ................ Allegheny .............. 5/14/96 GenCorp (Plastic Films Division)— Jeannette Plant. CENTRIA—Ambridge Coil Coating Operations Plant. J & L Structural, Inc.—Aliquippa .......... (OP)65–000–207 .. Westmoreland ....... 1/4/96 (OP)04–000–043 .. Beaver .................. 5/17/99 OP–04–000–467 ... Beaver .................. 6/23/95 Universal Stainless & Alloy Products, Inc.. Shenango, Inc. ..................................... CO–241 ................ Allegheny .............. 12/19/96 CO–233 ................ Allegheny .............. 12/30/96 LTV Steel Company ............................. CO–259 ................ Allegheny .............. 12/30/96 U.S. Steel (USX Corporation)—Clairton Works. CO–234 ................ Allegheny .............. 12/30/96 Tasty Baking Co. ................................. sroberts on PROD1PC70 with RULES Armstrong World Industries, Inc.— Beaver Falls Plant. Bacharach, Inc ..................................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00034 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/16/01 ................ 66 FR 52527 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/31/01 ................ 66 FR 54942 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/17/01 ................ 66 FR 52695 10/15/01 ................ 66 FR 52322 10/15/01 ................ 66 FR 52322 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 (c)(167)(i)(B)(7 ) E:\FR\FM\03JAR2.SGM 03JAR2 (c)(167)(i)(B)(8) (c)(167)(i)(B)(9) (c)(167)(i)(B)(10) (c)(169)(i)(B)(1) (c)(169)(i)(B)(2) (c)(169)(i)(B)(3) (c)(169)(i)(B)(4) (c)(169)(i)(B)(5) (c)(169)(i)(B)(6) (c)(169)(i)(B)(7 ) (c)(169)(i)(B)(8) (c)(169)(i)(B)(9) (c)(169)(i)(B)(10) (c)(169)(i)(B)(11) (c)(169)(i)(B)(12) (c)(169)(i)(B)(13) (c)(169)(i)(B)(14) (c)(170)(i)(B)(1) (c)(170)(i)(B)(2) (c)(170)(i)(B)(3) (c)(170)(i)(B)(4) (c)(170)(i)(B)(5) (c)(170)(i)(B)(6) (c)(170)(i)(B)(7 ) (c)(170)(i)(B)(8) (c)(170)(i)(B)(9) (c)(171)(i)(B) (c)(171)(i)(D) (c)(172)(i)(B)(1) (c)(172)(i)(B)(2) (c)(172)(i)(B)(3) (c)(172)(i)(B)(4) (c)(172)(i)(B)(5) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 233 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Name of source Permit number County USX Corporation—Edgar Thomson Works. USX, Inc.—Irvin Works ........................ CO–235 ................ Allegheny .............. 12/30/96 CO–258 ................ Allegheny .............. 12/30/96 Wheeling-Pittsburgh Steel Corporation—Allenport Plant. Koppers-Monessen Coke Plant ........... (OP)63–000–066 .. Washington ........... 2/8/99 (OP)65–000–853 .. Westmoreland ....... 3/20/98 J & L Specialty Steel, Inc.—Midland Facility. Washington Steel Corp.—Washington Plant. Equitrans, Inc.—Hartson ...................... (OP)04–000–013 .. Beaver .................. 3/23/01 (OP)63–000–023 .. Washington ........... 9/12/96 (OP)63–000–642 .. Washington ........... 7/10/95 Witco Corp.—Petrolia Facility .............. PA–10–037 ........... Butler .................... 6/27/95 Ranbar Electrical Materials Inc. (formerly Westinghouse Electric Co. EMD—Manor. Nova Chemicals, Inc. (formerly Arco Chemical Co.—Beaver Valley). BASF Corporation—Monaca Site ........ (OP)65–000–042 .. Westmoreland ....... 2/22/99 (OP)04–000–033 .. Beaver .................. (OP)04–000–306 .. Beaver .................. 4/16/99 1/24/01 3/23/01 Cardone Industries—Rising Sun Ave. PA(51–) PLID 3887. PA(51–) PLID 2237. PA(51–)9724 ......... Philadelphia .......... 5/29/95 Philadelphia .......... 5/29/95 Philadelphia .......... 12/27/97 OP–09–0013 ......... Bucks .................... US Steel Group/USX Corporation— Fairless Works. Brown Printing Company ..................... OP–09–0006 ......... Bucks .................... 1/11/96 5/17/96 4/8/99 OP–46–0018A ...... Montgomery .......... 5/17/00 Sun Chemical—General Printing Ink Division. Sunoco Chemicals, Frankford Plant .... PA(51–)2052 ......... Philadelphia .......... 7/14/00 PA(51–)1551 ......... Philadelphia .......... 7/27/99 Armco, Inc. Butler Operations Main Plant. Armco, Inc. Butler Operations Stainless Plant. Pennsylvania Power Co.—Bruce Mansfield Plant. West Penn Power Co.—Mitchell Station. Carnegie Natural Gas Company— Fisher Station. Apollo Gas Company—Shoemaker Station. Texas Eastern Transmission Corp.— Delmont Station. The Peoples Natural Gas Co.—Valley Station. The Peoples Natural Gas Co.—Girty Compressor Station. AES Beaver Valley Partners—Monaca Plant. Penreco—Karns City ........................... PA–10–001M ........ Butler .................... 2/23/96 PA–10–001S ......... Butler .................... 2/23/96 (PA)04–000–235 ... Beaver .................. 12/29/94 (PA)63–000–016 ... Washington ........... 6/12/95 (OP)03–000–182 .. Armstrong ............. 12/2/98 (OP)03–000–183 .. Armstrong ............. 9/12/96 (OP)65–000–839 .. Westmoreland ....... 1/9/97 (OP)03–000–125 .. Armstrong ............. 10/31/94 (PA)03–000–076 ... Armstrong ............. 10/27/95 (OP)04–000–446 .. Beaver .................. 3/23/01 OP–10–0027 ......... Butler .................... 5/31/95 Ashland Petroleum Company .............. CO–256 ................ Allegheny .............. 12/19/96 Bellefield Boiler Plant—Pittsburgh ....... EO–248 ................. Allegheny .............. 12/19/96 Gulf Oil, L.P. ........................................ CO–250 ................ Allegheny .............. 12/19/96 PA Dept. of Corrections ....................... EO–244 ................. Allegheny .............. 1/23/97 Cardone Industries—Chew St. ............ sroberts on PROD1PC70 with RULES U.S. Navy, Naval Surface Warfare Center—Carderock. Wheelabrator Falls, Inc. ....................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00035 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/16/01 ................ 66 FR 52511 10/17/01 ................ 66 FR 52705 10/17/01 ................ 66 FR 52705 10/17/01 ................ 66 FR 52705 (c)(172)(i)(B)(6) 10/17/01 ................ 66 FR 52705 10/17/01 ................ 66 FR 52705 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/30/01 ................ 66 FR 54710 10/15/01 ................ 66 FR 52338 10/15/01 ................ 66 FR 52338 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/15/01 ................ 66 FR 52333 10/12/01 ................ 66 FR 52044 10/12/01 ................ 66 FR 52044 10/12/01 ................ 66 FR 52044 10/12/01 ................ 66 FR 52044 10/12/01 ................ 66 FR 52044 (c)(173)(i)(B)(4) E:\FR\FM\03JAR2.SGM 03JAR2 (c)(172)(i)(B)(7 ) (c)(172)(i)(B)(8) (c)(172)(i)(B)(9) (c)(172)(i)(B)(10) (c)(172)(i)(B)(11) (c)(173)(i)(B)(1) (c)(173)(i)(B)(2) (c)(173)(i)(B)(3) (c)(173)(i)(B)(5) (c)(174)(i)(B)(1) (c)(174)(i)(B)(2) (c)(174)(i)(B)(3) (c)(174)(i)(B)(4) (c)(174)(i)(B)(5) (c)(174)(i)(B)(6) (c)(174)(i)(B)(7 ) (c)(174)(i)(B)(8) (c)(175)(i)(B) (c)(175)(i)(C) (c)(176)(i)(B)(1) (c)(176)(i)(B)(2) (c)(176)(i)(B)(3) (c)(176)(i)(B)(4) (c)(176)(i)(B)(5) (c)(176)(i)(B)(6) (c)(176)(i)(B)(7 ) (c)(176)(i)(B)(8) (c)(177)(i)(B)(1) (c)(177)(i)(B)(2) (c)(177)(i)(B)(3) (c)(177)(i)(B)(4) (c)(177)(i)(B)(5) 234 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Pittsburgh Thermal Limited Partnership. BP Exploration & Oil, Inc.—Greensburg Terminal. Pittsburgh Allegheny County Thermal, Ltd.. Aristech Chemical Corporation ............ CO–220 ................ Allegheny .............. 3/4/96 (OP)65–000–378 .. Westmoreland ....... 3/23/01 CO–265 ................ Allegheny .............. 11/9/98 CO–232 ................ Allegheny .............. 12/30/96 Heinz U.S.A.—Pittsburgh ..................... EO–211 ................. Allegheny .............. 3/8/96 Heinz U.S.A.—Pittsburgh ..................... CO–247 ................ Allegheny .............. 10/24/96 Koppers Industries, Inc. (Aristech Chem. Corp). Nabisco Biscuit Co. .............................. CO–223 ................ Allegheny .............. 8/27/96 CO–246 ................ Allegheny .............. 12/19/96 Pressure Chemical Co. ........................ CO–261 ................ Allegheny .............. 6/11/97 General Carbide Corp. ......................... (OP)65–000–622 .. Westmoreland ....... 12/29/95 Fansteel Hydro Carbide ....................... (OP)65–000–860 .. Westmoreland ....... 12/12/97 Carbidie Corporation ............................ (OP)65–000–720 .. Westmoreland ....... 7/31/98 Dyno Nobel Inc.—Donora .................... (OP)63–000–070 .. Washington ........... 3/31/99 Newcomer Products, Inc. ..................... (OP)65–000–851 .. Westmoreland ....... 8/7/97 PECO Energy Company—Cromby Generating Station. Waste Resource Energy, Inc. (Operator); Shawmut Bank, Conn. National Assoc. (Owner); Delaware County Resource Recovery Facility. G-Seven, Ltd. ....................................... OP–15–0019 ......... Chester ................. 4/28/95 OP–23–0004 ......... Delaware ............... 11/16/95 OP–46–0078 ......... Montgomery .......... 4/20/99 Leonard Kunkin Associates ................. OP–09–0073 ......... Bucks .................... 6/25/01 Kimberly-Clark Corporation .................. OP–23–0014A ...... Delaware ............... Sunoco, Inc. (R&M); Marcus Hook Plant. Waste Management Disposal Services of Pennsylvania, Inc. (GROWS Landfill). Koppel Steel Corporation—Ambridge Plant. General Motors Corporation ................ CP–23–0001 ......... Delaware ............... OP–09–0007 ......... Bucks .................... 6/24/98 8/1/01 6/8/95 8/2/01 12/19/97 7/17/01 OP–04–000–227 ... Beaver .................. 10/12/00 CO–243 ................ Allegheny .............. 8/27/96 Oakmont Steel, Inc. ............................. CO–226 ................ Allegheny .............. 5/14/96 The Peoples Natural Gas Co. ............. CO–240 ................ Allegheny .............. 8/27/96 U.S. Bureau of Mines .......................... sroberts on PROD1PC70 with RULES Name of source EO–215 ................. Allegheny .............. 3/8/96 Waste Management Disposal Services of Pennsylvania (Pottstown Landfill). FPL Energy MH50, LP (Sunoco, Inc. (R&M)). Exelon Generation Company— (PECO)—Richmond Generating Station. Jefferson Smurfit Corp./Container Corp. of America. Maritank Philadelphia, Inc. ................... OP–46–0033 ......... Montgomery .......... 4/20/99 PA–23–0084 ......... Delaware ............... 7/26/99 PA–51–4903 ......... Philadelphia .......... 7/11/01 PLID (PA–51–) 1566. PLID (PA–51–) 5013. OP–46–0001 ......... Philadelphia .......... 4/10/95 Philadelphia .......... 12/28/95 Montgomery .......... 3/15/96 Moyer Packing Company ..................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00036 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 10/12/01 ................ 66 FR 52044 10/12/01 ................ 66 FR 52044 10/12/01 ................ 66 FR 52044 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/17/01 ................ 66 FR 52700 10/30/01 ................ 66 FR 54699 10/30/01 ................ 66 FR 54699 (c)(177)(i)(B)(6) 10/30/01 ................ 66 FR 54699 10/30/01 ................ 66 FR 54699 10/30/01 ................ 66 FR 54699 10/30/01 ................ 66 FR 54699 10/30/01 ................ 66 FR 54699 (c)(179)(i)(B)(3) 10/15/01 ................ 66 FR 52317 10/15/01 ................ 66 FR 52327 10/15/01 ................ 66 FR 52327 10/15/01 ................ 66 FR 52327 10/15/01 ................ 66 FR 52327 10/30/01 ................ 66 FR 54704 10/30/01 ................ 66 FR 54704 10/30/01 ................ 66 FR 54704 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(177)(i)(B)(7 ) (c)(177)(i)(B)(8) (c)(178)(i)(B)(1) (c)(178)(i)(B)(2) (c)(178)(i)(B)(2) (c)(178)(i)(B)(3) (c)(178)(i)(B)(4) (c)(178)(i)(B)(5) (c)(178)(i)(B)(6) (c)(178)(i)(B)(7 ) (c)(178)(i)(B)(8) (c)(178)(i)(B)(9) (c)(178)(i)(B)(10) (c)(179)(i)(B)(1) (c)(179)(i)(B)(2) (c)(179)(i)(B)(4) (c)(179)(i)(B)(5) (c)(179)(i)(B)(6) (c)(179)(i)(B)(7 ) (c)(180)(i)(B) (c)(181)(i)(B)(1) (c)(181)(i)(B)(2) (c)(181)(i)(B)(3) (c)(181)(i)(B)(4) (c)(182)(i)(B)(1) (c)(182)(i)(B)(2) (c)(182)(i)(B)(3) (c)(184)(i)(B)(1) (c)(184)(i)(B)(2) (c)(184)(i)(B)(3) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 235 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date EPA approval date Additional explanation/ § 52.2063 citation 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 10/31/01 ................ 66 FR 54947 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 5469 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 (c)(184)(i)(B)(4) 7/21/00 10/30/01 ................ 66 FR 54691 (c)(185)(i)(B)(9) Philadelphia .......... 7/24/00 (c)(185)(i)(B)(10) PA–51–3811 ......... Philadelphia .......... 7/27/99 McWhorter Technologies, Inc. ............. PA–51–3542 ......... Philadelphia .......... 7/27/99 NortheastWater Pollution Control Plant PA–51–9513 ......... Philadelphia .......... 7/27/99 Newman and Company ....................... PLID (51–)3489 .... Philadelphia .......... 6/11/97 Allegheny Ludlum Steel Corporation ... (OP–)65–000–137 Westmoreland ....... 5/17/99 INDSPEC Chemical Corporation ......... PA10–021 ............. Butler .................... 10/19/98 Stoney Creek Technologies, L.L.C. ..... PA–23–0002 ......... Delaware ............... 2/24/99 Superpac, Inc. ...................................... OP–09–0003 ......... Bucks .................... 3/25/99 Transit America, Inc. ............................ PLID (51–)1563 .... Philadelphia .......... 6/11/97 American Bank Note Company ........... OP–46–0075 ......... Montgomery .......... Atlas Roofing Corporation— Quakertown. Beckett Corporation ............................. OP–09–0039 ......... Bucks .................... 5/19/97 8/10/98 3/10/99 OP–15–0040 ......... Chester ................. 7/8/97 Klearfold, Inc. ....................................... OP–09–0012 ......... Bucks .................... 4/15/99 National Label Company ..................... OP–46–0040 ......... Montgomery .......... 7/28/97 Bethlehem Steel Corporation ............... OP–22–02012 ....... Dauphin ................ 4/9/99 Hershey Chocolate USA ...................... OP–22–2004A ...... Dauphin ................ 1/24/00 Pennsylvania Power Company New Castle Plant. OP–37–0023 ......... Lawrence .............. 4/8/99 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/30/01 ................ 66 FR 54691 10/19/01 ................ 66 FR 53090 10/19/01 ................ 66 FR 53090 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 11/5/01 .................. 66 FR 55880 5/23/02 .................. 67 FR 36108 6/26/02 .................. 67 FR 43002 6/26/02 .................. 67 FR 43002 Permit number County Tullytown Resource Recovery Facility (Waste Management of Pa., Inc.). SPS Technologies, Inc. ....................... OP–09–0024 ......... Bucks .................... 7/14/97 OP–46–0032 ......... Montgomery .......... 10/30/97 PECO Energy Company ...................... OP–09–0077 ......... Bucks .................... 12/19/97 Philadelphia Gas Works—Richmond Plant. Exelon Generation Company—Delaware Generating Station. Exelon Generation Company—Schuylkill Generating Station. International Business Systems, Inc. ... PA–51–4922 ......... Philadelphia .......... 7/27/99 PA–51–4901 ......... Philadelphia .......... 7/11/01 PA–51–4904 ......... Philadelphia .......... 7/11/01 OP–46–0049 ......... Montgomery .......... 10/29/98 Bethlehem Lukens Plate ...................... OP–46–0011 ......... Montgomery .......... 12/11/98 Montenay Montgomery Limited Partnership. Northeast Foods, Inc. (Bake Rite Rolls). Aldan Rubber Company ...................... OP–46–0010A ...... Montgomery .......... OP–09–0014 ......... Bucks .................... 4/20/99 6/20/00 4/9/99 PA–(51–)1561 ....... Philadelphia .......... 7/21/00 Braceland Brothers, Inc. ...................... PA–(51–)3679 ....... Philadelphia .......... 7/14/00 Graphic Arts, Incorporated ................... PA–(51–)2260 ....... Philadelphia .......... 7/14/00 O’Brien (Philadelphia) Cogeneration, Inc.—Northeast Water Pollution Control Plant. O’Brien (Philadelphia) Cogeneration, Inc.—Southwest Water Pollution Control Plant. Pearl Pressman Liberty ....................... PA–(51–)1533 ....... Philadelphia .......... 7/21/00 PA–(51–)1534 ....... Philadelphia .......... PA–(51–)7721 ....... Arbill Industries, Inc. ............................ sroberts on PROD1PC70 with RULES Name of source VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00037 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(184)(i)(B)(5) (c)(184)(i)(B)(6) (c)(184)(i)(B)(7 ) (c)(184)(i)(B)(8) (c)(184)(i)(B)(9) (c)(185)(i)(B)(1) (c)(185)(i)(B)(2) (c)(185)(i)(B)(3) (c)(185)(i)(B)(4) (c)(185)(i)(B)(5) (c)(185)(i)(B)(6) (c)(185)(i)(B)(7 ) (c)(185)(i)(B)(8) (c)(185)(i)(B)(11) (c)(185)(i)(B)(12) (c)(185)(i)(B)(13) (c)(185)(i)(B)(14) (c)(186)(i)(B)(1) (c)(186)(i)(B)(2) (c)(187)(i)(B)(1) (c)(187)(i)(B)(2) (c)(187)(i)(B)(3) (c)(187)(i)(B)(4) (c)(187)(i)(B)(5) (c)(187)(i)(B)(6) (c)(187)(i)(B)(7 ) (c)(187)(i)(B)(8) (c)(191) (c)(194)(i)(B)(1) (c)(194)(i)(B)(2) 236 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Lafarge Corporation ............................. OP–39–0011B ...... Lehigh ................... 5/19/97 The Peoples Natural Gas Company .... (OP–)11–000–356 Cambria ................ 11/23/94 Horsehead Resource Development Company, Inc.. Williams Generation Company—Hazleton. Pennsylvania Power and Light Company, Holtwood Steam Electric Station. General Electric Transportation Systems. Bethlehem Structural Products Corporation. International Paper Company, Erie Mill OP–13–0001 ......... Carbon .................. 5/16/95 OP–40–0031A ...... Luzerne ................. 3/10/00 PA–36–2016 ......... Lancaster .............. 5/25/95 OP–25–025A ........ Erie ....................... 8/26/02 OP–48–0013 ......... Northampton ......... 10/24/96 PA–25–028 ........... Erie ....................... 12/21/94 National Fuel Gas Supply—Heath Compressor Station. PPG Industries, Inc. ............................. PA–33–144A ......... Jefferson ............... 10/5/98 OP–20–145 ........... Crawford ............... 5/31/95 Dominion Trans., Inc.—Finnefrock Station. Textron Lycoming—Oliver Street Plant Title V–18–00005 Clinton ................... 2/16/00 Title V–41–00005 Lycoming .............. 1/12/01 Lafayette College, Easton Campus ..... OP–48–0034 ......... Northampton ......... 8/18/97 Keystone Carbon Company ................. OP–24–016 ........... Elk ......................... 5/15/95 Mack Trucks, Inc. ................................. OP–39–0004 ......... Northampton ......... 5/31/95 Owens-Brockway Glass Container, Inc.. Resilite Sport Products, Inc. ................ OP–33–033 ........... Jefferson ............... 3/27/95 OP–49–0003 ......... Northumberland .... 12/3/96 Westfield Tanning Company ................ OP–59–0008 ......... Tioga ..................... 11/27/96 Tarkett, Incorporated ............................ OP–39–0002 ......... Lehigh ................... 5/31/95 Hacros Pigments, Inc. .......................... OP–48–0018 ......... Northampton ......... 7/31/96 GPU Generation Corp., Homer City Station. GPU Generation Corp., Seward Station. Ebensburg Power Company, Ebensburg Cogeneration Plant. Sithe Pennsylvania Holdings, LLC, Warren Station. Pennsylvania Power & Light Company, Sunbury SES. Lakeview Landfill .................................. (OP–)32–000–055 Indiana .................. 0/29/98 (OP–)32–000–040 Indiana .................. 4/30/98 (OP–)11–000–318 Cambria ................ 3/28/01 OP–62–012B ........ Warren .................. 1/20/00 OP–55–0001A ...... Snyder .................. 7/7/97 OP–25–920 ........... Erie ....................... 5/29/97 National Fuel Gas Supply Corp.— Roystone Compressor Station. Crompton Corporation, Fairview Township. Andritz, Inc. .......................................... OP 62–141F ......... Warren .................. 4/1/03 OP–10–037 ........... Butler .................... 6/4/03 41–00010C ........... Lycoming .............. 4/30/03 Brodart Company ................................. 18–0007A ............. Clinton ................... 4/8/03 Erie Sewer Authority ............................ sroberts on PROD1PC70 with RULES Name of source OP–25–179 ........... Erie ....................... 6/5/03 Hercules Cement Company ................. OP–48–0005A ...... Northampton ......... 4/16/99 Tennessee Gas Pipeline Company, Station 321. Tennessee Gas Pipeline Company, Station 219. OP 58–00001A ..... Susquehanna ........ 4/16/98 OP 43–0272 ......... Mercer ................... 4/7/99 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00038 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 4/1/03 68 FR 4/1/03 68 FR 4/1/03 68 FR 4/1/03 68 FR 4/1/03 68 FR (c)(196)(i)(B)(1) .................... 15661 .................... 15661 .................... 15661 .................... 15661 .................... 15661 4/7/03 .................... 68 FR 16724 5/2/03 .................... 68 FR 23404 5/2/03 .................... 68 FR 23404 5/2/03 .................... 68 FR 23404 3/24/03 .................. 68 FR 14154 5/7/03 .................... 68 FR 24365 5/7/03 .................... 68 FR 24365 5/20/03 .................. 68 FR 27471 10/17/03 ................ 68 FR 59741 10/17/03 ................ 68 FR 59741 10/17/03 ................ 68 FR 59741 10/17/03 ................ 68 FR 59741 10/17/03 ................ 68 FR 59741 8/6/03 .................... 68 FR 46487 8/6/03 .................... 68 FR 46487 10/15/03 ................ 68 FR 59321 10/15/03 ................ 68 FR 59321 10/15/03 ................ 68 FR 59321 10/15/03 ................ 68 FR 59321 10/15/03 ................ 68 FR 59321 10/15/03 ................ 68 FR 59321 10/27/04 ................ 69 FR 62583 5/25/04 .................. 69 FR 29444 10/15/03 ................ 68 FR 59318 10/15/03 ................ 68 FR 59318 10/15/03 ................ 68 FR 59318 11/24/03 ................ 68 FR 65846 10/27/04 ................ 69 FR 62585 10/27/04 ................ 69 FR 62585 E:\FR\FM\03JAR2.SGM 03JAR2 (c)(196)(i)(B)(2) (c)(196)(i)(B)(3) (c)(196)(i)(B)(4) (c)(196)(i)(B)(5) (c)(198)(i)(B) (c)(200)(i)(B)(1) (c)(200)(i)(B)(2) (c)(200)(i)(B)(3) (c)(201)(i)(B) (c)(202)(i)(B)(1) (c)(202)(i)(B)(2) (c)(205)(i)(B) (c)(207)(i)(B)(1) (c)(207)(i)(B)(1) (c)(207)(i)(B)(1) (c)(207)(i)(B)(1) (c)(207)(i)(B)(1) (c)(208)(i)(B)(1) (c)(208)(i)(B)(2) (c)(212)(i)(B)(1) (c)(212)(i)(B)(2) (c)(212)(i)(B)(3) (c)(212)(i)(B)(4) (c)(212)(i)(B)(5) (c)(212)(i)(B)(6) (c)(213)(i)(B)(1) (c)(213)(i)(B)(2) (c)(214)(i)(B)(1) (c)(214)(i)(B)(2) (c)(214)(i)(B)(3) (c)(217)(i)(B) (c)(218)(i)(B)(1) (c)(218)(i)(B)(2) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 237 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Information Display Technology, Inc. .. 32–000–085 .......... Indiana .................. 1/11/962 Bedford Materials Co., Inc. .................. 05–02005 .............. Bedford ................. 4/15/99 Bollman Hat Company ......................... 36–2031 ................ Lancaster .............. 7/3/95 Armco Inc. ............................................ OP 43–040 ........... Mercer ................... 9/30/99 Specialty Tires of America, Inc. ........... 32–000–065 .......... Indiana .................. 1/6/00 Truck Accessories Group East ............ OP–49–0005 ......... Northumberland .... 3/26/99 Jeraco Enterprises, Inc. ....................... OP–49–0014 ......... Northumberland .... 4/6/97 Insulation Corporation of America ....... 39–0012 ................ Lehigh ................... 10/17/95 Pope & Talbot, Inc. .............................. 40–0019 ................ Luzerne ................. 5/31/96 Universal Rundle Corporation .............. OP 37–059 ........... Lawrence .............. 5/31/95 Clark Filter ............................................ 36–02040 .............. Lancaster .............. 2/4/00 The Pennsylvania State University— University Park. Tennessee Gas Pipeline Company— Charleston Township. Tennessee Gas Pipeline Company— Wyalusing Township. Masland Industries ............................... OP–14– 0006 ....... Centre ................... 12/30/98 OP–59–0001 ......... Tioga ..................... 5/31/95 OP–08–0002 ......... Bradford ................ 5/31/95 21–2001 ................ Cumberland .......... 5/31/95 ESSROC Cement Corp. ...................... OP–37–003 ........... Lawrence .............. The Magee Carpet Company .............. OP–19–0001 ......... Columbia ............... 7/27/95 3/31/99 1/22/97 Tennessee Gas Pipeline Company— Howe Township. Transcontinental Gas Pipeline Corporation—Buck Township. Transcontinental Gas Pipe Line Corporation—Peach Bottom Township. Standard Steel Division of Freedom Forge Corp.. Pope and Talbot, Inc. .......................... OP–27–015 ........... Forest .................... 7/27/00 40–0002 ................ 40–0002A 67–2012 ................ Luzerne ................. 5/31/95 York ...................... 5/5/95 44–2001 ................ Mifflin .................... 5/31/95 35–0004 ................ Lackawanna .......... 5/31/96 Pennsylvania Power and Light Company. Ellwood Group Inc. .............................. 22–2011 ................ Dauphin ................ 6/7/95 OP 37–313 ........... Lawrence .............. 1/31/01 National Fuel Gas Supply Corporation 53–0009A ............. 53–0009 28–02002 .............. Potter .................... 8/5/96 Department of the Army ...................... Franklin ................. 2/3/00 Harley–Davidson Motor Company ....... 67–2032 ................ York ...................... 4/9/97 GE Transportation Systems ................. OP 43–196 ........... Mercer ................... 5/16/01 Stone Container Corporation ............... 67–2002 ................ York ...................... 9/3/96 Stanley Storage Systems, Inc. ............ 39–0031 ................ Lehigh ................... 6/12/98 York Group, Inc. ................................... sroberts on PROD1PC70 with RULES Name of source 67–2014 ................ York ...................... 7/3/95 Strick Corporation ................................ OP–19–0002 ......... Columbia ............... 6/6/97 Grumman Olson, Division of Grumman Allied Industries. Prior Coated Metals, Inc. ..................... OP–41–0002 ......... Lycoming .............. 9/25/97 39–0005 ................ Lehigh ................... 5/26/95 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00039 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 03/29/05 ................ 70 FR 15774 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16118 3/30/05 .................. 70 FR 16124 3/30/05 .................. 70 FR 16124 3/30/05 .................. 70 FR 16124 3/30/05 .................. 70 FR 16124 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16416 52.2020(d)(1)(h) E:\FR\FM\03JAR2.SGM 03JAR2 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(h) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020(d)(1)(c) 52.2020 (d)(1)(d) 52.2020(d)(1)(d) 52.2020(d)(1)(d) 52.2020(d)(1)(d) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 52.2020(d)(1)(g) 238 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Schindler Elevator Corporation ............ 01–2007 ................ Adams ................... 5/24/95 Hodge Foundry .................................... OP–43–036 ........... Mercer ................... 3/31/99 Resolite, A United Dominion Co. ......... OP–10–266 ........... Butler .................... Consolidation Coal Co.—Coal Preparation Plant. Urick Foundry ....................................... 30–000–063 .......... Greene .................. 10/15/99 2/18/00 5/17/99 OP–25–053 ........... Erie ....................... 10/24/96 Keystone Sanitary Landfill, Inc. ........... 35–0014 ................ Lackawanna .......... 4/19/99 Grinnell Corporation ............................. 36–2019 ................ Lancaster .............. 6/30/95 Buck Company Inc. .............................. 36–2035 ................ Lancaster .............. 8/1/95 Owens-Brockway Glass Container, Inc.. Alcoa Extrusion, Inc. ............................ OP 16–010 ........... Clarion .................. 54–0022 ................ Schuylkill ............... 3/27/95 5/31/95 4/19/99 Pennsylvania Electric Company .......... 32–000–059 .......... Indiana .................. 12/29/94 National Gypsum Company ................. OP–60–0003 ......... Union .................... 1/17/96 Stoney Creek Technologies, LLC ........ OP–23–0002 ......... Delaware ............... 7/24/03 Northeastern Power Company ............ 54–0008 ................ Schuylkill ............... 5/26/95 Texas Eastern Transmission Corporation. The Miller Group .................................. 22–2010 ................ Dauphin ................ 1/31/97 54–0024 ................ Schuykill ................ 2/1/99 CNG Transmission Corporation ........... 32–000–129 .......... Indiana .................. 6/22/95 I.H.F.P., Inc. ......................................... OP–49–0010A ...... Northumberland .... 1/7/98 National Forge Company ..................... OP 62–032 ........... Warren .................. 5/31/95 United Refining Company .................... OP 62–017 ........... Warren .................. Petrowax Refining ................................ OP 42–110 ........... McKean ................. Westvaco Corporation ......................... 07–2008 ................ Blair ....................... 5/31/95 11/14/96 3/4/96 5/31/96 9/29/95 Naval Surface Warfare Center, Caderock Division Ship Systems Engineering Station. R.H. Sheppard Co., Inc. ...................... PA–04108 ............. Philadelphia .......... 10/18/04 67–2016 ................ York ...................... 8/4/95 Wheatland Tube Company .................. OP 43–182 ........... Mercer ................... 7/26/95 Transcontinental Gas Pipeline Corporation. Transcontinental Gas Pipeline Corporation. Transcontinental Gas Pipeline Corporation. Molded Fiber Glass .............................. OP–53–0006 ......... Potter .................... 10/13/95 OP–19–0004 ......... Columbia ............... 5/30/95 PA–41–0005A ....... Lycoming .............. 8/9/95 OP 25–035 ........... Erie ....................... 7/30/99 Erie Forge and Steel, Inc. .................... OP 25–924 ........... Erie ....................... 2/10/00 OSRAM SYLVANIA Products, Inc. ...... sroberts on PROD1PC70 with RULES Name of source OP 59–0007 ......... Tioga ..................... 1/22/98 Owens-Brockway Glass Container ...... OP 33–002 ........... Jefferson ............... 11/23/98 Texas Eastern Transmission Corporation. SKF, USA, Incorporated ...................... 32–000–230 .......... Indiana .................. 9/25/95 67–02010A ........... York ...................... 7/19/00 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00040 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 3/31/05 .................. 70 FR 16416 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16420 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 3/31/05 .................. 70 FR 16423 4/29/05 .................. 70 FR 22257 52.2020(d)(1)(g) 8/24/05 .................. 70 FR 49496 8/24/05 .................. 70 FR 49496 8/24/05 .................. 70 FR 49496 8/24/05 .................. 70 FR 49496 8/24/05 .................. 70 FR 49496 11/1/05 .................. 70 FR 65842 11/1/05 .................. 70 FR 65842 11/1/05 .................. 70 FR 65842 11/1/05 .................. 70 FR 65842 11/1/05 .................. 70 FR 65842 11/1/05 .................. 70 FR 65842 E:\FR\FM\03JAR2.SGM 03JAR2 52.2020(d)(1)(a) 52.2020(d)(1)(a) 52.2020(d)(1)(a) 52.2020(d)(1)(a) 52.2020(d)(1)(a) 52.2020(d)(1)(a) 52.2020(d)(1)(a) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(f) 52.2020(d)(1)(j) 52.2020(d)(1)(i) 52.2020(d)(1)(i) 52.2020(d)(1)(i) 52.2020(d)(1)(i) 52.2020(d)(1)(i) 52.2020(d)(1)(k) 52.2020(d)(1)(k) 52.2020(d)(1)(k) 52.2020(d)(1)(k) 52.2020(d)(1)(k) 52.2020(d)(1)(k) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 239 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Johnstown America Corporation .......... 11–000–288 .......... Cambria ................ 1/13/99 SGL Carbon Corporation ..................... OP 24–131 ........... Elk ......................... Salem Tube, Inc. .................................. OP 43–142 ........... Mercer ................... 5/12/95 5/31/95 2/16/99 Dominion Trans, Inc. ............................ 18–00006 .............. Clinton ................... Waste Management Disposal Services of Pennsylvania (Pottstown Landfill). Waste Management Disposal Services of PA, Inc.. Armstrong World Industries, Inc. ......... OP–46–0033 ......... 67–02047 .............. Berks; .................... Montgomery York ...................... 6/15/99 9/29/03 4/20/99 1/27/04 4/20/99 36–2001 ................ Lancaster .............. 7/3/99 Cogentrix of Pennsylvania Inc. ............ OP–33–137 ........... Jefferson ............... 1/27/98 Scrubgrass Generating Company, LP PA–33–302–014 ... OP–33–302–014 ... PA–33–399–004 ... OP–33–399–004 ... OP–61–0181 ......... ............................... ............................... ............................... ............................... Venango ............... 11/15/90 5/31/93 10/31/98 5/31/93 4/30/98 Wheelabrator Frackville Energy Co. .... OP–54–005 ........... Schuylkill ............... 9/18/98 Indiana University of Pennsylvania— S.W. Jack Cogeneration Facility. Fleetwood Motor Homes ...................... OP–32–000–200 ... Indiana .................. 9/24/98 OP–49–0011 ......... Northumberland .... 10/30/98 Piney Creek, LP ................................... OP–16–0127 ......... Clarion .................. 12/18/98 Statoil Energy Power Paxton, LP ........ OP–22–02015 ....... Dauphin ................ 6/30/99 Harrisburg Steamworks ....................... OP–22–02005 ....... Dauphin ................ 3/23/99 Cove Shoe Company ........................... OP–07–02028 ....... Blair ....................... 4/7/99 PP&L—Fichbach C.T. Facility ............. OP–54–0011 ......... Schuylkill ............... 6/1/99 PP&L—Allentown C.T. Facility ............ OP–39–0009 ......... Lehigh ................... 6/1/99 PP&L—Harwood C.T. Facility .............. OP–40–0016 ......... Luzerne ................. 6/1/99 PP&L—Jenkins C.T. Facility ................ OP–40–0017 ......... Luzerne ................. 6/1/99 The International Metals Reclamation Co.. Petrowax, PA, Inc. ............................... OP 37–243 ........... Lawrence .............. 8/9/00 PA 61–020 ............ Venango ............... 1/2/96 Pennsylvania Electric Company .......... OP 32–000–059 ... Indiana .................. 12/29/94 The Harrisburg Authority ...................... OP 22–2007 ......... Dauphin ................ 1/02/95 Texas Eastern Transmission Corp. ..... OP 50–02001 ....... Perry ..................... 4/12/99 Graybec Lime, Inc. ............................... OP14–0004 ........... Centre ................... 4/16/99 Techneglas, Inc. ................................... OP 40–0009A ....... Luzerne ................. 1/29/99 DLM Foods (formerly Heinz USA) ....... sroberts on PROD1PC70 with RULES Name of source CO 211 ................. Allegheny .............. 3/8/96 NRG Energy Center (formerly Pittsburgh Thermal Limited Partnership). Tasty Baking Oxford, Inc. .................... CO 220 ................. Allegheny .............. 3/4/96 OP 15–0104 ......... Chester ................. 5/12/04 Silberline Manufacturing Company ...... OP 13–0014 ......... Carbon .................. 4/19/99 Adhesives Research, Inc. .................... OP 67–2007 ......... York ...................... 7/1/95 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00041 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 11/1/05 .................. 70 FR 65842 11/1/05 .................. 70 FR 65845 11/1/05 .................. 70 FR 65845 11/1/05 .................. 70 FR 65845 11/2/05 .................. 70 FR 66261 11/2/05 .................. 70 FR 66261 11/2/05 .................. 70 FR 66261 3/8/06 .................... 71 FR 11514 52.2020(d)(1)(k) 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/8/06 .................... 71 FR 11514 3/31/06 .................. 71 FR 16235 3/31/06 .................. 71 FR 16235 04/28/06 ................ 71 FR 25070 04/28/06 ................ 71 FR 25070 04/28/06 ................ 71 FR 25070 04/28/06 ................ 71 FR 25070 04/28/06 ................ 71 FR 25070 05/11/06 ................ 71 FR 27394 05/11/06 ................ 71 FR 27394 05/11/06 ................ 71 FR 27394 05/11/06 ................ 71 FR 27394 05/11/06 ................ 71 FR 27394 E:\FR\FM\03JAR2.SGM 03JAR2 52.2020(d)(1)(e) 52.2020(d)(1)(e) 52.2020(d)(1)(e) 52.2020(d)(1)(b) 52.2020(d)(1)(b) 52.2020(d)(1)(b) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(l) 52.2020(d)(1)(m) 52.2020(d)(1)(m) 52.2020(d)(1)(n) 52.2020(d)(1)(n) 52.2020(d)(1)(n) 52.2020(d)(1)(n) 52.2020(d)(1)(n) 52.2020(d)(1)(o) 52.2020(d)(1)(o) 52.2020(d)(1)(o) 52.2020(d)(1)(o) 52.2020(d)(1)(o) 240 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Permit number County Mohawk Flush Doors, Inc. ................... OP 49–0001 ......... Northumberland .... 1/20/99 Bigbee Steel and Tank Company ........ 36–2024 ................ Lancaster .............. 7/7/95 Conoco Phillips Company .................... OP–23–0003 ......... Delaware ............... 4/29/04 The Hershey Company ........................ 22–02004B ........... Dauphin ................ 12/23/05 LORD Corporation, Cambridge Springs. Pittsburgh Corning Corporation ........... OP–20–123 ........... Crawford ............... 7/27/95 PA–42–009 ........... McKean ................. 5/31/95 Small Tube Manufacturing, LLC .......... 07–02010 .............. Blair ....................... 2/27/06 Texas Eastern Transmission Corporation, Holbrook Compressor Station. Willamette Industries, Johnsonburgh Mill. American Refining Group, Inc. ............ 30–000–077 .......... Greene .................. 1/3/97 OP–24–009 ........... Elk ......................... 5/23/95 OP–42–004 ........... McKean ................. 11/23/98 Bellefonte Lime Company .................... OP–14–0002 ......... Centre ................... 10/19/98 Butter Krust Baking Company, Inc. ..... OP–49–0006 ......... Northumberland .... 11/5/96 Carnegie Natural Gas Company ......... 30–000–106 .......... Greene .................. 9/22/95 Caterpillar, Inc. ..................................... 67–2017 ................ York ...................... 8/1/95 Gencorp, Inc. ....................................... 54–0009 ................ Schuykill ................ 5/31/96 Harris Semiconductor .......................... OP–40–0001A ...... Luzerne ................. 4/16/99 Merisol Antioxidants LLC ..................... OP–61–00011 ....... Venango ............... 4/18/05 Norcon Power Partners, L.P. ............... OP–25–923 ........... Erie ....................... 9/21/95 Triangle Pacific Corp. .......................... 34–2001 ................ Juniata .................. 5/31/95 Viking Energy of Northumberland Limited Partnership. White Cap, Inc. .................................... OP–49–0004 ......... Northumberland .... 5/30/95 40–0004 ................ Luzerne ................. 7/20/95 Carlisle Tire & Rubber Company ......... 21–2003 ................ Cumberland .......... 3/10/95 The Carbide/Graphite Group, Inc. ....... OP 24–012 ........... Elk ......................... 5/12/95 Celotex Corporation ............................. OP–49–0013 ......... Northumberland .... 6/18/99 American Railcar Industries, Inc. Shippers Car Line Division. ACF Industries, Inc. ............................. OP–49–0012 ......... Northumberland .... 11/29/95 OP–49–0009 ......... Northumberland .... 12/12/96 New Holland North America, Inc. ........ 36–2028 ................ Lancaster .............. 10/17/95 Allsteel, Inc. .......................................... 40–001–5 .............. Luzerne ................. 5/26/95 Ball-Foster Glass Container Co. .......... OP 42–028 ........... McKean ................. Pennsylvania Power & Light Company—West Shore. Foster Wheeler Mt. Carmel, Inc. ......... sroberts on PROD1PC70 with RULES Name of source OP–21–2009 ......... Cumberland .......... 7/7/95 3/31/99 6/7/95 OP–49–0002 ......... Northumberland .... 6/30/95 Metropolitan Edison Company—Portland. Pennsylvania Power & Light Company OP–48–0006 ......... Northampton ......... 12/14/94 OP–41–0004 ......... Lycoming .............. 6/13/95 Pennsylvania Power & Light Company OP–18–0006 ......... Clinton ................... 6/13/95 VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00042 Fmt 4701 Sfmt 4700 EPA approval date Additional explanation/ § 52.2063 citation 05/11/06 ................ 71 FR 27394 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/13/06 .................. 71 FR 34011 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 6/14/06 .................. 71 FR 34259 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38993 7/11/06 .................. 71 FR 38995 7/11/06 .................. 71 FR 38995 7/11/06 .................. 71 FR 38995 7/11/06 .................. 71 FR 38995 7/11/06 .................. 71 FR 38995 52.2020(d)(1)(o) E:\FR\FM\03JAR2.SGM 03JAR2 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(p) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(q) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(t) 52.2020(d)(1)(r) 52.2020(d)(1)(r) 52.2020(d)(1)(r) 52.2020(d)(1)(r) 52.2020(d)(1)(r) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 241 (1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued State effective date Name of source Permit number County Texas Eastern Transmission Corporation. Pennsylvania Power & Light Company OP–34–2002 ......... Juniata .................. 1/31/97 OP 48–0011 ......... Northampton ......... 12/19/94 Johnstown Corporation ........................ OP–11–000–034 ... Cambria ................ 6/23/95 Koppers Industries, Inc. ....................... OP41–0008 ........... Lycoming .............. 3/30/99 EPA approval date Additional explanation/ § 52.2063 citation 7/11/06 .................. 71 FR 38995 7/11/06 .................. 71 FR 38995 7/11/06 .................. 71 FR 38995 7/13/06 .................. 71 FR 39572 52.2020(d)(1)(r) 52.2020(d)(1)(r) 52.2020(d)(1)(r) 52.2020(d)(1)(s) (2) EPA-APPROVED VOLATILE ORGANIC COMPOUNDS (VOC) EMISSIONS TRADING PROGRAMS State effective date Name of source Permit number County National Can Company Fres-co Systems, USA Inc. Paramount Packaging Corp.. 85–524 ............. 85–525 Bucks ................ 3/1/85 EPA approval date Additional explanation/§ 52.2063 citation 4/21/88 ................ 53 FR 13121 (c)(68); transfer of offsets from NCCo to Fres-co and Paramount. (3) EPA-APPROVED SOURCE SPECIFIC SULFUR DIOXIDE (SO2) REQUIREMENTS State effective date Name of source Permit number County USX Corporation, Clairton Coke Works ............. 200 ................... Allegheny .......... 11/17/94 Reliant Energy Mid-Atlantic Power Holdings LLC, Warren Generating Station. United Refining Company ................................... 203–62–00012 Warren .............. 11/21/01 SO2–62–017E .. Warren .............. 6/11/01 Trigen-Philadelphia Energy Corporation ............ SO2–95–002 .... Philadelphia ...... 7/27/00 Grays Ferry Cogeneration Partnership .............. SO2–95–002A .. Philadelphia ...... 7/27/00 PECO Energy Company, Schuylkill Generating Station. Sunoco, Inc. (R&M) Philadelphia Refinery ......... SO2–95–006 .... Philadelphia ...... 7/27/00 SO2–95–039 .... Philadelphia ...... 7/27/00 EPA approval date 8/18/95 ................ 60 FR 43012 1/17/03 ................ 68 FR 2459 1/17/03 ................ 68 FR 2459 9/9/02 .................. 67 FR 57155 9/9/02 .................. 67 FR 57155 9/9/02 .................. 67 FR 57155 9/9/02 .................. 67 FR 57155 Additional explanation/§ 52.2063 citation (c)(99) (c)(190)(i)(C)(1) (c)(190)(i)(C)(2) (c)(193)(i)(B)(1) (c)(193)(i)(B)(2) (c)(193)(i)(B)(3) (c)(193)(i)(B)(4) (4) EPA-APPROVED SOURCE SPECIFIC LEAD (PB) REQUIREMENTS State effective date Permit number County East Penn Manufacturing Corp. ......................... [None] ............... Berks ................ 5/29/84 General Battery Corporation ............................... [None] ............... Berks ................ 5/29/84 Tonolli Corporation (Closed) ............................... [None] ............... Carbon .............. 5/29/84 Franklin Smelting and Refining Corporation ...... [None] ............... Philadelphia ...... 9/21/94 MDC Industries, Inc. ........................................... [None] ............... Philadelphia ...... 9/21/94 Anzon, Inc. .......................................................... sroberts on PROD1PC70 with RULES Name of source [None] ............... Philadelphia ...... 9/21/94 EPA approval date 7/27/84 ................ 49 FR 30179 7/27/84 49 FR 30179. 7/27/84 ................ 49 FR 30179 12/20/96 .............. 61 FR 67275 12/20/96 .............. 61 FR 67275 12/20/96 .............. 61 FR 67275 (e) EPA-approved nonregulatory and quasi-regulatory material VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00043 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 Additional explanation/§ 52.2063 citation (c)(62) (c)(62) (c)(62) (c)(112) (c)(112) (c)(112) 242 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED NONREGULATORY AND QUASI-REGULATORY MATERIAL Name of non-regulatory SIP revision Applicable geographic area Sulfur Dioxide Attainment Demonstration ......................................... Conewego, Pleasant, and Glade Townships; City of Warren (Warren Co.). Allegheny County-sulfur dioxide area defined in 40 CFR 81.339. Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. Philadelphia County. Pittsburgh-Beaver Valley Ozone Nonattainment Area. Reading Area (Berks County). Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. Pittsburgh-Beaver Valley Ozone Nonattainment Area. City of Pittsburgh—CBD & Oakland. Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. ...................... Sulfur Dioxide Attainment Demonstration ......................................... Photochemical Assessment Monitoring Stations (PAMS) Program .. 1990 Base Year Emission Inventory—Carbon Monoxide ................. 1990 Base Year Emission Inventory—VOC ...................................... 1990 Base Year Emission Inventory—VOC, CO, NOX .................... 1990 Base Year Emission Inventory—VOC ...................................... 1990 Base Year Emission Inventory—NOX ...................................... 1990 Base Year Emission Inventory—NOX ...................................... 1990 Base Year Emission Inventory—Carbon Monoxide ................. Post 1996 Rate of Progress Plan ..................................................... One-Hour Ozone Attainment Demonstration .................................... Mobile Budgets for Post-1996 and 2005 attainment plans ............... sroberts on PROD1PC70 with RULES 15% Rate of Progress Plan ............................................................... VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00044 Pittsburgh-Beaver Valley Ozone Nonattainment Area. Fmt 4701 Sfmt 4700 State submittal date EPA approval date Additional explanation 8/20/01 1/17/03 ................ 68 FR 2454 52.2033(b) 8/15/03 7/21/04 ................ 69 FR 43522 52.2033(c) 9/23/94 9/11/95 ................ 60 FR 47081 52.2035 9/8/95 10/30/95 3/22/96 2/18/97 7/22/98 1/30/96 ................ 61 FR 2982 4/3/01 .................. 66 FR 17634 52.2036(a) 52.2036(d) 1/28/97 5/7/97 .................. 62 FR 24846 52.2036(e) 9/12/96 6/9/97 .................. 62 FR 31343 52.2036(i) 7/31/98 6/17/99 ................ 64 FR 32422 52.2036(l) 3/22/96 2/18/97 10/19/01 .............. 66 FR 53094 52.2036(m) 11/12/92 8/17/01 11/12/02 .............. 67 FR 68521 52.2036(n) 7/31/98 2/25/00 10/26/01 .............. 66 FR 54143 52.2037(i) 4/30/98 8/21/98 2/25/00 7/19/01 10/26/01 .............. 66 FR 54143 52.2037(j) 2/25/00 10/26/01 .............. 66 FR 54143 52.2037(k) 2/23/04 5/21/04 ................ 69 FR 29238 4/3/01 .................. 66 FR 17634 52.2037(k) 3/22/96 2/18/97 7/22/98 E:\FR\FM\03JAR2.SGM 03JAR2 52.2038(a) Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 243 (1) EPA-APPROVED NONREGULATORY AND QUASI-REGULATORY MATERIAL—Continued Name of non-regulatory SIP revision Applicable geographic area 15% Rate of Progress Plan ............................................................... Philadelphia-Wilmington-Trenton Ozone Nonattainment Area. Defined 16county area in Western PA and Southwestern PA. Allegheny County-Clairton PM10 nonattainment area. Statewide .......... Control of Asphalt Paving Material (Emission offset) ........................ Particulate matter SIP ....................................................................... Small Business Assistance Program ................................................. Source Testing Manual ..................................................................... Ozone Nonattainment Plan ............................................................... Non-regulatory measures .................................................................. Air Quality Monitoring Network .......................................................... Attainment plan for sulfur dioxide ...................................................... Air Quality Monitoring Network .......................................................... Expanded Ridesharing Program ....................................................... Lead (Pb) SIP .................................................................................... Lead (Pb) SIP .................................................................................... Lead (Pb) SIP .................................................................................... Ozone and Carbon Monoxide Plan ................................................... Ozone and Carbon Monoxide Plan ................................................... Ozone and Carbon Monoxide Plan ................................................... Carbon Monoxide Maintenance Plan ................................................ Allegheny County. Statewide .......... Southwest Pa. AQCR. Statewide (except Allegheny County). Armstrong County. Allegheny County. Metro. Philadelphia AQCR. Allegheny County. Philadelphia ...... Statewide (except Philadelphia and Allegheny Counties). Metro. Philadelphia AQCR. Southwestern Pa. ACQR. Allentown-Bethlehem-Easton Air Basin. Philadelphia County. State submittal date EPA approval date 9/12/96 4/10/97 6/5/98 8/24/01 ................ 66 FR 44547 52.2038(b) 5/20/77 7/15/77 10/6/77 ................ 42 FR 54417 52.1120(c)(15) 1 52.2054 1/6/94 9/8/98 .................. 63 FR 47434 52.2059 2/1/93 1/6/95 .................. 60 FR 1738 10/21/81 .............. 46 FR 51607 5/20/80 ................ 46 FR 33607 5/20/80 ................ 46 FR 33607 8/5/81 .................. 46 FR 39822 52.2060 9/10/79 4/24/79 9/17/79 1/25/80 4/9/81 52.2063(c)(63) 9/8/95 10/30/95 9/3/04 1/30/96 ................ 61 FR 2982 04/04/05 .............. 70 FR 16958 52.2063(c)(105) Statewide Testing Manual. 11/26/94 7/30/96 ................ 61 FR 39497 Ozone Maintenance Plan .................................................................. sroberts on PROD1PC70 with RULES Continuous Source ............................................................................ Reading Area (Berks County). 1/28/97 5/7/97 .................. 62 FR 24846 12/09/2003 2/26/04 ................ 68 FR 8824 Frm 00045 Fmt 4701 Sfmt 4700 52.2063(c)(34) 2/26/85 ................ 45 FR 7772 2/26/85 ................ 45 FR 7772 2/26/85 ................ 45 FR 7772 9/6/83 7/30/96 ................ 61 FR 39497 PO 00000 52.2063(c)(30) 6/30/82 10/24/83 6/30/82 10/24/83 6/30/82 10/24/83 12/9/81 11/26/94 Jkt 211001 52.2063(c)(22) 8/29/83 5/15/84 9/30/82 6/8/84 12/24/80 Statewide .......... 20:27 Dec 29, 2006 52.2063(c)(4) 8/18/81 ................ 46 FR 43423 9/15/81 ................ 46 FR 45762 10/7/82 ................ 47 FR 44259 2/6/84 .................. 49 FR 4379 8/1/84 .................. 49 FR 30696 7/27/84 ................ 49 FR 30179 Source Testing Manual ..................................................................... VerDate Aug<31>2005 Additional explanation E:\FR\FM\03JAR2.SGM 03JAR2 52.2063(c)(36) 52.2063(c)(38) 52.2063(c)(46) 52.2063(c)(59) 52.2063(c)(61) 52.2063(c)(62) 52.2063(c)(63) 52.2063(c)(63) Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6 52.2063(c)(110) (i)(D); cross-referenced in Section 139.5 52.2063(c)(110) (i)(D); cross-referenced in Section 139.5 52.2063(c)(123) 52.2063(c)(222) 244 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations (1) EPA-APPROVED NONREGULATORY AND QUASI-REGULATORY MATERIAL—Continued Name of non-regulatory SIP revision Applicable geographic area Ozone Maintenance Plan .................................................................. Pittsburgh-Beaver Valley Ozone Nonattainment Area. State submittal date EPA approval date Additional explanation 5/21/01 10/19/01 .............. 66 FR 53094 52.2063(c)(188) 4/11/03 8/5/03 .................. 68 FR 46099 12/10/04 .............. 69 FR 71212 11/12/02 .............. 67 FR 68521 52.2063(c)(210) 9/14/02 9/11/03 ................ 68 FR 53515 52.2063(c)(215) 8/15/03 7/21/04 ................ 69 FR 43522 52.2063(c)(216) (i)(B) 5/7/04 7/1/04 .................. 69 FR 39860 52.2063(c)(224) 4/22/04 Carbon Monoxide Maintenance Plan ................................................ PM10 Maintenance Plan .................................................................... Sulfur Dioxide Maintenance Plan ...................................................... Sulfur Dioxide Maintenance Plan ...................................................... City of Pittsburgh—CBD & Oakland. Allegheny County-Clairton PM10 nonattainment area. Allegheny County-sulfur dioxide area defined in 40 CFR 81.339. Conewego, Pleasant, and Glade Townships; City of Warren (Warren Co.). 8/17/01 52.2063(c)(226) 52.2063(c)(189) sroberts on PROD1PC70 with RULES 1 Because of an editing error, this section was placed in the wrong subpart of 40 CFR part 52 (subpart W instead of subpart NN), and subsequently removed. However, EPA considers this provision to be a current Federally-enforceable portion of the SIP. The ‘‘removed’’ paragraph reads as follows: ‘‘Pennsylvania Department of Transportation change to section 7.5.9.8 of the Paving Maintenance Manual creditable as emission offsets submitted by the Secretary of the Pennsylvania Department of Environmental Resources on July 15, 1997, as addenda to the Pennsylvania Air Quality Implementation Plan.’’ VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00046 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / Rules and Regulations 245 (2) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX) NOT INCORPORATED BY REFERENCE State submittal date EPA approval date Additional explanation/ § 52.2063 citation 8/11/95 11/15/95 04/09/96 ................ 61 FR 15709 Westmoreland ....... 7/5/95 43–0017 ................ Mercer ................... 12/8/95 R. R. Donnelley and Sons Co.—Lancaster East Plant. Rockwell Heavy Vehicle, Inc.—New Castle Forge Plant. 36–2027 ................ Lancaster .............. 9/20/95 37–065 .................. Lawrence .............. 4/8/98 05/16/96 ................ 61 FR 24727 12/20/96 ................ 61 FR 67275 07/21/97 ................ 62 FR 33891 04/16/99 ................ 64 FR 18818 52.2036(b); 52.2037(c); source shutdown date is 8/1/91. 52.2036(c); 52.2037(d). Pennsylvania Electric Co.— (PENELEC)—Williamsburg Station. 07–2006 ................ Blair ....................... 8/1/95 12/20/96 ................ 61 FR 67275 Caparo Steel Company ....................... 43–0285 ................ Mercer ................... 12/8/95 Mercersburg Tanning Co. .................... 28–2008 ................ Franklin ................. 4/26/95 12/20/96 ................ 61 FR 67275 03/12/97 ................ 62 FR 11079 Duquesne Light Co.—Brunot Island Station. Duquesne Light Co.—Phillips Station .. 214 ........................ Allegheny .............. 3/5/01 212 ........................ Allegheny .............. 4/15/99 Name of source Permit No. County USX Corp./ US Steel Group—Fairless Hills. 09–0006 ................ Bucks .................... General Glass—Jeannette ................... 65–0675 ................ Sharon Steel Company ........................ 10/18/01 ................ 66 FR 52867 10/18/01 ................ 66 FR 52867 [FR Doc. E6–22284 Filed 12–29–06; 8:45 am] sroberts on PROD1PC70 with RULES BILLING CODE 6560–50–P VerDate Aug<31>2005 20:27 Dec 29, 2006 Jkt 211001 PO 00000 Frm 00047 Fmt 4701 Sfmt 4700 E:\FR\FM\03JAR2.SGM 03JAR2 52.2036(f); 52.2037(e). 52.2036(j). 52.2036(k); source shutdown date is 4/1/ 93. 52.2037(f); 52.2063(c)(113)(i)(A) & (ii)(A). 52.2037(g). 52.2037(h); 52.2063(c)(114)(i)(A)(3) & (ii)(A). 52.2063(c)(161)(ii)(A). 52.2063(c)(161)(ii)(B).

Agencies

[Federal Register Volume 72, Number 1 (Wednesday, January 3, 2007)]
[Rules and Regulations]
[Pages 200-245]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-22284]



[[Page 199]]

-----------------------------------------------------------------------

Part II





Environmental Protection Agency





-----------------------------------------------------------------------



40 CFR Part 52



Approval and Promulgation of Air Quality Implementation Plans; 
Pennsylvania; Update to Materials Incorporated by Reference; Final Rule

Federal Register / Vol. 72, No. 1 / Wednesday, January 3, 2007 / 
Rules and Regulations

[[Page 200]]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[PA200-4201; FRL-8249-6]


Approval and Promulgation of Air Quality Implementation Plans; 
Pennsylvania; Update to Materials Incorporated by Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; Notice of administrative change.

-----------------------------------------------------------------------

SUMMARY: EPA is updating the materials submitted by Pennsylvania that 
are incorporated by reference (IBR) into the State implementation plan 
(SIP). The regulations affected by this update have been previously 
submitted by the Pennsylvania Department of Environmental Protection 
and approved by EPA. This update affects the SIP materials that are 
available for public inspection at the National Archives and Records 
Administration (NARA), the Air and Radiation Docket and Information 
Center located at EPA Headquarters in Washington, DC, and the Regional 
Office.

EFFECTIVE DATE: This action is effective January 3, 2007.

ADDRESSES: SIP materials which are incorporated by reference into 40 
CFR part 52 are available for inspection at the following locations: 
Air Protection Division, U.S. Environmental Protection Agency, Region 
III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and 
Radiation Docket and Information Center, EPA Headquarters Library, Room 
Number 3334, EPA West Building, 1301 Constitution Ave., NW., 
Washington, DC 20460, and the National Archives and Records 
Administration. If you wish to obtain materials from a docket in the 
EPA Headquarters Library, please call the Office of Air and Radiation 
(OAR) Docket/Telephone number: (202) 566-1742; or the National Archives 
and Records Administration (NARA). For information on the availability 
of this material at NARA, call 202-741-6030, or go to: https://
www.archives.gov/federal_register/code_of_federal_regulations/ibr_
locations.html.

FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814-2108 or 
by e-mail at frankford.harold@epa.gov.

SUPPLEMENTARY INFORMATION: The SIP is a living document which the State 
revises as necessary to address the unique air pollution problems. 
Therefore, EPA, from time to time must take action on SIP revisions 
containing new and/or revised regulations to make them part of the SIP. 
On May 22, 1997 (62 FR 27968), EPA revised the procedures for 
incorporating by reference Federally-approved SIPs, as a result of 
consultations between EPA and the Office of the Federal Register (OFR). 
The description of the revised SIP document, IBR procedures and 
``Identification of plan'' format are discussed in further detail in 
the May 22, 1997 Federal Register document. On February 25, 2005 (70 FR 
9450), EPA published a Federal Register beginning the new IBR procedure 
for Pennsylvania. In this document, EPA is doing the following:
    1. Announcing the update to the IBR material as of November 1, 
2006.
    2. Making corrections to the following entries listed in the 
paragraph 52.2020(c)(1) chart, as described below:
    a. Title 25, Sections 121.1 and 145.42--In the ``Additional 
explanation/Sec.  52.2063 citation'' column, text is added referring to 
the SIP-effective date of the revised rules.
    b. Title 25, Sections 129.201 through 129.205 and Chapter 145, 
subsections B and C--In the ``Additional explanation/Sec.  52.2063 
citation'' column, text is added referring to the SIP-effective date of 
the new rules.
    c. Title 25, Sections 129.54, 129.59, 129.60, 129.61, and 129.68--
In the ``EPA approval date'' column, the EPA approval date and Federal 
Register page citation are revised.
    d. Title 25, Chapter 130, Subchapters A and B--In the ``Additional 
explanation/Sec.  52.2063 citation'' column, the text referring to the 
SIP-effective date is removed from all entries.
    e. Title 67, Chapters 175 and 177--In the State citation column, 
the word ``Section'' is added before all numerical entries.
    3. Making corrections to the paragraph 52.2020(d)(1) chart, as 
described below:
    a. The title of the second column is revised from ``Permit no.'' to 
``Permit number.''
    b. Entry for the Hercules Cement Company--The permit number is 
revised.
    Pennsylvania Power and Light Co. (PP&L)-Montour--The permit number 
is revised.
    c. Entries for the Tennessee Gas Pipeline Company, Stations 321 and 
219-In the ``Additional explanation/Sec.  52.2063 citation'' column, 
the text referring to the SIP-effective date is removed.
    d. Entry for the Tennessee Gas Pipeline Corporation--Buck 
Township--The entry in the ``Name of source'' column is revised to 
read, ``Transcontinental Gas Pipeline Corporation-Buck Township.''
    e. Entry for Alcoa Extrusion, Inc.--The state effective date is 
revised.
    f. Entry for Stoney Creek Technologies, LLC--The permit number is 
revised.
    g. Entry for Texas Eastern Transmission Corporation (Dauphin 
County)--The permit number is revised.
    h. Entry for United Refining Company--The state effective date is 
revised.
    i. Entries for Waste Management Disposal Services of Pennsylvania 
(Pottstown Landfill), Waste Management Disposal Services of PA, Inc., 
and Armstrong World Industries, Inc.--The citation in the ``Additional 
explanation/Sec.  52.2063 citation'' column is revised.
    4. Making corrections to the following entries listed in the 
paragraph 52.2020(e)(1) chart, as described below:
    a. Entry for Mobile Budgets for Post-1996 and 2005 attainment plans 
for the Philadelphia-Wilmington-Trenton 1-Hour Ozone Nonattaiment 
Area--The revised entry adds a date and Federal Register citation, 
inadvertently omitted in the February 25, 2005 Federal Register 
document, in which EPA approved revisions to these mobile budgets.
    b. Entry for Ozone Maintenance Plan, Reading Area (Berks County)--
The revised entry adds a date and Federal Register citation, 
inadvertently omitted in the February 25, 2005 Federal Register 
document, in which EPA approved revisions to this ozone maintenance 
plan.
    EPA has determined that today's rule falls under the ``good cause'' 
exemption in section 553(b)(3)(B) of the Administrative Procedures Act 
(APA) which, upon finding ``good cause,'' authorizes agencies to 
dispense with public participation, and section 553(d)(3) which allows 
an agency to make a rule effective immediately (thereby avoiding the 
30-day delayed effective date otherwise provided for in the APA). 
Today's rule simply codifies provisions which are already in effect as 
a matter of law in Federal and approved State programs. Under section 
553 of the APA, an agency may find good cause where procedures are 
``impractical, unnecessary, or contrary to the public interest.'' 
Public comment is ``unnecessary'' and ``contrary to the public 
interest'' since the codification only reflects existing law. Immediate 
notice in the CFR benefits the public by removing outdated citations 
and incorrect chart entries.

[[Page 201]]

III. Statutory and Executive Order Reviews

A. General Requirements

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), this 
action is not a ``significant regulatory action'' and therefore is not 
subject to review by the Office of Management and Budget. For this 
reason, this action is also not subject to Executive Order 13211, 
``Actions Concerning Regulations That Significantly Affect Energy 
Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). This action 
merely approves state law as meeting Federal requirements and imposes 
no additional requirements beyond those imposed by state law. 
Accordingly, the Administrator certifies that this rule will not have a 
significant economic impact on a substantial number of small entities 
under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because 
this rule approves pre-existing requirements under state law and does 
not impose any additional enforceable duty beyond that required by 
state law, it does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Public Law 104-4). This rule also does not 
have tribal implications because it will not have a substantial direct 
effect on one or more Indian tribes, on the relationship between the 
Federal Government and Indian tribes, or on the distribution of power 
and responsibilities between the Federal Government and Indian tribes, 
as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). 
This action also does not have Federalism implications because it does 
not have substantial direct effects on the States, on the relationship 
between the national government and the States, or on the distribution 
of power and responsibilities among the various levels of government, 
as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). 
This action merely approves a state rule implementing a Federal 
standard, and does not alter the relationship or the distribution of 
power and responsibilities established in the Clean Air Act. This rule 
also is not subject to Executive Order 13045 ``Protection of Children 
from Environmental Health Risks and Safety Risks'' (62 FR 19885, April 
23, 1997), because it is not economically significant. In reviewing SIP 
submissions, EPA's role is to approve state choices, provided that they 
meet the criteria of the Clean Air Act. In this context, in the absence 
of a prior existing requirement for the State to use voluntary 
consensus standards (VCS), EPA has no authority to disapprove a SIP 
submission for failure to use VCS. It would thus be inconsistent with 
applicable law for EPA, when it reviews a SIP submission, to use VCS in 
place of a SIP submission that otherwise satisfies the provisions of 
the Clean Air Act. Thus, the requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) do not apply. This rule does not impose an information collection 
burden under the provisions of the Paperwork Reduction Act of 1995 (44 
U.S.C. 3501 et seq.).

B. Submission to Congress and the Comptroller General

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the 
Small Business Regulatory Enforcement Fairness Act of 1996, generally 
provides that before a rule may take effect, the agency promulgating 
the rule must submit a rule report, which includes a copy of the rule, 
to each House of the Congress and to the Comptroller General of the 
United States. EPA will submit a report containing this rule and other 
required information to the U.S. Senate, the U.S. House of 
Representatives, and the Comptroller General of the United States prior 
to publication of the rule in the Federal Register. This rule is not a 
``major rule'' as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

    EPA has also determined that the provisions of section 307(b)(1) of 
the Clean Air Act pertaining to petitions for judicial review are not 
applicable to this action. Prior EPA rulemaking actions for each 
individual component of the Pennsylvania SIP compilations had 
previously afforded interested parties the opportunity to file a 
petition for judicial review in the United States Court of Appeals for 
the appropriate circuit within 60 days of such rulemaking action. Thus, 
EPA sees no need in this action to reopen the 60-day period for filing 
such petitions for judicial review for this ``Identification of plan'' 
reorganization update action for Pennsylvania.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen 
dioxide, Ozone, Particulate matter, Reporting and recordkeeping 
requirements, Sulfur oxides, Volatile organic compounds.

    Dated: November 21, 2006.
William T. Wisniewski,
Acting Regional Administrator, Region III.

0
40 CFR part 52 is amended as follows:

PART 52--[AMENDED]

0
1. The authority for citation for part 52 continues to read as follows:

    Authority: 42.U.S.C. 7401 et seq.

Subpart NN--Pennsylvania

0
2. Section 52.2020 is amended by revising paragraphs (b), (c), (d), and 
(e) to read as follows:


Sec.  52.2020  Identification of plan.

* * * * *
    (b) Incorporation by reference.
    (1) Material listed as incorporated by reference in paragraphs (c) 
and (d) was approved for incorporation by reference by the Director of 
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Material incorporated as it exists on the date of the approval, and 
notice of any change in the material will be published in the Federal 
Register. Entries in paragraphs (c) and (d) of this section with EPA 
approval dates on or after November 1, 2006 will be incorporated by 
reference in the next update to the SIP compilation.
    (2) EPA Region III certifies that the rules/regulations provided by 
EPA at the addresses in paragraph (b)(3) of this section are an exact 
duplicate of the officially promulgated State rules/regulations which 
have been approved as part of the State implementation plan as of 
November 1, 2006.
    (3) Copies of the materials incorporated by reference may be 
inspected at the EPA Region III Office at 1650 Arch Street, 
Philadelphia, PA 19103; the EPA, Air and Radiation Docket and 
Information Center, EPA West Building, 1301 Constitution Avenue, NW., 
Washington, DC 20460; or at the National Archives and Records 
Administration (NARA). For information on the availability of this 
material at NARA, call 202-741-6030, or go to: https://www.archives.gov/
federal_register/code_of_federal_regulations/ibr_locations.html.
    (c) EPA-Approved Regulations

[[Page 202]]



                                    (1) EPA-Approved Pennsylvania Regulations
----------------------------------------------------------------------------------------------------------------
                                                             State                               Additional
          State citation                Title/subject      effective    EPA approval date     explanation/Sec.
                                                             date                             52.2063  citation
----------------------------------------------------------------------------------------------------------------
                                       Title 25.--Environmental Protection
                                           Article III.--Air Resources
----------------------------------------------------------------------------------------------------------------
                                         Chapter 121--General Provisions
----------------------------------------------------------------------------------------------------------------
Section 121.1.....................  Definitions.........    12/11/04  9/29/06, 71 FR 57428  Revised; SIP-
                                                                                             effective date is
                                                                                             10/30/06.
Section 121.2.....................  Purpose.............     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 121.3.....................  Applicability.......     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 121.4.....................  Regional                 5/23/92  12/22/94, 59 FR       (c)(94).
                                     Organization of the               65971.
                                     Department.
Section 121.7.....................  Prohibition of Air       3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     Pollution.
Section 121.8.....................  Compliance               8/13/77  12/17/79, 44 FR       (c)(21); correction
                                     responsibilities.                 73031.                published 8/22/80,
                                                                                             (45 FR 56060).
Section 121.9.....................  Circumvention.......     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 121.10....................  Existing orders.....     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 121.11....................  Severability clause.     3/20/72  5/31/72, 37 FR 10842  (c)(1); no longer in
                                                                                             PA DEP rules.
----------------------------------------------------------------------------------------------------------------
                                     Chapter 123--Standards for Contaminants
----------------------------------------------------------------------------------------------------------------
                                               Fugitive Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.1(a) through (c)......  Prohibition of           8/29/77  12/17/79, 44 FR       (c)(21); Paragraph
                                     certain fugitive                  73031.                123.1(d) is not in
                                     emissions.                                              the SIP.
Section 123.2.....................  Fugitive particulate     8/13/83  7/27/84, 49 FR 30183  (c)(60).
                                     matter.
----------------------------------------------------------------------------------------------------------------
                                          Particulate Matter Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.11....................  Combustion units....     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Appendix A [Graph]................  Particulate Matter--     3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     Combustion Units.
Section 123.12....................  Incinerators........     3/20/72  5/31/72, 37 10842...  (c)(1).
Section 123.13(a) through (c).....  Processes...........     8/27/80  11/13/81, 46 FR       (c)(39); paragraph
                                                                       55971.                123.13(d) is not in
                                                                                             the SIP.
Appendix B [Graph]................  Particulate Matter--     3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     Processes Listed in
                                     Table 1.
Appendix C [Graph]................  Particulate Matter--     3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     Processes Not
                                     Listed in Table 1.
----------------------------------------------------------------------------------------------------------------
                                            Sulfur Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.21....................  General.............     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 123.22....................  Combustion units         3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     [General
                                     provisions--air
                                     basins and non-air
                                     basins].
Section 123.22(a).................  Combustion units--        8/1/79  8/18/81, 46 FR 43423  (c)(36); approved as
                                     non air basins.                                         part of the control
                                                                                             strategy for the
                                                                                             Armstrong County
                                                                                             sulfur dioxide
                                                                                             nonattainment area.
Section 123.22(b).................  Combustion units--        8/1/79  8/8/79,.............  (c)(20); correction
                                     Erie Air Basin.                  44 FR 46465.........   published 1/23/80,
                                                                                             (45 FR 5303).
Section 123.22(c).................  Combustion units--       10/1/78  6/4/79, 44 FR 31980.  (c)(18).
                                     Southeast PA Air
                                     Basin.
Section 123.22(c).................  Combustion units--       8/21/82  7/5/83, 48 FR 30630.  (c)(53).
                                     Upper Beaver Valley
                                     Air Basin.
Section 123.22(d).................  Combustion units--        1/1/81  12/16/81, 46 FR       (c)(40).
                                     Lower Beaver Valley               61267.
                                     Air Basin.
Figure 4 [Graph]..................  Sulfur Oxides--          3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     Combustion Units.
Section 123.24....................  Primary zinc             8/11/75  4/30/76, 41 FR 18077  (c)(14).
                                     smelters.
Section 123.25....................  Monitoring              10/27/90  6/30/93, 58 FR 34911  (c)(81).
                                     requirements.
----------------------------------------------------------------------------------------------------------------
                                                 Odor Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.31....................  Limitations.........     3/20/72  5/31/72, 37 FR 10842  (c)(1); SIP version
                                                                                             of Section 123.31
                                                                                             is different from
                                                                                             State version.
----------------------------------------------------------------------------------------------------------------
                                                Visible Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.41....................  Limitations.........     3/20/72  5/31/72, 37 FR 10842  (c)(1).

[[Page 203]]

 
Section 123.42 (Except 123.42(4)..  Exceptions..........     3/20/72  5/31/72, 37 FR 10842  (c)(1); Paragraph is
                                                                                             paragraph declared
                                                                                             not 123.42(4)) in
                                                                                             SIP at (c)(21).
Section 123.43....................  Measuring Techniques     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 123.44....................  Limitations of          12/27/97  6/11/02, 67 FR 39854  (c)(189).
                                     visible fugitive
                                     air contaminants
                                     from operation of
                                     any coke oven
                                     battery.
Section 123.45....................  Alternative opacity      6/20/81  1/19/83, 48 FR 2319.  (c)(48).
                                     limitations.
Appendix D [Chart]................  Alternate Opacity        6/20/81  1/19/83, 48 FR 2319.  (c)(48).
                                     Limitation--Applica
                                     tion.
Section 123.46....................  Monitoring               6/20/81  1/19/83, 48 FR 2319.  (c)(48).
                                     requirements.
----------------------------------------------------------------------------------------------------------------
                                           Nitrogen Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.51....................  Monitoring              10/20/90  9/23/92, 57 FR 43905  (c)(74).
                                     requirements.
----------------------------------------------------------------------------------------------------------------
                                           NOX Allowance Requirements
----------------------------------------------------------------------------------------------------------------
Section 123.101...................  Purpose.............     11/1/97  6/6/00, 65 FR 35840.  (c)(145).
Section 123.102...................  Source NOX allowance     11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     requirements and
                                     NOX allowance
                                     control period.
Section 123.103...................  General NOX              11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     allowance
                                     provisions.
Section 123.104...................  Source authorized        11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     account
                                     representative
                                     requirements.
Section 123.105...................  NATS provisions.....     11/1/97  6/6/00, 65 FR 35840.  (c)(145).
Section 123.106...................  NOX allowance            11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     transfer protocol.
Section 123.107...................  NOX allowance            11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     transfer procedures.
Section 123.108...................  Source emissions         11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     monitoring
                                     requirements.
Section 123.109...................  Source emissions         11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     reporting
                                     requirements.
Section 123.110...................  Source compliance        11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     requirements.
Section 123.111...................  Failure to meet          11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     source compliance
                                     requirements.
Section 123.112...................  Source operating         11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     permit provision
                                     requirements.
Section 123.113...................  Source recordkeeping     11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     requirements.
Section 123.114...................  General NOX              11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     allocation
                                     provisions.
Section 123.115...................  Initial NOX              3/11/00  6/6/00, 65 FR 35840.  (c)(145).
                                     allowance NOX
                                     allocations.
Section 123.116...................  Source opt-in            11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     provisions.
Section 123.117...................  New NOX affected         11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     source provisions.
Section 123.118...................  Emission reduction       11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     credit provisions.
Section 123.119...................  Bonus NOX allowance      11/1/97  6/6/00, 65 FR 35840.  (c)(145).
                                     awards.
Section 123.120...................  Audit...............     11/1/97  6/6/00, 65 FR 35840.  (c)(145).
Appendix E [Chart]................  Appendix E [NOX          3/11/00  6/6/00, 65 FR 35840.  (c)(145).
                                     Allowances Chart].
----------------------------------------------------------------------------------------------------------------
                                      Chapter 126--Standard for Motor Fuels
----------------------------------------------------------------------------------------------------------------
                                  Subchapter A.--Oxygenate Content of Gasoline
----------------------------------------------------------------------------------------------------------------
Section 126.101...................  General.............     8/19/95  12/17/99, 64 FR       (c)(142).
                                                                       70589.
Section 126.102...................  Sampling and testing     8/19/95  2/17/99, 64 FR 70589  (c)(142).
Section 126.103...................  Recordkeeping and        8/19/95  12/17/99, 64 FR       (c)(142).
                                     reporting.                        70589.
Section 126.104...................  Labeling                 8/19/95  12/17/99, 64 FR       (c)(142).
                                     requirements.                     70589.
----------------------------------------------------------------------------------------------------------------
                                 Subchapter C.--Gasoline Volatility Requirements
----------------------------------------------------------------------------------------------------------------
Section 126.301 (a) through (c)...  Compliant fuel           11/1/97  6/8/98, 63 FR 31116.  (c)(131).
                                     requirement.
Section 126.302 (Except Paragraph   Recordkeeping and        11/1/97  6/8/98, 63 FR 31116.  (c)(131).
 (a)(6) pertaining to RFG).          reporting.
Section 126.303(a)................  Compliance and test      11/1/97  6/8/98, 63 FR 31116.  (c)(131).
                                     methods.
----------------------------------------------------------------------------------------------------------------
                             Subchapter D.--Motor Vehicle Emissions Control Program
----------------------------------------------------------------------------------------------------------------
                                               General Provisions
----------------------------------------------------------------------------------------------------------------
Section 126.401...................  Purpose.............     12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                                                       72564.

[[Page 204]]

 
Section 126.402...................  NLEV scope and           12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     applicability.                    72564.
----------------------------------------------------------------------------------------------------------------
                                       Pennsylvania Clean Vehicles Program
----------------------------------------------------------------------------------------------------------------
Section 126.411...................  General requirements     12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                                                       72564.
Section 126.412...................  Emission                 12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     requirements.                     72564.
Section 126.413...................  Exemptions..........     12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                                                       72564.
----------------------------------------------------------------------------------------------------------------
                                        Applicable Motor Vehicle Testing
----------------------------------------------------------------------------------------------------------------
Section 126.421...................  New motor vehicle        12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     certification                     72564.
                                     testing.
Section 126.422...................  New motor vehicle        12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     compliance testing.               72564.
Section 126.423...................  Assembly line            12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     testing.                          72564.
Section 126.424...................  In-use motor vehicle     12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     enforcement testing.              72564.
Section 126.425...................  In-use surveillance      12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     testing.                          72564.
----------------------------------------------------------------------------------------------------------------
                                    Motor Vehicle Manufacturers's Obligations
----------------------------------------------------------------------------------------------------------------
Section 126.431...................  Warranty and recall.     12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                                                       72564.
Section 126.432...................  Reporting                12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     requirements.                     72564.
----------------------------------------------------------------------------------------------------------------
                                      Motor Vehicle Dealer Responsibilities
----------------------------------------------------------------------------------------------------------------
Section 126.441...................  Responsibilities of      12/5/98  12/28/99, 64 FR       (c)(141)(i)(C).
                                     motor vehicle                     72564.
                                     dealers.
----------------------------------------------------------------------------------------------------------------
                 Chapter 127--Construction, Modification, Reactivation, and Operation of Sources
----------------------------------------------------------------------------------------------------------------
                                             Subchapter A.--General
----------------------------------------------------------------------------------------------------------------
Section 127.1.....................  Purpose.............    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.3.....................  Operational             11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     flexibility.
----------------------------------------------------------------------------------------------------------------
                                    Subchapter B.--Plan Approval Requirements
----------------------------------------------------------------------------------------------------------------
Section 127.11....................  Plan approval           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     requirements.
Section 127.11a...................  Reactivation of         11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     sources.
Section 127.12....................  Content of              11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     applications.
Section 127.12a...................  Compliance review...    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.12b...................  Plan approval terms     11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     and conditions.
Section 127.12c...................  Plan approval           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     reporting
                                     requirements.
Section 127.13....................  Extensions..........    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.13a...................  Plan approval           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     changes for cause.
Section 127.13b...................  Denial of Plan          11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     approval
                                     application.
Section 127.13c...................  Notice of basis for     11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     certain plan
                                     approval decisions.
Section 127.14....................  Exemptions..........    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.25....................  Compliance              11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     requirement.
Section 127.32....................  Transfer of plan        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     approvals.
Section 127.35....................  Maximum achievable      11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     control technology
                                     standards for
                                     hazardous air
                                     pollutants.
Section 127.36....................  Health risk-based       11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     emission standards
                                     and operating
                                     practice
                                     requirements.
Section 127.44....................  Public Notice.......    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.45....................  Contents of notice..    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.46....................  Filing protests.....     8/13/83  7/27/84, 49 FR 30183  (c)(60).
Section 127.47....................  Consideration of        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     protests.
Section 127.48....................  Conferences and          8/13/83  7/27/84, 49 FR 30183  (c)(60).
                                     hearings.
Section 127.49....................  Conference or           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     hearing procedure.
Section 127.50....................  Conference or           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     hearing record.
Section 127.51....................  Plan approval           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     disposition.
----------------------------------------------------------------------------------------------------------------
                      Subchapter D.--Prevention of Significant Deterioration of Air Quality
----------------------------------------------------------------------------------------------------------------
Section 127.81....................  Purpose.............     6/18/83  8/21/84, 49 FR 33127  (c)(57).
Section 127.82....................  Scope...............     6/18/83  8/21/84 49, FR 33127  (c)(57).

[[Page 205]]

 
Section 127.83....................  Adoption of Program.     6/18/83  8/21/84, 49 FR 33127  (c)(57).
----------------------------------------------------------------------------------------------------------------
                                        Subchapter E.--New Source Review
----------------------------------------------------------------------------------------------------------------
Section 127.201...................  General requirements     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.202...................  Effective date......     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.203...................  Facilities subject       1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     to special permit
                                     requirements.
Section 127.204...................  Emissions subject to     1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     this subchapter.
Section 127.205...................  Special permit           1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     requirements.
Section 127.206...................  ERC general              1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     requirements.
Section 127.207...................  ERC generation and       1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     creation.
Section 127.208...................  ERC use and transfer     1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     requirements.
Section 127.209...................  ERC registry system.     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.210...................  Offset ratios.......     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.211...................  Applicability            1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     determination.
Section 127.212...................  Portable facilities.     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.213...................  Construction and         1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     demolition.
Section 127.214...................  Exemption...........     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.215...................  Reactivation........     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.216...................  Circumvention.......     1/15/94  12/9/97, 62 FR 64722  (c)(107).
Section 127.217...................  Clean Air Act Titles     1/15/94  12/9/97, 62 FR 64722  (c)(107).
                                     III-V applicability.
----------------------------------------------------------------------------------------------------------------
                                  Subchapter F.--Operating Permit Requirements
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Section 127.401...................  Scope...............    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.402...................  General provisions..    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.403...................  Permitting of           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     sources operating
                                     lawfully without a
                                     permit.
Section 127.404...................  Compliance schedule     11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     for repermitting.
----------------------------------------------------------------------------------------------------------------
                                               Permit Applications
----------------------------------------------------------------------------------------------------------------
Section 127.411...................  Content of              11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     applications.
Section 127.412...................  Compliance review       11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     forms.
Section 127.413...................  Municipal               11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     notification.
Section 127.414...................  Supplemental            11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     information.
----------------------------------------------------------------------------------------------------------------
                                             Review of Applications
----------------------------------------------------------------------------------------------------------------
Section 127.421...................  Review of               11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     Applications.
Section 127.422...................  Denial of permits...    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.423...................  Notice of basis for     11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     certain operating
                                     permit decisions.
Section 127.424...................  Public notice.......    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.425...................  Contents of notice..    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.426...................  Filing protests.....    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.427...................  Consideration of        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     protest.
Section 127.428...................  Conferences and         11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     hearings.
Section 127.429...................  Conference or           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     hearing procedure.
Section 127.430...................  Conference or           11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     hearing record.
Section 127.431...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     disposition.
----------------------------------------------------------------------------------------------------------------
                                           Operating Permit Conditions
----------------------------------------------------------------------------------------------------------------
Section 127.441...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     terms and
                                     conditions.
Section 127.442...................  Reporting               11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     requirements.
Section 127.443...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     requirements.
Section 127.444...................  Compliance              11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     requirements.
Section 127.445...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     compliance
                                     schedules.
Section 127.446...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     duration.
Section 127.447...................  Alternate operating     11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     scenarios.
Section 127.448...................  Emissions trading at    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     facilities with
                                     Federally
                                     enforceable
                                     emissions cap.
Section 127.449...................  De minimis emission     11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     increases.

[[Page 206]]

 
Section 127.450...................  Administrative          11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     operating permit
                                     amendments.
----------------------------------------------------------------------------------------------------------------
                                         Operating Permit Modifications
----------------------------------------------------------------------------------------------------------------
Section 127.461...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     changes for cause.
Section 127.462...................  Minor operating         11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     permit
                                     modifications.
Section 127.463...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     revisions to
                                     incorporate
                                     applicable
                                     standards.
Section 127.464...................  Transfer of             11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     operating permits.
----------------------------------------------------------------------------------------------------------------
                           Subchapter H.--General Plan Approvals and Operating Permits
----------------------------------------------------------------------------------------------------------------
                                                     General
----------------------------------------------------------------------------------------------------------------
Section 127.601...................  Scope...............    11/26/94  7/30/96, 61 FR 39494  (c)(111).
----------------------------------------------------------------------------------------------------------------
                        Issuance of General Plan Approvals and General Operating Permits
----------------------------------------------------------------------------------------------------------------
Section 127.611...................  General plan            11/26/94  7/30/96, 61 FR 39494  (c)(111).
                                     approval and
                                     general operating
                                     permits.
Section 127.612...................  Public notice and       11/26/94  7/30/96, 61 FR 39494  (c)(111).
                                     review period.
----------------------------------------------------------------------------------------------------------------
                                    Use of General Plan Approvals and Permits
----------------------------------------------------------------------------------------------------------------
Section 127.621...................  Application for use     11/26/94  7/30/96, 61 FR 39494  (c)(111).
                                     of general plan
                                     approvals and
                                     general operating
                                     permits.
Section 127.622...................  Compliance with         11/26/94  7/30/96, 61 FR 39494  (c)(111).
                                     general plan
                                     approvals and
                                     general operating
                                     permits.
----------------------------------------------------------------------------------------------------------------
                             Subchapter I.--Plan Approval and Operating Permit Fees
----------------------------------------------------------------------------------------------------------------
Section 127.701...................  General provisions..    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.702...................  Plan approval fees..    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
Section 127.703...................  Operating permit        11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
                                     fees under
                                     Subchapter F.
Section 127.707...................  Failure to pay fee..    11/26/94  7/30/96, 61 FR 39497  (c)(110)(i)(C).
----------------------------------------------------------------------------------------------------------------
                                        Subchapter J.--General Conformity
----------------------------------------------------------------------------------------------------------------
Section 127.801...................  Purpose.............     11/9/96  9/29/97, 62 FR 50870  (c)(126).
Section 127.802...................  Adoption of              11/9/96  9/29/97, 62 FR 50870  (c)(126).
                                     Standards.
----------------------------------------------------------------------------------------------------------------
                                       Chapter 129--Standards for Sources
----------------------------------------------------------------------------------------------------------------
                                              Miscellaneous Sources
----------------------------------------------------------------------------------------------------------------
Section 129.11....................  Nitric acid plants..     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 129.12....................  Sulfuric acid plants     3/20/72  5/31/72, 37 FR 10842  (c)(1).
Section 129.13....................  Sulfur recovery          3/20/72  5/31/72, 37 FR 10842  (c)(1).
                                     plants.
APPENDIX A........................  Allowable emissions,     4/23/94  3/23/98, 63 FR 13789  (c)(129).
                                     sulfur oxides--
                                     sulfur recovery
                                     plants.
Section 129.14....................  Open burning              8/9/76  8/19/80, 45 FR 55178  (c)(33).
                                     operations.
Section 129.15....................  Coke pushing             8/29/77  12/17/79, 44 FR       (c)(21); correction
                                     operations.            12/31/77   73031.                published 8/22/80
                                                                                             45 FR 56060.
Section 129.16....................  Door maintenance,       12/12/77  7/17/79, 44 FR 41429  (c)(19).
                                     adjustment and
                                     replacement
                                     practices.
Section 129.18....................  Municipal waste         10/27/90  6/30/93, 58 FR 34911  (c)(81).
                                     incinerators.
----------------------------------------------------------------------------------------------------------------
                                                 Sources of VOCs
----------------------------------------------------------------------------------------------------------------
Section 129.52....................  Surface coating          6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     processes.
Section 129.54....................  Seasonal operation        8/3/91  5/13/93, 58 FR 28362  (c)(79).
                                     of auxiliary
                                     incineration
                                     equipment.
Section 129.55....................   Petroleum               6/20/81  1/19/83, 48 FR 2319.  (c)(48).
                                     refineries--specifi
                                     c sources.
Section 129.56....................  Storage tanks             9/5/98  7/26/00, 65 FR 45920  (c)(147).
                                     greater than 40,000
                                     gallons capacity
                                     containing VOCs.

[[Page 207]]

 
Section 129.57....................  Storage tanks less       6/20/81  1/19/83, 48 FR 2319.  (c)(48).
                                     than or equal to
                                     40,000 gallons
                                     capacity containing
                                     VOCs.
Section 129.58....................  Petroleum refineries-    8/13/83  7/27/84, 49 FR 30183  (c)(60).
                                     fugitive sources.
Section 129.59....................  Bulk gasoline             8/3/91  5/13/93, 58 FR 28362  (c)(79).
                                     terminals.
Section 129.60....................  Bulk gasoline plants      8/3/91  5/13/93, 58 FR 28362  (c)(79).
 Section 129.61...................  Small gasoline            8/3/91  5/13/93, 58 FR 28362  (c)(79).
                                     storage tank
                                     control (Stage I
                                     control).
Section 129.62....................  General standards        5/23/94  12/22/94, 59 FR       (c)(94).
                                     for bulk gasoline                 65971.
                                     terminals, bulk
                                     gasoline plants,
                                     and small gasoline
                                     storage tanks.
Section 129.63....................  Degreasing              12/22/01  1/16/03, 68 FR 2208.  (c)(195)(i)(B)(2).
                                     operations.
Section 129.64....................  Cutback asphalt          8/13/83  7/27/84, 49 FR 30183  (c)(60).
                                     paving.
Section 129.65....................  Ethylene production       8/1/79  5/20/80.............  (c)(22).
                                     plants.
Section 129.66....................  Compliance schedules     5/23/92  12/22/94, 59 FR       (c)(94).
                                     and final                         65971.
                                     compliance dates.
Section 129.67....................  Graphic arts              9/5/98  7/26/00, 65 FR 45920  (c)(147).
                                     systems..
Section 129.68....................  Manufacture of            8/3/91  5/13/93, 58 FR 28362  (c)(79).
                                     synthesized
                                     pharmaceutical
                                     products.
Section 129.69....................  Manufacture of           5/23/92  12/22/94, 59 FR       (c)(94).
                                     pneumatic rubber                  65971.
                                     tires.
Section 129.71....................  Synthetic organic        5/23/92  12/22/94, 59 FR       (c)(94).
                                     chemical and                      65971.
                                     polymer
                                     manufacturing--fugi
                                     tive sources.
Section 129.72....................  Manufacture of           5/23/92  12/22/94, 59 FR       (c)(94).
                                     surface active                    65971.
                                     agents.
Section 129.73....................  Aerospace                4/10/99  6/25/01, 66 FR 33645  (c)(155).
                                     manufacturing and
                                     rework.
Section 129.75....................  Mobile equipment        11/27/99  8/14/00, 65 FR 49501  (c)(148).
                                     repair and
                                     refinishing.
----------------------------------------------------------------------------------------------------------------
                                                 Mobile Sources
----------------------------------------------------------------------------------------------------------------
Section 129.81....................  Organic liquid cargo     9/28/91  9/28/93, 58 FR 50517  (c)(84).
                                     vessel loading and
                                     ballasting.
Section 129.82....................  Control of VOCs from     4/10/99  5/21/01, 66 FR 27875  (c)(153).
                                     gasoline dispensing
                                     facilities (Stage
                                     II).
----------------------------------------------------------------------------------------------------------------
                                       Stationary Sources of NOX and VOCs
----------------------------------------------------------------------------------------------------------------
Section 129.91....................  Control of major         6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     sources of NOX and
                                     VOCs.
Section 129.92....................  RACT proposal            4/23/94  3/23/98, 63 FR 13789  (c)(129).
                                     requirements.
Section 129.93 [Except for          Presumptive RACT         4/23/94  3/23/98, 63 FR 13789  (c)(129).
 129.93(c)(6 & 7)].                  emission
                                     limitations.
Section 129.94....................  NOX RACT emission        4/23/94  3/23/98, 63 FR 13789  (c)(129).
                                     averaging general
                                     requirements.
Section 129.95....................  Recordkeeping.......     4/23/94  3/23/98, 63 FR 13789  (c)(129).
----------------------------------------------------------------------------------------------------------------
                                     Wood Furniture Manufacturing Operations
----------------------------------------------------------------------------------------------------------------
Section 129.101...................  General provisions       6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     and applicability.
Section 129.102...................  Emission standards..     6/10/00  7/20/01, 66 FR 37908  (c)(152).
Section 129.103...................  Work practice            6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     standards.
Section 129.104...................  Compliance               6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     procedures and
                                     monitoring
                                     requirements.
Section 129.105...................  Recordkeeping            6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     requirements.
Section 129.106...................  Reporting                6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     requirements.
Section 129.107...................  Special provisions       6/10/00  7/20/01, 66 FR 37908  (c)(152).
                                     for facilities
                                     using an emissions
                                     averaging approach.
----------------------------------------------------------------------------------------------------------------
                                           Additional NOX Requirements
----------------------------------------------------------------------------------------------------------------
Section 129.201...................  Boilers.............    12/11/04  9/29/06, 71 FR 57428  SIP-effective date
                                                                                             is 10/30/06.
Section 129.202...................  Stationary              12/11/04  9/29/06, 71 FR 57428  SIP-effective d
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.