CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing, 78171 [E6-22224]
Download as PDF
Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–22223 Filed 12–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP96–200–160]
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
sroberts on PROD1PC70 with NOTICES
December 19, 2006.
Take notice that on December 15,
2006, CenterPoint Energy Gas
Transmission Company (CEGT)
tendered for filing and approval a
negotiated rate agreement between
CEGT and Constellation Energy
Commodities Group, Inc. CEGT states
that it has entered into an amended
agreement to provide firm
transportation service to this shipper
VerDate Aug<31>2005
20:03 Dec 27, 2006
Jkt 211001
under Rate Schedule FT and requests
the Commission accept and approve the
transaction under which transportation
service will commence upon the ‘‘inservice’’ date following completion of
certain Line CP facilities.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–22224 Filed 12–27–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
78171
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP96–200–161]
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
December 19, 2006.
Take notice that on December 15,
2006, CenterPoint Energy Gas
Transmission Company (CEGT)
tendered for filing and approval a
negotiated rate agreement between
CEGT and Chevron U.S.A. Inc. CEGT
states that it has entered into an
agreement to provide firm
transportation service to this shipper
under Rate Schedule FT and requests
the Commission accept and approve the
transaction under which transportation
service will commence upon the ‘‘inservice’’ date following completion of
certain Line CP facilities.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 71, Number 249 (Thursday, December 28, 2006)]
[Notices]
[Page 78171]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-22224]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP96-200-160]
CenterPoint Energy Gas Transmission Company; Notice of Negotiated
Rate Filing
December 19, 2006.
Take notice that on December 15, 2006, CenterPoint Energy Gas
Transmission Company (CEGT) tendered for filing and approval a
negotiated rate agreement between CEGT and Constellation Energy
Commodities Group, Inc. CEGT states that it has entered into an amended
agreement to provide firm transportation service to this shipper under
Rate Schedule FT and requests the Commission accept and approve the
transaction under which transportation service will commence upon the
``in-service'' date following completion of certain Line CP facilities.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-22224 Filed 12-27-06; 8:45 am]
BILLING CODE 6717-01-P