CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing, 78170-78171 [E6-22223]

Download as PDF 78170 Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices [Docket No. RP96–200–157] Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Magalie R. Salas, Secretary. [FR Doc. E6–22221 Filed 12–27–06; 8:45 am] December 19, 2006. BILLING CODE 6717–01–P docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–22220 Filed 12–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY sroberts on PROD1PC70 with NOTICES Federal Energy Regulatory Commission Take notice that on December 15, 2006, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval a negotiated rate agreement between CEGT and CenterPoint Energy Services, Inc. CEGT states that it has entered into an agreement to provide firm transportation service to this shipper under Rate Schedule FT and requests the Commission accept and approve the transaction under which transportation service will commence upon the ‘‘inservice’’ date following completion of certain Line CP facilities. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the VerDate Aug<31>2005 20:03 Dec 27, 2006 Jkt 211001 [Docket No. RP96–200–158] filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Magalie R. Salas, Secretary. [FR Doc. E6–22222 Filed 12–27–06; 8:45 am] December 19, 2006. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Take notice that on December 15, 2006, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval a negotiated rate transaction between CEGT and XTO Energy Company. CEGT states that it has entered into an agreement to provide firm transportation service to this shipper under Rate Schedule FT and requests the Commission accept and approve the transaction under which transportation service will commence upon the ‘‘inservice’’ date following completion of certain Line CP facilities. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP96–200–159] CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing December 19, 2006. Take notice that on December 15, 2006, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval a negotiated rate agreement between CEGT and EOG Resources, Inc. CEGT states that it has entered into an agreement to provide firm transportation service to this shipper under Rate Schedule FT and requests the Commission accept and approve the transaction under which transportation service will commence upon the ‘‘inservice’’ date following completion of certain Line CP facilities. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the E:\FR\FM\28DEN1.SGM 28DEN1 Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–22223 Filed 12–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP96–200–160] CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing sroberts on PROD1PC70 with NOTICES December 19, 2006. Take notice that on December 15, 2006, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval a negotiated rate agreement between CEGT and Constellation Energy Commodities Group, Inc. CEGT states that it has entered into an amended agreement to provide firm transportation service to this shipper VerDate Aug<31>2005 20:03 Dec 27, 2006 Jkt 211001 under Rate Schedule FT and requests the Commission accept and approve the transaction under which transportation service will commence upon the ‘‘inservice’’ date following completion of certain Line CP facilities. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–22224 Filed 12–27–06; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 78171 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP96–200–161] CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing December 19, 2006. Take notice that on December 15, 2006, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval a negotiated rate agreement between CEGT and Chevron U.S.A. Inc. CEGT states that it has entered into an agreement to provide firm transportation service to this shipper under Rate Schedule FT and requests the Commission accept and approve the transaction under which transportation service will commence upon the ‘‘inservice’’ date following completion of certain Line CP facilities. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed E:\FR\FM\28DEN1.SGM 28DEN1

Agencies

[Federal Register Volume 71, Number 249 (Thursday, December 28, 2006)]
[Notices]
[Pages 78170-78171]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-22223]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP96-200-159]


CenterPoint Energy Gas Transmission Company; Notice of Negotiated 
Rate Filing

December 19, 2006.
    Take notice that on December 15, 2006, CenterPoint Energy Gas 
Transmission Company (CEGT) tendered for filing and approval a 
negotiated rate agreement between CEGT and EOG Resources, Inc. CEGT 
states that it has entered into an agreement to provide firm 
transportation service to this shipper under Rate Schedule FT and 
requests the Commission accept and approve the transaction under which 
transportation service will commence upon the ``in-service'' date 
following completion of certain Line CP facilities.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the

[[Page 78171]]

appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a notice of intervention or motion to intervene, as appropriate. 
Such notices, motions, or protests must be filed in accordance with the 
provisions of Section 154.210 of the Commission's regulations (18 CFR 
154.210). Anyone filing an intervention or protest must serve a copy of 
that document on the Applicant. Anyone filing an intervention or 
protest on or before the intervention or protest date need not serve 
motions to intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-22223 Filed 12-27-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.