Federal Register / Vol. 71, No. 243 / Tuesday, December 19, 2006 / Notices
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a) (1) (iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link at https://www.ferc.gov.
The Commission strongly encourages
intervenors to file electronically.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Comment Date: January 2, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21550 Filed 12–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–102–000]
hsrobinson on PROD1PC76 with NOTICES
Northwest Pipeline Corporation; Notice
of Proposed Changes in FERC Gas
Tariff and Filing of Non-Conforming
Service Agreement
December 12, 2006.
Take notice that on December 8, 2006,
Northwest Pipeline Corporation
(Northwest) tendered for filing as part of
its FERC Gas Tariff, Third Revised
Volume No. 1, Fourth Revised Sheet No.
VerDate Aug<31>2005
17:07 Dec 18, 2006
Jkt 211001
374 to become effective January 8, 2007.
Northwest also tendered for filing a
restated Rate Schedule TF–1
nonconforming service agreement.
Northwest states that the purpose of
this filing is to (1) submit a restated nonconforming Rate Schedule TF–1 service
agreement for Commission acceptance
for filing, and (2) list the subject
agreement on the list of non-conforming
service agreements in Northwest’s tariff.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21554 Filed 12–18–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR07–4–000]
PanEnergy Louisiana Intrastate, LLC;
Notice of Petition for Rate Approval
December 12, 2006.
Take notice that on December 1, 2006,
PanEnergy Louisiana Intrastate, LLC
(PanEnergy) filed a petition for rate
approval pursuant to section
284.123(b)(2) of the Commission’s
regulations. PanEnergy requests
approval of a maximum system-wide
rate for both firm and interruptible
transportation of natural gas of $0.2617
per MMBtu plus actual compressor fuel
and lost-and-unaccounted-for gas
provided under Section 311(a)(2) of the
Natural Gas Policy Act of 1978.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\19DEN1.SGM
19DEN1
Agencies
[Federal Register Volume 71, Number 243 (Tuesday, December 19, 2006)]
[Notices]
[Page 75960]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21554]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP07-102-000]
Northwest Pipeline Corporation; Notice of Proposed Changes in
FERC Gas Tariff and Filing of Non-Conforming Service Agreement
December 12, 2006.
Take notice that on December 8, 2006, Northwest Pipeline
Corporation (Northwest) tendered for filing as part of its FERC Gas
Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. 374 to
become effective January 8, 2007. Northwest also tendered for filing a
restated Rate Schedule TF-1 nonconforming service agreement.
Northwest states that the purpose of this filing is to (1) submit a
restated non-conforming Rate Schedule TF-1 service agreement for
Commission acceptance for filing, and (2) list the subject agreement on
the list of non-conforming service agreements in Northwest's tariff.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-21554 Filed 12-18-06; 8:45 am]
BILLING CODE 6717-01-P