Northwest Pipeline Corporation; Notice of Proposed Changes in FERC Gas Tariff and Filing of Non-Conforming Service Agreement, 75960 [E6-21554]

Download as PDF 75960 Federal Register / Vol. 71, No. 243 / Tuesday, December 19, 2006 / Notices will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link at https://www.ferc.gov. The Commission strongly encourages intervenors to file electronically. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comment Date: January 2, 2007. Magalie R. Salas, Secretary. [FR Doc. E6–21550 Filed 12–18–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–102–000] hsrobinson on PROD1PC76 with NOTICES Northwest Pipeline Corporation; Notice of Proposed Changes in FERC Gas Tariff and Filing of Non-Conforming Service Agreement December 12, 2006. Take notice that on December 8, 2006, Northwest Pipeline Corporation (Northwest) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. VerDate Aug<31>2005 17:07 Dec 18, 2006 Jkt 211001 374 to become effective January 8, 2007. Northwest also tendered for filing a restated Rate Schedule TF–1 nonconforming service agreement. Northwest states that the purpose of this filing is to (1) submit a restated nonconforming Rate Schedule TF–1 service agreement for Commission acceptance for filing, and (2) list the subject agreement on the list of non-conforming service agreements in Northwest’s tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–21554 Filed 12–18–06; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR07–4–000] PanEnergy Louisiana Intrastate, LLC; Notice of Petition for Rate Approval December 12, 2006. Take notice that on December 1, 2006, PanEnergy Louisiana Intrastate, LLC (PanEnergy) filed a petition for rate approval pursuant to section 284.123(b)(2) of the Commission’s regulations. PanEnergy requests approval of a maximum system-wide rate for both firm and interruptible transportation of natural gas of $0.2617 per MMBtu plus actual compressor fuel and lost-and-unaccounted-for gas provided under Section 311(a)(2) of the Natural Gas Policy Act of 1978. Any person desiring to participate in this rate proceeding must file a motion to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\19DEN1.SGM 19DEN1

Agencies

[Federal Register Volume 71, Number 243 (Tuesday, December 19, 2006)]
[Notices]
[Page 75960]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21554]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP07-102-000]


Northwest Pipeline Corporation; Notice of Proposed Changes in 
FERC Gas Tariff and Filing of Non-Conforming Service Agreement

December 12, 2006.
    Take notice that on December 8, 2006, Northwest Pipeline 
Corporation (Northwest) tendered for filing as part of its FERC Gas 
Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. 374 to 
become effective January 8, 2007. Northwest also tendered for filing a 
restated Rate Schedule TF-1 nonconforming service agreement.
    Northwest states that the purpose of this filing is to (1) submit a 
restated non-conforming Rate Schedule TF-1 service agreement for 
Commission acceptance for filing, and (2) list the subject agreement on 
the list of non-conforming service agreements in Northwest's tariff.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-21554 Filed 12-18-06; 8:45 am]
BILLING CODE 6717-01-P