Southern Natural Gas Company; Notice of Application, 75528-75529 [E6-21413]
Download as PDF
75528
Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm eastern time on
December 29, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21415 Filed 12–14–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM06–16–000]
Mandatory Reliability Standards for the
Bulk-Power System; Notice of Filing
mstockstill on PROD1PC61 with NOTICES
December 8, 2006.
On December 1, 2006, the North
American Electric Reliability Council,
on behalf of its affiliate, the North
American Electric Reliability
Corporation (collectively NERC), made
an informational filing with the
Commission entitled ‘‘NERC’s
Reliability Standards Development Plan:
2007–2009’’ (Work Plan).1 NERC states
that the Work Plan has been submitted
to inform the Commission of NERC’s
program to improve the Reliability
Standards that currently are the subject
of the Commission’s Notice of Proposed
Rulemaking (NOPR) issued in this
docket on October 20, 2006. NERC states
that a portion of the Work Plan also
fulfills the commitment made in its
April 2006 ERO certification application
to provide the Commission with a plan
to address the ‘‘fill-in-the-blank’’
regional reliability standards. Finally,
the informational filing contains a status
report on the violation risk factors that
NERC plans to assign to each
requirement in NERC’s Reliability
Standards to help delineate the relative
risks associated with the violation of
each requirement of a Reliability
Standard.
The Commission stated in its October
20, 2006 NOPR that it is important that
1 The Commission certified NERC Corporation as
the Electric Reliability Organization (ERO) pursuant
to Section 215 of the Federal Power Act in an order
issued July 20, 2006, in Docket No. RR06–1–000.
VerDate Aug<31>2005
15:47 Dec 14, 2006
Jkt 211001
the ERO develop a detailed,
comprehensive work plan to address all
of the modifications that are directed
pursuant to a final rule issued in this
docket. The Commission believes that
the Work Plan could be useful for
determining such prioritization and
would therefore be informative for the
final rule. The Commission also believes
that industry comment on the Work
Plan would assist in developing an
appropriate prioritization plan.
The Commission therefore seeks
public comment on the Work Plan, with
comments due by the January 3, 2007 to
coincide with the date for filing
comments on the October 20, 2006
NOPR.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21387 Filed 12–14–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–29–000]
Sabine Pipe Line LLC; Notice of
Proposed Changes In FERC Gas Tariff
December 8, 2006.
Take notice that on December 4, 2006,
Sabine Pipe Line LLC (Sabine) tendered
for filing to its FERC Gas Tariff, Original
Volume No. 1, Seventh Revised Sheet
No. 20 to become effective January 1,
2007.
The proposed tariff sheet was filed
under the authority of Part 154 of the
Commission’s Regulations, and in
accordance with Section 27 of the
General Terms and Conditions of
Sabine’s FERC Gas Tariff, which
provides that Sabine will file, to be
effective each January 1, a
redetermination of its Fuel Gas and
Unaccounted For Gas reimbursement
percentages (FRP and UFRP,
respectively).
Any person desiring to intervene or to
protest this filing must file in
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21393 Filed 12–14–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–28–000]
Southern Natural Gas Company;
Notice of Application
December 11, 2006.
Take notice that on December 1, 2006,
Southern Natural Gas Company
(Southern), 1900 Fifth Avenue North,
Birmingham, Alabama 35203, filed in
Docket No. CP07–28–000, an
application pursuant to sections 7(b)
E:\FR\FM\15DEN1.SGM
15DEN1
mstockstill on PROD1PC61 with NOTICES
Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices
and (c) of the Natural Gas Act (NGA)
and Part 157 of the Commission’s
Regulations, for authorization to
abandon and modify certain pipeline
and appurtenant facilities on its 22-inch
North Main Loop Line and for a
certificate of public convenience and
necessity authorizing the construction,
installation, and operation of certain
pipeline facilities on its 24-inch 2nd
Northern Main Loop Line located in
Tuscaloosa County, Alabama, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. This
filing is accessible online at https://
www.ferc.gov, using the ‘‘eLibrary’’ link
and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email notification when a document is
added to a subscribed docket(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
In its application, Southern states that
it is currently involved in an extensive
pipeline integrity program (PIP). As part
of the PIP, Southern has identified for
replacement, certain sections of pipe
which were constructed using a
mechanical coupling methodology. One
of these areas is the North Main Loop
Line from 271.65 to Milepost 281.27
(9.62 miles) located in Tuscaloosa
County, Alabama. Southern proposes to
abandon in place a portion of the North
Main Loop Segment from Milepost
278.48 to Milepost 281.27 (2.79 miles).
Also, Southern proposes to abandon and
remove a portion of the North Main
Loop Segment from Milepost 271.65 to
Milepost 278.48 (6.83 miles). Southern
proposes to install a new 22-inch
mainline gate assembly at Milepost
278.48 and install a new 12-inch blind
flange to close the 12-inch crossover
value at Milepost 281.02. Southern
proposes to install a new 20-inch
crossover connection at the Black
Warrior River West Header at Milepost
281.23 between the 22-inch North Main
Line and the 22-inch North Main Loop
Line. The crossover connection will be
accomplished by installing a new 20inch tap on the 22-inch Northern Main
Line and a short segment of new 20-inch
crossover pipe for connection to the 22inch North Main Loop Line.
Also, Southern requests authority to
extend its 24-inch 2nd North Main Loop
Line, by constructing, installing and
operating 6.83 miles of 24-inch pipeline
from Milepost 148.93 to Milepost 155.75
in Tuscaloosa County, Alabama. This
VerDate Aug<31>2005
15:47 Dec 14, 2006
Jkt 211001
new segment of 24-inch pipeline will be
installed in the current location of the
22-inch pipeline proposed to be
abandoned. Southern stated that the
installation of this segment of the 24inch 2nd North Main Loop Line provide
the sufficient capacity and the level of
service necessary to continue to serve its
existing customers in this area. The cost
of constructing the 2nd North Main
Loop Segment is estimated to be $10.4
million.
Any questions regarding this
application should be directed to
Patrick B. Pope, Vice President and
General Counsel or Patricia S. Francis,
Senior Counsel for Southern, Post Office
Box 2563, Birmingham, Alabama
35202–2563, at (205) 325–7126 or (205)
325–7696, respectively.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
75529
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link at https://www.ferc.gov.
The Commission strongly encourages
intervenors to file electronically.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Comment Date: 5 p.m. eastern
standard time, January 2, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21413 Filed 12–14–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP07–27–000]
Tuscarora Gas Transmission
Company; Notice of Application
December 8, 2006.
Take notice that on November 30,
2006, Tuscarora Gas Transmission
Company (Tuscarora), 1140 Financial
Blvd. Suite 900 Reno, NV 89502, filed
in Docket No. CP07–27–000, an
application pursuant to Section 7(c) of
the Natural Gas Act (NGA), as amended,
for authorization to construct, install,
own, operate and maintain a new
compressor station and appurtenant
facilities in Modoc County, California to
render up to 40,000 dekatherms per day
of additional firm natural gas
transportation service pursuant to Rate
Schedule FT to Sierra Pacific Power
Company (2008 Expansion Project), all
as more fully set forth in the application
which is on file with the Commission
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 71, Number 241 (Friday, December 15, 2006)]
[Notices]
[Pages 75528-75529]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21413]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-28-000]
Southern Natural Gas Company; Notice of Application
December 11, 2006.
Take notice that on December 1, 2006, Southern Natural Gas Company
(Southern), 1900 Fifth Avenue North, Birmingham, Alabama 35203, filed
in Docket No. CP07-28-000, an application pursuant to sections 7(b)
[[Page 75529]]
and (c) of the Natural Gas Act (NGA) and Part 157 of the Commission's
Regulations, for authorization to abandon and modify certain pipeline
and appurtenant facilities on its 22-inch North Main Loop Line and for
a certificate of public convenience and necessity authorizing the
construction, installation, and operation of certain pipeline
facilities on its 24-inch 2nd Northern Main Loop Line located in
Tuscaloosa County, Alabama, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. This filing is accessible online at https://www.ferc.gov,
using the ``eLibrary'' link and is available for review in the
Commission's Public Reference Room in Washington, DC. There is an
``eSubscription'' link on the Web site that enables subscribers to
receive e-mail notification when a document is added to a subscribed
docket(s). For assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
In its application, Southern states that it is currently involved
in an extensive pipeline integrity program (PIP). As part of the PIP,
Southern has identified for replacement, certain sections of pipe which
were constructed using a mechanical coupling methodology. One of these
areas is the North Main Loop Line from 271.65 to Milepost 281.27 (9.62
miles) located in Tuscaloosa County, Alabama. Southern proposes to
abandon in place a portion of the North Main Loop Segment from Milepost
278.48 to Milepost 281.27 (2.79 miles). Also, Southern proposes to
abandon and remove a portion of the North Main Loop Segment from
Milepost 271.65 to Milepost 278.48 (6.83 miles). Southern proposes to
install a new 22-inch mainline gate assembly at Milepost 278.48 and
install a new 12-inch blind flange to close the 12-inch crossover value
at Milepost 281.02. Southern proposes to install a new 20-inch
crossover connection at the Black Warrior River West Header at Milepost
281.23 between the 22-inch North Main Line and the 22-inch North Main
Loop Line. The crossover connection will be accomplished by installing
a new 20-inch tap on the 22-inch Northern Main Line and a short segment
of new 20-inch crossover pipe for connection to the 22-inch North Main
Loop Line.
Also, Southern requests authority to extend its 24-inch 2nd North
Main Loop Line, by constructing, installing and operating 6.83 miles of
24-inch pipeline from Milepost 148.93 to Milepost 155.75 in Tuscaloosa
County, Alabama. This new segment of 24-inch pipeline will be installed
in the current location of the 22-inch pipeline proposed to be
abandoned. Southern stated that the installation of this segment of the
24-inch 2nd North Main Loop Line provide the sufficient capacity and
the level of service necessary to continue to serve its existing
customers in this area. The cost of constructing the 2nd North Main
Loop Segment is estimated to be $10.4 million.
Any questions regarding this application should be directed to
Patrick B. Pope, Vice President and General Counsel or Patricia S.
Francis, Senior Counsel for Southern, Post Office Box 2563, Birmingham,
Alabama 35202-2563, at (205) 325-7126 or (205) 325-7696, respectively.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link at https://www.ferc.gov. The Commission strongly encourages
intervenors to file electronically. Persons unable to file
electronically should submit an original and 14 copies of the protest
or intervention to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comment Date: 5 p.m. eastern standard time, January 2, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E6-21413 Filed 12-14-06; 8:45 am]