Download as PDF 75528 Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 pm eastern time on December 29, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–21415 Filed 12–14–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM06–16–000] Mandatory Reliability Standards for the Bulk-Power System; Notice of Filing mstockstill on PROD1PC61 with NOTICES December 8, 2006. On December 1, 2006, the North American Electric Reliability Council, on behalf of its affiliate, the North American Electric Reliability Corporation (collectively NERC), made an informational filing with the Commission entitled ‘‘NERC’s Reliability Standards Development Plan: 2007–2009’’ (Work Plan).1 NERC states that the Work Plan has been submitted to inform the Commission of NERC’s program to improve the Reliability Standards that currently are the subject of the Commission’s Notice of Proposed Rulemaking (NOPR) issued in this docket on October 20, 2006. NERC states that a portion of the Work Plan also fulfills the commitment made in its April 2006 ERO certification application to provide the Commission with a plan to address the ‘‘fill-in-the-blank’’ regional reliability standards. Finally, the informational filing contains a status report on the violation risk factors that NERC plans to assign to each requirement in NERC’s Reliability Standards to help delineate the relative risks associated with the violation of each requirement of a Reliability Standard. The Commission stated in its October 20, 2006 NOPR that it is important that 1 The Commission certified NERC Corporation as the Electric Reliability Organization (ERO) pursuant to Section 215 of the Federal Power Act in an order issued July 20, 2006, in Docket No. RR06–1–000. VerDate Aug<31>2005 15:47 Dec 14, 2006 Jkt 211001 the ERO develop a detailed, comprehensive work plan to address all of the modifications that are directed pursuant to a final rule issued in this docket. The Commission believes that the Work Plan could be useful for determining such prioritization and would therefore be informative for the final rule. The Commission also believes that industry comment on the Work Plan would assist in developing an appropriate prioritization plan. The Commission therefore seeks public comment on the Work Plan, with comments due by the January 3, 2007 to coincide with the date for filing comments on the October 20, 2006 NOPR. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–21387 Filed 12–14–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–29–000] Sabine Pipe Line LLC; Notice of Proposed Changes In FERC Gas Tariff December 8, 2006. Take notice that on December 4, 2006, Sabine Pipe Line LLC (Sabine) tendered for filing to its FERC Gas Tariff, Original Volume No. 1, Seventh Revised Sheet No. 20 to become effective January 1, 2007. The proposed tariff sheet was filed under the authority of Part 154 of the Commission’s Regulations, and in accordance with Section 27 of the General Terms and Conditions of Sabine’s FERC Gas Tariff, which provides that Sabine will file, to be effective each January 1, a redetermination of its Fuel Gas and Unaccounted For Gas reimbursement percentages (FRP and UFRP, respectively). Any person desiring to intervene or to protest this filing must file in PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–21393 Filed 12–14–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–28–000] Southern Natural Gas Company; Notice of Application December 11, 2006. Take notice that on December 1, 2006, Southern Natural Gas Company (Southern), 1900 Fifth Avenue North, Birmingham, Alabama 35203, filed in Docket No. CP07–28–000, an application pursuant to sections 7(b) E:\FR\FM\15DEN1.SGM 15DEN1 mstockstill on PROD1PC61 with NOTICES Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices and (c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s Regulations, for authorization to abandon and modify certain pipeline and appurtenant facilities on its 22-inch North Main Loop Line and for a certificate of public convenience and necessity authorizing the construction, installation, and operation of certain pipeline facilities on its 24-inch 2nd Northern Main Loop Line located in Tuscaloosa County, Alabama, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is accessible online at https:// www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. In its application, Southern states that it is currently involved in an extensive pipeline integrity program (PIP). As part of the PIP, Southern has identified for replacement, certain sections of pipe which were constructed using a mechanical coupling methodology. One of these areas is the North Main Loop Line from 271.65 to Milepost 281.27 (9.62 miles) located in Tuscaloosa County, Alabama. Southern proposes to abandon in place a portion of the North Main Loop Segment from Milepost 278.48 to Milepost 281.27 (2.79 miles). Also, Southern proposes to abandon and remove a portion of the North Main Loop Segment from Milepost 271.65 to Milepost 278.48 (6.83 miles). Southern proposes to install a new 22-inch mainline gate assembly at Milepost 278.48 and install a new 12-inch blind flange to close the 12-inch crossover value at Milepost 281.02. Southern proposes to install a new 20-inch crossover connection at the Black Warrior River West Header at Milepost 281.23 between the 22-inch North Main Line and the 22-inch North Main Loop Line. The crossover connection will be accomplished by installing a new 20inch tap on the 22-inch Northern Main Line and a short segment of new 20-inch crossover pipe for connection to the 22inch North Main Loop Line. Also, Southern requests authority to extend its 24-inch 2nd North Main Loop Line, by constructing, installing and operating 6.83 miles of 24-inch pipeline from Milepost 148.93 to Milepost 155.75 in Tuscaloosa County, Alabama. This VerDate Aug<31>2005 15:47 Dec 14, 2006 Jkt 211001 new segment of 24-inch pipeline will be installed in the current location of the 22-inch pipeline proposed to be abandoned. Southern stated that the installation of this segment of the 24inch 2nd North Main Loop Line provide the sufficient capacity and the level of service necessary to continue to serve its existing customers in this area. The cost of constructing the 2nd North Main Loop Segment is estimated to be $10.4 million. Any questions regarding this application should be directed to Patrick B. Pope, Vice President and General Counsel or Patricia S. Francis, Senior Counsel for Southern, Post Office Box 2563, Birmingham, Alabama 35202–2563, at (205) 325–7126 or (205) 325–7696, respectively. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 75529 Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link at https://www.ferc.gov. The Commission strongly encourages intervenors to file electronically. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comment Date: 5 p.m. eastern standard time, January 2, 2007. Magalie R. Salas, Secretary. [FR Doc. E6–21413 Filed 12–14–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP07–27–000] Tuscarora Gas Transmission Company; Notice of Application December 8, 2006. Take notice that on November 30, 2006, Tuscarora Gas Transmission Company (Tuscarora), 1140 Financial Blvd. Suite 900 Reno, NV 89502, filed in Docket No. CP07–27–000, an application pursuant to Section 7(c) of the Natural Gas Act (NGA), as amended, for authorization to construct, install, own, operate and maintain a new compressor station and appurtenant facilities in Modoc County, California to render up to 40,000 dekatherms per day of additional firm natural gas transportation service pursuant to Rate Schedule FT to Sierra Pacific Power Company (2008 Expansion Project), all as more fully set forth in the application which is on file with the Commission E:\FR\FM\15DEN1.SGM 15DEN1

Agencies

[Federal Register Volume 71, Number 241 (Friday, December 15, 2006)]
[Notices]
[Pages 75528-75529]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21413]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-28-000]


Southern Natural Gas Company; Notice of Application

December 11, 2006.
    Take notice that on December 1, 2006, Southern Natural Gas Company 
(Southern), 1900 Fifth Avenue North, Birmingham, Alabama 35203, filed 
in Docket No. CP07-28-000, an application pursuant to sections 7(b)

[[Page 75529]]

and (c) of the Natural Gas Act (NGA) and Part 157 of the Commission's 
Regulations, for authorization to abandon and modify certain pipeline 
and appurtenant facilities on its 22-inch North Main Loop Line and for 
a certificate of public convenience and necessity authorizing the 
construction, installation, and operation of certain pipeline 
facilities on its 24-inch 2nd Northern Main Loop Line located in 
Tuscaloosa County, Alabama, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. This filing is accessible online at https://www.ferc.gov, 
using the ``eLibrary'' link and is available for review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive e-mail notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    In its application, Southern states that it is currently involved 
in an extensive pipeline integrity program (PIP). As part of the PIP, 
Southern has identified for replacement, certain sections of pipe which 
were constructed using a mechanical coupling methodology. One of these 
areas is the North Main Loop Line from 271.65 to Milepost 281.27 (9.62 
miles) located in Tuscaloosa County, Alabama. Southern proposes to 
abandon in place a portion of the North Main Loop Segment from Milepost 
278.48 to Milepost 281.27 (2.79 miles). Also, Southern proposes to 
abandon and remove a portion of the North Main Loop Segment from 
Milepost 271.65 to Milepost 278.48 (6.83 miles). Southern proposes to 
install a new 22-inch mainline gate assembly at Milepost 278.48 and 
install a new 12-inch blind flange to close the 12-inch crossover value 
at Milepost 281.02. Southern proposes to install a new 20-inch 
crossover connection at the Black Warrior River West Header at Milepost 
281.23 between the 22-inch North Main Line and the 22-inch North Main 
Loop Line. The crossover connection will be accomplished by installing 
a new 20-inch tap on the 22-inch Northern Main Line and a short segment 
of new 20-inch crossover pipe for connection to the 22-inch North Main 
Loop Line.
    Also, Southern requests authority to extend its 24-inch 2nd North 
Main Loop Line, by constructing, installing and operating 6.83 miles of 
24-inch pipeline from Milepost 148.93 to Milepost 155.75 in Tuscaloosa 
County, Alabama. This new segment of 24-inch pipeline will be installed 
in the current location of the 22-inch pipeline proposed to be 
abandoned. Southern stated that the installation of this segment of the 
24-inch 2nd North Main Loop Line provide the sufficient capacity and 
the level of service necessary to continue to serve its existing 
customers in this area. The cost of constructing the 2nd North Main 
Loop Segment is estimated to be $10.4 million.
    Any questions regarding this application should be directed to 
Patrick B. Pope, Vice President and General Counsel or Patricia S. 
Francis, Senior Counsel for Southern, Post Office Box 2563, Birmingham, 
Alabama 35202-2563, at (205) 325-7126 or (205) 325-7696, respectively.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link at https://www.ferc.gov. The Commission strongly encourages 
intervenors to file electronically. Persons unable to file 
electronically should submit an original and 14 copies of the protest 
or intervention to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    Comment Date: 5 p.m. eastern standard time, January 2, 2007.

Magalie R. Salas,
Secretary.