City and Borough of Sitka, AK; Notice Soliciting Comments and Final Recommendations, Terms and Conditions, and Prescriptions, 75532-75533 [E6-21386]
Download as PDF
75532
Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices
federal action significantly affecting the
quality of the human environment.
The EA assesses the potential
environmental effects of the
construction and operation of the
proposed Maritimes Phase IV Project:
New Construction in Maine
• Approximately, 1.7 miles of 30inch-diameter pipeline in Washington
County (Baileyville Loop);
• Baileyville Meter Station in
Washington County;
• Woodchopping Ridge Compressor
Station (18,085 horsepower [HP]) in
Hancock County;
• Brewer Compressor Station (18,085
HP) in Penobscot County;
• Searsmont Compressor Station
(18,085 HP) in Waldo County;
• Westbrook Compressor Station
(26,666 HP) in Cumberland County;
• Westbrook Meter Station in
Cumberland County; and
• Eliot Compressor Station (8,943 HP)
in York County.
mstockstill on PROD1PC61 with NOTICES
Modifications in Maine
• Piping at the existing Richmond
Compressor Station in Sagadahoc
County;
• Piping at the existing Baileyville
Compressor Station in Washington
County; and
• Piping at the existing Baileyville
Meter Station in Washington County.
Modifications in Massachusetts
• At the existing Dracut Meter Station
in Middlesex County.
The purpose of the proposed
Maritimes Phase IV Project is to provide
the necessary infrastructure to transport
natural gas from the Canaport LNG
terminal currently under construction in
New Brunswick, Canada to markets in
the Northeastern U.S. The EA has been
placed in the public files of the FERC.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street, NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Copies of the EA have been mailed to
Federal, State and local agencies, public
interest groups, interested individuals,
newspapers, and parties to this
proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below. Please
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your comments to: Secretary, Federal
VerDate Aug<31>2005
15:47 Dec 14, 2006
Jkt 211001
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426;
• Label one copy of the comments for
the attention of the Gas Branch 2,
PJ11.2.
• Reference Docket No. C06–335–000;
and
• Mail your comments so that they
will be received in Washington, DC on
or before January 10, 2007.
The Commission strongly encourages
electronic filing of any comments or
interventions or protests to this
proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the
‘‘e-Filing’’ link and the link to the User’s
Guide. Before you can file comments
you will need to create a free account
which can be created by clicking on
‘‘Sign-up.’’
Comments will be considered by the
Commission but will not serve to make
the commentor a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21418 Filed 12–14–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2230–034]
City and Borough of Sitka, AK; Notice
Soliciting Comments and Final
Recommendations, Terms and
Conditions, and Prescriptions
December 8, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2230–034.
c. Date Filed: March 28, 2006.
d. Applicant: City and Borough of
Sitka, Alaska.
e. Name of Project: Blue Lake
Hydroelectric Project.
f. Location: On Sawmill Creek, 5
miles southeast of the City of Sitka,
Alaska. The project occupies lands of
the United States; specifically 1628.1
acres of the Tongass National Forest.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Andy Eggen,
Acting Utility Director, City and
Borough of Sitka, 105 Jarvis Street,
Sitka, AK 99835, (907) 747–4000.
i. FERC Contact: Thomas Dean, (202)
502–6041 or thomas.dean@ferc.gov.
j. Deadline for filing comments and
final recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person that is on
the official service list for the project.
Further, if an intervenor files comments
E:\FR\FM\15DEN1.SGM
15DEN1
mstockstill on PROD1PC61 with NOTICES
Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, recommendations, terms
and conditions, and prescriptions may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filing. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Description of Project: The existing
Blue Lake Project consists of the
following : (1) A 211-foot-high, 256-footlong concrete arch dam equipped with
a 140-foot-long spillway and a release
valve at the base of the dam; (2) a 1,225acre reservoir with a normal water
surface elevation of 342 feet msl; (3) a
7,110-foot-long power conduit
consisting of: (a) An 11.5-foot-diameter,
1,500-foot-long penstock; (b) an 84-inchdiameter, 460-foot-long penstock; (c) a
10-inch-diameter, 4,650-foot-long lower
penstock; (d) an 84-inch-diameter, 500foot-long penstock; (e) a 20-inchdiameter water supply tap; (f) an 84inch-diameter butterfly valve; and (g) a
24-inch conduit drain valve; (4) a
powerhouse containing two 3,000 kW
generating units; (5) a 150-foot-long
tailrace; (6) a 5-mile-long, 69-kV
transmission line; and (7) appurtenant
facilities.
Two additional generating units are
connected to the project power conduit
as follows:
The Fish Valve Unit consists of: (1) A
36-inch-diameter wye penstock
connected to the power conduit; (2) a
powerhouse containing one 670 kW
generating unit; (3) a 7,700-foot-long,
12.47-kV transmission line; and (4)
appurtenant facilities.
The Pulp Mill Feeder Unit consists of:
(1) A 36-inch-diameter tee connected to
the power conduit; (2) a 36-inchdiameter, 24-foot-long penstock; (3) a
powerhouse containing one 870 kW
generating unit; (4) a 470-foot-long 4.16kV transmission line; and (5)
appurtenant facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll-
VerDate Aug<31>2005
15:47 Dec 14, 2006
Jkt 211001
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments on
this application. In determining the
appropriate action to take, the
Commission will consider all comments
filed. Comments must be received on or
before the specified deadline date.
All filings must: (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the agency or other
individual submitting the filing; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate. The
Commission staff proposes to issue a
single environmental assessment for
comment rather than issuing a draft and
final EA. Comments, terms and
conditions, recommendations,
prescriptions, and reply comments, if
any, will be addressed in the EA. Staff
intend to give at least 30 days for
entities to comment on the EA, and will
take into consideration all comments
received on the EA before final action is
taken on the license application.
Notice of the availability of the EA
June 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21386 Filed 12–14–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
75533
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
December 11, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2210–143.
c. Date filed: October 10, 2006.
d. Applicant: Appalachian Power
Company.
e. Name of Project: Smith Mountain
Pumped Storage Project.
f. Location: The project is located on
the Roanoke River, in Bedford,
Pittsylvania, Franklin, and Roanoke
Counties, Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and § § 799
and 801.
h. Applicant Contact: Teresa P.
Rogers, Hydro Generation Department,
Appalachian Power, P.O. Box 2021,
Roanoke, VA 24022–2121, (540) 985–
2441.
i. FERC Contact: Brian Romanek at
202–502–6175, or e-mail:
Brian.Romanek@ferc.gov.
j. Deadline for filing comments and or
motions: January 12, 2007.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please include the project number (P–
2210–143) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Application: The
licensee requests a variance be granted
to Willard Companies (Willard) for the
construction of four floating docks
accommodating 17 boats and to
maintain an existing boat ramp, all of
which would serve a residential
community, known as ‘‘The Farms at
Smith Mountain Lake’’ (located in
Franklin County near Rocky Mount,
Virginia). The licensee is requesting the
variance because the proposed action is
not in conformance with the approved
project Shoreline Management Plan
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 71, Number 241 (Friday, December 15, 2006)]
[Notices]
[Pages 75532-75533]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21386]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2230-034]
City and Borough of Sitka, AK; Notice Soliciting Comments and
Final Recommendations, Terms and Conditions, and Prescriptions
December 8, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2230-034.
c. Date Filed: March 28, 2006.
d. Applicant: City and Borough of Sitka, Alaska.
e. Name of Project: Blue Lake Hydroelectric Project.
f. Location: On Sawmill Creek, 5 miles southeast of the City of
Sitka, Alaska. The project occupies lands of the United States;
specifically 1628.1 acres of the Tongass National Forest.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Andy Eggen, Acting Utility Director, City and
Borough of Sitka, 105 Jarvis Street, Sitka, AK 99835, (907) 747-4000.
i. FERC Contact: Thomas Dean, (202) 502-6041 or
thomas.dean@ferc.gov.
j. Deadline for filing comments and final recommendations, terms
and conditions, and prescriptions is 60 days from the issuance of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person that is on the official service list for the project. Further,
if an intervenor files comments
[[Page 75533]]
or documents with the Commission relating to the merits of an issue
that may affect the responsibilities of a particular resource agency,
they must also serve a copy of the document on that resource agency.
Comments, recommendations, terms and conditions, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filing. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``eFiling'' link.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. Description of Project: The existing Blue Lake Project consists
of the following : (1) A 211-foot-high, 256-foot-long concrete arch dam
equipped with a 140-foot-long spillway and a release valve at the base
of the dam; (2) a 1,225-acre reservoir with a normal water surface
elevation of 342 feet msl; (3) a 7,110-foot-long power conduit
consisting of: (a) An 11.5-foot-diameter, 1,500-foot-long penstock; (b)
an 84-inch-diameter, 460-foot-long penstock; (c) a 10-inch-diameter,
4,650-foot-long lower penstock; (d) an 84-inch-diameter, 500-foot-long
penstock; (e) a 20-inch-diameter water supply tap; (f) an 84-inch-
diameter butterfly valve; and (g) a 24-inch conduit drain valve; (4) a
powerhouse containing two 3,000 kW generating units; (5) a 150-foot-
long tailrace; (6) a 5-mile-long, 69-kV transmission line; and (7)
appurtenant facilities.
Two additional generating units are connected to the project power
conduit as follows:
The Fish Valve Unit consists of: (1) A 36-inch-diameter wye
penstock connected to the power conduit; (2) a powerhouse containing
one 670 kW generating unit; (3) a 7,700-foot-long, 12.47-kV
transmission line; and (4) appurtenant facilities.
The Pulp Mill Feeder Unit consists of: (1) A 36-inch-diameter tee
connected to the power conduit; (2) a 36-inch-diameter, 24-foot-long
penstock; (3) a powerhouse containing one 870 kW generating unit; (4) a
470-foot-long 4.16-kV transmission line; and (5) appurtenant
facilities.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Anyone may submit comments on this application. In determining
the appropriate action to take, the Commission will consider all
comments filed. Comments must be received on or before the specified
deadline date.
All filings must: (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the agency or other individual submitting the filing; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments, recommendations, terms and conditions or
prescriptions must set forth their evidentiary basis and otherwise
comply with the requirements of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from the applicant. Each filing must
be accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
o. Procedural schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made as appropriate. The Commission staff proposes to issue a
single environmental assessment for comment rather than issuing a draft
and final EA. Comments, terms and conditions, recommendations,
prescriptions, and reply comments, if any, will be addressed in the EA.
Staff intend to give at least 30 days for entities to comment on the
EA, and will take into consideration all comments received on the EA
before final action is taken on the license application.
Notice of the availability of the EA June 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E6-21386 Filed 12-14-06; 8:45 am]
BILLING CODE 6717-01-P