Download as PDF jlentini on PROD1PC65 with NOTICES 74518 Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices e. Name of Project: Rio Project. f. Location: The project is located on the Mongaup River in Orange County, New York. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r) and 799 and 801. h. Applicant Contact: Mr. Kevin McCleod, Mirant NY–Gen LLC,140 Samsondale Avenue, West Haverstraw, NY 10993 (914) 391–7715. i. FERC Contact: Any questions on this notice should be addressed to Mrs. Heather Campbell at (202) 502–6182, or e-mail address: heather.campbell@ferc.gov. j. Deadline for filing comments and or motions: January 5, 2007. All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. Please include the project number (P–9690–082) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov. under the ‘‘e-Filing’’ link. The Commission strongly encourages e-filings. k. Description of Filing: Mirant filed its Recreation Usage Report for 2004 required by article 408, as amended. This report provides an evaluation of the recreation facilities downstream of the Rio Dam and the effectiveness of the whitewater releases in meeting the needs of the public. The information will be used to determine if changes are needed to the whitewater releases at the project. l. Location of the Filing: This filing is available for review at the Commission in the Public Reference Room 888 First Street, NE., Room 2A, Washington, DC 20426 or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘E-Library’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the VerDate Aug<31>2005 18:00 Dec 11, 2006 Jkt 211001 requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E6–21073 Filed 12–11–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Soliciting Comments, Motions To Intervene, and Protests December 6, 2006. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 2413–083. c. Date Filed: November 1, 2006. d. Applicant: Georgia Power Company (GPC). e. Name of Project: Wallace Dam Project. f. Location: The proposed development is located on Lake Oconee in Greene County, Georgia. This project PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 does not occupy any Federal or tribal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r) and 799 and 801. h. Applicant Contact: Mr. Lee B. Glenn, Georgia Power Company, 125 Wallace Dam Road NE, Eatonton, GA 31024, (706) 485–8704. i. FERC Contact: Gina Krump, gina.krump@ferc.gov, 202–502–6704. j. Deadline for filing comments and or motions: January 8, 2007. All documents (original and eight copies) should be filed with Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Please reference ‘‘Wallace Dam Project, FERC Project No. 2413–083’’ on any comments or motions filed. k. Description of Request: GPC is seeking Commission approval to permit the construction of a 30-slip marina (26 boat slips and four refueling slips), a boat lift launch, and a boat ramp on approximately 1.2 acres of project land. Each slip will be five feet wide by 24 feet long along approximately 540 feet of shoreline. A seawall and rip-rap to stabilize the shoreline of the marina is also being proposed. The marina is being proposed in conjunction with a residential development and will be designed for use by the community residents. l. Location of the Application: This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to E:\FR\FM\12DEN1.SGM 12DEN1 Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described applications. A copy of the applications may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E6–21094 Filed 12–11–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at Organization of Midwest ISO States Annual Meeting jlentini on PROD1PC65 with NOTICES December 4, 2006. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may attend the following Organization of Midwest ISO States Annual Meeting: December 14, 2006 (11 a.m.–4 p.m.), Midwest ISO Headquarters, 701 City Center Drive, Carmel, IN 46032. The discussions may address matters at issue in the following proceedings: Docket No. ER02–2595, et al., Midwest Independent Transmission System Operator, Inc. Docket No. ER04–375, Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER04–458, et al., Midwest Independent Transmission System Operator, Inc. VerDate Aug<31>2005 18:00 Dec 11, 2006 Jkt 211001 Docket Nos. ER04–691, EL04–104 and ER04–106, et al., Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER05–6, et al., Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER05–752, Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, L.L.C. Docket No. ER05–1083, et al., Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER05–1085, et al., Midwest Independent Transmission System Operator, Inc. Docket No. ER05–1138, Midwest Independent Transmission System Operator, Inc. Docket No. ER05–1201, Midwest Independent Transmission System Operator, Inc. Docket No. ER05–1230, Midwest Independent Transmission System Operator, Inc. Docket No. EL05–103, Northern Indiana Power Service Co. v. Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, L.L.C. Docket No. EL05–128, Quest Energy, L.L.C. v. Midwest Independent Transmission System Operator, Inc. Docket No. ER06–18, Midwest Independent Transmission System Operator, Inc. Docket No. ER06–27, Midwest Independent Transmission System Operator, Inc., et al. Docket Nos. EC06–4 and ER06–20, LGE Energy LLC, et al. Docket No. ER06–360, et al., Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER06–356, Midwest Independent Transmission System Operator, Inc. Docket No. ER06–532, Midwest Independent Transmission System Operator, Inc. Docket No. EL06–31, Midwest Independent Transmission System Operator, Inc., et al. Docket No. EL06–49, Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER06–56, Midwest Independent Transmission System Operator, Inc. These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Markets and reliability, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov, or Christopher Miller, Office of Energy Markets and Reliability, Federal Energy Regulatory PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 74519 Commission at (317) 249–5936 or christopher.miller@ferc.gov. Magalie R. Salas, Secretary. [FR Doc. E6–21050 Filed 12–11–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at Southwest Power Pool Board of Directors/Members Committee Meetings and Southwest Power Pool Regional State Committee Meeting December 4, 2006. The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meetings of the Southwest Power Pool (SPP) Board of Directors/Members Committee and SPP Regional State Committee noted below. Their attendance is part of the Commission’s ongoing outreach efforts. Board of Directors/Members Committee December 12, 2006 (8 a.m.–3 p.m.) , DFW Airport Hyatt Regency, International Parkway, Dallas, Texas 75261, 972–453–1234. SPP Regional State Committee January 29, 2007 (1 p.m.–5 p.m.), Hilton Palacia Del Rio, The Pavilion, 200 South Alamo Street, San Antonio, Texas 78205, 210–222–1400. Board of Directors/Members Committee January 30, 2007 (8 a.m.–3 p.m.), Hilton Palacia Del Rio, The Pavilion, 200 South Alamo Street, San Antonio, Texas 78205, 210–222–1400. The discussions may address matters at issue in the following proceedings: Docket No. ER05–799, Southwest Power Pool, Inc. Docket No. ER05–526, Southwest Power Pool, Inc. Docket No. ER05–106, Entergy Services, Inc. Docket No. ER05–1416, Southwest Power Pool, Inc. Docket No. EL06–83, Southwest Power Pool, Inc. Docket No. ER06–432, Southwest Power Pool, Inc. Docket No. ER06–448, Southwest Power Pool, Inc. Docket No. ER06–451, Southwest Power Pool, Inc. Docket No. ER06–1047, Southwest Power Pool, Inc. Docket No. ER06–729, Southwest Power Pool, Inc. E:\FR\FM\12DEN1.SGM 12DEN1

Agencies

[Federal Register Volume 71, Number 238 (Tuesday, December 12, 2006)]
[Notices]
[Pages 74518-74519]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21094]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application for Non-Project Use of Project Lands and 
Soliciting Comments, Motions To Intervene, and Protests

December 6, 2006.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No: 2413-083.
    c. Date Filed: November 1, 2006.
    d. Applicant: Georgia Power Company (GPC).
    e. Name of Project: Wallace Dam Project.
    f. Location: The proposed development is located on Lake Oconee in 
Greene County, Georgia. This project does not occupy any Federal or 
tribal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r) 
and 799 and 801.
    h. Applicant Contact: Mr. Lee B. Glenn, Georgia Power Company, 125 
Wallace Dam Road NE, Eatonton, GA 31024, (706) 485-8704.
    i. FERC Contact: Gina Krump, gina.krump@ferc.gov, 202-502-6704.
    j. Deadline for filing comments and or motions: January 8, 2007.
    All documents (original and eight copies) should be filed with Ms. 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Comments, protests, and 
interventions may be filed electronically via the Internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site under the ``e-Filing'' link. Please reference 
``Wallace Dam Project, FERC Project No. 2413-083'' on any comments or 
motions filed.
    k. Description of Request: GPC is seeking Commission approval to 
permit the construction of a 30-slip marina (26 boat slips and four 
refueling slips), a boat lift launch, and a boat ramp on approximately 
1.2 acres of project land. Each slip will be five feet wide by 24 feet 
long along approximately 540 feet of shoreline. A seawall and rip-rap 
to stabilize the shoreline of the marina is also being proposed. The 
marina is being proposed in conjunction with a residential development 
and will be designed for use by the community residents.
    l. Location of the Application: This filing is available for review 
at the Commission or may be viewed on the Commission's Web site at 
https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to

[[Page 74519]]

intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any comments, protests, or motions to intervene must 
be received on or before the specified comment date for the particular 
application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described applications. A copy of the 
applications may be obtained by agencies directly from the Applicant. 
If an agency does not file comments within the time specified for 
filing comments, it will be presumed to have no comments. One copy of 
an agency's comments must also be sent to the Applicant's 
representatives.

Magalie R. Salas,
Secretary.
[FR Doc. E6-21094 Filed 12-11-06; 8:45 am]
BILLING CODE 6717-01-P