Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices
q. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate.
Issue Deficiency Letter (if necessary) ...............................................................................................................................
Issue Acceptance Letter .....................................................................................................................................................
Issue Scoping Document 1 for comments ........................................................................................................................
Hold Scoping Meetings .....................................................................................................................................................
Request Additional Information (if necessary) ................................................................................................................
Issue Scoping Document 2 ................................................................................................................................................
Notice of application is ready for environmental analysis .............................................................................................
Notice of the availability of the draft EA .........................................................................................................................
Initiate 10(j) process (if necessary) ...................................................................................................................................
Notice of the availability of the final EA .........................................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21071 Filed 12–11–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 925–010]
City of Ottumwa, Iowa; Notice
Soliciting Scoping Comments
jlentini on PROD1PC65 with NOTICES
December 5, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: P–925–010.
c. Date filed: April 26, 2006.
d. Applicant: City of Ottumwa, Iowa.
e. Name of Project: Ottumwa
Hydroelectric Project.
f. Location: On the Des Moines River
in the City of Ottumwa, Wapello
County, Iowa. The project does not
occupy federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Richard Wilcox,
Ottumwa Water and Hydro, 230 Turner
Drive, Ottumwa, Iowa 52501, (641) 684–
4606.
i. FERC Contact: Tim Konnert, (202)
502–6359 or timothy.konnert@ferc.gov.
j. Deadline for filing scoping
comments: January 4, 2007.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
VerDate Aug<31>2005
18:00 Dec 11, 2006
Jkt 211001
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘eFiling’’ link.
k. This application is not ready for
environmental analysis at this time.
l. The existing Ottumwa Project
consists of: (1) An 18-foot-high dam
with a 641-foot-long spillway section
equipped with eight Taintor gates and
one bascule gate; (2) a powerhouse
integral to the dam containing three
generating units, unit 1 and unit 3 each
rated at 1,000 kW and unit 2 rated at
1,250 kW; (3) a 125-acre reservoir with
a normal water surface elevation of
638.5 feet msl; and (4) appurtenant
facilities. The applicant estimates that
the average annual generation would be
10,261,920 kilowatt hours using the
three generating units with a combined
capacity of 3,250 kW.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov.esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
74517
January 2007.
April 2007.
May 2007.
June 2007.
August 2007.
August 2007.
August 2007.
February 2008.
April 2008.
August 2008.
pending projects. For assistance, contact
FERC Online Support.
o. Scoping Process—The Commission
staff intends to prepare a single
Environmental Assessment (EA) for the
Ottumwa Project in accordance with the
National Environmental Policy Act. The
EA will consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff do not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
(SD) issued on December 1, 2006.
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list and the
applicant’s service list. Copies of the SD
may be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call 1–866–208–3676 or for
TTY, (202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21072 Filed 12–11–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Compliance Filing and
Soliciting Comments, Motions to
Intervene, and Protests
December 5, 2006.
Take notice that the following
recreation usage report has been filed
with the Commission and is available
for public inspection:
a. Application Type: Recreation Usage
Report.
b. Project No: 9690–082.
c. Date Filed: March 31, 2005.
d. Applicant: Mirant, NY–Gen. LLC.
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 71, Number 238 (Tuesday, December 12, 2006)]
[Notices]
[Page 74517]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21072]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 925-010]
City of Ottumwa, Iowa; Notice Soliciting Scoping Comments
December 5, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: P-925-010.
c. Date filed: April 26, 2006.
d. Applicant: City of Ottumwa, Iowa.
e. Name of Project: Ottumwa Hydroelectric Project.
f. Location: On the Des Moines River in the City of Ottumwa,
Wapello County, Iowa. The project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Richard Wilcox, Ottumwa Water and Hydro, 230
Turner Drive, Ottumwa, Iowa 52501, (641) 684-4606.
i. FERC Contact: Tim Konnert, (202) 502-6359 or
timothy.konnert@ferc.gov.
j. Deadline for filing scoping comments: January 4, 2007.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Scoping comments may be filed electronically via the Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (https://www.ferc.gov) under the ``eFiling'' link.
k. This application is not ready for environmental analysis at this
time.
l. The existing Ottumwa Project consists of: (1) An 18-foot-high
dam with a 641-foot-long spillway section equipped with eight Taintor
gates and one bascule gate; (2) a powerhouse integral to the dam
containing three generating units, unit 1 and unit 3 each rated at
1,000 kW and unit 2 rated at 1,250 kW; (3) a 125-acre reservoir with a
normal water surface elevation of 638.5 feet msl; and (4) appurtenant
facilities. The applicant estimates that the average annual generation
would be 10,261,920 kilowatt hours using the three generating units
with a combined capacity of 3,250 kW.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
n. You may also register online at https://
www.ferc.gov.esubscribenow.htm to be notified via e-mail of new filings
and issuances related to this or other pending projects. For
assistance, contact FERC Online Support.
o. Scoping Process--The Commission staff intends to prepare a
single Environmental Assessment (EA) for the Ottumwa Project in
accordance with the National Environmental Policy Act. The EA will
consider both site-specific and cumulative environmental impacts and
reasonable alternatives to the proposed action.
Commission staff do not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document (SD) issued
on December 1, 2006.
Copies of the SD outlining the subject areas to be addressed in the
EA were distributed to the parties on the Commission's mailing list and
the applicant's service list. Copies of the SD may be viewed on the web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, call 1-866-208-3676 or for TTY,
(202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-21072 Filed 12-11-06; 8:45 am]
BILLING CODE 6717-01-P