Notice of Effectiveness of Holding Company and Transaction Exemptions and Waivers, 74499 [E6-21053]
Download as PDF
Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices
GTN further states that a copy of this
filing has been served on GTN’s
jurisdictional customers and interested
state regulatory agencies.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
IP Gyrfalcon Company ...................................................................................................................
Consolidated Midwest ...................................................................................................................
Edison International .......................................................................................................................
PPL Corporation .............................................................................................................................
Sempra Energy ...............................................................................................................................
Take notice that in October and
November 2006 the holding company
and transaction exemptions and waivers
requested in the above-captioned
proceedings are deemed to have been
granted by operation of law pursuant to
18 CFR 366.4.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21053 Filed 12–11–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP98–18–026]
Iroquois Gas Transmission System,
L.P.; Notice of Negotiated Rate
December 6, 2006.
Take notice that on December 1, 2006,
Iroquois Gas Transmission System, L.P.
(Iroquois) tendered for filing the
following revised sheets to its FERC Gas
Tariff, First Revised Volume No. 1, to be
effective on December 1, 2006:
jlentini on PROD1PC65 with NOTICES
Original Sheet No. 6K
Original Sheet No. 6L
Iroquois states that copies of its filing
were served on all jurisdictional
customers and interested state
regulatory agencies.
Any person desiring to intervene or to
protest this filing must file in
VerDate Aug<31>2005
18:00 Dec 11, 2006
Jkt 211001
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
74499
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21078 Filed 12–11–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Holding
Company and Transaction Exemptions
and Waivers
December 4, 2006.
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
PH06–103–000.
PH06–104–000.
PH06–106–000.
PH06–107–000.
PH06–108–000.
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–21092 Filed 12–11–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–155–000]
LBPC Power, Inc.; Notice of Issuance
of Order
December 5, 2006.
LBPC Power, Inc. (LBPC) filed an
application for market-based rate
authority, with an accompanying tariff.
The proposed market-based rate tariff
provides for the sale of energy and
capacity at market-based rates. LBPC
also requested waivers of various
Commission regulations. In particular,
LBPC requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by LBPC.
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 71, Number 238 (Tuesday, December 12, 2006)]
[Notices]
[Page 74499]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-21053]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Holding Company and Transaction
Exemptions and Waivers
December 4, 2006.
IP Gyrfalcon Company..................... Docket No. PH06-103-000.
Consolidated Midwest..................... Docket No. PH06-104-000.
Edison International..................... Docket No. PH06-106-000.
PPL Corporation.......................... Docket No. PH06-107-000.
Sempra Energy............................ Docket No. PH06-108-000.
Take notice that in October and November 2006 the holding company
and transaction exemptions and waivers requested in the above-captioned
proceedings are deemed to have been granted by operation of law
pursuant to 18 CFR 366.4.
Magalie R. Salas,
Secretary.
[FR Doc. E6-21053 Filed 12-11-06; 8:45 am]
BILLING CODE 6717-01-P