Notice of Quarterly Report (July 1, 2006-September 30, 2006), 71579-71583 [E6-20982]

Download as PDF Federal Register / Vol. 71, No. 237 / Monday, December 11, 2006 / Notices 71579 ADDITIONAL INFORMATION FOR 2008 (AND LATER) SCHEDULE R (RETIREMENT PLAN INFORMATION)—Continued [Parts I–IV remain as proposed on July 21, 2006. Part V expanded and Part VI added] 17. If assets and liabilities from another plan have been transferred to or merged with this plan during the plan year, check box and see instructions regarding supplemental information to be included as an attachment. Part VI—Additional Information for Single-Employer and Multiemployer Defined Benefit Pension Plans 18. If any liabilities to participants or their beneficiaries under the plan as of the end of the plan year consist (in whole or in part) of liabilities to such participants and beneficiaries under two or more pension plans as of immediately before such plan year, check box and see instructions regarding supplemental information to be included as an attachment. 19. If the total number of participants is 1,000 or more, complete items (a) through (c). a. Enter the percentage of plan assets held as Stock, Debt, Real Estate, Other. b. Provide the percentage held of each type of debt security: Government debt, Investment Grade Corporate Debt, and High-Yield Corporate Debt. c. Provide the Macaulay Duration for the total portfolio. Statutory Authority Accordingly, pursuant to the authority in sections 101, 103, 104, 109, 110 and 4065 of ERISA and section 6058 of the Code, the Form 5500 Annual Return/Report and the instructions thereto are proposed to be amended as set forth herein, including the addition of the proposed Short Form 5500. Signed at Washington, DC, this 6th day of December 2006. Bradford P. Campbell, Acting Assistant Secretary, Employee Benefits Security Administration, U.S. Department of Labor. Joseph H. Grant, Director, Employee Plans, Tax Exempt and Government Entities Division, Internal Revenue Service. Vincent K. Snowbarger, Interim Director, Pension Benefit Guaranty Corporation. [FR Doc. 06–9633 Filed 12–8–06; 8:45 am] BILLING CODE 4510–29–P MILLENNIUM CHALLENGE CORPORATION [MCC FR 06–22] Notice of Quarterly Report (July 1, 2006–September 30, 2006) Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter July 1, 2006 through September 30, 2006 with respect to both assistance provided under Section 605 of the Millennium Challenge Act of 2003 (Pub. L. 108–199, Division D (the Act)), and transfers of funds to other federal agencies pursuant to Section 619 of that Act. The following report shall be made available to the public by means of publication in the Federal Register and on the Internet Web site of the MCC (https://www.mcc.gov) in accordance with Section 612 (b) of the Act. AGENCY: ASSISTANCE PROVIDED UNDER SECTION 605 Projects Obligated Objectives Quarterly disbursements Measures Country: Madagascar Year: 2006 Quarter 4 Total Obligation: $109,773,000 Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $0 mstockstill on PROD1PC61 with NOTICES Land Tenure Project ....... VerDate Aug<31>2005 15:15 Dec 08, 2006 $37,803,000 Jkt 211001 Increase Land Titling and Security. PO 00000 Frm 00077 Fmt 4703 $0 Sfmt 4703 Legislative proposal (‘‘loin de cadrage’’) reflecting the PNF submitted to Parliament and passed. Percentage of land documents inventoried, restored, and/or digitized. Average time and cost required to carry out property-related transactions at the local and/or national land services offices. Time/cost to respond to information request, issue titles and to modify titles after the first land right. Number of land disputes reported and resolved in the target zones and sites of implementation. Percentage of land in the zones that is demarcated and ready for titling. Promote knowledge and awareness of land tenure reforms among inhabitants in the zones (surveys). E:\FR\FM\11DEN1.SGM 11DEN1 71580 Federal Register / Vol. 71, No. 237 / Monday, December 11, 2006 / Notices ASSISTANCE PROVIDED UNDER SECTION 605—Continued Projects Obligated Objectives Quarterly disbursements Measures Finance Project .............. 35,888,000 Increase Competition in the Financial Sector. 0 Agricultural Business Investment Project. 17,683,000 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas. 0 Program Administration* and Control, Monitoring and Evaluation. 18,399,000 ........................................ 0 Projects Obligated Objective Disbursements Country: Honduras Year: 2006 Quarter 4 Entity to which the assistance is provided: MCA Honduras Measures Total Obligation: $215,000,000 Total Quarterly Disbursement: $1,370,000 Rural Development Project. $72,195,000 Increase the productivity and business skills of farmers who operate small and mediumsize farms and their employees. $898,000 Transportation Project .... 125,700,000 Reduce transportation costs between targeted production centers and national, regional and global markets. 108,000 Program Administration* and Control, Monitoring and Evaluation. 17,105,000 ........................................ 364,000 Projects mstockstill on PROD1PC61 with NOTICES Submission to Parliament and passage of new laws recommended by outside experts and relevant commissions. CPA Association (CSC) list of accountants registered. Maximum check clearing delay. Volume of funds in payment system and number of transactions. Public awareness of new financial instruments (surveys). Report of credit and payment information to a central database. Number of holders of new denomination T-bill holdings, and T-bill issuance outside Antananarivo as measured by Central Bank report of redemption date. Volume of production covered by warehouse receipts in the zones. Volume of MFI lending in the zones. MFI portfolio-at-risk delinquency rate. Number of new bank accounts in the zones. Number of rural producers receiving or soliciting information from ABCs about the opportunities. Zones identified and description of beneficiaries within each zone submitted. Number of cost-effective investment strategies developed. Number of plans prepared. Number of farmers and business employing technical assistance received. Obligated Objectives Hours of technical assistance delivered to Program Farmers (thousands). Funds lent by MCA-Honduras to financial institutions (cumulative). Hours of technical assistance to financial institutions (cumulative). Lien Registry equipment installed. Kilometers of farm-to-market road upgraded (cumulative). Kilometers of highway upgraded. Kilometers of secondary road upgraded. Number of weight stations built. Quarterly disbursements Measures Country: Cape Verde Year: 2006 Quarter 4 Total Obligation: $110,078,000 Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $0 Watershed and Agricultural Support. VerDate Aug<31>2005 15:15 Dec 08, 2006 $10,848,000 Jkt 211001 Increase agricultural production in three targeted watershed areas on three islands. PO 00000 Frm 00078 Fmt 4703 $0 Sfmt 4703 Productivity: Horticulture (tons per hectare). Value-added for farms and agribusiness (millions of dollars). E:\FR\FM\11DEN1.SGM 11DEN1 Federal Register / Vol. 71, No. 237 / Monday, December 11, 2006 / Notices Projects Obligated Objectives Infrastructure Improvement. 78,760,000 Private Sector Development. Program Administration* and Control, Monitoring and Evaluation. Projects Quarterly disbursements Measures Increase integration of the internal market and reduce transportation costs. 0 7,200,000 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform. 0 13,270,000 ........................................ 0 Obligated Objective Measures Total Obligation: $174,925,000 Total Quarterly Disbursement: $668,000 $26,400,000 Increase investment by strengthening property rights. Transportation Project .... 92,800,000 Reduce transportation costs between Leon and Chinandega and national, regional and global markets. 0 Rural Business Development Project. 33,500,000 Increase the value added of farms and enterprises in the region. 208,000 Program Administration*, Due Diligence, Monitoring and Evaluation. 22,225,000 ........................................ 393,000 Projects Obligated Objective $67,000 Regional Infrastructure Rehabilitation. VerDate Aug<31>2005 15:15 Dec 08, 2006 $211,700,000 Jkt 211001 Key Regional Infrastructure Rehabilitated. PO 00000 Frm 00079 Fmt 4703 Automated registry—cadastre database installed. Number of parcels with a registered title, rural and urban (total of 21,000 and 22,000, rural and urban, respectively). Projected areas demarcated. Number of projected area management plans implemented. Number of conflicts resolved by program mediation. N–1 Road: Kilometers of road upgraded. Secondary Roads: Kilometers of secondary road upgraded. Rural business development centers: Value of TA and support services delivered to program businesses. Improvement of water supply for farming and forest production: Watershed Management Action Plan. Funds disbursed for improvement of water supply for farming and forest production projects. Disbursements Country: Georgia Year: 2006 Quarter 4 Entity to which the assistance is provided: MCA Georgia mstockstill on PROD1PC61 with NOTICES Volume of goods shipped between Praia and other islands (tons). Mobility Ratio: Percentage of beneficiary population who take at least 5 trips per month. Savings on transport costs from improvements (million dollars). Value added in priority sectors above current trends (escudos). Volume of private investment in priority sectors above current trends. Disbursements Country: Nicaragua Year: 2006 Quarter 4 Entity to which the assistance is provided: MCA Nicaragua Property Regularization Project. 71581 Measures Total Obligation: $294,693,000 Total Quarterly Disbursement: $6,509,000 $6,189,000 Sfmt 4703 Reduction in journey time: AkhalkalakiNinotsminda-Teleti (hours). Reduction in vehicle operating costs (cumulative). Increase in internal regional traffic volumes (cumulative). Decreased technical losses. Reduction in the production of greenhouse gas emissions measured in tons of CO2 equivalent. Increased in collection rate of GGIC. Number of household beneficiaries served by RID projects (cumulative). Actual operations and maintenance expenditures (USD). E:\FR\FM\11DEN1.SGM 11DEN1 71582 Federal Register / Vol. 71, No. 237 / Monday, December 11, 2006 / Notices Projects Obligated Objective Regional Enterprise Development. 47,500,000 Enterprises in Regions Developed. Program Administration*, Due Diligence, Monitoring and Evaluation. 35,493,000 Disbursements ........................................ Projects Obligated Objective Measures 0 Increase in annual revenue in portfolio companies (in 1,000 USD). Increase in number of portfolio company employees and number of local suppliers. Increase in portfolio companies’ wages and payments to local suppliers (in 1,000 USD). Jobs created. Increase in aggregate incremental net revenue to project assisted firms (in 1,000 USD and cumulative over five years). Direct household net income (in 1,000 USD cumulative over five years). Direct household net income for market information initiative beneficiaries (in 1,000 USD cumulative over five years). Number of beneficiaries. 320,000 Disbursements Country: Vanuatu Year: 2006 Quarter 4 Entity to which the assistance is provided: MCA Vanuatu Measures Total Obligation: $65,690,000 Total Quarterly Disbursement: $448,000 Transportation Infrastructure Project. $60,690,000 Facilitate transportation to increase tourism and business development. $0 Program Administration*, Due Diligence, Monitoring and Evaluation. 5,000,000 ........................................ 448,000 Projects Obligated Objective Traffic volume (average annual daily traffic). Days road is closed (number per annum). Number of S-W Bay, Malekula flights cancelled due to flooding (per annum). Time of wharf (hours/vessel). Disbursements Measures Country: Armenia Year: 2006 Quarter 4 Total Obligation: $235,150,000 Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $0 Irrigated Agriculture Project. $145,680 Increase agricultural productivity and improve quality of irrigation. $0 0 Better access to economic and social infrastructure. 0 Rural Road Rehabilitation Project. Increase in hectares covered by HVA crops (i.e., vegetables, potato, fruits, grapes). Percentage of respondents satisfied with irrigation services. Share of WUA water charges compared WUA annual operations and maintenance cost (percentage). Number of farmers using better on-farm water management: Drip irrigation; ET Gage, and soil moisture monitoring. Loans provided under the project (USD in thousands). Annual increase in irrigated land in project area (hectares). State budget expenditures on maintenance of irrigation system (AMD in millions). Reduction in Kilowatt hours used (thousand KWh). Share of water losses compared to total water intake (percentage). Share of WUA water charges compared to WUA annual operations and maintenance cost (percentage). mstockstill on PROD1PC61 with NOTICES Program Administration*, 22,370,000 ........................................ 0 Due Diligence, Monitoring and Evaluation. * Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. 619 Transfer funds U.S. Agency to which funds were transferred Amount N/A ............................................................................................................................................... VerDate Aug<31>2005 15:15 Dec 08, 2006 Jkt 211001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\11DEN1.SGM Country $0 11DEN1 N/A Description of program or project N/A Federal Register / Vol. 71, No. 237 / Monday, December 11, 2006 / Notices Dated: December 5, 2006. Frances C. McNaught, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. [FR Doc. E6–20982 Filed 12–8–06; 8:45 am] BILLING CODE 9210–01–P NATIONAL ARCHIVES AND RECORDS ADMINISTRATION Records Schedules; Availability and Request for Comments National Archives and Records Administration (NARA). ACTION: Notice of availability of proposed records schedules; request for comments. mstockstill on PROD1PC61 with NOTICES AGENCY: SUMMARY: The National Archives and Records Administration (NARA) publishes notice at least once monthly of certain Federal agency requests for records disposition authority (records schedules). Once approved by NARA, records schedules provide mandatory instructions on what happens to records when no longer needed for current Government business. They authorize the preservation of records of continuing value in the National Archives of the United States and the destruction, after a specified period, of records lacking administrative, legal, research, or other value. Notice is published for records schedules in which agencies propose to destroy records not previously authorized for disposal or reduce the retention period of records already authorized for disposal. NARA invites public comments on such records schedules, as required by 44 U.S.C. 3303a(a). DATES: Requests for copies must be received in writing on or before January 10, 2007. Once the appraisal of the records is completed, NARA will send a copy of the schedule. NARA staff usually prepare appraisal memorandums that contain additional information concerning the records covered by a proposed schedule. These, too, may be requested and will be provided once the appraisal is completed. Requesters will be given 30 days to submit comments. ADDRESSES: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle Management Division (NWML) using one of the following means: Mail: NARA (NWML), 8601 Adelphi Road, College Park, MD 20740–6001. E-mail: requestschedule@nara.gov. FAX: 301–837–3698. Requesters must cite the control number, which appears in parentheses after the name of the agency which VerDate Aug<31>2005 15:15 Dec 08, 2006 Jkt 211001 submitted the schedule, and must provide a mailing address. Those who desire appraisal reports should so indicate in their request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML), National Archives and Records Administration, 8601 Adelphi Road, College Park, MD 20740–6001. Telephone: 301–837–1539. E-mail: records.mgt@nara.gov. SUPPLEMENTARY INFORMATION: Each year Federal agencies create billions of records on paper, film, magnetic tape, and other media. To control this accumulation, agency records managers prepare schedules proposing retention periods for records and submit these schedules for NARA’s approval, using the Standard Form (SF) 115, Request for Records Disposition Authority. These schedules provide for the timely transfer into the National Archives of historically valuable records and authorize the disposal of all other records after the agency no longer needs them to conduct its business. Some schedules are comprehensive and cover all the records of an agency or one of its major subdivisions. Most schedules, however, cover records of only one office or program or a few series of records. Many of these update previously approved schedules, and some include records proposed as permanent. No Federal records are authorized for destruction without the approval of the Archivist of the United States. This approval is granted only after a thorough consideration of their administrative use by the agency of origin, the rights of the Government and of private persons directly affected by the Government’s activities, and whether or not they have historical or other value. Besides identifying the Federal agencies and any subdivisions requesting disposition authority, this public notice lists the organizational unit(s) accumulating the records or indicates agency-wide applicability in the case of schedules that cover records that may be accumulated throughout an agency. This notice provides the control number assigned to each schedule, the total number of schedule items, and the number of temporary items (the records proposed for destruction). It also includes a brief description of the temporary records. The records schedule itself contains a full description of the records at the file unit level as well as their disposition. If NARA staff has prepared an appraisal memorandum for the schedule, it too PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 71583 includes information about the records. Further information about the disposition process is available on request. Schedules Pending (Note that the new time period for requesting copies has changed from 45 to 30 days after publication): 1. Department of Agriculture, Agricultural Marketing Service (N1– 136–06–1, 1 item, 1 temporary item). Master data file associated with an electronic information system used to collect information and report on the grading of poultry and related billing matters. This schedule authorizes the agency to apply the proposed disposition instructions to any recordkeeping medium. 2. Department of Agriculture, Agricultural Marketing Service (N1– 136–06–5), 4 items, 4 temporary items). Records of a system used by the Science and Technology Program to provide vital records protection and ready reference assistance. The schedule authorizes the agency to apply the proposed disposition instructions to any recordkeeping medium. 3. Department of Agriculture, Cooperative State Research, Education, and Extension Service (N1–540–06–4, 11 items, 9 temporary items). Inputs, outputs, master files, and documentation relating to a data warehouse that provides a centralized source of information on research, education, and extension programs of the agency and its partner institutions in the areas of food, agriculture, and natural resources. Scheduled for permanent retention are recordkeeping copies of 4–H enrollment data and the documentation needed to access and maintain those files. Records with significant research value pertaining to related agency programs are scheduled separately for permanent retention. 4. Department of Agriculture, Cooperative State Research, Education, and Extension Service (N1–540–07–1, 6 items, 6 temporary items). Reports on funding and staffing levels for research projects and salary information from institutions which receive agency funding, along with working files and other supporting documentation. Records with significant research value are captured in the Current Research Information System, which has been scheduled as permanent. 5. Department of the Army, Agencywide (N1–AU–06–2, 1 item, 1 temporary item). Records related to administrative actions taken to correct conduct deficiencies of soldiers. Included are copies of administrative reprimands, admonitions, and censures of a nonpunitive nature. This schedule E:\FR\FM\11DEN1.SGM 11DEN1

Agencies

[Federal Register Volume 71, Number 237 (Monday, December 11, 2006)]
[Notices]
[Pages 71579-71583]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-20982]


=======================================================================
-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC FR 06-22]


Notice of Quarterly Report (July 1, 2006-September 30, 2006)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter July 1, 2006 through September 30, 2006 with respect to 
both assistance provided under Section 605 of the Millennium Challenge 
Act of 2003 (Pub. L. 108-199, Division D (the Act)), and transfers of 
funds to other federal agencies pursuant to Section 619 of that Act. 
The following report shall be made available to the public by means of 
publication in the Federal Register and on the Internet Web site of the 
MCC (https://www.mcc.gov) in accordance with Section 612 (b) of the Act.

                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                           Quarterly
            Projects                 Obligated         Objectives        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2006 Quarter 4 Total Obligation: $109,773,000
           Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Land Tenure Project............       $37,803,000  Increase Land                     $0  Legislative proposal
                                                    Titling and                           (``loin de cadrage'')
                                                    Security.                             reflecting the PNF
                                                                                          submitted to
                                                                                          Parliament and passed.
                                                                                         Percentage of land
                                                                                          documents inventoried,
                                                                                          restored, and/or
                                                                                          digitized.
                                                                                         Average time and cost
                                                                                          required to carry out
                                                                                          property-related
                                                                                          transactions at the
                                                                                          local and/or national
                                                                                          land services offices.
                                                                                          Time/cost to respond
                                                                                          to information
                                                                                          request, issue titles
                                                                                          and to modify titles
                                                                                          after the first land
                                                                                          right.
                                                                                         Number of land disputes
                                                                                          reported and resolved
                                                                                          in the target zones
                                                                                          and sites of
                                                                                          implementation.
                                                                                         Percentage of land in
                                                                                          the zones that is
                                                                                          demarcated and ready
                                                                                          for titling.
                                                                                         Promote knowledge and
                                                                                          awareness of land
                                                                                          tenure reforms among
                                                                                          inhabitants in the
                                                                                          zones (surveys).

[[Page 71580]]

 
Finance Project................        35,888,000  Increase                           0  Submission to
                                                    Competition in                        Parliament and passage
                                                    the Financial                         of new laws
                                                    Sector.                               recommended by outside
                                                                                          experts and relevant
                                                                                          commissions.
                                                                                         CPA Association (CSC)
                                                                                          list of accountants
                                                                                          registered.
                                                                                         Maximum check clearing
                                                                                          delay.
                                                                                         Volume of funds in
                                                                                          payment system and
                                                                                          number of
                                                                                          transactions.
                                                                                         Public awareness of new
                                                                                          financial instruments
                                                                                          (surveys).
                                                                                         Report of credit and
                                                                                          payment information to
                                                                                          a central database.
                                                                                         Number of holders of
                                                                                          new denomination T-
                                                                                          bill holdings, and T-
                                                                                          bill issuance outside
                                                                                          Antananarivo as
                                                                                          measured by Central
                                                                                          Bank report of
                                                                                          redemption date.
                                                                                         Volume of production
                                                                                          covered by warehouse
                                                                                          receipts in the zones.
                                                                                         Volume of MFI lending
                                                                                          in the zones.
                                                                                         MFI portfolio-at-risk
                                                                                          delinquency rate.
                                                                                         Number of new bank
                                                                                          accounts in the zones.
Agricultural Business                  17,683,000  Improve                            0  Number of rural
 Investment Project.                                Agricultural                          producers receiving or
                                                    Projection                            soliciting information
                                                    Technologies and                      from ABCs about the
                                                    Market Capacity                       opportunities.
                                                    in Rural Areas.                      Zones identified and
                                                                                          description of
                                                                                          beneficiaries within
                                                                                          each zone submitted.
                                                                                         Number of cost-
                                                                                          effective investment
                                                                                          strategies developed.
                                                                                         Number of plans
                                                                                          prepared.
                                                                                         Number of farmers and
                                                                                          business employing
                                                                                          technical assistance
                                                                                          received.
Program Administration* and            18,399,000  ..................                 0
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------


 
            Projects                 Obligated          Objective        Disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2006 Quarter 4 Total Obligation: $215,000,000
        Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $1,370,000
----------------------------------------------------------------------------------------------------------------
Rural Development Project......       $72,195,000  Increase the                $898,000  Hours of technical
                                                    productivity and                      assistance delivered
                                                    business skills                       to Program Farmers
                                                    of farmers who                        (thousands).
                                                    operate small and                    Funds lent by MCA-
                                                    medium-size farms                     Honduras to financial
                                                    and their                             institutions
                                                    employees.                            (cumulative).
                                                                                         Hours of technical
                                                                                          assistance to
                                                                                          financial institutions
                                                                                          (cumulative).
                                                                                         Lien Registry equipment
                                                                                          installed.
                                                                                         Kilometers of farm-to-
                                                                                          market road upgraded
                                                                                          (cumulative).
Transportation Project.........       125,700,000  Reduce                       108,000  Kilometers of highway
                                                    transportation                        upgraded.
                                                    costs between                        Kilometers of secondary
                                                    targeted                              road upgraded.
                                                    production                           Number of weight
                                                    centers and                           stations built.
                                                    national,
                                                    regional and
                                                    global markets.
                                                                                         .......................
                                                                                         .......................
Program Administration* and            17,105,000  ..................           364,000
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------


 
                                                                           Quarterly
            Projects                 Obligated         Objectives        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2006 Quarter 4 Total Obligation: $110,078,000
           Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $10,848,000  Increase                          $0  Productivity:
 Support.                                           agricultural                          Horticulture (tons per
                                                    production in                         hectare).
                                                    three targeted                       Value-added for farms
                                                    watershed areas                       and agribusiness
                                                    on three islands.                     (millions of dollars).

[[Page 71581]]

 
Infrastructure Improvement.....        78,760,000  Increase                           0  Volume of goods shipped
                                                    integration of                        between Praia and
                                                    the internal                          other islands (tons).
                                                    market and reduce                    Mobility Ratio:
                                                    transportation                        Percentage of
                                                    costs.                                beneficiary population
                                                                                          who take at least 5
                                                                                          trips per month.
                                                                                         Savings on transport
                                                                                          costs from
                                                                                          improvements (million
                                                                                          dollars).
Private Sector Development.....         7,200,000  Spur private                       0  Value added in priority
                                                    sector                                sectors above current
                                                    development on                        trends (escudos).
                                                    all islands                          Volume of private
                                                    through increased                     investment in priority
                                                    investment in the                     sectors above current
                                                    priority sectors                      trends.
                                                    and through
                                                    financial sector
                                                    reform.
                                                                                         .......................
Program Administration* and            13,270,000  ..................                 0
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------


 
            Projects                 Obligated          Objective        Disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2006 Quarter 4 Total Obligation: $174,925,000
        Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $668,000
----------------------------------------------------------------------------------------------------------------
Property Regularization Project       $26,400,000  Increase                     $67,000  Automated registry--
                                                    investment by                         cadastre database
                                                    strengthening                         installed.
                                                    property rights.                     Number of parcels with
                                                                                          a registered title,
                                                                                          rural and urban (total
                                                                                          of 21,000 and 22,000,
                                                                                          rural and urban,
                                                                                          respectively).
                                                                                         Projected areas
                                                                                          demarcated.
                                                                                         Number of projected
                                                                                          area management plans
                                                                                          implemented.
                                                                                         Number of conflicts
                                                                                          resolved by program
                                                                                          mediation.
Transportation Project.........        92,800,000  Reduce                             0  N-1 Road: Kilometers of
                                                    transportation                        road upgraded.
                                                    costs between                        Secondary Roads:
                                                    Leon and                              Kilometers of
                                                    Chinandega and                        secondary road
                                                    national,                             upgraded.
                                                    regional and
                                                    global markets.
                                                                                         .......................
Rural Business Development             33,500,000  Increase the value           208,000  Rural business
 Project.                                           added of farms                        development centers:
                                                    and enterprises                       Value of TA and
                                                    in the region.                        support services
                                                                                          delivered to program
                                                                                          businesses.
                                                                                         Improvement of water
                                                                                          supply for farming and
                                                                                          forest production:
                                                                                          Watershed Management
                                                                                          Action Plan.
                                                                                         Funds disbursed for
                                                                                          improvement of water
                                                                                          supply for farming and
                                                                                          forest production
                                                                                          projects.
Program Administration*, Due           22,225,000  ..................           393,000
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------


 
            Projects                 Obligated          Objective        Disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2006 Quarter 4 Total Obligation: $294,693,000
        Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $6,509,000
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $211,700,000  Key Regional              $6,189,000  Reduction in journey
 Rehabilitation.                                    Infrastructure                        time: Akhalkalaki-
                                                    Rehabilitated.                        Ninotsminda-Teleti
                                                                                          (hours).
                                                                                         Reduction in vehicle
                                                                                          operating costs
                                                                                          (cumulative).
                                                                                         Increase in internal
                                                                                          regional traffic
                                                                                          volumes (cumulative).
                                                                                         Decreased technical
                                                                                          losses.
                                                                                         Reduction in the
                                                                                          production of
                                                                                          greenhouse gas
                                                                                          emissions measured in
                                                                                          tons of CO2
                                                                                          equivalent.
                                                                                         Increased in collection
                                                                                          rate of GGIC.
                                                                                         Number of household
                                                                                          beneficiaries served
                                                                                          by RID projects
                                                                                          (cumulative).
                                                                                         Actual operations and
                                                                                          maintenance
                                                                                          expenditures (USD).

[[Page 71582]]

 
Regional Enterprise Development        47,500,000  Enterprises in                     0  Increase in annual
                                                    Regions Developed.                    revenue in portfolio
                                                                                          companies (in 1,000
                                                                                          USD).
                                                                                         Increase in number of
                                                                                          portfolio company
                                                                                          employees and number
                                                                                          of local suppliers.
                                                                                         Increase in portfolio
                                                                                          companies' wages and
                                                                                          payments to local
                                                                                          suppliers (in 1,000
                                                                                          USD).
                                                                                         Jobs created.
                                                                                         Increase in aggregate
                                                                                          incremental net
                                                                                          revenue to project
                                                                                          assisted firms (in
                                                                                          1,000 USD and
                                                                                          cumulative over five
                                                                                          years).
                                                                                         Direct household net
                                                                                          income (in 1,000 USD
                                                                                          cumulative over five
                                                                                          years).
                                                                                         Direct household net
                                                                                          income for market
                                                                                          information initiative
                                                                                          beneficiaries (in
                                                                                          1,000 USD cumulative
                                                                                          over five years).
                                                                                         Number of
                                                                                          beneficiaries.
Program Administration*, Due           35,493,000  ..................           320,000
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------


 
            Projects                 Obligated          Objective        Disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2006 Quarter 4 Total Obligation: $65,690,000
         Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $448,000
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,690,000  Facilitate                        $0  Traffic volume (average
 Project.                                           transportation to                     annual daily traffic).
                                                    increase tourism                     Days road is closed
                                                    and business                          (number per annum).
                                                    development.                         Number of S-W Bay,
                                                                                          Malekula flights
                                                                                          cancelled due to
                                                                                          flooding (per annum).
                                                                                         Time of wharf (hours/
                                                                                          vessel).
Program Administration*, Due            5,000,000  ..................           448,000
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------


 
            Projects                 Obligated          Objective        Disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2006 Quarter 4 Total Obligation: $235,150,000
            Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project..          $145,680  Increase                          $0  Increase in hectares
                                                    agricultural                          covered by HVA crops
                                                    productivity and                      (i.e., vegetables,
                                                    improve quality                       potato, fruits,
                                                    of irrigation.                        grapes).
                                                                                         Percentage of
                                                                                          respondents satisfied
                                                                                          with irrigation
                                                                                          services.
                                                                                         Share of WUA water
                                                                                          charges compared WUA
                                                                                          annual operations and
                                                                                          maintenance cost
                                                                                          (percentage).
                                                                                         Number of farmers using
                                                                                          better on-farm water
                                                                                          management: Drip
                                                                                          irrigation; ET Gage,
                                                                                          and soil moisture
                                                                                          monitoring.
                                                                                         Loans provided under
                                                                                          the project (USD in
                                                                                          thousands).
Rural Road Rehabilitation                       0  Better access to                   0  Annual increase in
 Project.                                           economic and                          irrigated land in
                                                    social                                project area
                                                    infrastructure.                       (hectares).
                                                                                         State budget
                                                                                          expenditures on
                                                                                          maintenance of
                                                                                          irrigation system (AMD
                                                                                          in millions).
                                                                                         Reduction in Kilowatt
                                                                                          hours used (thousand
                                                                                          KWh).
                                                                                         Share of water losses
                                                                                          compared to total
                                                                                          water intake
                                                                                          (percentage).
                                                                                         Share of WUA water
                                                                                          charges compared to
                                                                                          WUA annual operations
                                                                                          and maintenance cost
                                                                                          (percentage).
Program Administration*, Due           22,370,000  ..................                0
 Diligence, Monitoring and
 Evaluation.
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
----------------------------------------------------------------------------------------------------------------


 
                                               619 Transfer funds
-----------------------------------------------------------------------------------------------------------------
                                                                                                  Description of
           U.S. Agency to which funds were transferred                Amount          Country       program or
                                                                                                      project
----------------------------------------------------------------------------------------------------------------
N/A.............................................................              $0             N/A             N/A
----------------------------------------------------------------------------------------------------------------



[[Page 71583]]

    Dated: December 5, 2006.
Frances C. McNaught,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.
[FR Doc. E6-20982 Filed 12-8-06; 8:45 am]
BILLING CODE 9210-01-P