Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 71161-71162 [E6-20822]

Download as PDF 71161 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 71, No. 236 / Friday, December 8, 2006 / Notices Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filing. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. Description of Project: The proposed run-of-river project, using the Corps’ existing Broken Bow Re-Regulation Dam and Reservoir, would consist of: (1) Three 93.5-foot-long penstocks connecting to; (2) a 112-foot-wide by 129-foot-long powerhouse containing three turbine-generator units and having a total installed capacity of 4 megawatts; (3) a tailrace returning flows to the Mountain Fork River; (4) a 1,600-footlong, 13.8-kilovolt transmission line or a 3.5-mile-long, 13.8 kilovolt transmission line; and (5) appurtenant facilities. The project would have an average annual generation of 17,450 megawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field (P–12470), to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. You may also register online at https://www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of VerDate Aug<31>2005 20:12 Dec 07, 2006 Jkt 211001 intent to file such an application. Submission of a timely notice of intent allows an interested person to file a competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ or ‘‘COMPETING APPLICATION;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule will be made if the Commission determines it necessary to do so: PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Action Tentative date Issue Scoping Document for comments. Notice that application is ready for environmental analysis. Notice of the availability of the draft EA. Notice of the availability of the final EA (if necessary). January 2007. April 2007. October 2007. April 2008. Magalie R. Salas, Secretary. [FR Doc. E6–20807 Filed 12–7–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments December 1, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12752–000. c. Date filed: November 22, 2006. d. Applicant: AquaEnergy Group Ltd. e. Name of Project: Coos County Offshore Wave Energy Project. f. Location: The project would be located in the Pacific Ocean off the coast of Coos County, Oregon, southwest of the City of Bandon. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contacts: Ms. Alla Weinstein, President, AquaEnergy Group, Ltd., P.O. Box 1267, Mercer Island, WA 98040, phone: (425)–430– 7924, fax: (425)–988–1977, or e-mail address: allawa@aeg-ltd.com. i. FERC Contact: Chris Yeakel, (202) 502–8132. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. E:\FR\FM\08DEN1.SGM 08DEN1 sroberts on PROD1PC70 with NOTICES 71162 Federal Register / Vol. 71, No. 236 / Friday, December 8, 2006 / Notices k. Description of Project: The proposed project would consist of: (1) 200–300 wave-energy conversion buoys with a generating capacity of 200 kilowatts to 1 megawatt each consisting of; (2) integrated generators; (3) anchoring devices; and (4) interconnection transmission lines. The anticipated annual generation of the project will be approximately 175 gigawatt-hours. l. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. o. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. VerDate Aug<31>2005 19:05 Dec 07, 2006 Jkt 211001 p. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. s. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’,’’COMPETING APPLICATION’’ or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 upon each representative of the Applicant specified in the particular application. t. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E6–20822 Filed 12–7–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests December 1, 2006. a. Type of Application: Application for non-project use of project lands and waters. b. Project Number: P–2055–039. c. Date Filed: November 17, 2006. d. Applicant: Idaho Power Company. e. Name of Project: C.J. Strike Hydroelectric Project. f. Location: The project is located on the Snake River in Owyhee County, Idaho. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. § §791 (a) 825(r) and § §799 and 801. h. Applicant Contact: Mr. L. Lewis Wardle, Idaho Power Company, 1221 West Idaho Street, Boise, ID 83707, phone: (208) 388–2964. i. FERC Contact: Any questions on this notice should be addressed to Chris Yeakel at (202) 502–8132, or e-mail address: christopher.yeakel@ferc.gov. j. Deadline for filing comments and or motions: December 29, 2006. k. Description of Application: The licensee proposes to issue a special use permit to Mr. Dale Hooley for the use of less than one acre of land within the project boundary of the C.J. Strike Project for the construction, maintenance, and use of an irrigation pumping station and buried pipeline, and the necessary ingress and egress. The proposed pumping station will consist of: (1) A concrete box 8 feet square by 13 feet deep with a metal grate opening; (2) a pump station cover; (3) an inlet canal 35 feet in length by 8 E:\FR\FM\08DEN1.SGM 08DEN1

Agencies

[Federal Register Volume 71, Number 236 (Friday, December 8, 2006)]
[Notices]
[Pages 71161-71162]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-20822]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene, Protests, and Comments

December 1, 2006.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12752-000.
    c. Date filed: November 22, 2006.
    d. Applicant: AquaEnergy Group Ltd.
    e. Name of Project: Coos County Offshore Wave Energy Project.
    f. Location: The project would be located in the Pacific Ocean off 
the coast of Coos County, Oregon, southwest of the City of Bandon.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contacts: Ms. Alla Weinstein, President, AquaEnergy 
Group, Ltd., P.O. Box 1267, Mercer Island, WA 98040, phone: (425)-430-
7924, fax: (425)-988-1977, or e-mail address: allawa@aeg-ltd.com.
    i. FERC Contact: Chris Yeakel, (202) 502-8132.
    j. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.

[[Page 71162]]

    k. Description of Project: The proposed project would consist of: 
(1) 200-300 wave-energy conversion buoys with a generating capacity of 
200 kilowatts to 1 megawatt each consisting of; (2) integrated 
generators; (3) anchoring devices; and (4) interconnection transmission 
lines. The anticipated annual generation of the project will be 
approximately 175 gigawatt-hours.
    l. Locations of Applications: A copy of the application is 
available for inspection and reproduction at the Commission in the 
Public Reference Room, located at 888 First Street NE., Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item h 
above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    o. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    q. Proposed Scope of Studies under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    r. Comments, Protests, or Motions To Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and 
the instructions on the Commission's Web site under ``e-filing'' link. 
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'',''COMPETING APPLICATION'' or 
``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number 
of copies provided by the Commission's regulations to: The Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    t. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
 [FR Doc. E6-20822 Filed 12-7-06; 8:45 am]